Вы находитесь на странице: 1из 1

Calendario de Utilizacion de Recursos

Obra
Ubicacion
Costo A

: "MANTENIMIENTO DE CAMINOS VECINALES,COMUNALES DE CHORRILLOS-SONCOHUAYCO,CAICO Y CCOROSA EN EL DISTRITO DE PALLPATA,PROVINCIA DE ESPINAR-CUSCO"


: PALLPATA - ESPINAR - CUSCO
Cliente
: MUNICIPALIDAD DE PALLPATA
: Nov - 2016
PLAZO DE EJECUCION

Cod

Descripcion

Unid

Cantidad

Precio

Parcial

30 Dias

30 Dias

TOTAL
65 Dias

05 Dias

MANO DE OBRA
47 00032

TOPOGRAFO

HH

80.19

10.00

801.90

771.69

30.21

47 00008

OPERARIO

HH

657.24

10.00

6,572.40

2,793.20

3,028.70

750.50

801.90

47 00009

OFICIAL

HH

536.97

8.00

4,295.76

2,614.54

1,580.95

100.27

4,295.76

47 01412

PEON

HH

2,340.32

7.00

16,382.24

12,608.31

3,472.11

301.82

16,382.24
186.30

6,572.40

MATERIALES
00 01182

GASOLINA 84

gal

13.80

13.50

186.30

177.03

9.27

00 01418

PETROLEO D-2

gal

62.50

12.50

781.25

781.25

781.25

00 01185

PIEDRA GRANDE DE 4"

m3

73.80

80.00

5,904.00

5,184.00

5,904.00

02 00019

ALAMBRE NEGRO N16

KG

122.70

5.50

674.85

674.85

674.85

02 00043

ALAMBRE NEGRO N8

KG

15.06

5.00

75.30

75.30

75.30

02 01411

CAMPAMENTO PROVISIONAL

GLB

1.00

1,800.00

1,800.00

1,800.00

1,800.00

02 00048

CLAVOS CON CABEZA DE 3"

KG

105.22

7.00

736.54

683.83

52.71

736.54

03 01420

ACERO CORRUGADO FY=4200KG/CM2 GRADO 60

KG

2,532.90

5.50

13,930.95

13,930.95

13,930.95

04 00055

ARENA FINA

M3

0.96

70.00

67.20

05 00042

PIEDRA GRANDE ( 8")

M3

42.36

80.00

3,388.80

3,388.80

05 00464

PIEDRA MEDIANA DE 4"

M3

49.20

80.00

3,936.00

21 00004

CEMENTO PORTLAND TIPO IP (42.5KG)

BOL

389.33

25.00

9,733.25

600.00

30 00493

YESO DE 28 Kg

BOL

5.78

10.00

57.80

27.57

30.23

38 00006

HORMIGON

M3

50.60

60.00

3,036.00

207.01

2,737.49

38 01413

MATERIAL DE CANTERA (LASTRE)

M3

2,272.54

50.00

113,627.00

113,627.00

39 01417

AGUA PARA LA CONSTRUCCION(INC.RIEGO)

M3

1,221.68

2.00

2,443.36

2,259.99

43 01415

MADERA CORRIENTES PARA ESTACAS

P2

18.84

3.00

56.52

43 00011

MADERA TORNILLO

P2

225.90

4.24

957.82

47 00010

COLOC. DE CARTEL DE OBRA

GLB

1.00

1,000.00

1,000.00

72 01409

TUBERIA PVC-CORRUGADO

UND

13.00

500.00

6,500.00

720.00

67.20

67.20

3,388.80

3,936.00

3,936.00

8,527.32

605.93

9,733.25

91.50

57.80
3,036.00

14.13

169.24

113,627.00

56.52

56.52

957.82

957.82

1,000.00

1,000.00

6,500.00

6,500.00

2,443.36

EQUIPO
00 01394

MEZCLADORA DE CONCRETO DE 9-11P3

hm

53.79

10.00

537.90

39.99

497.91

537.90

30 00386

NIVEL TOPGRAFICO

HM

680.22

10.00

6,802.20

6,318.84

483.36

6,802.20

37 00005

HERRAMIENTAS MANUALES

1,283.28

1,034.56

216.41

32.31

1,283.28

48 00409

CAMIONETA

HM

12.13

70.00

849.10

849.10

849.10

48 01414

VOLQUETE DE 15M3

HM

75.22

150.00

11,283.00

11,283.00

11,283.00

49 00028

CARGADOR S/LLANTAS 110 - 125 HP

HM

68.44

190.00

13,003.60

13,003.60

13,003.60

49 00602

COMPACTADOR VIBR. TIPO PLANCHA 4 HP

HM

3.76

10.00

37.60

49 00540

MOTONIVELADORA DE 125 HP

HM

113.51

190.00

21,566.90

49 00539

RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.

HM

113.51

190.00

49 00390

TRACTOR DE ORUGAS DE 190-240 HP

HM

42.07

200.00

49 00052

VIBRADORA DE CONCRETO 4HP 2.40

HM

17.91

5.43

COSTO DIRECTO

%MO

37.60

37.60

21,566.90

21,566.90

21,566.90

21,566.90

21,566.90

8,414.00

6,733.90

97.25

7.23

87.26

2.76

97.25

282,386.97

227,824.58

50,751.49

3,810.90

282,386.97

1,680.10

8,414.00

Pgina 1 de 1