A)
WELL LOGS:
B)
WELL DATA:
1. M/U & RIH with Schl. open end Frac. assy. on same 3 1/2 EUE TBG, Bottomsup is as follows:-
3.
o
o
Close Schlumberger 2 x 2 valve in Annulus line and ensure annulus wing valve is closed. Pressure test the
annulus surface line to 3500 psi against Schlumberger 2 x 2 valve. Observe for 10 minutes and bleed off
line pressure.
Open Schlumberger 2 x 2 valve and pressure lines to annulus wing valve to 2,500 psi. Observe for 5
minutes and bleed off line pressure. Company man on location to confirm any discrepancies in maximum
pressure limitations for testing.
Open the isolation valve to the pressure relief valve and set PRV to 2,300 psi. Pressure up line to confirm
pop-off activation pressure. Reset Pop-off PRV. Re-test until activation pressure is exact.
3.75
3.5
1.75
-1.75
-3.5
-3.75
3713
7427
11140
FracCADE*
KPC
AG 101
2_AG-101_20/40
28-6-2013
9880
< 0.0 lb/ft2
0.0 - 0.5 lb/ft2
0.5 - 0.9 lb/ft2
0.9 - 1.4 lb/ft2
1.4 - 1.9 lb/ft2
1.9 - 2.3 lb/ft2
2.3 - 2.8 lb/ft2
2.8 - 3.3 lb/ft2
3.3 - 3.7 lb/ft2
> 3.7 lb/ft2
9920
9960
Fracture# 1 Initiation MD = 9907.05 ft
10000
6000
8000
Stress - psi
-0
0.1
0.2
0.3
150
300
450
600
750
Fracture Half-Length - ft
*Mark of Schlumberger
Bottomhole Pressure
Surface Pressure
EOJ
10000
30
8000
20
7000
6000
10
5000
4000
0
10
20
30
40
50
60
70
80
90
100
110
0
120
Pressure - psi
9000
Premature
screen out
All
proppant
displaced into
well ?
No
Close wellhead
at master valve
Open bleed
line to the pit (or
pump prime-up
lines)
Yes
Reset pumps
Monitor pressure
Bleed down if
above max
working pressure
Shut in Wellhead
Isolation valve
Bleed down
surface lines
Monitor pressure
of well and start
forced closure
procedure
Continuously
clear prop from
outlet of bleed
to avoid plugging
Blender
Screen
out
Back up
blender (side)
working?
Pump
manifolds
clear?
No
No
Stop pumping
Yes
No
Yes
Lines open to
pumps?
Yes
Close in the
screened out
blender (side)
Continue
treament
Yes
Continue as
planned with
backup side
No
Displace the
treatment
Switch to direct
feed from fluid
source and
flush well
High
pressure
pump
failure
Go to flush
Yes
Are
backups
available?
No
Did the
well screen
out?
No
Enough
rate for job
as
designed?
No
Redesign
job
Yes
Yes
No
Complete the
treatment as
designed
Go to flush
Client
approves new
design?
Yes
Complete the
treatment as
designed
Failure of
Sand
Chief
Yes
Enough
prop to continue
job while
repairing?
Yes
Switch to other
compartments,
complete repairs
and finish job as
designed
No
Hydraulic
(belt) or gate
failure?
Gate
Same
prop in other
compartments?
No
Go to flush
Hydraulics
Backup
hydraulic system
Yes
rigged up?
No
Reduce rate as
much as possible
and swap to
backup
Go to flush
Client
approves?
Yes
Complete job on
backup
No
Computer
or Comm
failure
Go to
flush
Yes
Is the
job still per
design?
No
Can
the job
continue?
No
Prop in
the well?
No
Stop Pumping
Yes
Redesign the
treatment for the
current situation
Yes
Client
approves?
Yes
What
failed?
POD
Computer
Both or
one?
Network
(Communication)
FracCAT
Computer
One
Both
Continue
pumping - POD
controls blending
Continue
pumping - POD
controls blending
Can job
continue in
manual?
Yes
Do not attempt to
reestablish
communication
No
Go to
flush
No
Go to
flush
Failure of
high
pressure
iron
Stop Pumping
Leak or
complete
failure?
Complete
Leak
Can the
line be
isolated?
No
Yes
No
Isolate the line
Can the
job be
continued?
No
Is there
prop in the
lines?
Yes
Yes
Continue the
job as
designed
Flush proppant
out of surface lines
to the pit
Make repairs
Failure of
the low
pressure
side
Can
the leak
be isolated?
No
Stop pumping
Secure the
equipment
Can
the spill be
contained?
Yes
Job rate
reduced?
No
Yes
No
Can the
spill be dealt
with after the
job?
Yes
Yes
Can
the job
continue?
Continue the
treatment as
scheduled
Yes
Stop pumping
Secure the
equipment