Академический Документы
Профессиональный Документы
Культура Документы
1.
Rp.
### / m3
2.
Rp.
#REF! / m3
3.
Rp.
### / m3
4.
Rp.
22,135.00 / m3
5.
Rp.
23,170.00 / kg
6.
Rp.
151,397.50 / kg
7.
Rp.
188,551.50 / m2
8.
Rp.
327,620.00 / m2
9.
Rp.
520,432.00 / m2
( BAHAN PAKAI PASIR BETON KLAS II, BATU PECAH TANGAN 2/3, BEKISTING PAPAN )
AN.CK.B
1.
( 1 M3 : (
Rp.
0.2 X
0.5 X
215.3
0.5 ) (
0.2 X
0.5 X
2+
0.2 X
KG/M3
Rp. 1,211,180.00 / m3
X Rp. 22,135.00
Rp. 4,765,665.50 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 175 DGN BERAT BESI 215,3 KG/M3
AN.CK.B
2.
### / m3
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.2 X
0.6 X
197.29
0.6 ) (
0.2 X
0.6 X
2+
0.2 X
KG/M3
Rp. 1,009,316.67 / m3
X Rp. 22,135.00
Rp. 4,367,014.15 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 175 DGN BERAT BESI 197,29 KG/M3
AN.CK.B
3.
Rp.
### / m3
( 1 M3 : (
0.2 X
0.75 X 0.75 ) (
179.94
0.2 X
0.75 X
2+
0.2 X
KG/M3
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 175 DGN BERAT BESI 179,94 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
807,453.33 / m3
Rp. 3,982,971.90 / m3
Rp.
### / m3
( 1 M3 : (
0.2 X
0.8 X
175.64
0.8 ) (
0.2 X
0.8 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 175 DGN BERAT BESI 175,64 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
756,987.50 / m3
Rp. 3,887,791.40 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 100 X 100 cm mutu beton K.175
dengan berat besi beton U. 24, 185 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.2 X
1X
185
1) (
0.2 X
1 X
2+
0.2 X
KG/M3
1 X 2 ) X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 175 DGN BERAT BESI 185 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
605,590.00 / m3
Rp. 4,094,975.00 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 100 X 100 cm mutu beton K.175
dengan berat besi beton U. 24, 209,52 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
1X
209.52
1) (
0.3 X
1 X
2+
0.3 X
KG/M3
1 X 2 ) X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 175 DGN BERAT BESI 209,52 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
605,590.00 / m3
Rp. 4,637,725.20 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 120 X 120 cm mutu beton K.175
dengan berat besi beton U. 24, 276,01 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.2 X
1.2 X
276.01
2) (
0.2 X
1.2 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 175 DGN BERAT BESI 276,01 KG/M3
Rp.
### / m3
Rp.
302,795.00 / m3
Rp. 6,109,481.35 / m3
Rp.
### / m3
AN.CK.B
8.
Menghitung harga satuan poor beton bertulang 30 X 150 X 150 cm mutu beton K.175
dengan berat besi beton U. 24, 184,99 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
1.5 X
184.99
1.5 ) (
0.3 X
1.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 175 DGN BERAT BESI 184,99 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
403,726.67 / m3
Rp. 4,094,753.65 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 130 X 200 cm mutu beton K.175
dengan berat besi beton U. 24, 195,6 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
1.3 X
195.6
2) (
0.3 X
1.3 X
2+
0.3 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 20 X 130 X 200 CM K. 175 DGN BERAT BESI 195,6 KG/M3
Rp.
### / m3
Rp.
384,316.73 / m3
Rp. 4,329,606.00 / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan poor beton bertulang 20 X 200 X 200 cm mutu beton K.175
dengan berat besi beton U. 24, 248,83 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.2 X
2X
248.83
2) (
0.2 X
2 X
2+
0.2 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 175 DGN BERAT BESI 248,83 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
302,795.00 / m3
Rp. 5,507,852.05 / m3
Rp.
### / m3
11. Menghitung harga satuan poor beton bertulang 30 X 200 X 200 cm mutu beton K.175
dengan berat besi beton U. 24, 172,74 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
2X
172.74
1.5 ) (
0.3 X
2 X
2+
0.3 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 175 DGN BERAT BESI 172,74 KG/M3
Rp.
### / m3
Rp.
403,726.67 / m3
Rp. 3,823,599.90 / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan poor beton bertulang 30 X 250 X 250 cm mutu beton K.175
dengan berat besi beton U. 24, 165,51 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
2.5 X
165.51
2.5 ) (
0.3 X
2.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 175 DGN BERAT BESI 165,51 KG/M3
Rp.
### / m3
Rp.
242,236.00 / m3
Rp. 3,663,563.85 / m3
Rp.
### / m3
AN.CK.B
1.
1 M3 : (
Rp.
0.12 X
0.15 )
= 170.29
( 0.15 X
2)
KG/M3
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 3,769,369.15 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 12 X 15 CM K.175 DGN BERAT BESI 170,29 KG/M3
AN.CK.B
2.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.12 X
0.18 )
= 168.97
( 0.18 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 3,740,150.95 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 12 X 18 CM K.175 DGN BERAT BESI 168,97 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.15 )
= 162.21
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,590,518.35 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.175 DGN BERAT BESI 162,21 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.18 )
= 168.97
( 0.18 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,740,150.95 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 18 CM K.175 DGN BERAT BESI 168,97 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,638,551.30 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,299,000.40 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 2,844,126.15 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
8.
Rp.
### / m3
0.2 )
0.2 X
2)
X Rp. 151,397.50
Rp.
### / m3
Rp. 2,018,633.33 / m3
AN.CK.B
9.
AN.CK.B 10. Menghitung harga satuan sloof beton bertulang 15 X 30 cm mutu beton K.175
dengan berat besi beton U. 24, 191,04 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : ( 0.15 X
0.3 )
( 0.3 X
2)
- Besi beton U.24, 7 dia 12, dia 8 - 15
= 191.04 KG/M3
X Rp. 22,135.00
Rp.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,824,928.00 / m3
Rp.
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.175 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
Rp. 4,439,174.25 / m3
### / m3
Rp.
### / m3
Rp. 2,018,633.33 / m3
Rp. 4,228,670.40 / m3
Rp.
### / m3
11. Menghitung harga satuan sloof beton bertulang 20 X 30 cm mutu beton K.175
dengan berat besi beton U. 24, 228,41 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : (
0.2 X
0.3 )
(
- Besi beton U.24, 7 dia 16, dia 8 - 15
= 228.41 KG/M3
0.3 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.175 DGN BERAT BESI 228,41 KG/M3
Rp.
### / m3
Rp. 1,513,975.00 / m3
Rp. 5,055,855.35 / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan sloof beton bertulang 20 X 30 cm mutu beton K.175
dengan berat besi beton U. 24, 147,83 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : (
0.2 X
0.3 )
(
- Besi beton U.24, 7 dia 12, dia 8 - 15
= 147.83 KG/M3
0.3 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.175 DGN BERAT BESI 147,83 KG/M3
Rp.
### / m3
Rp. 1,513,975.00 / m3
Rp. 3,272,217.05 / m3
Rp.
### / m3
AN.CK.B 13. Menghitung harga satuan sloof beton bertulang 20 X 40 cm mutu beton K.175
dengan berat besi beton U. 24, 200,22 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : (
0.2 X
0.4 )
( 0.4 X
2)
- Besi beton U.24, 7 dia 16 + 2 dia 12
= 200.22 KG/M3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.175 DGN BERAT BESI 200,22 KG/M3
X Rp. 151,397.50
X Rp. 22,135.00
AN.CK.B 14. Menghitung harga satuan sloof beton bertulang 30 X 40 cm mutu beton K.175
dengan berat besi beton U. 24, 138,05 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : (
0.3 X
0.4 )
( 0.4 X
2)
- Besi beton U.24, 7 dia 16 + 2 dia 12
= 138.05 KG/M3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.175 DGN BERAT BESI 138,05 KG/M3
AN.CK.B 15. Menghitung harga satuan sloof beton bertulang 20 X 50 cm mutu beton K.175
dengan berat besi beton U. 24, 179,13 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
1 M3 : (
0.2 X
0.5 )
( 0.5 X
2)
- Besi beton U.24, 9 dia 16, dia 8 - 15
179.13
KG/M3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.175 DGN BERAT BESI 179,13 KG/M3
X Rp. 151,397.50
X Rp. 22,135.00
Rp.
### / m3
Rp. 1,513,975.00 / m3
Rp. 4,431,869.70 / m3
Rp.
### / m3
Rp.
### / m3
Rp. 1,009,316.67 / m3
Rp. 3,055,736.75 / m3
Rp.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 3,965,042.55 / m3
Rp.
### / m3
1.
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 12 X 12 CM K.175 DGN BERAT BESI 228,57 KG/M3
AN.CK.B
2.
Rp.
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.175 DGN BERAT BESI 178,82 KG/M3
3.
2)
4.
X Rp. 151,397.50
X Rp. 22,135.00
0.2 )
( 0.15 X
184.93 KG/M3
2+
0.2 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 184,93 KG/M3
5.
0.2 )
( 0.15 X
239.18 KG/M3
2+
0.2 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 239,18 KG/M3
AN.CK.B
6.
7.
143.58
2+
0.2 X
2)
8.
Rp.
### / m3
Rp.
### / m3
KG/M3
2+
0.3 X
2)
Rp. 3,532,608.33 / m3
Rp. 4,093,425.55 / m3
Rp.
### / m3
Rp.
### / m3
Rp. 3,532,608.33 / m3
Rp. 5,294,249.30 / m3
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp. 3,532,608.33 / m3
X Rp. 22,135.00
Rp. 3,178,143.30 / m3
Rp.
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.175 DGN BERAT BESI 171,3 KG/M3
AN.CK.B
Rp.
### / m3
Rp. 2,018,633.33 / m3
Rp. 3,595,388.05 / m3
Rp.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 143,58 KG/M3
AN.CK.B
### / m3
AN.CK.B
Rp.
### / m3
Rp. 2,018,633.33 / m3
Rp. 3,958,180.70 / m3
Rp.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.175 DGN BERAT BESI 162,43 KG/M3
AN.CK.B
### / m3
AN.CK.B
Rp.
### / m3
Rp. 2,523,291.67 / m3
Rp. 5,059,396.95 / m3
### / m3
Rp.
### / m3
Rp. 3,027,950.00 / m3
Rp. 3,791,725.50 / m3
Rp.
### / m3
0.2 )
(
235.2 KG/M3
0.2 X
2+
0.2 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
Rp.
### / m3
Rp. 3,027,950.00 / m3
Rp. 5,206,152.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
AN.CK.B
9.
2+
0.2 X
Rp.
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 215,53 KG/M3
AN.CK.B
Rp.
### / m3
Rp. 3,027,950.00 / m3
Rp. 4,770,756.55 / m3
Rp.
### / m3
0.2 X
2+
0.4 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.175 DGN BERAT BESI 189,01 KG/M3
AN.CK.B
### / m3
Rp.
### / m3
Rp. 2,270,962.50 / m3
Rp. 4,183,736.35 / m3
Rp.
### / m3
0.3 )
(
148.32 KG/M3
0.3 X
2+
0.3 X
2)
X Rp. 151,397.50
X Rp. 22,135.00
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.175 DGN BERAT BESI 148,32 KG/M3
Rp.
### / m3
Rp. 2,018,633.33 / m3
Rp. 3,283,063.20 / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan kolom beton 30 X 40 cm mutu beton K.175
dengan berat besi beton U. 24, 130,97 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan ( 1 M3 :
0.3 X
0.4 )
( 0.3 X
2+
0.4 X
2)
- Besi beton U.24,4 dia 16 + 6 dia 12
= 130.97 KG/M3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.175 DGN BERAT BESI 130,97 KG/M3
X Rp. 151,397.50
X Rp. 22,135.00
Rp.
### / m3
Rp. 1,766,304.17 / m3
Rp. 2,899,020.95 / m3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 13. Menghitung harga satuan kolom beton 30 X 40 cm mutu beton K.175
dengan berat besi beton U. 24, 165,48 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 :
0.3 X
=
0.4 )
165.48
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,766,304.17 / m3
X Rp. 22,135.00
Rp. 3,662,899.80 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.175 DGN BERAT BESI 165,48 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 14. Menghitung harga satuan kolom beton 30 X 50 cm mutu beton K.175
dengan berat besi beton U. 24, 155,02 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 :
0.3 X
=
0.5 )
155.02
0.3 X
2+
0.5 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,614,906.67 / m3
X Rp. 22,135.00
Rp. 3,431,367.70 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.175 DGN BERAT BESI 155,02 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 15. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.175
dengan berat besi beton U. 24, 117,78 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 : (
0.3 X
=
0.6 )
117.78
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 2,607,060.30 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.175 DGN BERAT BESI 117,78 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 16. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.175
dengan berat besi beton U. 24, 152,27 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 :
0.3 X
=
0.6 )
152.27
(
KG/M3
0.3 X
2+
0.6 X
2)
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 3,370,496.45 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.175 DGN BERAT BESI 152,27 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B
1.
