Вы находитесь на странице: 1из 52

Royal Commission for Juabil & Yanbu

Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

PART A: DESIGN OF ARCH CULVERT

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

1.0

GENERAL DESCRIPTION AND DESIGN METHODOLGY

The proposed cast-in-situ unreinforced concrete structures is a multi-cells storm drainage Culvert along road (Typical). The structure is des
resisting frames consisting of unreinforced precast concrete arches roof and unreinforced conrete walls on continuous unreinforced base s
supported by node springs. The whole structure is modelled as series of elements, analyzed and designed by STAAD Pro structural progr
using Ultimate Strength Design (USD) method. All applicable loads are in accordance with MOT and AASHTO requirements and applied on
selfweight, soil pressure and surcharge on exterior walls etc. Wheel load pressure per MOT Design Trucks & Lane Loads such as; standard
150 kN for moment and 220 kN concentrated loads spread over lane width; 3 axle 600 kN (61.2T) truck per lane, and 320 kN (32.62T) hypo
are applied on structure in different loading pattern/cases similar to a moving loads All these loads are applied systematically in various crit
corresponding load factor multipliers, as required by AASHTO. Please refer to design load calculations, Wheel Loads Summary Table and d
designed to safely withstand the vertical and lateral loads due to traffic and earth and comply with minimum factors of safety and 100 kPa r
bearing capacity as per RC manual.

2.0

DESIGN CRITERIA:
Dead Loads :
Normal concrete weight

24

Unit weight of soil


Unit weight of asphalt
Minimum Uniform Distributed Live Load Per RC
Guideline, wL(min)

=
=
=

19
21
5.00

Live Loads:
Traffic Loads

see wheel load calculations

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

Thermal Loads
Change in Temperature (Expansion Joints provided)
Materials:
Concrete, f c
Fusion bonded epoxy coated rebar, fy
Steel Modulus of Elasticity, E s
Minimum concrete cover
Soil Properties:

25

C30b or 4.35 Ksi

29007 Ksi

=
=

30
414
200000
75

21

100

0.4

Soil unit weight, ws


Soil bearing capacity, SBC

For (DC -004),

Soil coefficient against sliding,

Factors of Safety:
Against overturning,

F.S(O.T)

Against sliding,
Against uplift,

F.S(SLIDING)
F.S(U)

=
=

1.5
1.1

Dead load, DL

1.3

Traffic Wheel Live load, LL

2.171

Earth Pressure on Walls


Beta,

=
=

0.65
0.75

Phi,
Per ACI 318-05, (Load Combination 9-7)
Dead load, DL
Earthquake Forces
Earth Pressure on Walls

=
=
=
=
=

0.9

Load Factors and Constants:


Per AASHTO Standard Specifications, 16th Ed.

0.9
1.00
1.6

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:
Subject:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Design of Arch Culvert

Revision:

REFERENCES:
A. MOT - Highway Design Manual, Structural Design Specifications
B. AASHTO Standard Specifications For Highway Bridges
C. Foundation Analysis and Design by Joseph E. Bowles
D. Building Code Requirements for Reinf. Concrete with Commentary
E. Addendum, RGME Geotechnical investigation final draft report dated October 2012.
SOFTWARES:

STAAD Pro , MS Excel

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

3.0 STRUCTURAL MODEL

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

4.0 LOAD CALCULATION

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

Design Lane Width & Wheel Load Distribution:


Road way width

22

Std. width of each lane, ls

3.65

Number of design lanes, ld

L/3.65

6.03
say

Design lane width, lw

L/6

3.667

MOC Design Trucks & Lane Loads:


3 - Axle 600 kN (61.2 T) Truck Per Lane

Wwdl =

0.85

hf =

1.700
Uniform wheel load distribution:
hf

0.85

mt.

>

0.61

Width of equivalent uniform distributed load, wd wl =


=
However, consider 45 vertical angle pressure distribution to top of culvert below. Hence, use
o

Width of equivalent uniform distributed load, wd wl =

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

80 kN

4.3 260 kN
0

260 kN

4.3
0

130 kN

1.80

TOA
0.8
5

TOC

1.7

1.7

1.7

0.85
3.50

Load per axle

260

kN

2*130/(1.7 * 3.50)

Wheel load pressure on culvert:


Average intensity of load

320 kN (32.62 T) Hypothetical Single Axle Load Per Lane

160 kN

320 kN

1.80

160 kN

TOA

TOC

0.85

0.85 0.85

0.85

1.7

Load per axle

3.50

320

kN

2*160 / (1.70* 3.50)

udl

20/lw

5.45

150

kN

Wheel load pressure on culvert:


