Вы находитесь на странице: 1из 71

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002

BID SHEET

No.
1
2
3
4
5
6
7
8
9
10

SERVICES RATE
Project Management Team
Construction Management Team
Non Construction Team
Operator and Driver
Operator and Driver with Equipment
Welder
Others skill
Scaffolding provision
Survey Instrument Package provision
Provisional Sum for Rates Adjustment
TOTAL BID (Rp)
HSD Fuel Price Assumption Without Tax (Rp)

RUPIAH (Rp)

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.1 Project Management Team Service Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Monthly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Monthly Rate Compensation


I
Project Manager
II
Area Superintendent
III
PMT Superintendent (PC, QC, HES, CEM)
Sub Total

Class

Position

Hypothetical
Quantity

Additional Work
Daily Rate (for Off
Days)

Additional Work
Days Factor

Duration (Months)

4 Years of
Additional Work
Days

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [C] x [D] x [E]


x [F]

II. Additional Work Daily Rate for Off Days


I
Project Manager
II
Area Superintendent
III
PMT Superintendent (PC, QC, HES, CEM)
Sub Total

Class

Position

Hypothetical
Quantity

Daily Rate
Deduction

[A]

[B]

[C]

[D]

III. Non Permitted Off Days


I
Project Manager
II
Area Superintendent
III
PMT Superintendent (PC, QC, HES, CEM)
Sub Total
TOTAL 4 YEARS PROJECT MANAGEMENT TEAM SERVICES RATE (I + II + III)

Non permitted Off


Duration (Months)
Days Factor
[E]

[F]

4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]

Duration (Months)

4 Years of Monthly
Rate

[H]

[I] = [C] x [G] x [H]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Project Management Team Service Rates
Class
I
II
III

Class
I
II
III

Position

Fuel Cost

Manpower Cost

Additional Work
Daily Rate (For Off
Days)

Daily Rate
Deduction

Project Manager
Area Superintendent
PMT Superintendent (PC, QC, HES, CEM)

Position
Project Manager
Area Superintendent
PMT Superintendent (PC, QC, HES, CEM)

Consumables
Cost

Direct Cost

Overhead & Profit

Total Rate

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.2 Construction Management Team Service Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Monthly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Monthly Rate Compensation


III
Construction Superintendent
III
Material Superintendent
III
Surveying Superintendent
III
Equipment Operation Superintendent
IV
Construction Supervisor
V
General Foreman
Sub Total

Class

Position

Hypothetical
Quantity

Additional Work
Daily Rate (for Off
Days)

Additional Work
Days Factor

Duration (Months)

4 Years of
Additional Work
Days

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [C] x [D] x [E]


x [F]

II. Additional Work Daily Rate for Off Days


III
Construction Superintendent
III
Material Superintendent
III
Surveying Superintendent
III
Equipment Operation Superintendent
IV
Construction Supervisor
V
General Foreman
Sub Total

Class

Position

Hypothetical
Quantity

Daily Rate
Deduction

[A]

[B]

[C]

[D]

III. Non Permitted Off Days


III
Construction Superintendent
III
Material Superintendent
III
Surveying Superintendent

Non permitted Off


Duration (Months)
Days Factor
[E]

[F]

4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.2 Construction Management Team Service Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Monthly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Monthly Rate Compensation


III
Equipment Operation Superintendent
IV
Construction Supervisor
V
General Foreman
Sub Total
TOTAL 4 YEARS CONSTRUCTION MANAGEMENT TEAM SERVICES RATE (I + II + III)

Duration (Months)

4 Years of Monthly
Rate

[H]

[I] = [C] x [G] x [H]

Duration (Months)

4 Years of Monthly
Rate

[H]

[I] = [C] x [G] x [H]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Construction Management Team Service Rates
Class
III
III
III
III
IV
V

Class
III
III
III
III
IV
V

Position

Fuel Cost

Manpower Cost

Additional Work
Daily Rate (For Off
Days)

