Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

WATER SUPPLY LOAN PROJECT IN


MID-WESTERN IRAQ IQ-P13
PROPOSED BAJI CENTRAL
BOOSTER STATION DRY WELL
WORK SCOPE PACKAGE 4B1

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

Table of Contents
1

DESIGN WORK SCOPE: PROPOSED BAJI CENTRAL BOOSTER STATION DRY WELL ... 3
1.1

DESCRIPTION: .................................................................................................................. 3
1.1.1 Process Description .............................................................................................................. 6

1.2
1.3

OTHER CONSIDERATIONS FOR THE DETAILED DESIGNER. ..................................... 6


REQUIREMENTS: .............................................................................................................. 7

STANDARDS: ............................................................................................................................... 9

DESIGN PARAMETERS: ........................................................................................................... 10


3.1
3.2
3.3
3.4
3.5

CIVIL: ................................................................................................................................ 10
ELECTRICAL:................................................................................................................... 10
MECHANICAL: ................................................................................................................. 11
PROCESS: ....................................................................................................................... 11
DOCUMENTATION INCLUDED: ..................................................................................... 12
3.5.1 Previous Details to Be Used: ............................................................................................... 15
3.5.2 Design Documents Expected: ............................................................................................. 15

List of Tables
Table 2.1 Civil Standards ..................................................................................................................... 9
Table 2.2 Electrical Standards ............................................................................................................. 9
Table 2.3 Mechanical Standards .......................................................................................................... 9
Table 2.4 Process Standards ............................................................................................................... 9
Table 3.1 List of Drawings.................................................................................................................. 12
Table 3.2 List of Records ................................................................................................................... 14
Table 3.3 Drawings to be Provided .................................................................................................... 15
Table 3.4 Relevant Standard Details ................................................................................................. 20
Table 3.5 Standard Details in Development ...................................................................................... 21
Table 3.6 Detailed Design Timescale ................................................................................................ 22
Table 3.7 Contact List ........................................................................................................................ 22

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

1 Design Work Scope: Proposed Baji Central Booster


Station Dry Well
Please refer to the attached drawings when reading this scope.

1.1

Description:

The work scope covers the detailed design of the proposed Baji Central Booster Station
situated on a new site to the west of Baji town.
This scope includes:

Dry well and building

MCC room

Generator and fuel storage slab

Loading bay

Compressors and air handling units

Refer to work scope for Ground Storage Tank (PE-S-60001-4-34-201-C-1000) for:

Ground storage tank

To follow in Part 2:

Fuel delivery slab

Administration building

Operator dwellings

Flow meter chambers

Access road and lay-bys

Security wall

Site layout including levels, hardstandings, ducting, buried pipework, foul drainage,
potable water and cable layout.

The proposed Baji Central booster station shall receive a maximum of 180 Ml/d from the
existing and proposed Baji WTPs.

The design philosophy is to construct the booster station within the proposed site that will
deliver treated water to proposed Baji East and West distribution networks and to the
proposed booster stations at Siniya and Hajaj & Butameh.

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

Ground storage tank


Refer to PE-S-60001-4-34-201-C-1000.

Dry well
The dry well will be a below ground concrete structure containing a total of 18 no. pumps,
manifolded to serve a number of areas. At least 1m will be provided between each pump
arrangement. The dry well is also to contain a floor drainage channel and a sump pump
discharging to a wadi outside the booster station compound. Pump removal and
replacement will be by a 5 ton gantry crane, which will deposit pumps onto a pump lay-down
area within the loading bay. The lower level of the dry well is to be accessed by staircases
at each end.
Outflow pipework is to exit the dry well and rise to the standard minimum operational depth.
The dry well chamber is to be forced ventilated.
An indicative pipe fittings schedule has been provided.
schedule during completion of the detailed design.

