Flushing and Cleaning FSO Surya Putra Jaya
Crude Oil Tank & Flexible Export Hose
NO

TO DO

DESCRIPTION

Tank Cleaning
Cargo heater

Test and inspection of readiness

Tank Cleaning
Test and inspection of readiness
Line
A/E #2
General Overhaul for maintenance
3 General over
Auxiliary Engine #2
haul
Stripping
4 Pump
Test and inspection of readiness
readiness
5 Stripping COT Stripping COT #1C, transfer to COT#7C
2

START
DATE

TARGET
DATE

27-Dec-16 28-Dec-16
27-Dec-16 28-Dec-16
27-Dec-16 04-Jan-17
27-Dec-16 28-Dec-16
28-Dec-16 29-Dec-16

6 Stripping COT Stripping COT #5C, transfer to COT#7C

28-Dec-16 29-Dec-16

7 Stripping COT Stripping COT #4C, transfer to COT#8C

09-Jan-17 12-Jan-17

8
9
10
11
12

Cleaning COT
#1C
Cleaning COT
#5C
Cleaning COT
#4C
Settling
Transfer Clean
Crude

13 OFFTAKE
Inject
14 Chemical to
COT #6C

Tank Cleaning works on COT #1C, then


transfer Oily water to Slop tank
Tank Cleaning works on COT #5C, then
transfer Oily water to Slop tank
Tank Cleaning works on COT #4C, then
transfer Oily water to Slop tank
Slop tank Settling
Clean oil transfer from slop tank to COT
#7C
Crude Oil Lifting of +/- 60,000 Bbls from
COT #7C & #8C

05-Jan-17 08-Jan-17
09-Jan-17 11-Jan-17
12-Jan-17 14-Jan-17

18-Mar-17 19-Mar-17

Stripping COT #6C Production Tank,


22-Mar-17 23-Mar-17
transfer to COT#8C
Receive
COT #6C Commence receiving Flushing
16
13-Jun-17 20-Jun-17
Flushing
from Sea Good 101
Stripping COT #6C Production Tank,
17 Stripping COT
12-Jun-17 13-Jun-17
transfer to COT#8C
Receive
COT #2C Ready to commence receiving
18
13-Jun-17 20-Jun-17
Flushing
Flushing from Sea Good 101
Crude Oil Lifting of +/- 100,000 Bbls
19 OFFTAKE
20-Jun-17 22-Jun-17
from COT #3C, #7C & #8C
Fushing Export Flushing Export Hose by Air Preassure
20
22-Jun-17 22-Jun-17
Hose
to tanker

Cleaning COT Tank Cleaning works on COT #3C, then


#3C
transfer to Slop tank (oily water)
Tank Cleaning works on COT #7C, then
Cleaning COT
23
transfer Oily water to Slop tank(oily
#7C
water)
22

24

Tank Cleaning works on COT #8C, then


Cleaning COT
transfer Oily water to Slop tank(oily
#8C
water)

Cleaning
Heater line
online
Tank Cleaning
Line ready
A/E #2 back
Online
Stripping
Pump Ready
Make empty
COT # 1C
Make empty
COT # 5C
Make empty
COT # 5C
Make Clean
COT # 1C
Make Clean
COT # 5C
Make Clean
COT # 4C

17-Jan-17 18-Jan-17

Inject chemical by Nalco to Make Sludge


21-Mar-17 22-Mar-17
melt in COT #6C Production Tank

Stripping COT #3C, #7C, #8C, then


transfer to Slop Tank Port (clean Crude)

OBJECTIVE REMARK

14-Jan-17 16-Jan-17

15 Stripping COT

21 Stripping COT

ACTUAL
COMPLETE

to make oil
able to be
suction
Make empty
COT # 6C

Make empty
COT # 6C

Make Dry
export hose

24-Jun-17 24-Jun-17
25-Jun-17 26-Jun-17

Make Clean
COT # 3C

26-Jun-17 27-Jun-17

Make Clean
COT # 7C

27-Jun-17 28-Jun-17

Make Clean
COT # 8C

check to
nalco for
quantity
required

25

Transfer Oily
water

Transfer all oily water to Tanker

Tanker
standby for
waiting oily
water

Oily water
sebagai
OBQ +/3000 Bbls in
Slop tank