Daily Rate
Deduction

Construction Superintendent
Material Superintendent
Surveying Superintendent
Equipment Operation Superintendent
Construction Supervisor
General Foreman

Position
Construction Superintendent
Material Superintendent
Surveying Superintendent
Equipment Operation Superintendent
Construction Supervisor
General Foreman

Consumables
Cost

Direct Cost

Overhead & Profit

Total Rate

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.3 Non Construction Team Service Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Monthly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

Class

Position

Hypothetical
Quantity

Additional Work
Daily Rate (for Off
Days)

Additional Work
Days Factor

Duration (Months)

4 Years of
Additional Work
Days

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [C] x [D] x [E]


x [F]

Class

Position

Hypothetical
Quantity

Daily Rate
Deduction

[A]

[B]

[C]

[D]

I. Monthly Rate Compensation


IV
Non Construction Supervisor
V
Administration Coordinator
V
Inspector (HES/QC/QS)(F)
Sub Total

II. Additional Work Daily Rate for Off Days


IV
Non Construction Supervisor
V
Administration Coordinator
V
Inspector (HES/QC/QS)(F)
Sub Total

III. Non Permitted Off Days


IV
Non Construction Supervisor
V
Administration Coordinator
V
Inspector (HES/QC/QS)(F)
Sub Total
TOTAL 4 YEARS NON CONSTRUCTION TEAM SERVICES RATE (I + II + III)

Non permitted Off


Duration (Months)
Days Factor
[E]

[F]

4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]

Duration (Months)

4 Years of Monthly
Rate

[H]

[I] = [C] x [G] x [H]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Non Construction Team Service Rates
Class
IV
V
V

Fuel Cost

Manpower Cost

Position

Additional Work
Daily Rate (For Off
Days)

Daily Rate
Deduction

Non Construction Supervisor


Administration Coordinator
Inspector (HES/QC/QS)(F)

Class
IV
V
V

Position

Non Construction Supervisor


Administration Coordinator
Inspector (HES/QC/QS)(F)

Consumables
Cost

Direct Cost

Overhead & Profit

Total Rate

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4 Operator - Driver Daily Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE


B

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver
Sub Total I
II. Daily Compensation Rate for REMOTE
E

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver
Sub Total II
E

Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Hourly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

III. Hourly Stand By Rate for NON REMOTE


B

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver
Sub Total III
E

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4 Operator - Driver Daily Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

Work Days
Working Hours > 8
< 10 hours

Off Days

Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

I. Daily Compensation Rate for NON REMOTE


IV. Hourly Stand By Rate for REMOTE
B

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver
Sub Total IV
E

Class

Position

V. Hypothetical Overtime Hours


B

REMOTE

NON REMOTE

REMOTE

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Class

Position

VI. Overtime
B

NON REMOTE

Vehicle driver, heavy vehicless & construction equipment operator/driver

Work Days
Working Hours > 8
< 10 hours

Off Days

Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4 Operator - Driver Daily Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE


C

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver
Subtotal VI
TOTAL 4 YEARS OPERATOR - DRIVER SERVICES RATE (I + II + III + IV + VI)
E

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

0
Duration (Hours)

4 Years of Hourly
Rate

[H]

[I] = [C] x [G] x [H]

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

Work Days
Working > 10
Hours

REMOTE

REMOTE
Work Days
Working > 10
Hours

4 Years of
Overtime

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Operator & Driver
Daily Rate - NON REMOTE
Class

Fuel Cost
B

Daily Rate - REMOTE

Position
Manpower Cost

Consumables Cost

Direct Cost

Overhead & Profit

Total Rate

Fuel Cost

Manpower Cost

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Stand By Rate (Hourly) - NON REMOTE


