PROJEC
PETRONAS RAPID OUI PROJECT
T:
START
FROM:
*ALL DIMENSIONS
FOLLOWED STAADPRO
INPUT ON MARCH 2016
18650
h
b
b
dd
73125
89500
REFER CL 2.2
FIG 3.1
WHERE,
Vs
32.5
Md =
1.0
m/s
(ZONE II )
(SEE MALAYSIA
WINDMAP)
Mz =
CATEGORY I
HEIGHT =
18.65
Mz =
1.241
REFER CL 4.4
Mh =
1.0
Ms =
1.0
Vsit =
40.336
REFER CL 2.3
REFER CL 2.4.1
m/s
Vsit x I
EQN (3)
REFER TABLE 3.2
Nature of Occupancy =
Category =
REFER CL 2.4.1
I=
1.15
Thus,
Vdes =
46.39
REFER CL 5.5
( Pascal, Pa)
m/s
EQN (2)
REFER CL 5.2
III
Cp,e x Ka x Kc x Ki x Kp
d=
73.125
b=
89.5
h=
18.65
INTERNAL PRESSURE , Cpi
m
m
m
Cpi =
-0.3
Cfig =
CpI x Kc
-0.3
<
<
4
4
0.817
3.921
Cf =
Cfig =
Cf x Kc
0
b
C
ELEVATION
A
B
PLAN
WALL
BUILDING-Z AXIS
= 0
FLAT ROOF
REFER TABLE 5.2
(TABLE 5.2a)
(TABLE 5.2b)
-0.50
<
=
d/b
10
0.817
<
FOR SIDEWALLS, S
Cp,e =
-0.65
(0 TO 1 h)
(TABLE 5.4)
AREA REDUCTION, Ka
Ka =
1.0
(TABLE 5.5)
COMBINATION FACTOR, Kc
Kc =
1.0
0.8/Ka
LOCAL PRESSURE, KI
KI =
1.0
(TABLE 5.2c)
(TABLE 5.6)
(TABLE 5.8)
or Cl 6.1
REFER CL 2.4.1
POROUS CLADDING, Kp
Kp =
REFER Cl 2.4.1
0.8
Pair =
( Pascal, Pa)
1.225
kg/m3
Cfig = -0.400
P = -0.527
kN/m2
Cfig = -0.3
P = -0.395
kN/m2
Cfig = -0.520
P = -0.685
INTERNAL PRESSURE ('kN/m2)
Cfig = -0.3
P = -0.395
S
Cfig = -0.3
P = -0.395
PLAN
S
Cfig = -0.3
P = -0.395
SUMMARY PRESSURE ('kN/m2)
P=
LEVEL
Parapet
Roof
1st Wall Beam
1st Floor
P=
LEVEL ELEVATION
Parapet
+10.900
Roof
+9.400
1st Wall Beam +6.400
1st Floor
+3.4
0.448kPa
OK
HEIGHT (m)
3.000
3.000
1.500
-1.081kPa
ELEVATION
+10.900
+9.400
+6.400
+3.4
OK
-3.242
-3.242
-1.621
P=
P (Kn/m)
1.344
1.344
0.672
LEVEL
Parapet
Roof
1st Wall Beam
1st Floor
L
S
-1.081kPa
ELEVATION
+10.900
+9.400
+6.400
+3.4
OK
HEIGHT (m) P (Kn/m)
0
3.000 -3.242
3.000 -3.242
1.500 -1.621
BUILDING-Z AXIS
Parapet
Roof
-0.923kPa
OK
LEVEL
ELEV.
Parapet +10.900
Roof
+9.400
1st Wall Beam
+6.400
1st Floor
+3.4
HEIGHT P (Kn/m)
1st Floor
Ground