Average intensity of load
Standard Lane-Load Per Lane
Lane load:
Live load:

Moment

0.85

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:
Calc No:
Subject:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Design of Arch Culvert


Maximum shear,

Vmax

Maximum moment,

Mmax

Revision:

220/lw

60.0

150/lw

40.91

Wheel Loads Summary:


Wheel Pressure
Load Type
Standard Wheel Loads:
260 kN
320 kN
Standard Lane Load:

Width

Wheel Pressure on Culvert


Magnification factor

Live load

3.5
3.5

N/A
N/A

43.70
53.8

5.4

N/A

5.45

5.4
5.4

N/A
N/A

35.29
24.06

mts. cover on top of culvert.


mt
hf
mt

Live:
60kN/m
40.9kN/m

Weight of fill and Road structure on culvert: wfill

For an average
Height of fill on culvert, hf

0.85
0.6

Asphalt pavement, hap


Wt of asphalt , Wap

=
=

0.25
21

Unit weight of dry soil, w


Thickness of culvert base, Tf

=
=

19
0.5

kN/m3

Culvert wall height, Hwc

1.3

mt

Top of arch to top of wall, Ta


Total Height of earth
Culvert Exterior Wall Thickness
Culvert Interior Wall Thickness

=
=
=
=

0.85
3.5
0.35
0.35

mt

kN/m3
mt

mt
mt
mt

Ta
Hwc
Tf

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Roof Arch Thickness

Revision:
0.35

Wt of asphalt pavement, ws

wap * hap
5.25
w * hf

kN/m2

Weight of fill on culvert, ws

=
=
=

11.4

kN/m2

mt

Tot. wt of pavement & road fill Tp+r


NOTE:
Hence,

kN/m2
=
16.65
Due to extra gap between culverts and fill, the load is increasing up to 25%
=
Tot. wt of pavement & road fill Tp+r

Wt. of concrete barrier


Wt of security fence

=
=
=

0.505 * 24
12.12
kN/m
1.34
kN/m
(post and chain link)

Earth Pressure on culvert Wall:


For rigid wall
Total height of culvert Hcul

mt

Angle of internal friction :


Earth pressure coeff. At rest ko

=
=

33
1-sin

degrees

0.455

Soil Pressure at Bottom of Base


P1 = w*ko*1*(Ht. of earth)

30.28

kN/m

Soil Pressure at top of culvert wall


P1a =

13.84

kN/m

Surcharge due to maximum wheel load :


P2 = 53.8 * ko

24.5

kN/m2

P1a

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

A
P1

soil pressure load on parapet ph


P3 = w * ko * ph * 1.0

=
=

0.4
3.461

mt. high parapet wall


kN/m2

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

5.0 LOADING DIAGRAMS

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

6.0 STRUCTURAL ANALYSIS AND DESIGN RESULT


PRO

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

7.0 STAAD PRO JOB INFORMATION

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Subject:

Design of Arch Culvert

Design Stage:
90% Submittal
7.0 STAAD PRO
JOB
INFORMATION
Revision:

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

8.0 STAAD PRO RESULT PRINT OUTPUT

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

9.0 DESIGN CALCULATION

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

Design Checks for Plain concrete:


Exterior Wall:
a. Out-of-plane Shear (Maximum of SQx or SQy)
Plate Number :

1604

Element Number

202

Page No.

68 of 88

Wall Thickness

350

mm

Effec. Depth.

300

mm

Max Out-of-plane Shear Stress (SQx) =

49.43

kPa

Maximum out-of-plane Shear, Vu =

17.30

kN

348

kPa

Membrane Stress, Sx, (Nu/Ag)


Allowable Vc =

STAAD PRINT OUTPUT

SQX

SQy

0.75 [ 1/6f'c (b)(d)][1+Nu/14Ag]

Vc =

210.50

>

17.30
OK

b. In-plane Shear, Sxy (along local X-axis)


Plate Number :

1802

Element Number

201

ACI 318 Section 11.9.6


Page No.

69 of 88

Wall Thickness

350

mm

Effec. Depth.

