Академический Документы
Профессиональный Документы
Культура Документы
CLARIO
QUALIFICATION:
SUMMARY OF EXPERIENCE
More than eight (8) years of experience in construction for various projects in oil and
gas. Petrochemical and various industrial set-ups.
Exposure includes welding works using GTAW and SMAW process or combination
of both certifications as 6G position welder. Familiarity with both stainless and carbon
steel pipe welding works.
Possesses good understanding and actual application of good welding approach
especially knowing how critical their work is for the success of the project. With
knowledge. Understand and having characteristics as follow.
WORK EXPERIENCE:
Name of Company
Project Destination
:
:
Position
Year Covered
:
:
Job Description
Full welding of major pipe line like Boiler Feed discharged size 18 diameter to
24 diameter 100% of x-ray.
Production welding of all ramdom pipe from pipe rack going to machine turbine.
Full welding of alloy pipe P-11 to P-22 at primary boiler especially stainless still
pipe
Full welding of stainless heavy wall pipe at reactor area discharged size 18
diameter to 24 diameter schedule 160 of which contain a 100% of x-ray, also full
welding of small bore and big bore stainless pipe at compressor lube oil supply
going to machine turbine.
Name of Company
Project Destination
Position
Year Covered
:
:
:
Job Description
Assigned as TIG and ARC welder performing welding works for pipe of various
sizes and thickness. Flexibility to welding works for both carbon steel and
stainless observing and following the best approach. Welding works done are
tested for visual. Radiographic and various other tests as operational equipment
would dictate.
Tube size 1 to 42 dia.
Full welding of tube to tube but joint small bore pipe all GTAW and SMAW
process for heavy wall pipe, as per the drawing and welding procedure
specification.
Electrode filler ER 70S-2 2.4.3.0 dia.mm.
Electrode TL 50 7018 2.6.3.2 dia.mm.
Name of Company
Project Destination
Position
Year Covered
:
Job Description
Assigned as TIG and ARC welder performing welding works for pipe of various
sizes and thickness. Flexibility to welding works for both carbon steel and
stainless observing and following the best approach. Welding works done are
tested for visual. Radiographic and various other test as operational equipment
would dictate.
Full welding of tube line in pipe rack.
Furnace to rack tube. Pressure vessels to pipe rack line carbon steel.
Tube size 1 to 70 dia.
Full welding of tube to tube but joint small bore pipe all GTAW and SMAW
process for heavy wall pipe, as per the drawing and welding procedure
specification.
Electrode filler ER 7016 2.4.3.0 dia.mm.
Electrode TL 50 7016 2.6.3.2 dia.mm.
Name of Company
Address
Project Destination
Company Year Covered
Designation
:
:
:
:
:
Job Description
Full welding of 30 inch up to 2 inch diameter of pipe, steam power pipe line
welding of pipe support and assist in the erection/ installation to fabrication
spools/ shot down works and expansion project. 1005 X-ray or ultrasonic
testing passed under the Stamp# P-41.
Name of Company:
Address
Project Destination
Year Covered
Designation
:
:
:
:
SEJONG Corporation
Doha Qatar
RAS LAFFAN Q-Power (Siemens)
October, 2005 to March, 2006
GTAW/SMAW
Job Description
Company
Address
Project Destination
Year Covered
Designation
:
:
:
Job Description
Full welding of high pressure pipe line such as steam line project, steam
boiler, gas and oil line. The diameter of pipe line is those ranging from 2
diameter up to 42 diameter of pipe with 100% R.T. Qualified of carbon steel
material as a GTAW/SMAW. The diameter of pipe 73mm O.D. and 25.4mm
O.D. and over. Under the Stamp # WAR-404.
Company
Address
Project Destination
Year Covered
Designation
:
:
:
:
:
Job Description
To weld Stainless Steel Pipe 304L/316L and Carbon Steel Material from 2
inches diameter to 42 inches diameter. Steam line, pipe line project with
100% X-ray. I follow rules and regulations from the supervisor and all office
staff with stamp # TW-MIE 037.
Company
Address
Project Destination
Year Covered
Designation
:
:
:
:
:
ALI H. AL-GHAMDI
Rahima Rastanura Saudi Arabia
Rastanura Refinery
June 14, 1998 to November 2000.
Pipe Welder
Job Description
Installation of pipeline in Saudi Arabia project in Rastanura Refinery from 42
inch diameter up to 3 inch diameter pipe. Welded in accordance with welding
procedure specification (WPS) Uphill position with 100% R.T. Stamp #
AAOV.
EDUCATIONAL
Vocational
High School
Elementary
PERSONAL DATA
Date of Birth
Civil Status
Height
Weight
Name of Spouse
Fathers Name
Mothers Name
Nationality
Language
:
:
:
:
:
:
:
:
:
June 23,1976
Married
57
144 lbs.
Liezel C. Clarino
Azur Clarino
Emma Clarino
Filipino
Tagalog/English