The designer shall confirm the

Dry well building


The dry well building will be constructed of reinforced concrete columns and beams with a
suitable infill material such as brick or concrete block. To reduce the impact of differential
settlement between the two sections of the building, it is proposed that the sections will be
designed and constructed as separate individually supporting structures. An outline
proposal for this has been included within the outline design. The structural GAs and
structural design will be undertaken within the UK and provided to Mumbai to allow
reinforced details to be completed.
Vehicles shall be able to drive into the loading bay for collection and drop off of
pumps/equipment. The loading bay will be provided with double steel access doors of a
minimum height of 3m. The maximum vehicle height allowable in the building shall be 2.6m.
Sand trap ventilation louvers are to be provided adjacent to air handling equipment and
compressors.
Davit sockets will be provided for removal and fitting of equipment as required where safe
systems of access are to be provided.

MCC room
An MCC room is to be located to the end of the dry well and will consist of two areas:
1. MCC room housing the LV Distribution Board and MCC/ICA panels for the booster
pumping station operation.
2. Transformer compound and HV switchboard area, housing 2 no. HV/LV distribution
transformers and associated HV switchgear. This area will have a mesh frontage
Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

with 300mm thick reinforced concrete blast walls separating each transformer and
HV switchgear.
The MCC room is to have double access doors for maintenance, suitable door access to the
dry well, escape exit and venting panels. A hard standing area is to be provided beside the
room with access to the works access road.
The MCC room is to have a cable trench under the panel position a minimum of 1m deep
with steel supports for the panel. Areas of trench around the panel are to be covered with
chequer plate flooring. Ducts are to be provided into the cable trench from outside the
building.
Walls are to be in masonry and have sand trap louvers for the ventilation. The roof is to be
reinforced concrete with an overlay of mastic sealed concrete tiles.
Instruments, equipment and access will be supported by the structure.
The detailed design shall specify heating, ventilation and air conditioning systems to meet
the requirements of the Republic of Iraq General Directorate for Water General Specification.

Generator and fuel storage slab


A reinforced concrete slab suitable for the specified containerised generator and fuel tank to
be provided adjacent to the MCC room. Slab to be based on PF standard details PF-D60001-9-90-900-Y-7502 and PF-D-60001-9-90-900-Y-7014 but adjusted to suit the specific
site.
Ducting is to be provided for the connection to the MCC room and earth connection.
Further details i.e. specific plan to follow in Part 2.

Loading bay
The loading bay is to be located at the other end of the dry well building and consist of:

Operator access around the vehicular access point.


Roller/ shutter door access to the building, sized to allow typical loaded vehicular
access.
Gantry support and access to enable loading of vehicles and pump lay down area
Building air management unit.
Base slab designed for 10 tonne axial load.

Compressors and air handling units


Compressors and air handling units are to be provided at the end of the loading bay section
of the building. Equipment specification is to be confirmed at detailed design.

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

Administration building
Awaiting detail from Architect in Abu Dhabi, to follow.

Operator dwellings
Awaiting detail from Architect in Abu Dhabi, to follow.

Guard house
Awaiting detail from Architect in Abu Dhabi, to follow.

Flow meter chambers


A number of reinforced concrete flow meter chambers are required. These chambers shall
comply with the relevant standard detail in Table 3.4. Other smaller flow meters will be
housed in precast concrete rings.
Details to follow in Part 2.

Access road and lay-bys


Details to follow in Part 2.

Security wall
For details of the security wall refer to PF standard detail PF-D-60001-9-90-900-Y-7210

Site layout including levels, hardstandings, ducting, buried pipework, foul drainage potable
water and cable layout.
Details to follow in Part 2.

1.1.1

Process Description

N/A

1.2

Other considerations for the detailed designer.

The detailed designer shall include uplift/flotation calculations where appropriate.


Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

1.3

PE-S-60001-4-34-200-C-1000_A

Requirements:

Detailed design of the booster station and compound, in accordance with the principal
dimensions and levels noted on the outline design sketches. This must include the
mechanical and electrical equipment identified for inclusion on the sketches and the P&IDs.
Detailed design of the:

Foundations

Reinforced concrete chamber walls and floors

Building structure and infill panels

Roof structure and any drainage requirements

Gantry crane and support

All pipework configuration and supports (It is to be noted that the pipework
arrangement stated within the schedule has been requested within the
mechanical specification. The layout of this arrangement is to be determined
during detailed design. However, the diameters of the configuration and
equipment selection are not to be adjusted without approval of the Exeter
Office mechanical team)

Pump configuration and supports

Design and details of all connecting pipelines

Associated walkways and access platforms (including any foundations), handrailing


and access stairs

Cable ducting and cable tray locations and arrangement around and within the
structure

Loading bay facilities

Access doorways and shutters

Access road

Compound including hardstandings, fencing and equipment plinths

Windows to enable the best use of natural light and with facilities to reduce mid day
solar gain

Lighting to enable safe operations at all times and within all locations within the
booster station compound

Power connection locations

Likely differential settlement between structure

Equipment supports including valve/penstock spindles, submersible pumps and


instrumentation

Air conditioning of the MCC

Forced ventilation of the pump dry well

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

Generator Slab

Diesel tank slab and filling area

PE-S-60001-4-34-200-C-1000_A

IT IS TO BE NOTED that it is not a requirement of the detailed design to change or


modify the PROCESS design; the PROCESS design is to remain unchanged. If
during detailed design a process query is identified, it must be discussed with the Exeter
Office Team Manager/ Lead Design Engineer.

Pell Frischmann | Design Work Scope: Proposed Baji Central Booster Station Dry Well

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

2 Standards:
Table 2.1 Civil Standards
Standards Number

Title

BS EN 1992

Design of Concrete Structures

BS EN 1998

Design of Structures for Earthquake


Resistance

BS 5395 pt 3

Stairs, Ladders and Walkways

Table 2.2 Electrical Standards


Standards Number
BS7671

Title
17th Edition Wiring Regulations

Table 2.3 Mechanical Standards


Standards Number
M001

Title
General Requirements

M201

Penstocks

M202

Valves

M301

Motors

M310

Static Standby Generators

M401

Axial Split Casing Pumps

M405

Sump Pumps

M451

Air Compressor & Surge Vessel

Table 2.4 Process Standards


Standards Number

Title

None

Pell Frischmann | Standards:

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

3 Design Parameters:
The work is to be undertaken in conjunction with the design parameters noted in the Pell
Frischmann Design Statement and Technical Standards document for the project. However
the following specific design parameters apply to the requirements in this Work Scope:

3.1

Civil:

Minimum reinforcing steel yield stress shall be 450 N/mm2.


The minimum clear walkway width is to be 800 mm.

3.2

Electrical:

Instrumentation: Refer to P&ID for instrumentation details.


Flow Meters: See ABB manual. Show electro-magnetic flow meter as a spool piece if CAD
drawing not forthcoming with length between flanges equal to the pipe diameter. See page
13 of the manual.
Ultra-sonic level transmitters and level switches will bracketed off the structures and will be
contractor designed.

MCC Panel: The pumping station MCC panel is located inside the MCC room. The MCC
room to have suitable access doorways for installation/removal of the MCCs. The MCC
panels are based on Form 4 fully compartmented enclosures designed for front access and
cabling from below. The length of the MCCs is a preliminary estimate using nominal sizing
which will be subject to detailed design sizing by the selected MCC panel manufacturer.
The pump starters include electronic soft start systems.
The MCC panels will have integrated cooling systems to control the internal MCC
temperature as required for all the enclosed components and in accordance with the
specified climatic conditions.