( 1 M3 :
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 5,734,293.10 / m3
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.175 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 X
0.18 )
155.63
( 0.18 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 3,444,870.05 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK 12 X 18 CM K.175 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,958,180.70 / m3
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.175 DGN BERAT BESI 299 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,638,551.30 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,299,000.40 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 2,844,126.15 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
200
(
KG/M3
0.2 X
2+
0.15 )
X Rp. 151,397.50
Rp. 2,775,620.83 / m3
X Rp. 22,135.00
Rp. 4,427,000.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
X Rp. 327,620.00
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.175 DGN BERAT BESI 278 KG/M3
AN.CK.B
8.
Rp. 1,638,100.00 / m3
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
=
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 5,142,403.20 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.175 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
=
0.4 )
214.9
0.4 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 1,892,468.75 / m3
X Rp. 22,135.00
Rp. 4,756,811.50 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.175 DGN BERAT BESI 214,9 KG/M3
1.
( 1 M3 :
Rp.
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 5,734,293.10 / m3
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.175 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,958,180.70 / m3
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.175 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 X
=
0.18 )
155.63
( 0.18 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 3,444,870.05 / m3
dia 8 - 15
JUMLAH HARGA SATUAN BALOK BETON 12 X 18 CM K.175 DGN BERAT BESI 155,63 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,638,551.30 / m3
dia 8 - 15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 3,299,000.40 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 2,844,126.15 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
7.
Rp.
### / m3
( 1 M3 :
Rp.
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
### / m3
X Rp. 151,397.50
Rp. 2,775,620.83 / m3
X Rp. 22,135.00
Rp. 4,427,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 278 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.3 )
191.04
0.3 X
2+
0.15 )
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 22,135.00
Rp. 4,228,670.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.3 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.175 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 22,135.00
Rp. 5,142,403.20 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.175 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
0.4 )
197.64
0.4 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 1,892,468.75 / m3
X Rp. 22,135.00
Rp. 4,374,761.40 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.175 DGN BERAT BESI 197,64 KG/M3
AN.CK.B
( 1 M3 :
0.25 X
0.5 )
211.78
0.5 X
2+
0.25 )
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 4,687,750.30 / m3
X Rp. 327,620.00
Rp.
655,240.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.25 X
0.5 )
X 0.25
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.175 DGN BERAT BESI 211,78 KG/M3
( 1 M3 :
0.3 X
=
0.4 )
166.57
0.4 X
2+
0.3 )
KG/M3
X Rp. 151,397.50
Rp. 1,387,810.42 / m3
X Rp. 22,135.00
Rp. 3,687,026.95 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.175 DGN BERAT BESI 166,57 KG/M3
- Bekisting papan
( 1 M3 :
0.3 X
0.4 )
178.07
0.4 X
2+
0.3 )
KG/M3
X Rp. 151,397.50
Rp. 1,387,810.42 / m3
X Rp. 22,135.00
Rp. 3,941,579.45 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.175 DGN BERAT BESI 275 KG/M3
( 1 M3 :
0.3 X
0.6 )
169.12
0.6 X
2+
0.3 )
KG/M3
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 22,135.00
Rp. 3,743,471.20 / m3
X Rp. 327,620.00
Rp.
546,033.33 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.6 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.175 DGN BERAT BESI 169,12 KG/M3
1.
( 1 M3 :
0.1 )
( 1 M3 :
113.9
KG/M3
0.1 )
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 2,521,176.50 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,90 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.1 )
( 1 M3 :
56.95
KG/M3
0.1 )
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 22,135.00
Rp. 1,260,588.25 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
74.22
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 22,135.00
Rp. 1,642,859.70 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
148.51
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 22,135.00
Rp. 3,287,268.85 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,51 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
95
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 22,135.00
Rp. 2,102,825.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
( 1 M3 :
47
KG/M3
0.12 )
X Rp. 22,135.00
Rp. 1,040,345.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.08 X
0.3 )
( 1 M3 :
95.47
0.08 X
0.3 X
0.1
2+
0.08 )
KG/M3
0.3 )
X Rp. 151,397.50
Rp. 4,289,595.83 / m3
X Rp. 22,135.00
Rp. 2,113,228.45 / m3
X Rp. 327,620.00
Rp. 1,365,083.33 / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/30 CM K.175 DGN BERAT BESI 95,47 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.08 X
0.4 )
( 1 M3 :
91.4
0.08 X
0.4 X
0.1
2+
0.08 )
KG/M3
0.4 )
X Rp. 151,397.50
Rp. 4,163,431.25 / m3
X Rp. 22,135.00
Rp. 2,023,139.00 / m3
X Rp. 327,620.00
Rp. 1,023,812.50 / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/40 CM K.175 DGN BERAT BESI 91,40 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.08 X
0.5 )
( 1 M3 :
88.97
0.08 X
0.5 X
0.1
2+
0.08 )
KG/M3
0.5 )
X Rp. 151,397.50
Rp. 4,087,732.50 / m3
X Rp. 22,135.00
Rp. 1,969,350.95 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/50 CM K.175 DGN BERAT BESI 88,97 KG/M3
AN.CK.B 10. Menghitung 1 m3 harga satuan listplank beton 8/70 cm mutu beton K.175
dengan berat besi beton U. 24, 86,23 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
( 1 M3 :
0.08 X
0.7 )
( 1 M3 :
86.23
0.08 X
0.7 X
0.1
2+
0.08 )
KG/M3
0.7 )
X Rp. 151,397.50
Rp. 4,001,219.64 / m3
X Rp. 22,135.00
Rp. 1,908,701.05 / m3
X Rp. 327,620.00
Rp.
585,035.71 / m3
Rp.
### / m3
Rp.
### / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 88,23 KG/M3
AN.CK.B
11. Menghitung harga satuan sirip beton tebal 8 cm mutu beton K.175
dengan berat besi beton U. 24, 99 kg/m3
- Adukan beton ( site Mix K.175 )
- Bekisting papan
25
M2
8.33
99
KG/M3
M2
X Rp. 151,397.50
Rp. 3,784,937.50 / m3
X Rp. 22,135.00
Rp. 2,191,365.00 / m3
X Rp. 327,620.00
Rp. 2,729,074.60 / m3
Rp.
### / m3
Rp.
### / m3
25.19
KG
X Rp. 22,135.00
Rp.
557,580.65 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
Rp.
### / m3
8,500.00
Rp.
### / m3
43.8
KG
X Rp. 22,135.00
Rp.
969,513.00 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
Rp.
### / m3
8,500.00
Rp.
### / m3
87.6
KG
X Rp. 22,135.00
Rp. 1,939,026.00 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
Rp.
### / m3
Rp.
### / m3
8,500.00
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING PAPAN )
1.
( 1 M3 : (
0.2 X
0.5 X
215.3
0.5 ) (
0.2 X
0.5 X
2+
0.2 X
KG/M3
Rp. 1,211,180.00 / m3
X Rp. 23,170.00
Rp. 4,988,501.00 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.2 X
0.6 X
197.29
0.6 ) (
0.2 X
0.6 X
2+
0.2 X
KG/M3
Rp. 1,009,316.67 / m3
X Rp. 23,170.00
Rp. 4,571,209.30 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
AN.CK.B
3.
Rp.
### / m3
( 1 M3 : (
0.2 X
0.75 X 0.75 ) (
179.94
0.2 X
0.75 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
807,453.33 / m3
Rp. 4,169,209.80 / m3
Rp.
### / m3
( 1 M3 : (
0.2 X
0.8 X
175.64
0.8 ) (
0.2 X
0.8 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
756,987.50 / m3
Rp. 4,069,578.80 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 185 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.2 X
1X
185
1) (
0.2 X
1 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
AN.CK.B
6.
Menghitung harga satuan poor beton bertulang 30 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 209,52 kg/m3
1 X 2 ) X Rp. 151,397.50
X Rp. 23,170.00
Rp.
### / m3
Rp.
605,590.00 / m3
Rp. 4,286,450.00 / m3
Rp.
### / m3
( 1 M3 : (
0.3 X
1X
209.52
1) (
0.3 X
1 X
2+
0.3 X
KG/M3
1 X 2 ) X Rp. 151,397.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
605,590.00 / m3
Rp. 4,854,578.40 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 120 X 120 cm mutu beton K.225
dengan berat besi beton U. 39, 276,01 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.2 X
1.2 X
276.01
2) (
0.2 X
1.2 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
302,795.00 / m3
Rp. 6,395,151.70 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 150 X 150 cm mutu beton K.225
dengan berat besi beton U. 39, 184,99 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.3 X
1.5 X
184.99
1.5 ) (
0.3 X
1.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
403,726.67 / m3
Rp. 4,286,218.30 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 130 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 195,6 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.3 X
1.3 X
195.6
2) (
0.3 X
1.3 X
2+
0.3 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp.
### / m3
Rp.
384,316.73 / m3
Rp. 4,532,052.00 / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan poor beton bertulang 20 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 248,83 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.2 X
2X
248.83
2) (
0.2 X
2 X
2+
0.2 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
302,795.00 / m3
Rp. 5,765,391.10 / m3
Rp.
### / m3
11. Menghitung harga satuan poor beton bertulang 30 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 172,74 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.3 X
2X
172.74
1.5 ) (
0.3 X
2 X
2+
0.3 X
KG/M3
2 X 2 ) X Rp. 151,397.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
### / m3
Rp.
403,726.67 / m3
Rp. 4,002,385.80 / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan poor beton bertulang 30 X 250 X 250 cm mutu beton K.225
dengan berat besi beton U. 39, 165,51 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.3 X
2.5 X
165.51
2.5 ) (
0.3 X
2.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
### / m3
Rp.
242,236.00 / m3
Rp. 3,834,866.70 / m3
Rp.
### / m3
1.
1 M3 : (
Rp.
0.15 X
0.15 )
= 178.82
( 0.15 X
2)
KG/M3
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
AN.CK.B
2.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
200.55
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,646,743.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
AN.CK.B
6.
Rp.
### / m3
1 M3 : (
Rp.
0.15 X
0.3 )
172.8
0.3 X
2)
KG/M3
### / m3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,003,776.00 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.3 )
191.04
0.3 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.2 X
0.3 )
228.41
0.3 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 5,292,259.70 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.2 X
0.3 )
147.83
0.3 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 3,425,221.10 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan sloof beton bertulang 20 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 200,22 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
1 M3 : (
0.2 X
0.4 )
200.22
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 4,639,097.40 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
### / m3
11. Menghitung harga satuan sloof beton bertulang 30 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 138,05 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
1 M3 : (
0.3 X
0.4 )
138.05
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,009,316.67 / m3
X Rp. 23,170.00
Rp. 3,198,618.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan sloof beton bertulang 20 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 179,13 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
1 M3 : (
0.2 X
0.5 )
179.13
0.5 X
2)
KG/M3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 4,150,442.10 / m3
Rp.
### / m3
1.
( 1 M3 : (
Rp.
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
AN.CK.B
2.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.15 X
0.15 )
162.43
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,763,503.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.15 X
0.2 )
184.93
( 0.15 X
2+
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 3,532,608.33 / m3
X Rp. 23,170.00
Rp. 4,284,828.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.15 X
0.2 )
239.18
( 0.15 X
2+
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 3,532,608.33 / m3
X Rp. 23,170.00
Rp. 5,541,800.60 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.15 X
0.3 )
171.3
( 0.15 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
2)
X Rp. 151,397.50
Rp. 3,027,950.00 / m3
X Rp. 23,170.00
Rp. 3,969,021.00 / m3
Rp.
### / m3
AN.CK.B
6.
( 1 M3 :
Rp.
0.2 X
0.2 )
235.2
0.2 X
2+
0.2 X
2)
KG/M3
Rp. 3,027,950.00 / m3
X Rp. 23,170.00
Rp. 5,449,584.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
AN.CK.B
7.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
0.2 )
215.53
0.2 X
2+
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 3,027,950.00 / m3
X Rp. 23,170.00
Rp. 4,993,830.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.2 X
=
0.4 )
189.01
0.2 X
2+
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,270,962.50 / m3
X Rp. 23,170.00
Rp. 4,379,361.70 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
( 1 M3 : (
0.3 X
=
0.3 )
148.32
0.3 X
2+
0.3 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,436,574.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan kolom beton 30 X 40 cm mutu beton K.22
dengan berat besi beton U. 39, 130,97 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 :
0.3 X
=
0.4 )
130.97
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,766,304.17 / m3
X Rp. 23,170.00
Rp. 3,034,574.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.3 X
=
0.4 )
165.48
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,766,304.17 / m3
X Rp. 23,170.00
Rp. 3,834,171.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan kolom beton 30 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 155,02 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 :
0.3 X
=
0.5 )
155.02
0.3 X
2+
0.5 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,614,906.67 / m3
X Rp. 23,170.00
Rp. 3,591,813.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 13. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 117,78 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 : (
0.3 X
=
0.6 )
117.78
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 2,728,962.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp.