Class

Fuel Cost
B

Manpower Cost

Consumables Cost

Direct Cost

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Overtime (Hourly)
Class

Stand By Rate (Hourly) - REMOTE

Position

Position

Vehicle driver, heavy vehicless & construction equipment operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Sr. vehicle driver, sr. heavy vehicless & construction equipment


operator/driver

Work Days
Working Hours > 8
< 10 hours

Off Days Non


Remote

Off Days Remote

Work Days
Working > 10
Hours

Overhead & Profit

Total Rate

Fuel Cost

Manpower Cost

Daily Rate - REMOTE


Consumables Cost

Direct Cost

Overhead & Profit

Total Rate

Overhead & Profit

Total Rate

Stand By Rate (Hourly) - REMOTE


Consumables Cost

Direct Cost

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

I. Hourly Compensation Rate for NON REMOTE


Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34
Truck Water Tank (6x4)
35
Wheel Loader
36
Sub Total I
No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

I. Hourly Compensation Rate for NON REMOTE


II. Hourly Compensation Rate for REMOTE
Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34
Truck Water Tank (6x4)
35
Wheel Loader
36
Sub Total II
No

Type of Equipment & Specification

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

I. Hourly Compensation Rate for NON REMOTE


[A]

[B]

III. Stand By Rate for NON REMOTE


Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34
Truck Water Tank (6x4)
35
Wheel Loader
36
Sub Total III

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

I. Hourly Compensation Rate for NON REMOTE


No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

IV. Stand By Rate for REMOTE


Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34
Truck Water Tank (6x4)
35
Wheel Loader
36

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

I. Hourly Compensation Rate for NON REMOTE


Sub Total II
NON REMOTE
No

Type of Equipment & Specification

V. Overtime Hour
Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34

Capacity

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L

Min Power

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS

Work Days
Working Hours > 8
< 10 hours

Off Days

REMOTE
Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

5,000 - 8,000 L
3.5 - 4.0 M3

190 PS
220 HP

I. Hourly Compensation Rate for NON REMOTE


Truck Water Tank (6x4)
35
Wheel Loader
36
Subtotal V

NON REMOTE
No

Type of Equipment & Specification

VI. Overtime Rate


Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33

Capacity

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton

Min Power

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS

Work Days
Working Hours > 8
< 10 hours

Off Days

REMOTE
Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.4.2 Operator & Driver with Equipment Service Rate (Rupiah)

No

Type of Equipment & Specification

Capacity

Min Power

Hypothetical
Number of
Equipment

Hypothetical
Duration

Fuel Cost

Personnel Cost

Equipment Cost

[A]

[B]

[C]

[D]

[E]

[F]

[G]

[H]

[I]

I. Hourly Compensation Rate for NON REMOTE


Truck Vacuum (6x4)
8,000 L
34
Truck Water Tank (6x4)
5,000 - 8,000 L
35
Wheel Loader
3.5 - 4.0 M3
36
Subtotal VI
TOTAL 4 YEARS OPERATOR - DRIVER WITH EQUIPMENT SERVICES RATE (I + II + III + IV + VI)

190 PS
190 PS
220 HP

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

0
Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

0
Other Cost

Total Hourly Rate

4 Years of Stand
By Rate for Non
Remote

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

Other Cost

Total Hourly Rate

4 Years of Stand
By Rate for
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]
0

REMOTE
Work Days
Working > 10
Hours

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

0
REMOTE
Work Days
Working > 10
Hours

4 Years of
Overtime

Other Cost

Total Hourly Rate

4 Years of Hourly
Rate for Non
Remote

[J]

[K] = [G + H + I + J]

[L] = [E x F x K]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Operator & Driver with Equipment
Hourly Rate - NON REMOTE
No

Type of Equipment & Specification

Capacity

Min Power
Fuel Cost

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Air Compressor - without operator