HV/LV Distribution transformers: Refer to typical 2500kVA distribution transformer details


included in the documentation. The duty/standby rated transformers are designed as an
outside installation with separation from the adjacent MCC room and HV switchgear by blast
walls. Flat and level access to the roadway is required for maintenance access.
The transformer enclosure is to have walls/mesh barriers/lockable gates to restrict access
and for protection from electric shock.

Pell Frischmann | Design Parameters:

10

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

HV Switchgear: Refer to typical HV switchgear details included in the documentation. The 4


way HV switchgear unit is located adjacent to the distribution transformers with separation
from the distribution transformers and MCC room by blast walls. Flat and level access to the
roadway is required for maintenance access.
The HV Switchgear enclosure to have walls/mesh barriers/gates to restrict access and for
protection from electric shock.

Standby generators: 2 no. 1500kVA standby diesel generators and associated bulk fuel tank
are located adjacent to the MCC room. The generators and bulk fuel tank are factory
assembled/tested containerised units - refer to example quotation from DDSL Ltd for details.

3.3

Mechanical:

The following items to be included in the design as shown in the attached sketches and
manufacturers literature.

18 No. axial split casing pumps


Sump pump
Compressor & surge vessel package
Fuel tank & standby generator
Gantry crane

Installation of the pumps to be at a level such that, to ensure correct priming of the pumps,
the top of the pump casing is to be below the minimum water level in the ground storage
tank

3.4

Process:
N/A

Pell Frischmann | Design Parameters:

11

Mid-Western Iraq IQ-P13

3.5

PE-S-60001-4-34-200-C-1000_A

Documentation Included:

The following documents are included for use during the detailed design. It must be noted that any details specified and listed, that are not
included in the below, will be issued under 4B1 Part 2
Table 3.1 List of Drawings
Document Number

Record Title

PE-K-60001-4-34-200-C-1000-A

Proposed Baji Central Booster Station, Pump Dry Well, Layout Plan (DWG)

PE-K-60001-4-34-200-C-1001-A

Proposed Baji Central Booster Station, Pump Dry Well, Sections (DWG)

PE-K-60001-4-34-200-C-1003-A

Proposed Baji Central Booster Station, Pump Dry Well, Pipework Plan (DWG)

PE-K-60001-4-34-200-C-1002-A

Proposed Baji Central Booster Station, Pump Dry Well, Roof Plan (DWG)

PE-K-60001-4-34-200-C-1004-A

Proposed Baji Central Booster Station, Pump Dry Well, Section 2-2 Plan (DWG)

PE-K-60001-4-34-200-C-1005-A

Proposed Baji Central Booster Station, Pump Dry Well, Section D-D (DWG)

PE-K-60001-4-34-200-C-1006-A

Proposed Baji Central Booster Station, Pump Dry Well, External Elevation (DWG)

PE-K-60001-4-34-200-C-1007-A

Proposed Baji Central Booster Station, Pump Dry Well, Pipework Plan 2 of 2(DWG)

PF-D-60001-4-34-208-P-5000-A

Proposed Baji Central Booster Station, P&ID Sheet 1 (PDF)

PF-D-60001-4-34-208-P-5001-A

Proposed Baji Central Booster Station, P&ID Sheet 2 (PDF)

PF-D-60001-4-34-208-P-5002-A

Proposed Baji Central Booster Station, P&ID Sheet 3 (PDF)

PF-D-60001-4-34-207-E-4001-A

Proposed Baji Central Booster Station, Proposed Transformer Details (PDF) to follow

PF-D-60001-4-34-207-E-4002-A

Proposed Baji Central Booster Station, Proposed Generator & Fuel Tank (PDF) to follow

PF-D-60001-4-34-901-Y-0001-C

Proposed Baji Central Booster Station, Topographical Survey

PF-MD-60001-4-34-200-M-3007-A

Siniya and Baji West pumps (DWG)

PF-MD-60001-4-34-200-M-3005-A

Hajaj pumps (DWG)


Pell Frischmann | Design Parameters:

12

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

PF-MD-60001-4-34-200-M-3006-A

Baji East pumps (DWG)

PF-MD-60001-4-34-200-M-3000-A

Siniya Pump Data Sheet

PF-MD-60001-4-34-200-M-3001-A

Hajaj Pump Data Sheet

PF-MD-60001-4-34-200-M-3003-A

Baji East Pump Data Sheet

PF-MD-60001-4-34-200-M-3004-A

Baji West Pump Data Sheet

PF-C-60001-4-34-200-M-3000-A

Siniya Pump Duty Calculation

PF-C-60001-4-34-200-M-3001-A

Hajaj Pump Duty Calculation

PF-C-60001-4-34-200-M-3003-A

Baji East Pump Duty Calculation

PF-C-60001-4-34-200-M-3004-A

Baji West Pump Duty Calculation

PF-D-60001-4-34-102-M-3000-A

Gantry Crane Drawing - (DWG already issued under package 3A4)

PF-S-60001-4-34-200-M-3000-A

Axial Split Casing Pump Data Sheet

Pell Frischmann | Design Parameters:

13

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

Table 3.2 List of Records


Document Number

Record Title

PE-S-60001-4-34-200-C-1000-A

Work Scope Proposed Baji Central Booster Station Dry Well [this document]

PF-RA-60001-9-90-900-C-1000-A

Design Risk Assessment - Proposed Booster Stations (Generic) previously issued under
number PF-RA-60001-3-90-900-C-1000-B

PE-RA-60001-4-34-200-C-1000-A

Design Risk Assessment - Proposed Baji Central Booster Station Dry Well

AL-SI-60001-4-90-900-C-1000

Geotechnical Report for the Baji Central Zone As previously issued

PF-R-60001-4-34-900-Y-0001-P1

Proposed Baji Central Booster Pre-Tender HAZOP Report - to follow in Part 2

PF-S-60001-4-34-209-Y-0001-P1

Baji Central BPS - Equipment Schedule

Pell Frischmann | Design Parameters:

14

Mid-Western Iraq IQ-P13

3.5.1

PE-S-60001-4-34-200-C-1000_A

Previous Details to Be Used:

The following previous detailed designed elements shall be used for this work scope:
Principles and details used during the design of the proposed Haditha booster station should
be used for the Baji Central booster station where practicable in order to maximise efficiency
in design and construction.
3.5.2

Design Documents Expected:

The following documents are ultimately expected to be supplied by the detailed design team:

All detailed civil and structural plans covering the booster station, including plant and
equipment and indicative cabling routes

Detailed civil sections and details sufficient for a contractor to price at tender and
ultimately construct

Reinforcement details and bar bending schedules for all concrete elements including
any subsidiary foundations

Signed off structural and civil calculations associated with the booster station

Signed off flotation calculations associated with the booster station

An updated design risk assessment

The table below contains the drawings that are expected to be produced during the detailed
design. These drawing numbers have been reserved on Aconex for use by the detailed
design team. Where specific drawings have not been identified (mechanical or electrical for
example) the details should be included on an appropriate drawing from the list

Table 3.3 Drawings to be Provided


Drawing Number
PF-D-60001-4-34200-C-1000
PF-D-60001-4-34-

Title
Proposed Baji Central Booster Station, Booster Station Building,
Layout Plan
Proposed Baji Central Booster Station, Booster Station Building, Roof

200-C-1001

Plan & Elevation

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, General

200-C-1002

Arrangement

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Plan &

200-C-1003

Sections

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Pipework Plan

200-C-1004

& Section

Drawing Number
PF-D-60001-4-34-

Title
Proposed Baji Central Booster Station, MCC Building, General
Pell Frischmann | Design Parameters:

15

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

200-C-1005

Arrangement

PF-D-60001-4-34-

Proposed Baji Central Booster Station, MCC Building, Sections &

200-C-1006

Details

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Loading Bay General

200-C-1007

Arrangement

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Loading Bay Sections

200-C-1008
PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-E-4000

Cable Layout Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-E-4001

Cable Layout Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-M-3000

Building Services, Small Power & Lighting

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-M-3001

Building Services, MCC Air Conditioning

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-M-3002

Building Services, Dry Well Ventilation

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Booster Station Building,

200-M-3003

Building Services, Fire & Security Systems

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Roof RC

200-S-2000

Details, Sheet 1

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Roof RC

200-S-2001

Details, Sheet 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Roof RC

200-S-2002

Details, Sheet 3

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Roof RC

200-S-2003

Details, Sheet 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Base

200-S-2004

Plan RC Details, Sheet 1

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Base

200-S-2005

Plan RC Details, Sheet 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Base

200-S-2006

Plan RC Details, Sheet 3

Drawing Number
PF-D-60001-4-34-

Title
Proposed Baji Central Booster Station, Pump Dry Well, Well Walls RC

Pell Frischmann | Design Parameters:

16

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

200-S-2007

Details, Sheet 1

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Walls RC

200-S-2008

Details, Sheet 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Walls RC

200-S-2009

Details, Sheet 3

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Well Walls RC

200-S-2010

Details, Sheet 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, MCC & Cable

200-S-2011

Trench, RC Details Base Plan

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, MCC & Cable

200-S-2012

Trench, RC Details Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, MCC & Cable

200-S-2013

Trench, RC Details Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Blast Walls &

200-S-2014

MCC Frame, RC Details Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Blast Walls &

200-S-2015

MCC Frame, RC Details Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Columns &

200-S-2016

Beams RC Details Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Pump Dry Well, Columns &

200-S-2017

Beams RC Details Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Layout Plan

201-C-1000
PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Sections Sheet

201-C-1001

1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Sections Sheet

201-C-1002

2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Roof Plan

201-C-1003
PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Drain Down

201-C-1004

Chambers (Civil & Mechanical)

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, General

201-E-4000

Arrangement (Electrical)

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, General

201-M-3000

Arrangement (Mechanical)

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Roof RC


Pell Frischmann | Design Parameters:

17

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

201-S-2000

Details, Sheet 1 of 2

Drawing Number
PF-D-60001-4-34-

Title
Proposed Baji Central Booster Station, Storage Tank, Roof RC

201-S-2001

Details, Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Base RC

201-S-2002

Details, Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Base RC

201-S-2003

Details, Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Walls RC

201-S-2004

Details, Sheet 1 of 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Walls RC

201-S-2005

Details, Sheet 2 of 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Walls RC

201-S-2006

Details, Sheet 3 of 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank, Walls RC

201-S-2007

Details, Sheet 4 of 4

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-C-1000

Area Slab, General Arrangement

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-C-1001

Area Slab, Sections Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-C-1002

Area Slab, Sections Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-S-2000

Area Slab, RC Details Base Plan

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-S-2001

Area Slab, RC Details Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Generator and Fuel Delivery

203-S-2002

Area Slab, RC Details Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank & Fuel Delivery

204-C-1000

Area Drainage, Plan & Long Section (including elevated storage tank
overflow)

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Storage Tank Overflow, Plan &

204-C-1001

Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Transmission Main to

204-C-1002

proposed Hajaj & Butameh BS, Plan & Long Section

Pell Frischmann | Design Parameters:

18

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Transmission Main to

204-C-1003

proposed Siniya BS, Plan & Long Section

Drawing Number
PF-D-60001-4-34-

Title
Proposed Baji Central Booster Station, Distribution Main to Baji North,

204-C-1004

Plan & Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Distribution Main to Baji South,

204-C-1005

Plan & Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Distribution Main to Baji West,

204-C-1006

Plan & Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Incoming Transmission Main

204-C-1007

from proposed Baji WTP, Plan & Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Incoming Transmission Main

