IRON MAKING
BLAST
FURNACE
HOT
METAL
STEEL MAKING
HOT
METAL
COREX
BOF
(INCL. EOF)
OPEN
HEARTH
DR-SHAFT
FURNACE
DRI
DR-ROTARY
KILN
DRI
EAF
INDUCN FCE
PROCESSES ADOPTED IN
INDIAN STEEL INDUSTRY
DASTURCO
LIQUID
STEEL
DR SHAFT
7%
DR - KILN
43%
BF
48%
COREX
2%
Ironmaking
OH
2%
EAF
27%
BOF
41%
IF
30%
Steelmaking
DASTURCO
200
180
Million tons
150
~ 10% CAGR
100
50
0
1990
2000
2007
2020
PROJECTED GROWTH OF
STEEL PRODUCTION IN INDIA
DASTURCO
Brown-field
40%
Green-field
60%
DASTURCO
Process features:
7 units installed, incl. 4 in
India
Requires low ash coal &
some amount of coke
Iron oxide feed
comprises pellet & sized
ore
Largest module about
3,000 tons/day
Large amount of export
gas which has to be
gainfully utilised, eg for
power generation
COREX PROCESS
DASTURCO
10
Process features:
Only one unit installed
in Australia
Requires low ash coal
Iron oxide feed
comprises iron ore fines
Design capacity not
attained even after
extended period of
operation
No silicon in hot metal
HIsmelt PROCESS
DASTURCO
11
Process features:
1 unit installed in Korea
Design capacity 1.5 mtpy
Design capacity on
sustained basis to be
demonstrated
Requires low ash coal &
some amount of coke
Iron oxide feed
comprises ore fines with
low moisture content
Substantial amount of
export gas which has to
be gainfully utilised, eg for
power generation
FINEX PROCESS
DASTURCO
12
13
PROCESS
ROUTE
CAPACITY, MTPY
~0.25
~0.5
BF-BOF
~1
~3
1.05
1.00
1.14
FINEX-BOF
COREX-BOF
1.34
HIsmelt-BOF
1.63
Scrap-EAF
2.13
Scrap-IF
2.13
1.24
DASTURCO
1.23
1.07
14
CAPEX
OPEX
BF-BOF
100
100
COREX-BOF
86
125
HIsmelt-BOF
83
104
110
94
88
113
79
80
Source: Process Route Selection for Tata Steels Chhattisgarh Project by V K Bari, M K Keshari,
A K Das, Vijoy Kumar and Varun Jha, AWAKENING OF THE INDIAN STEEL INDUSTRY:
2005-2020, published by TATA STEEL LIMITED, 2006
DASTURCO
CONCLUDING REMARKS
India has embarked on an ambitious steel
development programme
120-130 million tons capacity will be added
over the next decade
Major part of this capacity will be realised
through new green-field plants
Selection of process route will have to be
judiciously done by taking cognizance of
relevant techno-economic & environmental
factors
DASTURCO