Вы находитесь на странице: 1из 4

DAILY SAFETY OBSERVATION

REPORT
CAR) in Reference To:
Safety Officer Daily Observation Report

(CAR) submitted on: January 18, 2017

Issued by / Dept.:
Md Gufran Khan
Issued on:
January 18, 2017

Site Location:
ELS 6H1 Metro Project Riyadh KSA.

N
o.

DESCRIPTION

OBSERVATION
01

02

Chemical analysis of
drinking water certificate
Urgent to updateLast
inspection date is 7 Aug
2016.

Today we found skip bins


was full

ACTION

(1) CAR
Status:
(2) Date
closed/To
be
rectified
(TBR) on:
(3) Incharge:
(1) Open.

We are still
awaiting the
results of the
drinking water
samples.

We informed to
department that Please

(2) January 18,


2017.
(3)Eng...
Husain
(Site manager)

(2)

Open.

03

Our temporary storage


near the gate no. 1 was no
barricaded.

remove ASAP.

(2) January 18,


2017.
(3)Eng... Husain
(Site manager)

We assign our guys to


barricade that area with
signage.

(3)

Closed.

(2) January 18,


2017.
(3) HSE.

04

05

Backfilling work was on


going. Need of dust
control.

We assigned our guys for


water spraying.

(4)

Toilet is not fixed properly.

We informed site
management for this one.
Until now no fixed.

(5)

Closed.

(2) January 18,


2017.
(3) HSE.

Open.

(2) January 18,


2017.
(3)Eng... Husain
(Site manager)

06

07

Acetylene Gas was


observed without shade in
wet basement.

We immediately Provided
the shelter protect from
direct sunlight.

(1)

Water proofing material


was opened near the HSE
office.

We covered Water
proofing material by
polythene sheet.

(1)

Prepared by: MD Gufran Khan


Reviewed by: Jimmy G. Lagman
HSE Supervisor
Project Manager

Closed.

(2) January 18,


2017.
(3) HSE.

Closed.

(2) January 18,


2017.
(3) HSE.

Reported to: Darryl McCabe


HSSEQ Manager

Вам также может понравиться