### / m3
AN.CK.B 14. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 152,27 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting papan
( 1 M3 :
Rp.
0.3 X
0.6 )
152.27
0.3 X
2+
0.6 X
2)
KG/M3
### / m3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 3,528,095.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp.
### / m3
Rp.
### / m3
1.
( 1 M3 :
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 23,170.00
Rp. 6,002,420.20 / m3
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
0.2 X
2)
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
128.49
KG/M3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 151,397.50
Rp. 2,775,620.83 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
=
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
=
0.4 )
214.9
0.4 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 1,892,468.75 / m3
X Rp. 23,170.00
Rp. 4,979,233.00 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
1.
( 1 M3 :
Rp.
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
Rp. 2,523,291.67 / m3
X Rp. 23,170.00
Rp. 6,002,420.20 / m3
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
### / m3
X Rp. 151,397.50
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
=
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp.
### / m3
( 1 M3 :
Rp.
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
### / m3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 151,397.50
Rp. 2,775,620.83 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.15 X
0.3 )
191.04
0.3 X
2+
0.15 )
KG/M3
X Rp. 151,397.50
Rp. 2,523,291.67 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.3 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 2,018,633.33 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.2 X
0.4 )
197.64
0.4 X
2+
0.2 )
KG/M3
X Rp. 151,397.50
Rp. 1,892,468.75 / m3
X Rp. 23,170.00
Rp. 4,579,318.80 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
( 1 M3 :
0.25 X
0.5 )
211.78
0.5 X
2+
0.25 )
KG/M3
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 4,906,942.60 / m3
X Rp. 327,620.00
Rp.
655,240.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.25 X
0.5 )
X 0.25
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
AN.CK.B
( 1 M3 :
0.3 X
=
0.4 )
166.57
(
KG/M3
0.4 X
2+
0.3 )
X Rp. 151,397.50
Rp. 1,387,810.42 / m3
X Rp. 23,170.00
Rp. 3,859,426.90 / m3
( 1 M3 :
0.3 X
0.4 )
0.3
X Rp. 327,620.00
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.3 X
=
0.4 )
178.07
0.4 X
2+
0.3 )
KG/M3
X Rp. 151,397.50
Rp. 1,387,810.42 / m3
X Rp. 23,170.00
Rp. 4,125,881.90 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
( 1 M3 :
0.3 X
=
0.6 )
169.12
0.6 X
2+
0.3 )
KG/M3
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 23,170.00
Rp. 3,918,510.40 / m3
X Rp. 327,620.00
Rp.
546,033.33 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.6 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
1.
( 1 M3 :
0.1 )
( 1 M3 :
113.89
KG/M3
0.1 )
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 2,638,831.30 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.1 )
( 1 M3 :
56.95
KG/M3
0.1 )
X Rp. 151,397.50
Rp. 1,513,975.00 / m3
X Rp. 23,170.00
Rp. 1,319,531.50 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
74.22
KG/M3
0.12 )
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
AN.CK.B
4.
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 23,170.00
Rp. 1,719,677.40 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
Rp.
### / m3
Rp.
### / m3
- Bekisting papan
( 1 M3 :
0.12 )
( 1 M3 :
148.45
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 23,170.00
Rp. 3,439,586.50 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
95
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 23,170.00
Rp. 2,201,150.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.12 )
( 1 M3 :
47
KG/M3
0.12 )
X Rp. 151,397.50
Rp. 1,261,645.83 / m3
X Rp. 23,170.00
Rp. 1,088,990.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
( 1 M3 :
0.08 X
( 1 M3 :
0.7 )
134.29
0.08 X
0.7 X
0.1
2+
0.08 )
KG/M3
0.7 )
X Rp. 151,397.50
Rp. 4,001,219.64 / m3
X Rp. 23,170.00
Rp. 3,111,499.30 / m3
X Rp. 327,620.00
Rp.
585,035.71 / m3
Rp.
### / m3
Rp.
### / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
AN.CK.B
8.
25
M2
8.33
99
KG/M3
M2
X Rp. 151,397.50
Rp. 3,784,937.50 / m3
X Rp. 23,170.00
Rp. 2,293,830.00 / m3
X Rp. 327,620.00
Rp. 2,729,074.60 / m3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
20.46
KG
X Rp. 23,170.00
Rp.
474,058.20 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
Rp.
### / m3
8,500.00
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING MULTIPLEK )
1.
Rp.
0.2 X
0.5 X
215.3
0.5 ) (
0.2 X
0.5 X
2+
0.2 X
KG/M3
Rp. 1,508,412.00 / m3
X Rp. 23,170.00
Rp. 4,988,501.00 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
AN.CK.B
2.
### / m3
Rp.
### / m3
Rp.
### / m3
0.2 X
0.6 X
197.29
0.6 ) (
0.2 X
0.6 X
2+
0.2 X
KG/M3
Rp. 1,257,010.00 / m3
X Rp. 23,170.00
Rp. 4,571,209.30 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
0.2 X
0.75 X 0.75 ) (
179.94
0.2 X
0.75 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
AN.CK.B
4.
Rp. 1,005,608.00 / m3
X Rp. 23,170.00
Rp. 4,169,209.80 / m3
Rp.
### / m3
0.2 X
0.8 X
175.64
0.8 ) (
0.2 X
0.8 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
942,757.50 / m3
Rp. 4,069,578.80 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 185 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.2 X
1X
185
1) (
0.2 X
1 X
2+
0.2 X
KG/M3
1 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
754,206.00 / m3
Rp. 4,286,450.00 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 209,52 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.3 X
1X
209.52
1) (
0.3 X
1 X
2+
0.3 X
KG/M3
1 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
754,206.00 / m3
Rp. 4,854,578.40 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 20 X 120 X 120 cm mutu beton K.225
dengan berat besi beton U. 39, 276,01 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.2 X
1.2 X
276.01
2) (
0.2 X
1.2 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
377,103.00 / m3
Rp. 6,395,151.70 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 150 X 150 cm mutu beton K.225
dengan berat besi beton U. 39, 184,99 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.3 X
1.5 X
184.99
1.5 ) (
0.3 X
1.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
502,804.00 / m3
Rp. 4,286,218.30 / m3
Rp.
### / m3
Menghitung harga satuan poor beton bertulang 30 X 130 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 195,6 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.3 X
1.3 X
195.6
2) (
0.3 X
1.3 X
2+
0.3 X
KG/M3
2 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp.
### / m3
Rp.
478,630.73 / m3
Rp. 4,532,052.00 / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan poor beton bertulang 20 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 248,83 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.2 X
2X
248.83
2) (
0.2 X
2 X
2+
0.2 X
KG/M3
2 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
377,103.00 / m3
Rp. 5,765,391.10 / m3
Rp.
### / m3
11. Menghitung harga satuan poor beton bertulang 30 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 172,74 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
- Besi beton U.39, dia 16 - 15
0.3 X
2X
172.74
1.5 ) (
KG/M3
0.3 X
2 X
2+
0.3 X
2 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
Rp.
### / m3
Rp.
502,804.00 / m3
Rp. 4,002,385.80 / m3
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan poor beton bertulang 30 X 250 X 250 cm mutu beton K.225
dengan berat besi beton U. 39, 165,51 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.3 X
2.5 X
165.51
2.5 ) (
0.3 X
2.5 X
2+
0.3 X
KG/M3
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
### / m3
Rp.
301,682.40 / m3
Rp. 3,834,866.70 / m3
Rp.
### / m3
Rp.
### / m3
1.
1 M3 : (
0.15 X
0.15 )
= 178.82
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
4.
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
Rp.
### / m3
1 M3 : (
Rp.
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
5.
### / m3
X Rp. 188,551.50
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.2 )
200.55
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,646,743.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.3 )
172.8
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,003,776.00 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.15 X
0.3 )
191.04
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.2 X
0.3 )
228.41
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 5,292,259.70 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
1 M3 : (
0.2 X
0.3 )
147.83
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 3,425,221.10 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan sloof beton bertulang 20 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 200,22 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek
1 M3 : (
0.2 X
0.4 )
200.22
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,639,097.40 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
### / m3
11. Menghitung harga satuan sloof beton bertulang 30 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 138,05 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek
1 M3 : (
0.3 X
0.4 )
138.05
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,257,010.00 / m3
X Rp. 23,170.00
Rp. 3,198,618.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan sloof beton bertulang 20 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 179,13 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek
1 M3 : (
0.2 X
0.5 )
179.13
0.5 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,150,442.10 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
Rp.
### / m3
Rp.
### / m3
1.
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.15 )
162.43
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,763,503.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
184.93
( 0.15 X
2+
0.2 X
2)
KG/M3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
X Rp. 188,551.50
Rp. 4,399,535.00 / m3
X Rp. 23,170.00
Rp. 4,284,828.10 / m3
Rp.
### / m3
AN.CK.B
4.
Rp.
0.15 X
0.2 )
239.18
( 0.15 X
2+
0.2 X
2)
KG/M3
Rp. 4,399,535.00 / m3
X Rp. 23,170.00
Rp. 5,541,800.60 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
AN.CK.B
5.
### / m3
X Rp. 188,551.50
Rp.
### / m3
Rp.
### / m3
0.15 X
0.3 )
171.3
( 0.15 X
2+
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 3,969,021.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
0.2 X
0.2 )
235.2
0.2 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 5,449,584.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
0.2 X
0.2 )
215.53
0.2 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 4,993,830.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
0.2 X
=
0.4 )
189.01
0.2 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,828,272.50 / m3
X Rp. 23,170.00
Rp. 4,379,361.70 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
0.3 X
=
0.3 )
148.32
0.3 X
2+
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,436,574.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 10. Menghitung harga satuan kolom beton 30 X 40 cm mutu beton K.22
dengan berat besi beton U. 39, 130,97 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 :
- Besi beton U.39,4 dia 16 + 6 dia 12
0.3 X
=
0.4 )
130.97
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,199,767.50 / m3
X Rp. 23,170.00
Rp. 3,034,574.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
AN.CK.B
Rp.
### / m3
Rp.
### / m3
0.3 X
=
0.4 )
165.48
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,199,767.50 / m3
X Rp. 23,170.00
Rp. 3,834,171.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp.
### / m3
AN.CK.B 12. Menghitung harga satuan kolom beton 30 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 155,02 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 :
Rp.
0.3 X
0.5 )
155.02
0.3 X
2+
0.5 X
2)
KG/M3
### / m3
X Rp. 188,551.50
Rp. 2,011,216.00 / m3
X Rp. 23,170.00
Rp. 3,591,813.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 13. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 117,78 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 : (
0.3 X
0.6 )
117.78
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 2,728,962.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp.
### / m3
Rp.
### / m3
AN.CK.B 14. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 152,27 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 :
0.3 X
0.6 )
152.27
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 3,528,095.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp.
### / m3
Rp.
### / m3
1.
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,142,525.00 / m3
X Rp. 23,170.00
Rp. 6,002,420.20 / m3
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
0.2 X
2)
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
164.38
KG/M3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,456,777.50 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
0.2 X
=
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
0.2 X
=
0.4 )
214.9
0.4 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,356,893.75 / m3
X Rp. 23,170.00
Rp. 4,979,233.00 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
1.
Rp.
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
Rp. 3,142,525.00 / m3
X Rp. 23,170.00
Rp. 6,002,420.20 / m3
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
### / m3
X Rp. 188,551.50
Rp.
### / m3
Rp.
### / m3
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
Rp.
### / m3
Rp.
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
### / m3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,456,777.50 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
0.15 X
0.3 )
191.04
0.3 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,142,525.00 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.3 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp.
### / m3
0.2 X
=
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
0.2 X
=
0.4 )
197.64
0.4 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,356,893.75 / m3
X Rp. 23,170.00
Rp. 4,579,318.80 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
Rp.
0.25 X
0.5 )
211.78
0.5 X
2+
0.25 )
KG/M3
### / m3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,906,942.60 / m3
X Rp. 327,620.00
Rp.