Amphib. Excavator
Backhoe Loader Whl
Bulldozer
Bulldozer
Compactor Pad Foot
Crane Mobil Lat (8x4)
Crane Roughterrain Tel (4x4)
Crane Roughterrain Tel (4x4)
Crawler Crane Lat. Boom
Crawler Excavator
Excavator Track-LR
Excavator Wheel (4x4)
Forklift
Generator Set - without operator
Mobil Crane tel. Boom (8x4)
Mobil Excavator (6x6)
Motor Grader
Primemover (6x4)
Primemover (6x6)
Sm Drum/Tyre Compactor
Track Loader
Trailer Hi-Boy (3 axles) - without operator
Trailer Low Boy (3 axles) - without operator
Trailer Low Boy (4 axles) - without operator
Truck A Frame (6x6)
Truck Crane - 3 Ton (4x4)
Truck Crane - 5 Ton (6x4)
Truck Crane - 8 Ton (6x4)
Truck Crane - Long Bed (6x4)
Truck Dump (6x4)
Truck Dump Tail Gate (6x4) - with cover seal
Truck Flatbed (4x2)
Truck Vacuum (6x4)
Truck Water Tank (6x4)
Wheel Loader

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP

10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

Manpower Cost

Maintenance
and Repair

Consumables

Equipment Cost

Hourly Rate - REMOTE


Overhead &
Profit

Total Hourly
Rate

Fuel Cost

Manpower Cost

Maintenance
and Repair

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Operator & Driver with Equipment
Stand By Rate - NON REMOTE
No

Type of Equipment & Specification

Capacity

Min Power
Fuel Cost

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Air Compressor - without operator


Amphib. Excavator
Backhoe Loader Whl
Bulldozer
Bulldozer
Compactor Pad Foot
Crane Mobil Lat (8x4)
Crane Roughterrain Tel (4x4)
Crane Roughterrain Tel (4x4)
Crawler Crane Lat. Boom
Crawler Excavator
Excavator Track-LR
Excavator Wheel (4x4)
Forklift
Generator Set - without operator
Mobil Crane tel. Boom (8x4)
Mobil Excavator (6x6)
Motor Grader
Primemover (6x4)
Primemover (6x6)
Sm Drum/Tyre Compactor
Track Loader
Trailer Hi-Boy (3 axles) - without operator
Trailer Low Boy (3 axles) - without operator
Trailer Low Boy (4 axles) - without operator
Truck A Frame (6x6)
Truck Crane - 3 Ton (4x4)
Truck Crane - 5 Ton (6x4)
Truck Crane - 8 Ton (6x4)
Truck Crane - Long Bed (6x4)
Truck Dump (6x4)
Truck Dump Tail Gate (6x4) - with cover seal
Truck Flatbed (4x2)
Truck Vacuum (6x4)
Truck Water Tank (6x4)
Wheel Loader

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP

10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

Manpower Cost

Maintenance
and Repair

Consumables

Equipment Cost

Stand By Rate - REMOTE


Overhead &
Profit

Total Hourly
Rate

Fuel Cost

Manpower Cost

Maintenance
and Repair

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Operator & Driver with Equipment

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Type of Equipment & Specification

Air Compressor - without operator


Amphib. Excavator
Backhoe Loader Whl
Bulldozer
Bulldozer
Compactor Pad Foot
Crane Mobil Lat (8x4)
Crane Roughterrain Tel (4x4)
Crane Roughterrain Tel (4x4)
Crawler Crane Lat. Boom
Crawler Excavator
Excavator Track-LR
Excavator Wheel (4x4)
Forklift
Generator Set - without operator
Mobil Crane tel. Boom (8x4)
Mobil Excavator (6x6)
Motor Grader
Primemover (6x4)
Primemover (6x6)
Sm Drum/Tyre Compactor
Track Loader
Trailer Hi-Boy (3 axles) - without operator
Trailer Low Boy (3 axles) - without operator
Trailer Low Boy (4 axles) - without operator
Truck A Frame (6x6)
Truck Crane - 3 Ton (4x4)
Truck Crane - 5 Ton (6x4)
Truck Crane - 8 Ton (6x4)
Truck Crane - Long Bed (6x4)
Truck Dump (6x4)
Truck Dump Tail Gate (6x4) - with cover seal
Truck Flatbed (4x2)
Truck Vacuum (6x4)
Truck Water Tank (6x4)
Wheel Loader

