BID SHEET
No.
1
2
3
4
5
6
7
8
9
10
SERVICES RATE
Project Management Team
Construction Management Team
Non Construction Team
Operator and Driver
Operator and Driver with Equipment
Welder
Others skill
Scaffolding provision
Survey Instrument Package provision
Provisional Sum for Rates Adjustment
TOTAL BID (Rp)
HSD Fuel Price Assumption Without Tax (Rp)
RUPIAH (Rp)
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Additional Work
Daily Rate (for Off
Days)
Additional Work
Days Factor
Duration (Months)
4 Years of
Additional Work
Days
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Daily Rate
Deduction
[A]
[B]
[C]
[D]
[F]
4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]
Duration (Months)
4 Years of Monthly
Rate
[H]
0
0
Class
I
II
III
Position
Fuel Cost
Manpower Cost
Additional Work
Daily Rate (For Off
Days)
Daily Rate
Deduction
Project Manager
Area Superintendent
PMT Superintendent (PC, QC, HES, CEM)
Position
Project Manager
Area Superintendent
PMT Superintendent (PC, QC, HES, CEM)
Consumables
Cost
Direct Cost
Total Rate
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Additional Work
Daily Rate (for Off
Days)
Additional Work
Days Factor
Duration (Months)
4 Years of
Additional Work
Days
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Daily Rate
Deduction
[A]
[B]
[C]
[D]
[F]
4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Duration (Months)
4 Years of Monthly
Rate
[H]
Duration (Months)
4 Years of Monthly
Rate
[H]
0
0
Class
III
III
III
III
IV
V
Position
Fuel Cost
Manpower Cost
Additional Work
Daily Rate (For Off
Days)
Daily Rate
Deduction
Construction Superintendent
Material Superintendent
Surveying Superintendent
Equipment Operation Superintendent
Construction Supervisor
General Foreman
Position
Construction Superintendent
Material Superintendent
Surveying Superintendent
Equipment Operation Superintendent
Construction Supervisor
General Foreman
Consumables
Cost
Direct Cost
Total Rate
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Additional Work
Daily Rate (for Off
Days)
Additional Work
Days Factor
Duration (Months)
4 Years of
Additional Work
Days
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Daily Rate
Deduction
[A]
[B]
[C]
[D]
[F]
4 Years of Non
Permitted Off
Days
[G] = [C] x [D] x [E]
x [F]
Duration (Months)
4 Years of Monthly
Rate
[H]
0
0
Fuel Cost
Manpower Cost
Position
Additional Work
Daily Rate (For Off
Days)
Daily Rate
Deduction
Class
IV
V
V
Position
Consumables
Cost
Direct Cost
Total Rate
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Class
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Work Days
Working Hours > 8
< 10 hours
Off Days
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Class
Position
REMOTE
NON REMOTE
REMOTE
Class
Position
VI. Overtime
B
NON REMOTE
Work Days
Working Hours > 8
< 10 hours
Off Days
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Duration (Days)
4 Years of Daily
Rate
[H]
0
Duration (Hours)
4 Years of Hourly
Rate
[H]
Duration (Days)
4 Years of Daily
Rate
[H]
Work Days
Working > 10
Hours
REMOTE
REMOTE
Work Days
Working > 10
Hours
4 Years of
Overtime
Duration (Days)
4 Years of Daily
Rate
[H]
0
0
Fuel Cost
B
Position
Manpower Cost
Consumables Cost
Direct Cost
Total Rate
Fuel Cost
Manpower Cost
Fuel Cost
B
Manpower Cost
Consumables Cost
Direct Cost
Overtime (Hourly)
Class
Position
Position
Work Days
Working Hours > 8
< 10 hours
Work Days
Working > 10
Hours
Total Rate
Fuel Cost
Manpower Cost
Direct Cost
Total Rate
Total Rate
Direct Cost
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
[B]
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
V. Overtime Hour
Air Compressor - without operator
1
Amphib. Excavator
2
Backhoe Loader Whl
3
Bulldozer
4
Bulldozer
5
Compactor Pad Foot
6
Crane Mobil Lat (8x4)
7
Crane Roughterrain Tel (4x4)
8
Crane Roughterrain Tel (4x4)