655,240.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.25 X
0.5 )
X 0.25
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
AN.CK.B
0.3 X
=
0.4 )
166.57
0.4 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,728,388.75 / m3
X Rp. 23,170.00
Rp. 3,859,426.90 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
0.3 X
=
0.4 )
178.07
0.4 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,728,388.75 / m3
X Rp. 23,170.00
Rp. 4,125,881.90 / m3
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
AN.CK.B 13. Menghitung harga satuan balok beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 169,12 kg/m3
- Adukan beton ( site Mix K.225 )
- Bekisting multiplek ( 1 M3 :
- Besi beton U.39, 16 dia 16
0.3 X
=
0.6 )
169.12
0.6 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 3,918,510.40 / m3
X Rp. 327,620.00
Rp.
546,033.33 / m3
Rp.
### / m3
Rp.
### / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.6 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
1.
0.1 )
( 1 M3 :
113.89
KG/M3
0.1 )
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 2,638,831.30 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp.
### / m3
0.1 )
( 1 M3 :
0.1 )
56.95
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 1,319,531.50 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
AN.CK.B
3.
Rp.
### / m3
Rp.
### / m3
0.12 )
( 1 M3 :
74.22
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 1,719,677.40 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp.
### / m3
0.12 )
( 1 M3 :
148.45
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 3,439,586.50 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp.
### / m3
0.12 )
( 1 M3 :
95
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 2,201,150.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
6.
Rp.
### / m3
Rp.
### / m3
0.12 )
( 1 M3 :
47
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 1,088,990.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
7.
Rp.
### / m3
Rp.
### / m3
0.08 X
( 1 M3 :
0.7 )
134.29
0.08 X
0.7 X
0.1
2+
0.08 )
KG/M3
0.7 )
X Rp. 188,551.50
Rp. 4,983,146.79 / m3
X Rp. 23,170.00
Rp. 3,111,499.30 / m3
X Rp. 327,620.00
Rp.
585,035.71 / m3
Rp.
### / m3
Rp.
### / m3
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
AN.CK.B
8.
25
M2
8.33
99
KG/M3
M2
X Rp. 188,551.50
Rp. 4,713,787.50 / m3
X Rp. 23,170.00
Rp. 2,293,830.00 / m3
X Rp. 327,620.00
Rp. 2,729,074.60 / m3
AN.CK.B
9.
Rp.
### / m3
Rp.
### / m3
20.46
KG
X Rp. 23,170.00
Rp.
474,058.20 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
Rp.
### / m3
8,500.00
1.
Rp. 1,366,650.00 / m3
0.2 X
0.5 X
215.3
0.5 ) (
0.2 X
0.5 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
AN.CK.B
2.
Rp. 1,508,412.00 / m3
X Rp. 23,170.00
Rp. 4,988,501.00 / m3
Rp. 7,863,563.00 / m3
Rp. 1,366,650.00 / m3
0.2 X
0.6 X
197.29
0.6 ) (
0.2 X
0.6 X
2+
0.2 X
KG/M3
Rp. 1,257,010.00 / m3
X Rp. 23,170.00
Rp. 4,571,209.30 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
AN.CK.B
3.
Rp. 7,194,869.30 / m3
Rp. 1,366,650.00 / m3
0.2 X
0.75 X 0.75 ) (
179.94
0.2 X
0.75 X
2+
0.2 X
Rp. 1,005,608.00 / m3
X Rp. 23,170.00
Rp. 4,169,209.80 / m3
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
AN.CK.B
4.
Rp. 6,541,467.80 / m3
Rp. 1,366,650.00 / m3
0.2 X
0.8 X
175.64
0.8 ) (
0.2 X
0.8 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
AN.CK.B
5.
Rp.
942,757.50 / m3
Rp. 4,069,578.80 / m3
Rp. 6,378,986.30 / m3
Menghitung harga satuan poor beton bertulang 20 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 185 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
1X
185
1) (
0.2 X
1 X
2+
0.2 X
KG/M3
1 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
AN.CK.B
6.
Rp.
754,206.00 / m3
Rp. 4,286,450.00 / m3
Rp. 6,407,306.00 / m3
Menghitung harga satuan poor beton bertulang 30 X 100 X 100 cm mutu beton K.225
dengan berat besi beton U. 39, 209,52 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.3 X
1X
209.52
1) (
0.3 X
1 X
2+
0.3 X
KG/M3
1 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
AN.CK.B
7.
Rp.
754,206.00 / m3
Rp. 4,854,578.40 / m3
Rp. 6,975,434.40 / m3
Menghitung harga satuan poor beton bertulang 20 X 120 X 120 cm mutu beton K.225
dengan berat besi beton U. 39, 276,01 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
1.2 X
276.01
2) (
0.2 X
1.2 X
2+
0.2 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
AN.CK.B
8.
Rp.
377,103.00 / m3
Rp. 6,395,151.70 / m3
Rp. 8,138,904.70 / m3
Menghitung harga satuan poor beton bertulang 30 X 150 X 150 cm mutu beton K.225
dengan berat besi beton U. 39, 184,99 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.3 X
1.5 X
184.99
1.5 ) (
0.3 X
1.5 X
2+
0.3 X
KG/M3
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
AN.CK.B
9.
Rp.
502,804.00 / m3
Rp. 4,286,218.30 / m3
Rp. 6,155,672.30 / m3
Menghitung harga satuan poor beton bertulang 30 X 130 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 195,6 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
- Besi beton U.39, dia 16 - 15
Rp. 1,366,650.00 / m3
0.3 X
1.3 X
195.6
2) (
KG/M3
0.3 X
1.3 X
2+
0.3 X
2 X 2 ) X Rp. 188,551.50
X Rp. 23,170.00
Rp.
478,630.73 / m3
Rp. 4,532,052.00 / m3
JUMLAH HARGA SATUAN POOR BETON 20 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp. 6,377,332.73 / m3
AN.CK.B 10. Menghitung harga satuan poor beton bertulang 20 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 248,83 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
2X
248.83
2) (
0.2 X
2 X
2+
0.2 X
2 X 2 ) X Rp. 188,551.50
KG/M3
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
AN.CK.B
Rp.
377,103.00 / m3
Rp. 5,765,391.10 / m3
Rp. 7,509,144.10 / m3
11. Menghitung harga satuan poor beton bertulang 30 X 200 X 200 cm mutu beton K.225
dengan berat besi beton U. 39, 172,74 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.3 X
2X
172.74
1.5 ) (
0.3 X
2 X
2+
0.3 X
2 X 2 ) X Rp. 188,551.50
KG/M3
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
502,804.00 / m3
Rp. 4,002,385.80 / m3
Rp. 5,871,839.80 / m3
AN.CK.B 12. Menghitung harga satuan poor beton bertulang 30 X 250 X 250 cm mutu beton K.225
dengan berat besi beton U. 39, 165,51 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
Rp. 1,366,650.00 / m3
0.3 X
2.5 X
165.51
2.5 ) (
0.3 X
2.5 X
2+
0.3 X
KG/M3
X Rp. 23,170.00
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
301,682.40 / m3
Rp. 3,834,866.70 / m3
Rp. 5,503,199.10 / m3
1.
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.15 )
= 178.82
( 0.15 X
2)
KG/M3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
AN.CK.B
2.
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
Rp. 8,023,929.40 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
3.
Rp. 7,689,354.60 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
4.
Rp. 7,333,926.80 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
5.
Rp. 6,857,783.30 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
200.55
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,646,743.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
AN.CK.B
6.
Rp. 8,527,413.50 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.3 )
172.8
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,003,776.00 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
AN.CK.B
7.
Rp. 7,884,446.00 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.15 X
0.3 )
191.04
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp. 8,307,066.80 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
0.3 )
228.41
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 5,292,259.70 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
AN.CK.B
9.
Rp. 8,544,424.70 / m3
1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
0.3 )
147.83
0.3 X
2)
KG/M3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 3,425,221.10 / m3
Rp. 6,677,386.10 / m3
AN.CK.B 10. Menghitung harga satuan sloof beton bertulang 20 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 200,22 kg/m3
- Adukan beton ( Redymix K. 225 )
Rp. 1,366,650.00 / m3
- Bekisting multiplek
1 M3 : (
0.2 X
0.4 )
200.22
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,639,097.40 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
AN.CK.B
Rp. 7,891,262.40 / m3
11. Menghitung harga satuan sloof beton bertulang 30 X 40 cm mutu beton K.225
dengan berat besi beton U. 39, 138,05 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek
1 M3 : (
Rp. 1,366,650.00 / m3
0.3 X
0.4 )
138.05
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,257,010.00 / m3
X Rp. 23,170.00
Rp. 3,198,618.50 / m3
dia 8 - 15
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp. 5,822,278.50 / m3
AN.CK.B 12. Menghitung harga satuan sloof beton bertulang 20 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 179,13 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek
1 M3 : (
Rp. 1,366,650.00 / m3
0.2 X
0.5 )
179.13
0.5 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,150,442.10 / m3
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
Rp. 7,402,607.10 / m3
1.
Rp. 1,366,650.00 / m3
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
Rp. 8,023,929.40 / m3
AN.CK.B
2.
Rp. 1,366,650.00 / m3
0.15 X
0.15 )
162.43
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,763,503.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
AN.CK.B
3.
Rp. 7,644,173.10 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
184.93
( 0.15 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 4,399,535.00 / m3
X Rp. 23,170.00
Rp. 4,284,828.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
AN.CK.B
4.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
239.18
( 0.15 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 4,399,535.00 / m3
X Rp. 23,170.00
Rp. 5,541,800.60 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
AN.CK.B
5.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.15 X
0.3 )
171.3
( 0.15 X
2+
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 3,969,021.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
AN.CK.B
6.
Rp. 9,106,701.00 / m3
Rp. 1,366,650.00 / m3
0.2 X
0.2 )
235.2
0.2 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 5,449,584.00 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.2 X
0.2 )
215.53
0.2 X
2+
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,771,030.00 / m3
X Rp. 23,170.00
Rp. 4,993,830.10 / m3
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.2 X
=
0.4 )
189.01
0.2 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,828,272.50 / m3
X Rp. 23,170.00
Rp. 4,379,361.70 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
AN.CK.B
9.
Rp. 8,574,284.20 / m3
Rp. 1,366,650.00 / m3
0.3 X
=
0.3 )
148.32
0.3 X
2+
0.3 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,436,574.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp. 7,317,244.40 / m3
AN.CK.B 10. Menghitung harga satuan kolom beton 30 X 40 cm mutu beton K.22
dengan berat besi beton U. 39, 130,97 kg/m3
- Adukan beton ( Redymix K. 225 )
Rp. 1,366,650.00 / m3
- Bekisting multiplek ( 1 M3 :
0.3 X
0.4 )
130.97
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,199,767.50 / m3
X Rp. 23,170.00
Rp. 3,034,574.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
AN.CK.B
Rp. 6,600,992.40 / m3
Rp. 1,366,650.00 / m3
0.3 X
=
0.4 )
165.48
0.3 X
2+
0.4 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,199,767.50 / m3
X Rp. 23,170.00
Rp. 3,834,171.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp. 7,400,589.10 / m3
AN.CK.B 12. Menghitung harga satuan kolom beton 30 X 50 cm mutu beton K.225
dengan berat besi beton U. 39, 155,02 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 :
- Besi beton U.39,12 dia 16
Rp. 1,366,650.00 / m3
0.3 X
=
0.5 )
155.02
0.3 X
2+
0.5 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,011,216.00 / m3
X Rp. 23,170.00
Rp. 3,591,813.40 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp. 6,969,679.40 / m3
AN.CK.B 13. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 117,78 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 : (
- Besi beton U.39,10 dia 16
Rp. 1,366,650.00 / m3
0.3 X
=
0.6 )
117.78
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 2,728,962.60 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp. 5,981,127.60 / m3
AN.CK.B 14. Menghitung harga satuan kolom beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 152,27 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 :
- Besi beton U.39,14 dia 16
Rp. 1,366,650.00 / m3
0.3 X
=
0.6 )
152.27
0.3 X
2+
0.6 X
2)
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 3,528,095.90 / m3
dia 8 - 12,5 - 15
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp. 6,780,260.90 / m3
1.
Rp. 1,366,650.00 / m3
0.12 X
0.12 )
( 0.12 X
2)
X Rp. 188,551.50
Rp. 3,142,525.00 / m3
259.06
KG/M3
X Rp. 23,170.00
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
Rp. 6,002,420.20 / m3
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp. 8,023,929.40 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp. 7,689,354.60 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp. 7,333,926.80 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp. 6,857,783.30 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,456,777.50 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.2 X
=
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.2 X
=
0.4 )
214.9
(
KG/M3
0.4 X
2+
0.2 )
X Rp. 188,551.50
Rp. 2,356,893.75 / m3
X Rp. 23,170.00
Rp. 4,979,233.00 / m3
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
1.
X Rp. 327,620.00
Rp.
