Вы находитесь на странице: 1из 3

1

1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Cdigo
0147010002
0147010003
0147010004
0147010098
0147010104
0202000008
0202010005
0204000000
0205000009
0205010004
0205020021
0221000000
0229030001
0230460011
0232010097
0238000000
0239050000
0239150000
0243550001
0243580015
0243900001
0245010001
0285010060
0330550057
0337580101
0348000040
0348010007
0348010011
0348120095
0349040035
0349070003

Descripcin
Und. Cantidad
Precio S/.
Parcial
S/.2
OPERARIO
hh
132.1094
15.82
2,089.97
OFICIAL
hh
162.0255
13.73
2,224.61
PEON
hh
392.5090
12.20
4,788.61
LIMPIEZA FINAL DE OBRA
GLB
1.0000
1,000.00
1,000.00
GUARDIANIA
mes
1.0000
1,200.00
1,200.00
ALAMBRE NEGRO RECOCIDO # 8
kg
18.3680
5.00
91.84
CLAVOS PARA MADERA C/C 3"
kg
6.8320
5.00
34.16
ARENA FINA
m3
0.2240
150.00
33.60
PIEDRA GRANDE DE 8"
m3
1.9600
80.00
156.80
ARENA GRUESA
m3
1.9600
80.00
156.80
PIEDRA GRANDE
m3
11.2000
80.00
896.00
CEMENTO PORTLAND TIPO I (42.5KG)
BOL
241.3600
22.50
5,430.60
YESO
kg
0.5760
10.00
5.76
PEGAMENTO PARA PVC AGUA FORDUIT
gln
0.5126
35.00
17.94
TRANSPORTE DE MATERIALES
GLB
1.0000
1,000.00
1,000.00
HORMIGON
m3
25.1384
80.00
2,011.07
AGUA
m3
3.5840
0.50
1.79
PRUEBAS DE CALIDAD DE CONCRETO ROTURund
4.0000
30.00
120.00
ANDAMIO DE MADERA
p2
120.4493
5.50
662.47
LISTONES DE 2"X3"X10 PIES
und
6.7200
23.00
154.56
CASETA ADICIONAL TECHADA SEDAPAL
m2
1.0000
600.00
600.00
MADERA TORNILLO INC.CORTE P/ENCOFRAD p2
117.0478
5.50
643.76
TUBERIA PVC SAP C-10 DE 2"
und
1.8090
24.00
43.42
ESTACION TOTAL
hm
0.5126
15.00
7.69
EXCAVADORA SOBRE ORUGAS 170 - 250 HP hm
4.8000
350.00
1,680.00
MOTOBOMBA DE 4" x 12 HP (FE)
hm
3.2000
6.23
19.94
MEZCLADORA DE CONCRETO DE 9 - 11 P3
hm
12.4665
20.00
249.33
MEZCLADORA DE CONCRETO DE 9 -11P3
hm
1.5680
20.00
31.36
CAMION CISTERNA
hm
8.0000
152.49
1,219.92
TRACTOR DE ORUGAS DE 270-295 HP
hm
2.0010
408.70
817.81
VIBRADOR DE CONCRETO 4 HP 1.50"
hm
15.6800
20.00
313.60

Auxiliar1 S/.

Auxiliar2 S/.

Auxiliar3 S/.

Parcial Auxiliar1 S/. Parcial Auxiliar2 S/. Parcial Auxiliar3 S/. Incidencia %
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Incid. Acum. %Factor S/.


0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
1.000000
1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
0.0000 1.000000
1.000000
0.0000 1.000000
1.000000
0.0000 1.000000
1.000000
1.000000
0.0000 1.000000
0.0000 1.000000
1.000000
1.000000
0.0000 1.000000

Indice Unificado
47
47
47
47
47
02
02
04
05
05
05
21
29
30
32
38
39
39
43
43
43
45
72
30
37
48
48
48
48
49
49

Вам также может понравиться