Capacity

Min Power

300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3

115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP

10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3

220 PS/320 HP
190 PS
190 PS
190 PS
220 HP

Fuel Cost

Equipment Cost

WORK DAYS
Working Hours > 8 < 10
Other Cost
Total Rate
C

D =A+ B + C

OVERTIME HOURLY RATE


OFF DAYS
NON REMOTE
REMOTE
Other Cost
Total Rate
Other Cost
Total Rate
E

F =A+ B + E

H =A+ B + G

WORK DAYS
Working Hours > 10
Other Cost
Total Rate
I

J =A+ B + I

Hourly Rate - REMOTE


Consumables

Equipment Cost

Overhead &
Profit

Total Hourly
Rate

Stand By Rate - REMOTE


Consumables

Equipment Cost

Overhead &
Profit

Total Hourly
Rate

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.6 Welder Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE


Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G
Sub Total I
II. Daily Compensation Rate for REMOTE
Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G
Sub Total II
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Hourly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

III. Hourly Stand By Rate for NON REMOTE


Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G
Sub Total III
IV. Hourly Stand By Rate for REMOTE
Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.6 Welder Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

Work Days
Working Hours > 8
< 10 hours

Off Days

Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

I. Daily Compensation Rate for NON REMOTE


Certified Welder A
F
Certified Welder Class 1
G
Sub Total IV

Class

Position

V. Hypothetical Overtime Hours


Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G

Class

Position

VI. Overtime
Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G
Subtotal VI
TOTAL 4 YEARS WELDER SERVICES RATE (I + II + III + IV + VI)

Work Days
Working Hours > 8
< 10 hours

NON REMOTE

REMOTE

NON REMOTE

REMOTE

Off Days

Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

0
Duration (Hours)

4 Years of Hourly
Rate

[H]

[I] = [C] x [G] x [H]

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

Work Days
Working > 10
Hours

REMOTE

REMOTE
Work Days
Working > 10
Hours

4 Years of
Overtime

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Welder
Daily Rate - NON REMOTE
Class

Position
Fuel Cost

B
C
D
E
F
G

Manpower Cost

Consumables
Cost

Direct Cost

Daily Rate - REMOTE


Overhead & Profit

Total Rate

Fuel Cost

Manpower Cost

Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1

Stand By Rate (Hourly) - NON REMOTE


Class

Position
Fuel Cost

B
C
D
E
F
G

Manpower Cost

Consumables
Cost

Direct Cost

Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1

Overtime (Hourly)
Class

B
C
D
E
F
G

Consumables
Cost

Position

Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1

Work Days
Working Hours >
8 < 10 hours

Off Days Non


Remote

Off Days Remote

Work Days
Working > 10
Hours

Stand By Rate (Hourly) - REMOTE


Overhead & Profit

Total Rate

Fuel Cost

Manpower Cost

Consumables
Cost

Daily Rate - REMOTE


Direct Cost

Overhead & Profit

Total Rate

Overhead & Profit

Total Rate

Stand By Rate (Hourly) - REMOTE


Direct Cost

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant
G
Sub Total I
II. Daily Compensation Rate for REMOTE

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright

126,000.00

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE

Helper, serviceman, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant
G
Sub Total II
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Hourly Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

III. Hourly Stand By Rate for NON REMOTE

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE

Helper, serviceman, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant
G
Sub Total III
IV. Hourly Stand By Rate for REMOTE

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

Work Days
Working Hours > 8
< 10 hours

Off Days

Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

I. Daily Compensation Rate for NON REMOTE

Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant
G
Sub Total IV

Class

Position

V. Hypothetical Overtime Hours

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic

NON REMOTE

REMOTE

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE

E
F
G

Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant
NON REMOTE

Class

Position

VI. Overtime

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic

Work Days
Working Hours > 8
< 10 hours

Off Days

REMOTE
Work Days
Working > 10
Hours

Work Days
Working Hours > 8
< 10 hours

Off Days

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.7 Other Skills Rate (Rupiah)
Class