819,050.00 / m3
Rp. 9,521,826.75 / m3
Rp. 1,366,650.00 / m3
0.12 X
0.12 )
259.06
( 0.12 X
2)
KG/M3
X Rp. 188,551.50
Rp. 3,142,525.00 / m3
X Rp. 23,170.00
Rp. 6,002,420.20 / m3
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
AN.CK.B
2.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.15 X
0.15 )
178.82
( 0.15 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 4,143,259.40 / m3
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
AN.CK.B
3.
Rp. 8,023,929.40 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
164.38
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,808,684.60 / m3
dia 8 - 15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
AN.CK.B
4.
Rp. 7,689,354.60 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
149.04
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 3,453,256.80 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
AN.CK.B
5.
Rp. 7,333,926.80 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
128.49
0.2 X
2)
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 2,977,113.30 / m3
dia 8 - 20
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
AN.CK.B
6.
Rp. 6,857,783.30 / m3
Rp. 1,366,650.00 / m3
0.15 X
0.2 )
200
0.2 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,456,777.50 / m3
X Rp. 23,170.00
Rp. 4,634,000.00 / m3
X Rp. 327,620.00
Rp. 1,638,100.00 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.2 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
AN.CK.B
7.
Rp.
### / m3
Rp. 1,366,650.00 / m3
0.15 X
=
0.3 )
191.04
0.3 X
2+
0.15 )
KG/M3
X Rp. 188,551.50
Rp. 3,142,525.00 / m3
X Rp. 23,170.00
Rp. 4,426,396.80 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 15
- Stoot Werk ----
( 1 M3 :
0.15 X
0.3 )
X 0.15
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
AN.CK.B
8.
Rp.
### / m3
Rp. 1,366,650.00 / m3
- Bekisting multiplek ( 1 M3 :
0.2 X
0.3 )
232.32
0.3 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,514,020.00 / m3
X Rp. 23,170.00
Rp. 5,382,854.40 / m3
X Rp. 327,620.00
Rp. 1,092,066.67 / m3
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.3 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
AN.CK.B
9.
Rp.
### / m3
Rp. 1,366,650.00 / m3
- Bekisting multiplek ( 1 M3 :
0.2 X
0.4 )
197.64
0.4 X
2+
0.2 )
KG/M3
X Rp. 188,551.50
Rp. 2,356,893.75 / m3
X Rp. 23,170.00
Rp. 4,579,318.80 / m3
X Rp. 327,620.00
Rp.
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.2 X
0.4 )
0.2
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
819,050.00 / m3
Rp. 9,121,912.55 / m3
Rp. 1,366,650.00 / m3
0.25 X
0.5 )
211.78
0.5 X
2+
0.25 )
KG/M3
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 4,906,942.60 / m3
X Rp. 327,620.00
Rp.
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.25 X
0.5 )
X 0.25
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
AN.CK.B
655,240.00 / m3
Rp. 8,814,347.60 / m3
Rp. 1,366,650.00 / m3
0.3 X
=
0.4 )
166.57
0.4 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,728,388.75 / m3
X Rp. 23,170.00
Rp. 3,859,426.90 / m3
X Rp. 327,620.00
Rp.
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
819,050.00 / m3
Rp. 7,773,515.65 / m3
Rp. 1,366,650.00 / m3
0.3 X
=
0.4 )
178.07
0.4 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,728,388.75 / m3
X Rp. 23,170.00
Rp. 4,125,881.90 / m3
X Rp. 327,620.00
Rp.
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.4 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
819,050.00 / m3
Rp. 8,039,970.65 / m3
AN.CK.B 13. Menghitung harga satuan balok beton 30 X 60 cm mutu beton K.225
dengan berat besi beton U. 39, 169,12 kg/m3
- Adukan beton ( Redymix K. 225 )
- Bekisting multiplek ( 1 M3 :
- Besi beton U.39, 16 dia 16
Rp. 1,366,650.00 / m3
0.3 X
=
0.6 )
169.12
0.6 X
2+
0.3 )
KG/M3
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 3,918,510.40 / m3
X Rp. 327,620.00
Rp.
dia 8 - 12,5 - 15
- Stoot Werk ----
( 1 M3 :
0.3 X
0.6 )
0.3
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
546,033.33 / m3
Rp. 7,402,456.23 / m3
AN.CK.B
1.
Rp. 1,366,650.00 / m3
0.1 )
( 1 M3 :
113.89
KG/M3
0.1 )
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 2,638,831.30 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
AN.CK.B
2.
Rp. 9,167,196.30 / m3
Rp. 1,366,650.00 / m3
0.1 )
( 1 M3 :
56.95
KG/M3
0.1 )
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 1,319,531.50 / m3
X Rp. 327,620.00
Rp. 3,276,200.00 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
AN.CK.B
3.
Rp. 7,847,896.50 / m3
Rp. 1,366,650.00 / m3
0.12 )
( 1 M3 :
74.22
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 1,719,677.40 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
AN.CK.B
4.
Rp. 7,387,756.57 / m3
Rp. 1,366,650.00 / m3
0.12 )
( 1 M3 :
148.45
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 3,439,586.50 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
AN.CK.B
5.
Rp. 9,107,665.67 / m3
Rp. 1,366,650.00 / m3
0.1 )
( 1 M3 :
95
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,885,515.00 / m3
X Rp. 23,170.00
Rp. 2,201,150.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
6.
Rp. 8,183,481.67 / m3
Rp. 1,366,650.00 / m3
0.12 )
( 1 M3 :
47
KG/M3
0.12 )
X Rp. 188,551.50
Rp. 1,571,262.50 / m3
X Rp. 23,170.00
Rp. 1,088,990.00 / m3
X Rp. 327,620.00
Rp. 2,730,166.67 / m3
AN.CK.B
7.
Rp. 6,757,069.17 / m3
Rp. 1,366,650.00 / m3
0.08 X
( 1 M3 :
0.08 X
0.7 )
134.29
0.7 )
0.7 X
2+
0.08 )
KG/M3
X
0.1
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
X Rp. 188,551.50
Rp. 4,983,146.79 / m3
X Rp. 23,170.00
Rp. 3,111,499.30 / m3
X Rp. 327,620.00
Rp.
585,035.71 / m3
Rp.
### / m3
AN.CK.B
8.
Rp. 1,366,650.00 / m3
25
M2
8.33
99
KG/M3
M2
X Rp. 188,551.50
Rp. 4,713,787.50 / m3
X Rp. 23,170.00
Rp. 2,293,830.00 / m3
X Rp. 327,620.00
Rp. 2,729,074.60 / m3
AN.CK.B
9.
Rp.
### / m3
Rp. 1,366,650.00 / m3
20.46
KG
X Rp. 23,170.00
Rp.
474,058.20 / m3
10
m2
X Rp.
Rp.
85,000.00 / m3
8,500.00
Rp. 1,925,708.20 / m3
0.00
0.00
PEKERJAAN
LOKASI
UPPKB
: Blambangan Umpu
KECAMATAN : Blambangan Umpu
KABUPATEN : Way Kanan
No.
URAIAN PEKERJAAN
VOLUME
HARGA
SATUAN
( Rp. )
4
SUB
JUMLAH
( Rp. )
5=(3X4)
JUMLAH
( Rp. )
6
I. PEKERJAAN PERSIAPAN
1
2
3
1.00 bh
68.00 m'
1.00 ls
748,038.50
150,000.00
500,000.00
748,038.50
10,200,000.00
500,000.00
11,448,038.50
57.90 m3
10.08 m3
20.68 m3
44,250.00
21,556.00
143,300.00
2,562,252.00
217,316.81
2,963,444.00
5,743,012.81
251,000.00
505,780.50
5,373,939.00
36,082,219.28
37,906,123.62
35,186,194.48
2,206,039.00
5,491,258.89
150,029,629.00
111,927,044.22
157,784,239.55
109,077,202.90
536,515,413.56
1
2
3
4
5
6
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
8.79
10.86
27.92
3.10
4.16
3.10
m3
m3
m3
m3
m3
m3
No.
1
1
2
3
4
URAIAN PEKERJAAN
2
IV. PEKERJAAN KUSEN PINTU
Pek.
Pek.
Pek.
Pek.
VOLUME
3
76.08
21.79
16.00
32.35
m'
unit
stl
bh
HARGA
SATUAN
( Rp. )
4
207,075.00
1,744,500.00
24,000.00
24,000.00
SUB
JUMLAH
( Rp. )
5=(3X4)
JUMLAH
( Rp. )
6
15,754,266.00
38,012,655.00
384,000.00
776,448.00
54,927,369.00
558.00 m2
1,116.00 m2
995,044.70
488,381.50
555,234,942.60
545,033,754.00 1,100,268,696.60
No.
URAIAN PEKERJAAN
2
VI. PEKERJAAN ATAP & RANGKA
1
2
3
4
5
6
7
8
9
10
11
12
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
VOLUME
3
6,338.30
76.06
950.75
142.61
168.00
106.96
672.00
672.00
75.00
4.00
10.00
440.00
HARGA
SATUAN
( Rp. )
4
SUB
JUMLAH
( Rp. )
5=(3X4)
JUMLAH
( Rp. )
6
kg
kg
kg
kg
bh
kg
m2
m2
m'
bh
ttk
m'
27,898.00
27,898.00
19,498.00
27,898.00
9,000.00
27,898.00
115,167.40
138,924.00
682,004.50
12,000.00
1,500,000.00
62,540.00
176,826,004.99
2,121,912.06
18,537,637.71
3,978,585.11
1,512,000.00
2,983,938.83
77,392,492.80
93,356,928.00
51,150,337.50
48,000.00
15,000,000.00
27,517,600.00
470,425,437.00
146.00 m2
148.00 m2
308.00 m'
169,148.25
98,493.75
7,200.00
24,695,644.50
14,577,075.00
2,217,600.00
41,490,319.50
148.00 m2
15.00 m2
829,877.50
1,205,813.90
122,821,870.00
18,087,208.50
140,909,078.50
1
2
No.
URAIAN PEKERJAAN
2
IX. PEKERJAAN ELEKTRIKAL
1
2
3
4
5
6
7
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Titik cahaya
Stop kontak ( setara broco )
Lampu TL 20 watt lengkap ( setara philip )
Lampu down light + SL 25 watt
Biaya Penyambungan Listrik ( BP ) 4.400 watt
Panel MCB
Pemutusan dan penyambungan kembali
VOLUME
3
64.00
32.00
32.00
256.00
1.00
4.00
1.00
ttk
bh
bh
bh
unit
unit
ls
HARGA
SATUAN
( Rp. )
4
SUB
JUMLAH
( Rp. )
5=(3X4)
JUMLAH
( Rp. )
6
146,950.00
107,850.00
66,000.00
177,500.00
3,372,050.00
250,000.00
250,000.00
9,404,800.00
3,451,200.00
2,112,000.00
45,440,000.00
3,372,050.00
1,000,000.00
250,000.00
65,030,050.00
bh
1,118,245.00
bh
1,575,154.00
bh
2,086,536.94
bh
37,500.00
bh
30,000.00
bh
2,381,445.00
ls
250,000.00
ls
250,000.00
unit 87,306,841.15
0.00
18,901,848.00
25,038,443.28
450,000.00
720,000.00
14,288,670.00
250,000.00
250,000.00
349,227,364.60
409,126,325.88
56,277,090.00
56,277,090.00
X. PEKERJAAN SANITASI
1
2
3
4
5
6
7
8
9
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
12.00
12.00
12.00
24.00
6.00
1.00
1.00
4.00
1,116.00 m2
50,427.50
No.
URAIAN PEKERJAAN
VOLUME
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN PONDASI & BETON
IV. PEKERJAAN KUSEN PINTU
V. PEKERJAAN DINDING & PLESTERAN
VI. PEKERJAAN ATAP & RANGKA
VII. PEKERJAAN PLAPOND + RANGKA
VIII. PEKERJAAN LANTAI
IX. PEKERJAAN ELEKTRIKAL
X. PEKERJAAN SANITASI
XI. PEKERJAAN PENGECATAN
JUMLAH BIAYA
R E K A P I T U LA S I
HARGA
SATUAN
( Rp. )
4
SUB
JUMLAH
( Rp. )
5=(3X4)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,448,038.50
5,743,012.81
536,515,413.56
0.00
1,100,268,696.60
470,425,437.00
41,490,319.50
140,909,078.50
65,030,050.00
409,126,325.88
Rp.
2,837,233,462.35
56,277,090.00
JUMLAH
( Rp. )
6
0
NO.
URAIAN
HARGA SATUAN
Rp
748,038.50
RP
3,399.00
U RAIAN
HARGA SATUAN
( Rp. )
3
AN.CK
Rp.
AN.CK
Rp.
680,035.00
3,090.00
AN.CK
Rp.
301,637.50
AN.CK
Rp.
4,600.00
AN.CK
Rp.
6,010.00
AN.CK
Rp.
22,924.50
AN.CK
1 M2 PEK. DIREKSIKEET
Rp.