300

mm

454.61

kPa

Max In plane Shear Stress (Sxy) =


(From STAAD Element Stresses)

STAAD PRINT OUTPUT

SQX

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:
Calc No:
Subject:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal


Revision:

Design of Arch Culvert


Maximum In plane Shear, Vuxy

159.11

kN/m

240.36

kPa

72.11

kN/m

800

lw =

Membrane Stress Normal to section, Sx =

d = 0.8 lw
Allowable Vc =

A
SQy

1000

mm

0.75 [ 0.27f'c (h)(d)][1+Nud/4lw]

Vc =

310.57

>

159.11
OK

c. bending strength check


Plate Number :

1604

Element Number

202

Page No.

68 of 88

Wall Thickness

350

mm

Effec. Depth.

300

mm

Max. Moment Mx

11

kN-m/m

bending strength,

Mn Mu

0.6

S = bh /6

MX

As per ACI 318 section 22.5.1


(plain concrete strength reduction factor)
S=

STAAD PRINT OUTPUT

0.020

My

m3

Mn = *0.42 sqrt(f'c) S
Mn =

28.18

kN-m
>
Mu =

11.00

SAFE

d:Plain concrete members subject to combined flexure and axial load:


Plate Number :

1604

Page No.

68 of 88

STAAD PRINT OUTPUT

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:
Calc No:
Subject:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Design of Arch Culvert

Revision:

Element Number

202

Max. SX or SY

Max Pu = S * h

613

kpa

214.55

kN

On compression face;
Section 22.5.3 of ACI-318;
compression strength,
where:
=

0.6

(plain concrete strength reduction factor)

c =

1.3

mts (length of member from supports)

h=

0.35

mts (overall thickness of member)

b=

mts

Ag =

0.35

m2

Pn = 0.45 f'c[1-(lc/32h)2] Ag

4661.34

Pn =

kN

>
Pu =

214.55

SAFE

therefore, On compression face

Pu / Pn + Mu /Mn

214.55

4661.34

1.0

11.00

0.436

-0.074

28.18

On tension face:
Mu / S - Pu /Ag

11.00
0.020
e: Check for shear:

0.42 sqrt(f'c)
214.55
0.35
Section ACI 22.5.4

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:
Calc No:

181-C01-CALCS-20LS-SA-001

Subject:

Design of Arch Culvert

Design Stage: 90% Submittal


Revision:

Vn = 0.11 sqrt(f'c)bh
Vn =

301.19

>

49.43
SAFE

Culvert Base Slab:


a. bending strength check
Plate Number :

1644

Element Number

202

Page No.

75 of 88

Slab Thickness

500

mm

Effec. Depth.

450

mm

Max. Moment Mx

24

kN-m/m

bending strength,

Mn Mu

0.6

S = bh /6
2

STAAD PRINT OUTPUT

As per ACI 318 section 22.5.1


(plain concrete strength reduction factor)
S=

0.042

m3

My

Mn = *0.42 sqrt(f'c) S
Mn =

57.51

kN-m
>
Mu =

Shear
Base Slab Foundation

24.00

SAFE

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:
Calc No:
Subject:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal


Revision:

Design of Arch Culvert


Plate Number :

1644

Element Number

201

Page No.

75 of 88

Slab Thickness

500

mm

Effec. Depth.

450

mm

Maximum Shear Stress (SQx)

143

kN

Maximum Shear, Vu (SQx)

71.5

kN

Allowable Vc =

STAAD PRINT OUTPUT

Y
X

0.75 [ 1/6f'c (b)(d)]

Vc =

308.09

>

SQy

71.5
OK

Culvert Arch Roof Slab:


c. bending strength check
Plate Number :

1473

Element Number

201

Page No.

43 of 88

Wall Thickness

350

mm

Effec. Depth.

300

mm

Max. Moment Mx

16.5

kN-m/m

bending strength,

Mn Mu

0.6

S = bh /6
2

STAAD PRINT OUTPUT

MX

As per ACI 318 section 22.5.1


(plain concrete strength reduction factor)
S=

0.020

m3

Mn = *0.42 sqrt(f'c) S
Mn =

28.18

kN-m
>
Mu =

16.50

SAFE

My

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

d:Plain concrete members subject to combined flexure and axial load:


Plate Number :

1473

Element Number

201

Page No.