9
Crawler Crane Lat. Boom
10
Crawler Excavator
11
Excavator Track-LR
12
Excavator Wheel (4x4)
13
Forklift
14
Generator Set - without operator
15
Mobil Crane tel. Boom (8x4)
16
Mobil Excavator (6x6)
17
Motor Grader
18
Primemover (6x4)
19
Primemover (6x6)
20
Sm Drum/Tyre Compactor
21
Track Loader
22
Trailer Hi-Boy (3 axles) - without operator
23
Trailer Low Boy (3 axles) - without operator
24
Trailer Low Boy (4 axles) - without operator
25
Truck A Frame (6x6)
26
Truck Crane - 3 Ton (4x4)
27
Truck Crane - 5 Ton (6x4)
28
Truck Crane - 8 Ton (6x4)
29
Truck Crane - Long Bed (6x4)
30
Truck Dump (6x4)
31
Truck Dump Tail Gate (6x4) - with cover seal
32
Truck Flatbed (4x2)
33
Truck Vacuum (6x4)
34
Capacity
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
8,000 L
Min Power
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
190 PS
Work Days
Working Hours > 8
< 10 hours
Off Days
REMOTE
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
5,000 - 8,000 L
3.5 - 4.0 M3
190 PS
220 HP
NON REMOTE
No
Capacity
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
10 M3
8 Ton
Min Power
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
220 PS/320 HP
190 PS
Work Days
Working Hours > 8
< 10 hours
Off Days
REMOTE
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
No
Capacity
Min Power
Hypothetical
Number of
Equipment
Hypothetical
Duration
Fuel Cost
Personnel Cost
Equipment Cost
[A]
[B]
[C]
[D]
[E]
[F]
[G]
[H]
[I]
190 PS
190 PS
220 HP
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
0
Other Cost
4 Years of Hourly
Rate for Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
0
Other Cost
4 Years of Stand
By Rate for Non
Remote
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
Other Cost
4 Years of Stand
By Rate for
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
0
REMOTE
Work Days
Working > 10
Hours
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
0
REMOTE
Work Days
Working > 10
Hours
4 Years of
Overtime
Other Cost
4 Years of Hourly
Rate for Non
Remote
[J]
[K] = [G + H + I + J]
[L] = [E x F x K]
0
0
Capacity
Min Power
Fuel Cost
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
Manpower Cost
Maintenance
and Repair
Consumables
Equipment Cost
Total Hourly
Rate
Fuel Cost
Manpower Cost
Maintenance
and Repair
Capacity
Min Power
Fuel Cost
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
Manpower Cost
Maintenance
and Repair
Consumables
Equipment Cost
Total Hourly
Rate
Fuel Cost
Manpower Cost
Maintenance
and Repair
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Capacity
Min Power
300 CFM
6 M Deep
2 - 4 M Deep
D6
D7
15 Ton
40 Ton
25 Ton
50 Ton
30 - 50 Ton
1 m3
14 M Reach
4x4
3 Ton
6 kVA
50 Ton
6.5 M Deep
12 Feet
25 - 30 Ton
35 - 50 Ton
10 - 14 Ton
3.1 M3
20 - 30 Ton
60 Ton
75 Ton
8 Ton
3 Ton
5 Ton
8 Ton
5 Ton
10 M3
115 HP
125 HP
85 HP
160 HP
200 HP
126 HP
315 HP
180 PS
185 PS
200 PS
138 HP
125 HP
157 PS
70 HP
10 HP
315 HP
255 HP
145 HP
320 HP
380 HP
125 HP
260 HP
n/a
n/a
n/a
320 HP
190 PS
290 PS
290 PS
290 PS
220 PS/320 HP
10 M3
8 Ton
8,000 L
5,000 - 8,000 L
3.5 - 4.0 M3
220 PS/320 HP
190 PS
190 PS
190 PS
220 HP
Fuel Cost
Equipment Cost
WORK DAYS
Working Hours > 8 < 10
Other Cost
Total Rate
C
D =A+ B + C
F =A+ B + E
H =A+ B + G
WORK DAYS
Working Hours > 10
Other Cost
Total Rate
I
J =A+ B + I
Equipment Cost
Overhead &
Profit
Total Hourly
Rate
Equipment Cost
Overhead &
Profit
Total Hourly
Rate
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Work Days
Working Hours > 8
< 10 hours
Off Days
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Class
Position
Class
Position
VI. Overtime
Welder
B
Welder
C
Welder, Certified Welder B
D
Welder, Certified Welder B
E
Certified Welder A
F
Certified Welder Class 1
G
Subtotal VI
TOTAL 4 YEARS WELDER SERVICES RATE (I + II + III + IV + VI)
Work Days
Working Hours > 8
< 10 hours
NON REMOTE