1,075,750.00
AN.CK
Rp.
976,375.00
AN.CK
Rp.
44,250.00
AN.CK
10
Rp.
58,118.00
AN.CK
11
Rp.
81,260.00
AN.CK
12
Rp.
104,452.00
AN.CK
13
Rp.
164,644.00
AN.CK
14
Rp.
80,875.00
AN.CK
15
Rp.
94,000.00
AN.CK
16
Rp.
70,325.00
AN.CK
17
Rp.
30,950.00
AN.CK
18
Rp.
122,450.00
AN.CK
19
1 M3 PEK. URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN ( 5000 M3 )
Rp.
207,875.00
AN.CK
20
Rp.
21,556.00
AN.CK
21
Rp.
143,300.00
AN.CK
22
Rp.
56,562.50
AN.CK
23
Rp.
251,000.00
AN.CK
24
Rp.
378,111.00
AN.CK
25
Rp.
118,350.00
AN.CK
26
Rp.
505,780.50
AN.CK
27
Rp.
598,942.70
AN.CK
28
Rp.
17,975,135.00
AN.CK
29
Rp.
9,071,239.00
AN.CK
30
Rp.
8,331,779.00
AN.CK
31
Rp.
7,592,319.00
AN.CK
32
Rp.
6,848,569.00
AN.CK
33
Rp.
6,113,399.00
AN.CK
34
1 M3 PAS. BATU KALI / BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARAN
Rp.
6,265,955.00
AN.CK
35
Rp.
5,373,939.00
AN.CK
36
Rp.
4,778,939.00
AN.CK
37
Rp.
628,550.00
AN.CK
38
Rp.
2,476,700.50
AN.CK
39
Rp.
1,935,702.00
AN.CK
40
Rp.
1,555,044.70
AN.CK
41
Rp.
995,044.70
AN.CK
42
Rp.
815,669.70
AN.CK
43
Rp.
931,832.50
AN.CK
44
1 M2 SIARAN 1 PC : 2 PSR
Rp.
513,216.25
AN.CK
45
Rp.
1,086,881.50
AN.CK
46
Rp.
750,881.50
AN.CK
47
Rp.
665,131.50
AN.CK
48
Rp.
488,381.50
AN.CK
49
1 M2 ACIAN PC
Rp.
370,942.00
AN.CK
50
Rp.
685,142.50
AN.CK
51
Rp.
683,692.50
AN.CK
52
Rp.
711,192.50
AN.CK
53
Rp.
867,752.50
AN.CK
54
Rp.
893,002.50
AN.CK
55
Rp.
658,442.50
AN.CK
56
Rp.
672,192.50
AN.CK
57
Rp.
672,192.50
AN.CK
58
Rp.
795,942.50
AN.CK
59
Rp.
800,718.00
AN.CK
60
Rp.
798,698.00
AN.CK
61
Rp.
798,193.00
AN.CK
62
Rp.
796,678.00
AN.CK
63
Rp.
805,768.00
AN.CK
64
Rp.
803,243.00
AN.CK
65
Rp.
813,848.00
AN.CK
66
Rp.
827,352.50
AN.CK
67
Rp.
829,877.50
AN.CK
68
1 M2 PAS. LANTAI KERAMIK 10/20 & 20/20 CM CORAK / WARNA ( SETARA MULIA )
Rp.
829,877.50
AN.CK
69
Rp.
827,352.50
AN.CK
70
1 M2 PAS. LANTAI KERAMIK KM/WC 10/20 & 20/20 CM ANTI SLIP CORAK / WARNA ( SETARA MULIA )
Rp.
1,190,871.50
AN.CK
71
Rp.
1,205,813.90
AN.CK
72
Rp.
837,452.50
AN.CK
73
Rp.
837,452.50
AN.CK
74
1 M2 PAS. LANTAI KERAMIK 10/20 & 20/20 CM CORAK / WARNA ( SETARA ROMAN / ASIA TILE )
Rp.
827,352.50
AN.CK
75
Rp.
827,352.50
AN.CK
76
1 M2 PAS. LANTAI KERAMIK KM/WC 10/20 & 20/20 CM ANTI SLIP CORAK / WARNA ( SETARA ROMAN / ASIA TILERp.
1,184,811.50
AN.CK
77
Rp.
1,212,378.90
AN.CK
78
Rp.
837,452.50
AN.CK
79
Rp.
853,612.50
AN.CK
80
Rp.
1,507,805.00
AN.CK
81
Rp.
1,662,805.00
AN.CK
82
Rp.
1,706,185.00
AN.CK
83
Rp.
1,427,805.00
AN.CK
84
Rp.
1,874,745.00
AN.CK
85
Rp.
2,102,045.00
AN.CK
86
Rp.
834,942.50
AN.CK
87
Rp.
786,542.50
AN.CK
88
Rp.
834,422.50
AN.CK
89
Rp.
827,352.50
AN.CK
90
Rp.
829,877.50
AN.CK
91
Rp.
827,352.50
AN.CK
92
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CORAK / WARNA ( SETARA MULIA )
Rp.
829,877.50
AN.CK
93
Rp.
837,452.50
AN.CK
94
Rp.
837,452.50
AN.CK
95
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CM POLOS ( SETARA ROMAN / ASIA TILE )
Rp.
827,352.50
AN.CK
96
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CORAK / WARNA ( SETARA ROMAN / ASIA TILE )
Rp.
827,352.50
AN.CK
97
Rp.
1,520,160.00
AN.CK
98
Rp.
1,672,685.00
AN.CK
99
Rp.
2,081,225.00
AN.CK
100
Rp.
2,313,725.00
AN.CK
101
Rp.
1,956,897.50
AN.CK
102
Rp.
1,403,397.50
AN.CK
103
Rp.
803,054.50
AN.CK
104
Rp.
1,831,897.50
AN.CK
105
Rp.
264,335.75
AN.CK
106
Rp.
282,185.75
AN.CK
107
Rp.
284,210.75
AN.CK
108
Rp.
302,060.75
AN.CK
109
Rp.
283,235.75
AN.CK
110
Rp.
303,110.75
AN.CK
111
Rp.
6,378,725.00
AN.CK
112
Rp.
7,203,725.00
AN.CK
113
Rp.
19,833,925.00
AN.CK
114
Rp.
612,525.00
AN.CK
115
Rp.
575,025.00
AN.CK
116
Rp.
507,220.00
AN.CK
117
Rp.
544,720.00
AN.CK
118
1 M2 DAUN PINTU TRIPLEK UK. PINTU LAPIS ALUMUNIUM ( u/KM/WC ) RANGKA KAYU KLAS II
Rp.
522,882.50
AN.CK
119
1 M2 DAUN PINTU TRIPLEK UK. PINTU LAPIS ALUMUNIUM ( u/KM/WC )RANGKA KAYU KLAS I
Rp.
590,632.50
AN.CK
120
Rp.
522,982.50
AN.CK
121
Rp.
562,082.50
AN.CK
122
Rp.
1,174,125.00
AN.CK
123
Rp.
291,810.00
AN.CK
124
Rp.
306,810.00
AN.CK
125
Rp.
531,450.00
AN.CK
126
Rp.
364,277.50
AN.CK
127
Rp.
375,527.50
AN.CK
128
Rp.
574,277.50
AN.CK
129
Rp.
585,527.50
AN.CK
130
Rp.
242,723.50
AN.CK
131
Rp.
255,473.50
AN.CK
132
Rp.
446,417.50
AN.CK
133
Rp.
509,105.00
AN.CK
134
Rp.
554,105.00
AN.CK
135
Rp.
1,228,025.00
AN.CK
136
Rp.
41,902.50
AN.CK
137
Rp.
46,402.50
AN.CK
138
Rp.
113,794.50
AN.CK
139
Rp.
630,347.50
AN.CK
140
Rp.
697,847.50
AN.CK
141
Rp.
1,708,727.50
AN.CK
142
Rp.
6,138,300.00
AN.CK
143
Rp.
7,038,300.00
AN.CK
144
Rp.
3,382,950.00
AN.CK
145
Rp.
5,052,750.00
AN.CK
146
Rp.
5,877,750.00
AN.CK
147
Rp.
79,665.00
AN.CK
148
Rp.
115,167.40
AN.CK
149
Rp.
127,767.40
AN.CK
150
Rp.
115,167.40
AN.CK
151
Rp.
127,767.40
AN.CK
152
Rp.
115,167.40
AN.CK
153
Rp.
127,767.40
AN.CK
154
Rp.
51,341.80
AN.CK
155
Rp.
56,769.70
AN.CK
156
Rp.
62,540.00
AN.CK
157
Rp.
70,040.00
AN.CK
158
Rp.
13,950.00
AN.CK
159
Rp.
81,424.00
AN.CK
160
Rp.
128,924.00
AN.CK
161
Rp.
106,424.00
AN.CK
162
Rp.
163,924.00
AN.CK
163
Rp.
138,924.00
AN.CK
164
Rp.
243,220.00
AN.CK
165
Rp.
373,675.50
AN.CK
166
Rp.
381,925.50
AN.CK
167
Rp.
666,004.50
AN.CK
168
Rp.
668,004.50
AN.CK
169
Rp.
690,504.50
AN.CK
170
Rp.
703,517.70
AN.CK
171
Rp.
682,004.50
AN.CK
172
Rp.
83,274.00
AN.CK
173
Rp.
395,174.00
AN.CK
174
Rp.
50,554.00
AN.CK
175
Rp.
169,412.00
AN.CK
176
Rp.
155,586.25
AN.CK
177
Rp.
129,021.25
AN.CK
178
Rp.
33,576.70
AN.CK
179
Rp.
156,436.25
AN.CK
180
Rp.
129,871.25
AN.CK
181
Rp.
163,286.25
AN.CK
182
Rp.
46,297.00
AN.CK
183
Rp.
169,321.85
AN.CK
184
Rp.
142,756.85
AN.CK
185
Rp.
191,122.50
AN.CK
186
Rp.
168,610.75
AN.CK
187
Rp.
169,976.25
AN.CK
188
Rp.
98,493.75
AN.CK
189
Rp.
45,547.00
AN.CK
190
Rp.
37,487.00
AN.CK
191
Rp.
32,726.70
AN.CK
192
Rp.
51,557.60
AN.CK
193
Rp.
60,411.20
AN.CK
194
Rp.
3,570,421.27
AN.CK
195
Rp.
1,175,050.60
AN.CK
196
Rp.
1,432,755.72
AN.CK
197
Rp.
87,960.00
AN.CK
198
Rp.
88,465.00
AN.CK
199
Rp.
89,475.00
AN.CK
200
Rp.
90,485.00
AN.CK
201
Rp.
1,253,445.00
AN.CK
202
Rp.
1,111,745.00
AN.CK
203
Rp.
1,118,245.00
AN.CK
204
Rp.
1,575,154.00
AN.CK
205
1 BH MEMASANG URINOIR
Rp.
2,184,295.00
AN.CK
206
1 BH MEMASANG WASTAFEL
Rp.
2,381,445.00
AN.CK
207
Rp.
2,955,650.00
AN.CK
208
Rp.
2,086,536.94
AN.CK
209
Rp.
2,118,036.94
AN.CK
210
Rp.
72,607.50
AN.CK
211
Rp.
77,107.50
AN.CK
212
Rp.
50,427.50
AN.CK
213
Rp.
51,915.00
AN.CK
214
Rp.
36,248.00
AN.CK
215
1 M2 PENGECATAN KANSTIN
Rp.
33,710.00
AN.CK
216
Rp.
60,927.50
AN.CK
217
Rp.
57,568.00
AN.CK
218
Rp.
55,760.00
AN.CK
219
Rp.
56,568.00
AN.CK
220
Rp.
55,918.00
AN.CK
221
Rp.
66,060.00
AN.CK
222
Rp.
71,144.00
AN.CK
223
Rp.
33,577.50
AN.CK
224
Rp.
73,605.50
AN.CK
225
Rp.
22,884.20
AN.CK
226
Rp.
23,745.20
AN.CK
227
Rp.
25,206.00
AN.CK
228
Rp.
12,606.75
AN.CK
229
Rp.
26,200.50
AN.CK
230
Rp.
24,679.50
AN.CK
231
Rp.
32,226.00
AN.CK
232
Rp.
31,319.50
AN.CK
233
Rp.
32,450.00
AN.CK
234
Rp.
30,721.00
AN.CK
235
Rp.
39,299.50
AN.CK
236
Rp.
60,692.00
AN.CK
237
Rp.
60,227.50
AN.CK
238
1 M2 PLITURAN BIASA
Rp.
88,560.00
AN.CK
239
1 M2 PLITURAN MEUBELAIR
Rp.
115,860.00
AN.CK
240
Rp.
33,933.00
AN.CK
241
Rp.