Max. SX or SY

43 of 88
680

kpa

Max Pu = S * h

238

kN

Max Qx or Qy

93.28

kPa

Vu = Q * h

32.648

kN

STAAD PRINT OUTPUT

On compression face;
Section 22.5.3 of ACI-318;
compression strength,
where:
=

0.6

(plain concrete strength reduction factor)

c =

1.5

mts (length of member from supports)

h=

0.35

mts (overall thickness of member)

b=

mts

Ag =

0.35

m2

Pn = 0.45 f'c[1-(lc/32h)2] Ag
Pn =

4640.25

kN

>
Pu =

238.00

SAFE

therefore, On compression face

Pu / Pn + Mu /Mn

238.00
4640.25
On tension face:

16.50
28.18

1.0
=

0.637

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Calculation Sheet

Contract No: 027-T04

Project Title: Ras Al Khair Industrial City

Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:
Mu / S - Pu /Ag

16.50

0.42 sqrt(f'c)
238.00

0.020

0.128

0.35

Check for shear; ACI 22.5.4


Vn = 0.11 sqrt(f'c)bh

1265.24

Vn =

>

32.65
SAFE

Development Length and Dowel Calculations:


Required minimum dowels
ACI 15.8, 14.2.8, & 14.3.2 (For Culvert Walls)
As(required)

0.0012 * Ag

As(required)

210

mm2

dia of bar =

16

mm

No. of bar =

As(provided)

402.12

mm2

#REF!
Required development length
ldb = 1.2 * dbFy / 4 (basic dev't length)

275.172

say

where:
Fy =

665

Mpa (Yield strength of GFRP 16mm (#5) bar)s

11.6

Mpa (recommended maximum bond stress based on results from pull out test)

db =

16

bar diameter, mm

1.2

Factor for reserve strength above Fy to maintain ductility (same as with steel)

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

Royal Commission for Juabil & Yanbu


Royal Commision in Jubail

Project Title: Ras Al Khair Industrial City

Calculation Sheet

Contract No: 027-T04


Task No:

Calc No:

181-C01-CALCS-20LS-SA-001

Design Stage: 90% Submittal

Subject:

Design of Arch Culvert

Revision:

10.0 BASE PRESSURE SUMMARY

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

CULVERT

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

oad (Typical). The structure is designed as moment and shear


n continuous unreinforced base slab serving as mat foundation
ed by STAAD Pro structural program in accordance with ACI Code,
HTO requirements and applied on structure such as dead loads,
s & Lane Loads such as; standard lane- load per lane 20 kN/m UDL,
er lane, and 320 kN (32.62T) hypothetical single axle load per lane
plied systematically in various critical load combinations with
Wheel Loads Summary Table and diagrams. Arch culverts are
m factors of safety and 100 kPa recommended net allowable

kN/m3
kN/m3
kN/m3
KPa

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

MPa
MPa
MPa
mm
kN/m3
KPa

Assumed

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

Volume - 3
16th Edition
4th Edition
ACI 318M

ODEL

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

TION

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

mts.
mts.
>

2.83

lanes

mts.

Top of culvert

450

Design lane width

3.667

lw =

mt.

or

1.75hf

AASHTO 6.4.1

1.488

mts

1.70

mts

ft

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

130 kN
TOA

0.85

TOC
0.85

43.70

kN/m2

TOA

0.85

TOC

53.8

kN/m2

220

kN

kN/m2
Shear =

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

kN/m
kN/m

el Pressure on Culvert
Total

surcharge on wall

Code &
Std.

19.90
24.49

43.70
53.8

MOT
MOT

2.48

5.45

MOT

16.07
10.96

35.29
24.06

MOT
MOT

top of culvert.
gap

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

20.813

kN/m2

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

P1

pet wall
(worst condition)

AMS

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

SIGN RESULT BY STAAD

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

FORMATION

Designed by:

MIQ

Date :

30/10/2012

Checked by:
FORMATION
Date :

MAW
30/10/2012

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

RINT OUTPUT

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

LATION

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

STAAD PRINT OUTPUT

SQX

STAAD PRINT OUTPUT

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012
X
Y

lw

STAAD PRINT OUTPUT

STAAD PRINT OUTPUT

X
Y

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

<

1.00
SAFE

<

2.30
SAFE

Mpa

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

kN

STAAD PRINT OUTPUT

Y
X

My

Mx

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

STAAD PRINT OUTPUT

SQx

STAAD PRINT OUTPUT

X
Y

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

STAAD PRINT OUTPUT

Y
X

SQx

SQy

<

1.00
SAFE

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012
<

2.30
SAFE

kN

500mm

sults from pull out test)

Mpa

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

Designed by:

MIQ

Date :

30/10/2012

Checked by:

MAW

Date :

30/10/2012

SUMMARY