204-C-1008

from existing Baji WTP, Plan & Long Section

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Foul Drainage, Plan & Long

205-C-1000

Section, Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Foul Drainage, Plan & Long

205-C-1001

Section Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Surface Water Drainage, Plan

205-C-1002

& Long Section Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Surface Water Drainage, Plan

205-C-1003

& Long Section Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Potable Service Water, Plan

205-C-1004
PF-D-60001-4-34-

Proposed Baji Central Booster Station, Access Road, Layout & Setting

205-C-1005

Out Details

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Access Road, Long Section

205-C-1006
PF-D-60001-4-34-

Proposed Baji Central Booster Station, Foot Paths, Layout & Setting

205-C-1007

Out Details

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Cable Layout, Ducting and

205-E-4000

External Lighting, Plan Sheet 1 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Cable Layout, Ducting and

205-E-4001

External Lighting, Plan Sheet 2 of 2

PF-D-60001-4-34-

Proposed Baji Central Booster Station, Site Layout

901-C-1002

Pell Frischmann | Design Parameters:

19

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

The detailed designer is to make use of standard details where appropriate to maximise
efficiency of design. The following standard details are deemed relevant for this package.

Table 3.4 Relevant Standard Details


Drawing Number
Title
PF-D-60001-9-90900-Y-7014

Standard Details Tanker Loading Point

PF-D-60001-9-90900-Y-7102

Standard Details Magnetic Flowmeter Chamber- No Bypass

PF-D-60001-9-90900-Y-7107

Standard Details Ducts / Drawpits for Small Diameter Pipelines

PF-D-60001-9-90900-Y-7117

Standard Details Magnetic Flowmeter Chamber with Bypass

PF-D-60001-9-90900-Y-7118

Standard Details Magnetic Flowmeter Chamber with Bypass RC


Details Sheet 1 of 2

PF-D-60001-9-90900-Y-7119

Standard Details Magnetic Flowmeter Chamber with Bypass RC


Details Sheet 2 of 2

PF-D-60001-9-90900-Y-7210

Standard Details Compound Wall and Fence

PF-D-60001-9-90900-Y-7301

Standard Details Reinforced Concrete Steps

PF-D-60001-9-90900-Y-7405

Standard Details Duct Adjacent to Structure and Duct Within


Structure

PF-D-60001-9-90900-Y-7201

Standard Details Access Roads and Pavements

PF-D-60001-9-90900-Y-7202

Standard Details Armco Type Barrier and Bollard

PF-D-60001-9-90900-Y-7213

Standard Details Standard Road Joint

PF-D-60001-9-90900-Y-7404

Standard Details Concrete Protection and Tanking to Concrete


Structure

PF-D-60001-9-90900-Y-7502

Standard Details Diesel Generator & Fuel Containers

Pell Frischmann | Design Parameters:

20

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

The following standard details are in development and will be issued when complete.

Table 3.5 Standard Details in Development


Area
Details
Operator House

General arrangement, RC details and building services

Engineer House

General arrangement, RC details and building services

Guard House

General arrangement, RC details and building services

Administration
Building

General arrangement, RC details and building services

Pell Frischmann | Design Parameters:

21

Mid-Western Iraq IQ-P13

PE-S-60001-4-34-200-C-1000_A

Table 3.6 Detailed Design Timescale


Description of Task

Date (Latest)

Receive work order (drgs, loadings)

12/11/2013

Sign off GA's (Exeter)

12/11/2013

Table 3.7 Contact List


Last Name
First
Name
Davy

Paul

IP
Phone
Number

Job Title
Principal
Contact

540

Email address

Location

pdavy@pellfrischmann.com

Exeter

Prepared By: Gary Taylor

Checked By: Paul Davy

Approved By: Stewart Neal

Signature:

Signature:

Signature:

GAT

Date: 11/10/13

Date:

PD

12/11/13

Date

SN

12/11/13

Pell Frischmann | Design Parameters:

22