124,947.50
AN.CK
242
Rp.
146,935.00
AN.CK
243
Rp.
159,000.00
AN.CK
244
Rp.
296,000.00
AN.CK
245
Rp.
290,000.00
AN.CK
246
Rp.
31,200.00
AN.CK
247
Rp.
36,200.00
AN.CK
248
Rp.
52,200.00
AN.CK
249
Rp.
22,300.00
AN.CK
250
Rp.
21,300.00
AN.CK
251
Rp.
19,800.00
AN.CK
252
Rp.
19,800.00
AN.CK
253
Rp.
24,800.00
AN.CK
254
Rp.
22,300.00
AN.CK
255
Rp.
217,190.00
AN.CK
256
Rp.
223,790.00
AN.CK
257
Rp.
161,090.00
AN.CK
258
Rp.
227,090.00
AN.CK
259
Rp.
139,090.00
AN.CK
260
Rp.
206,190.00
AN.CK
261
Rp.
144,723,235.25
AN.CK
262
Rp.
87,306,841.15
AN.CK
263
Rp.
44,584,970.59
AN.CK
264
Rp.
117,740.00
AN.CK
265
Rp.
689,996.00
AN.CK
266
Rp.
6,500.00
AN.CK
267
Rp.
159,900.00
AN.CK
268
Rp.
84,900.00
AN.CK
269
Rp.
6,500.00
AN.CK
270
1 M2 MEMBONGKAR GENTENG/SIRAP
Rp.
2,600.00
AN.CK
271
1 M2 MEMBONGKAR GENTENG/SIRAP
Rp.
5,200.00
AN.CK
272
Rp.
10,185.00
AN.CK
273
Rp.
20,370.00
AN.CK
274
Rp.
834,400.00
AN.CK
275
Rp.
639,000.00
AN.CK
276
1 M2 MEMBONGKAR PLAPOND
Rp.
12,800.00
AN.CK
277
1 M2 MEMBONGKAR PLAPOND
Rp.
27,060.00
AN.CK
278
Rp.
18,359,141.00
AN.CK
279
Rp.
30,323,435.00
AN.CK
280
Rp.
35,150,230.00
AN.CK
281
Rp.
38,668,990.00
AN.CK
282
Rp.
1,335,650.00
AN.CK
283
Rp.
1,366,650.00
AN.CK
284
Rp.
1,480,150.00
AN.CK
285
Rp.
22,135.00
AN.CK
286
Rp.
23,170.00
AN.CK
287
Rp.
151,397.50
AN.CK
288
Rp.
188,551.50
AN.CK
289
Rp.
201,564.00
AN.CK
290
Rp.
327,620.00
AN.CK
291
Rp.
520,432.00
AN.CK
292
Rp.
1,669.82
AN.CK
293
Rp.
27,898.00
AN.CK
294
Rp.
26,848.00
AN.CK
295
Rp.
2,997.00
AN.CK
296
Rp.
7,857.00
AN.CK
297
1 M2 PEKERJAAN BONDEX
Rp.
266,090.00
AN.CK
298
1 M2 PEKERJAAN WIREMESH M8
Rp.
171,425.00
AN.CK
299
Rp.
146,950.00
AN.CK
300
Rp.
137,950.00
AN.CK
301
Rp.
107,850.00
AN.CK
302
Rp.
197,906.25
AN.CK
303
Rp.
130,330.00
AN.CK
304
Rp.
331,032.84
AN.K.641
305
Rp.
125,835.77
AN.K.636
306
Rp.
82,671.88
AN.K.620
307
Rp.
4,027.61
AN.K.619
308
Rp.
14,790.50
AN.K.618
309
Rp.
102,675.64
AN.K.521
310
Rp.
432,753.84
AN.K.520
311
Rp.
352,640.20
AN.K.516
312
Rp.
494,181.25
AN.K.514
313
Rp.
206,570.17
AN.CK
314
Rp.
15,963.33
AN.CK
315
Rp.
57,008.87
AN.CK
316
Rp.
55,625.94
AN.CK
317
1 M2 PENGASPALAN MANUAL
Rp.
70,150.00
AN.CK
318
Rp.
15,746.00
AN.CK
319
Rp.
AN.CK
320
Rp.
34,960.00
54,360.00
AN.CK
321
Rp.
175,216.00
AN.CK
322
Rp.
84,312.00
AN.CK
323
Rp.
1,906,900.00
AN.CK
324
Rp.
1,744,500.00
AN.CK
325
Rp.
1,845,300.00
AN.CK
326
1 UNIT DAUN PINTU ALUMUNIUM DOBLE SILVER TANPA KACA ( MENGGUNAKAN ENGSEL )
Rp.
4,006,800.00
AN.CK
327
1 UNIT DAUN PINTU ALUMUNIUM DOBLE HITAM DOP TANPA KACA ( MENGGUNAKAN ENGSEL )
Rp.
3,682,000.00
AN.CK
328
1 UNIT DAUN PINTU ALUMUNIUM DOBLE COKLAT MENGKILAP TANPA KACA ( MENGGUNAKAN ENGSEL )
Rp.
3,883,600.00
AN.CK
329
Rp.
135,900.00
AN.CK
330
1 M' PAS. DAUN JENDELA ALUMUNIUM HITAM DOP TANPA KACA ( Uk. 07 x 1 m )
Rp.
135,900.00
AN.CK
331
1 M' PAS. DAUN JENDELA ALUMUNIUM COKLAT MENGKILAP TANPA KACA ( Uk. 07 x 1 m )
Rp.
143,050.00
AN.CK
332
Rp.
113,625.00
AN.CK
333
Rp.
132,000.00
AN.CK
334
Rp.
221,250.00
AN.CK
335
Rp.
204,450.00
AN.CK
336
Rp.
207,075.00
AN.CK
337
Rp.
237,000.00
AN.CK
338
1 UNIT DAUN PINTU ALUMUNIUM DOBLE SILVER TANPA KACA ( MENGGUNAKAN FLOORHING )
Rp.
31,296,800.00
AN.CK
339
1 UNIT DAUN PINTU ALUMUNIUM DOBLE HITAM DOP TANPA KACA ( MENGGUNAKAN FLOORHING )
Rp.
30,972,000.00
AN.CK
340
1 UNIT DAUN PINTU ALUMUNIUM DOBLE COKLAT MENGKILAP TANPA KACA ( MENGGUNAKAN FLOORHING ) Rp.
31,173,600.00
AN.CK
341
Rp.
638,892.00
AN.CK
342
Rp.
836,392.00
AN.CK
343
1 M2 LANTAI KARPET
Rp.
182,323.00
AN.CK
344
Rp.
327,890.00
AN.CK
345
Rp.
91,035.00
AN.CK
346
Rp.
175,625.00
AN.CK
347
Rp.
320,262.00
AN.CK
348
Rp.
324,812.50
AN.CK
349
Rp.
160,805.00
AN.CK
350
Rp.
158,780.00
AN.CK
351
Rp.
169,148.25
AN.CK
352
Rp.
104,302.00
AN.CK
353
Rp.
68,441.50
AN.CK
354
Rp.
286,910.75
AN.CK
355
Rp.
19,498.00
AN.CK
356
Rp.
156,000.00
( BAHAN PAKAI PASIR BETON KLAS II, BATU PECAH TANGAN 2/3, BEKISTING PAPAN )
1.
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 175 DGN BERAT BESI 215,3 KG/M3
Rp.
36,300,280.50
AN.CK.B
2.
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 175 DGN BERAT BESI 197,29 KG/M3
Rp.
35,699,765.82
AN.CK.B
3.
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 175 DGN BERAT BESI 179,94 KG/M3
Rp.
35,113,860.23
AN.CK.B
4.
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 175 DGN BERAT BESI 175,64 KG/M3
Rp.
34,968,213.90
AN.CK.B
5.
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 175 DGN BERAT BESI 185 KG/M3
Rp.
35,024,000.00
AN.CK.B
6.
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 175 DGN BERAT BESI 209,52 KG/M3
Rp.
35,566,750.20
AN.CK.B
7.
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 175 DGN BERAT BESI 276,01 KG/M3
Rp.
36,735,711.35
AN.CK.B
8.
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 175 DGN BERAT BESI 184,99 KG/M3
Rp.
34,821,915.32
AN.CK.B
9.
JUMLAH HARGA SATUAN POOR BETON 20 X 130 X 200 CM K. 175 DGN BERAT BESI 195,6 KG/M3
Rp.
35,037,357.73
AN.CK.B
10.
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 175 DGN BERAT BESI 248,83 KG/M3
Rp.
36,134,082.05
AN.CK.B
11.
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 175 DGN BERAT BESI 172,74 KG/M3
Rp.
34,550,761.57
AN.CK.B
12.
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 175 DGN BERAT BESI 165,51 KG/M3
Rp.
34,229,234.85
1.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 12 X 15 CM K.175 DGN BERAT BESI 170,29 KG/M3
Rp.
36,616,095.82
AN.CK.B
2.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 12 X 18 CM K.175 DGN BERAT BESI 168,97 KG/M3
Rp.
36,586,877.62
AN.CK.B
3.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.175 DGN BERAT BESI 162,21 KG/M3
Rp.
35,932,586.68
AN.CK.B
4.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 18 CM K.175 DGN BERAT BESI 168,97 KG/M3
Rp.
36,082,219.28
AN.CK.B
5.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
Rp.
35,980,619.63
AN.CK.B
6.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
Rp.
35,641,068.73
AN.CK.B
7.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
Rp.
35,186,194.48
AN.CK.B
8.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.175 DGN BERAT BESI 200,55 KG/M3
Rp.
36,781,242.58
AN.CK.B
9.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.175 DGN BERAT BESI 172,8 KG/M3
Rp.
36,166,996.33
AN.CK.B
10.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.175 DGN BERAT BESI 191,04 KG/M3
Rp.
36,570,738.73
AN.CK.B
11.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.175 DGN BERAT BESI 228,41 KG/M3
Rp.
36,893,265.35
AN.CK.B
12.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.175 DGN BERAT BESI 147,83 KG/M3
Rp.
35,109,627.05
AN.CK.B
13.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.175 DGN BERAT BESI 200,22 KG/M3
Rp.
36,269,279.70
AN.CK.B
14.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.175 DGN BERAT BESI 138,05 KG/M3
Rp.
34,388,488.42
AN.CK.B
15.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.175 DGN BERAT BESI 179,13 KG/M3
Rp.
35,802,452.55
1.
JUMLAH HARGA SATUAN KOLOM BETON 12 X 12 CM K.175 DGN BERAT BESI 228,57 KG/M3
Rp.
37,906,123.62
AN.CK.B
2.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.175 DGN BERAT BESI 178,82 KG/M3
Rp.
36,300,249.03
AN.CK.B
3.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.175 DGN BERAT BESI 162,43 KG/M3
Rp.
35,937,456.38
AN.CK.B
4.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 184,93 KG/M3
Rp.
37,949,468.88
AN.CK.B
5.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 239,18 KG/M3
Rp.
39,150,292.63
AN.CK.B
6.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.175 DGN BERAT BESI 143,58 KG/M3
Rp.
37,034,186.63
AN.CK.B
7.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.175 DGN BERAT BESI 171,3 KG/M3
Rp.
37,143,110.50
AN.CK.B
8.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
Rp.
38,557,537.00
AN.CK.B
9.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 215,53 KG/M3
Rp.
38,122,141.55
AN.CK.B
10
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.175 DGN BERAT BESI 189,01 KG/M3
Rp.
36,778,133.85
AN.CK.B
11.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.175 DGN BERAT BESI 148,32 KG/M3
Rp.
35,625,131.53
AN.CK.B
12.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.175 DGN BERAT BESI 130,97 KG/M3
Rp.
34,988,760.12
AN.CK.B
13.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.175 DGN BERAT BESI 165,48 KG/M3
Rp.
35,752,638.97
AN.CK.B
14.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.175 DGN BERAT BESI 155,02 KG/M3
Rp.
35,369,709.37
AN.CK.B
15.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.175 DGN BERAT BESI 117,78 KG/M3
Rp.
34,444,470.30
AN.CK.B
16.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.175 DGN BERAT BESI 152,27 KG/M3
Rp.
35,207,906.45
1.
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.175 DGN BERAT BESI 259,06 KG/M3
Rp.
38,581,019.77
AN.CK.B
2.
JUMLAH HARGA SATUAN RING BALOK 12 X 18 CM K.175 DGN BERAT BESI 259,06 KG/M3
Rp.
36,291,596.72
AN.CK.B
3.
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.175 DGN BERAT BESI 299 KG/M3
Rp.
36,300,249.03
AN.CK.B
4.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
Rp.
35,980,619.63
AN.CK.B
5.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
Rp.
35,641,068.73
AN.CK.B
6.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
Rp.