REMOTE
NON REMOTE
REMOTE
Off Days
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Duration (Days)
4 Years of Daily
Rate
[H]
0
Duration (Hours)
4 Years of Hourly
Rate
[H]
Duration (Days)
4 Years of Daily
Rate
[H]
Work Days
Working > 10
Hours
REMOTE
REMOTE
Work Days
Working > 10
Hours
4 Years of
Overtime
0
0
Position
Fuel Cost
B
C
D
E
F
G
Manpower Cost
Consumables
Cost
Direct Cost
Total Rate
Fuel Cost
Manpower Cost
Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1
Position
Fuel Cost
B
C
D
E
F
G
Manpower Cost
Consumables
Cost
Direct Cost
Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1
Overtime (Hourly)
Class
B
C
D
E
F
G
Consumables
Cost
Position
Welder
Welder
Welder, Certified Welder B
Welder, Certified Welder B
Certified Welder A
Certified Welder Class 1
Work Days
Working Hours >
8 < 10 hours
Work Days
Working > 10
Hours
Total Rate
Fuel Cost
Manpower Cost
Consumables
Cost
Total Rate
Total Rate
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
126,000.00
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
Work Days
Working Hours > 8
< 10 hours
Off Days
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Class
Position
NON REMOTE
REMOTE
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
E
F
G
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant
NON REMOTE
Class
Position
VI. Overtime
Work Days
Working Hours > 8
< 10 hours
Off Days
REMOTE
Work Days
Working > 10
Hours
Work Days
Working Hours > 8
< 10 hours
Off Days
Position
Hypothetical
Quantity
Fuel Cost
Personnel Cost
Other Cost
[A]
[B]
[C]
[D]
[E]
[F]
E
F
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Duration (Days)
4 Years of Daily
Rate
[H]
Duration (Days)
4 Years of Daily
Rate
[H]
0
Duration (Hours)
4 Years of Hourly
Rate
[H]
Duration (Days)
4 Years of Daily
Rate
[H]
REMOTE
Duration (Days)
4 Years of Daily
Rate
[H]
Work Days
Working > 10
Hours
Duration (Days)
4 Years of Daily
Rate
[H]
REMOTE
Work Days
Working > 10
Hours
4 Years of
Overtime
Duration (Days)
4 Years of Daily
Rate
[H]
0
0
Position
Fuel Cost
E
F
Manpower Cost
Consumables
Cost
Direct Cost
Total Rate
Fuel Cost
Manpower Cost
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Class
Position
Consumables
Cost
Manpower Cost
Consumables
Cost
Direct Cost
Total Rate
Fuel Cost
Manpower Cost
Consumables
Cost
E
F
G
Clerk, sr. materialsman, serviceman, sr. pipe fitter, sr. carpenter, sr.
mason, sr. painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument
tech, sr. electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr.
machinist, sr. millwright, instrumentman
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant
Overtime (Hourly)
Class
E
F
G
Position
Sr. clerk, sr. materialsman, sr. pipe fitter, sr. carpenter, sr. mason, sr.
painter, sr. plumber, sr. insulator, sr. mechanic, sr. instrument tech, sr.
electrician, sr. lineman, sr. vehicle driver, sr. rigger, sr. machinist, sr.
millwright, instrumentman, technical assistant, computer operator
Sr. vehicle driver, party chief, sr. technical assistant, sr. computer
operator, office administration
Sr. office administration, sr. computer operator, project control assistant
Project controls assistant
Work Days
Working Hours
> 8 < 10 hours
Off Days
Remote
Work Days
Working > 10
Hours
Overhead &
Profit
Total Rate
Overhead &
Profit
Total Rate
Unit
cu. meter/day
Unit Rate
1,548,000.00
Estimated
Quantity
1800
Total
2,786,400,000.00
Item
Main Frame
Leader Frame
Jack Base
U-hade Jack
Helper
Scaffolder
Foreman
Mobilisasi
Volume
1.00
1.00
4.00
4.00
0.30
0.50
0.05
1.00
Unit
unit
unit
bh
bh
oh
oh
oh
unit
Harga Satuan
550,000.00
395,000.00
55,000.00
55,000.00
65,000.00
75,000.00
120,000.00
100,000.00
Harga
550,000.00
395,000.00
220,000.00
220,000.00
19,500.00
37,500.00
6,000.00
100,000.00
1,548,000.00
Unit
package
Unit Rate
7,000,000.00
Estimated
Quantity
Total
60