Position

Hypothetical
Quantity

Fuel Cost

Personnel Cost

Other Cost

Total Daily Rate

[A]

[B]

[C]

[D]

[E]

[F]

[G] = [D] + [E] + [F]

I. Daily Compensation Rate for NON REMOTE

E
F

Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant
G
Subtotal VI
TOTAL 4 YEARS OTHERS SKILL SERVICES RATE (I + II + III + IV + VI)

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

0
Duration (Hours)

4 Years of Hourly
Rate

[H]

[I] = [C] x [G] x [H]

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

REMOTE

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

Work Days
Working > 10
Hours

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

REMOTE
Work Days
Working > 10
Hours

4 Years of
Overtime

Duration (Days)

4 Years of Daily
Rate

[H]

[I] = [C] x [G] x [H]

0
0

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Other Skill
Daily Rate - NON REMOTE
Class

Position
Fuel Cost

E
F

Manpower Cost

Consumables
Cost

Direct Cost

Daily Rate - REMOTE


Overhead &
Profit

Total Rate

Fuel Cost

Manpower Cost

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration

Sr. office administration, sr. computer operator, project control assistant


Project controls assistant

Class

Position

Stand By Rate (Hourly) - NON REMOTE


Fuel Cost

Consumables
Cost

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic

Manpower Cost

Consumables
Cost

Direct Cost

Stand By Rate (Hourly) - REMOTE


Overhead &
Profit

Total Rate

Fuel Cost

Manpower Cost

Consumables
Cost

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
Break Down Costs - Other Skill

E
F
G

Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant

Overtime (Hourly)
Class

E
F
G

Position

Laborer, swamper, helper, materialsman, pipe fitter, carpenter, mason,


steelman, painter, plumber, insulator, mechanic, instrument technician,
chainman, electrician, lineman, chainsaw rigger, machinist, millwright
Helper, serviceman, materialsman, pipe fitter, carpenter, mason,
steelman, painter, plumber, insulator, instrument technician, chainman,
electrician, lineman, chainsaw operator, vehicle driver, rigger, machinist,
millwright, mechanic
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman

Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant

Work Days
Working Hours
> 8 < 10 hours

Off Days Non


Remote

Off Days
Remote

Work Days
Working > 10
Hours

Daily Rate - REMOTE


Direct Cost

Overhead &
Profit

Total Rate

Overhead &
Profit

Total Rate

Stand By Rate (Hourly) - REMOTE


Direct Cost

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.8 Scaffolding Rate (Rupiah)
Description
Steel pipe/tubular tower scaffolding

Unit
cu. meter/day

Unit Rate
1,548,000.00

Estimated
Quantity
1800

Total
2,786,400,000.00

1 Unit Perancah Scaffolding


No
1
2
3
4
5
6
7
8

Item
Main Frame
Leader Frame
Jack Base
U-hade Jack
Helper
Scaffolder
Foreman
Mobilisasi

Volume
1.00
1.00
4.00
4.00
0.30
0.50
0.05
1.00

Unit
unit
unit
bh
bh
oh
oh
oh
unit

Harga Satuan
550,000.00
395,000.00
55,000.00
55,000.00
65,000.00
75,000.00
120,000.00
100,000.00

Harga
550,000.00
395,000.00
220,000.00
220,000.00
19,500.00
37,500.00
6,000.00
100,000.00
1,548,000.00

CONSTRUCTION SERVICES - RESOURCES UNIT RATES (CS-RUR) B - C965002


BID SHEET
TABLE D-1.9 Survey Instrument Rate (Rupiah) - estimated during contract period
Description
Total station survey instrument

Unit
package

Unit Rate
7,000,000.00

Estimated
Quantity

Total
60

420,000,000.00