35,186,194.48
AN.CK.B
7.
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.175 DGN BERAT BESI 278 KG/M3
Rp.
39,164,155.83
AN.CK.B
8.
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.175 DGN BERAT BESI 232,32 KG/M3
Rp.
38,576,538.20
AN.CK.B
9.
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.175 DGN BERAT BESI 214,9 KG/M3
Rp.
37,791,765.25
( BAHAN PAKAI PASIR BETON KLAS II, BATU PECAH TANGAN 2/3, BEKISTING PAPAN )
1.
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.175 DGN BERAT BESI 259,06 KG/M3
Rp.
38,581,019.77
AN.CK.B
2.
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.175 DGN BERAT BESI 299 KG/M3
Rp.
36,300,249.03
AN.CK.B
3.
JUMLAH HARGA SATUAN BALOK BETON 12 X 18 CM K.175 DGN BERAT BESI 155,63 KG/M3
Rp.
36,291,596.72
AN.CK.B
4.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 164,38 KG/M3
Rp.
35,980,619.63
AN.CK.B
5.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 149,04 KG/M3
Rp.
35,641,068.73
AN.CK.B
6.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 128,49 KG/M3
Rp.
35,186,194.48
AN.CK.B
7.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.175 DGN BERAT BESI 278 KG/M3
Rp.
39,164,155.83
AN.CK.B
8.
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.175 DGN BERAT BESI 191,04 KG/M3
Rp.
38,167,463.73
AN.CK.B
9.
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.175 DGN BERAT BESI 232,32 KG/M3
Rp.
38,576,538.20
AN.CK.B
10
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.175 DGN BERAT BESI 197,64 KG/M3
Rp.
37,409,715.15
AN.CK.B
11.
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.175 DGN BERAT BESI 211,78 KG/M3
Rp.
37,180,400.30
AN.CK.B
12.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.175 DGN BERAT BESI 166,57 KG/M3
Rp.
36,217,322.37
AN.CK.B
13.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.175 DGN BERAT BESI 275 KG/M3
Rp.
36,471,874.87
AN.CK.B
14.
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.175 DGN BERAT BESI 169,12 KG/M3
Rp.
35,874,585.37
1.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,90 KG/M3
Rp.
37,634,786.50
AN.CK.B
2.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
Rp.
36,374,198.25
AN.CK.B
3.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
Rp.
35,958,107.20
AN.CK.B
4.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,51 KG/M3
Rp.
37,602,516.35
AN.CK.B
5.
Rp.
36,418,072.50
AN.CK.B
6.
Rp.
35,355,592.50
AN.CK.B
7.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/30 CM K.175 DGN BERAT BESI 95,47 KG/M3
Rp.
38,091,342.62
AN.CK.B
8.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/40 CM K.175 DGN BERAT BESI 91,40 KG/M3
Rp.
37,533,817.75
AN.CK.B
9.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/50 CM K.175 DGN BERAT BESI 88,97 KG/M3
Rp.
37,199,568.45
AN.CK.B
10.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 88,23 KG/M3
Rp.
36,818,391.41
AN.CK.B
11.
Rp.
39,028,812.10
AN.CK.B
12.
Rp.
30,966,015.65
AN.CK.B
13.
Rp.
31,377,948.00
AN.CK.B
14.
Rp.
32,347,461.00
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING PAPAN )
1.
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
Rp.
41,349,911.00
AN.CK.B
2.
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
Rp.
40,730,755.97
AN.CK.B
3.
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
Rp.
40,126,893.13
AN.CK.B
4.
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
Rp.
39,976,796.30
AN.CK.B
5.
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
Rp.
40,042,270.00
AN.CK.B
6.
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
Rp.
40,610,398.40
AN.CK.B
7.
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
Rp.
41,848,176.70
AN.CK.B
8.
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
Rp.
39,840,174.97
AN.CK.B
9.
JUMLAH HARGA SATUAN POOR BETON 30 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp.
40,066,598.73
AN.CK.B
10.
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
Rp.
41,218,416.10
AN.CK.B
11.
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
39,556,342.47
AN.CK.B
12.
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
39,227,332.70
1.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
41,312,122.73
AN.CK.B
2.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
40,977,547.93
AN.CK.B
3.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
40,622,120.13
AN.CK.B
4.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,145,976.63
AN.CK.B
5.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
Rp.
41,815,606.83
AN.CK.B
6.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
Rp.
41,172,639.33
AN.CK.B
7.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
41,595,260.13
AN.CK.B
8.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
Rp.
41,956,464.70
AN.CK.B
9.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
Rp.
40,089,426.10
AN.CK.B
10.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
Rp.
41,303,302.40
AN.CK.B
11.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp.
39,358,165.17
AN.CK.B
12.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
Rp.
40,814,647.10
1.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
41,312,122.73
AN.CK.B
2.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
Rp.
40,932,366.43
AN.CK.B
3.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
Rp.
42,967,666.43
AN.CK.B
4.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
Rp.
44,224,638.93
AN.CK.B
5.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
Rp.
42,147,201.00
AN.CK.B
6.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
Rp.
43,627,764.00
AN.CK.B
7.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
Rp.
43,172,010.10
AN.CK.B
8.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
Rp.
41,800,554.20
AN.CK.B
9.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp.
40,605,437.73
AN.CK.B
10.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
Rp.
39,951,109.07
AN.CK.B
11.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp.
40,750,705.77
AN.CK.B
12.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp.
40,356,950.07
AN.CK.B
13.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp.
39,393,167.60
AN.CK.B
14.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp.
40,192,300.90
1.
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
43,675,941.87
AN.CK.B
2.
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
41,312,122.73
AN.CK.B
3.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
40,977,547.93
AN.CK.B
4.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
40,622,120.13
AN.CK.B
5.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,145,976.63
AN.CK.B
6.
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
44,197,950.83
AN.CK.B
7.
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
43,643,784.40
AN.CK.B
8.
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
Rp.
42,840,981.75
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING PAPAN )
1.
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
43,675,941.87
AN.CK.B
2.
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
41,312,122.73
AN.CK.B
3.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
40,977,547.93
AN.CK.B
4.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
40,622,120.13
AN.CK.B
5.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,145,976.63
AN.CK.B
6.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
44,197,950.83
AN.CK.B
7.
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
43,191,985.13
AN.CK.B
8.
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
43,643,784.40
AN.CK.B
9.
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
Rp.
42,441,067.55
AN.CK.B
10.
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
Rp.
42,226,387.60
AN.CK.B
11.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
Rp.
41,216,517.32
AN.CK.B
12.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
Rp.
41,482,972.32
AN.CK.B
13.
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
Rp.
40,876,419.57
1.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
Rp.
42,579,236.30
AN.CK.B
2.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
Rp.
41,259,936.50
AN.CK.B
3.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
Rp.
40,861,719.90
AN.CK.B
4.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
Rp.
42,581,629.00
AN.CK.B
5.
Rp.
41,343,192.50
AN.CK.B
6.
Rp.
40,231,032.50
AN.CK.B
7.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
Rp.
42,847,984.66
AN.CK.B
8.
Rp.
43,958,072.10
AN.CK.B
9.
Rp.
35,709,288.20
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING MULTIPLEK )
1.
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
Rp.
41,647,143.00
AN.CK.B
2.
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
Rp.
40,978,449.30
AN.CK.B
3.
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
Rp.
40,325,047.80
AN.CK.B
4.
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
Rp.
40,162,566.30
AN.CK.B
5.
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
Rp.
40,190,886.00
AN.CK.B
6.
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
Rp.
40,759,014.40
AN.CK.B
7.
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
Rp.
41,922,484.70
AN.CK.B
8.
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
Rp.
39,939,252.30
AN.CK.B
9.
JUMLAH HARGA SATUAN POOR BETON 30 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp.
40,160,912.73
AN.CK.B
10.
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
Rp.
41,292,724.10
AN.CK.B
11.
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
39,655,419.80
AN.CK.B
12.
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
39,286,779.10
AN.CK.B
1.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
41,807,509.40
AN.CK.B
2.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
41,472,934.60
AN.CK.B
3.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
41,117,506.80
AN.CK.B
4.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,641,363.30
AN.CK.B
5.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
Rp.
42,310,993.50
AN.CK.B
6.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
Rp.
41,668,026.00
AN.CK.B
7.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
42,090,646.80
AN.CK.B
8.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
Rp.
42,328,004.70
AN.CK.B
9.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
Rp.
40,460,966.10
AN.CK.B
10.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
Rp.
41,674,842.40
AN.CK.B
11.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp.
39,605,858.50
AN.CK.B
12.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
Rp.
41,186,187.10
1.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
41,807,509.40
AN.CK.B
2.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
Rp.
41,427,753.10
AN.CK.B
3.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
Rp.
43,834,593.10
AN.CK.B
4.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
Rp.
45,091,565.60
AN.CK.B
5.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
Rp.
42,890,281.00
AN.CK.B
6.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
Rp.
44,370,844.00
AN.CK.B
7.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
Rp.
43,915,090.10
AN.CK.B
8.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
Rp.
42,357,864.20
AN.CK.B
9.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp.
41,100,824.40
AN.CK.B
10.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
Rp.
40,384,572.40
AN.CK.B
11.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp.
41,184,169.10
AN.CK.B
12.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp.
40,753,259.40
AN.CK.B
13.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp.
39,764,707.60
AN.CK.B
14.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp.
40,563,840.90
1.
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
44,295,175.20
AN.CK.B
2.
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
41,807,509.40
AN.CK.B
3.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
41,472,934.60
AN.CK.B
4.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
41,117,506.80
AN.CK.B
5.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,641,363.30
AN.CK.B
6.
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
44,879,107.50
AN.CK.B
7.
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
44,139,171.07
AN.CK.B
8.
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
Rp.
43,305,406.75
( BAHAN PAKAI PASIR BETON KLAS I, BATU PECAH MESIN 2/3, BEKISTING MULTIPLEK )
1.
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
44,295,175.20
AN.CK.B
2.
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
41,807,509.40
AN.CK.B
3.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
41,472,934.60
AN.CK.B
4.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
41,117,506.80
AN.CK.B
5.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
40,641,363.30
AN.CK.B
6.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
44,879,107.50
AN.CK.B
7.
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
43,811,218.47
AN.CK.B
8.
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
44,139,171.07
AN.CK.B
9.
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
Rp.
42,905,492.55
AN.CK.B
10.
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
Rp.
42,597,927.60
AN.CK.B
11.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
Rp.
41,557,095.65
AN.CK.B
12.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
Rp.
41,823,550.65
AN.CK.B
13.
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
Rp.
41,186,036.23
1.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
Rp.
42,950,776.30
AN.CK.B
2.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
Rp.
41,631,476.50
AN.CK.B
3.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
Rp.
41,171,336.57
AN.CK.B
4.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
Rp.
42,891,245.67
AN.CK.B
5.
Rp.
41,652,809.17
AN.CK.B
6.
Rp.
40,540,649.17
AN.CK.B
7.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
Rp.
43,829,911.80
AN.CK.B
8.
Rp.
44,886,922.10
AN.CK.B
9.
Rp.
35,709,288.20
1.
JUMLAH HARGA SATUAN POOR BETON 20 X 50 X 50 CM K. 225 DGN BERAT BESI 215,3 KG/M3
Rp.
7,863,563.00
AN.CK.B
2.
JUMLAH HARGA SATUAN POOR BETON 20 X 60 X 60 CM K. 225 DGN BERAT BESI 197,29 KG/M3
Rp.
7,194,869.30
AN.CK.B
3.
JUMLAH HARGA SATUAN POOR BETON 20 X 75 X 75 CM K. 225 DGN BERAT BESI 179,94 KG/M3
Rp.
6,541,467.80
AN.CK.B
4.
JUMLAH HARGA SATUAN POOR BETON 20 X 80 X 80 CM K. 225 DGN BERAT BESI 175,64 KG/M3
Rp.
6,378,986.30
AN.CK.B
5.
JUMLAH HARGA SATUAN POOR BETON 20 X 100 X 100 CM K. 225 DGN BERAT BESI 185 KG/M3
Rp.
6,407,306.00
AN.CK.B
6.
JUMLAH HARGA SATUAN POOR BETON 30 X 100 X 100 CM K. 225 DGN BERAT BESI 209,52 KG/M3
Rp.
6,975,434.40
AN.CK.B
7.
JUMLAH HARGA SATUAN POOR BETON 20 X 120 X 120 CM K. 225 DGN BERAT BESI 276,01 KG/M3
Rp.
8,138,904.70
AN.CK.B
8.
JUMLAH HARGA SATUAN POOR BETON 30 X 150 X 150 CM K. 225 DGN BERAT BESI 184,99 KG/M3
Rp.
6,155,672.30
AN.CK.B
9.
JUMLAH HARGA SATUAN POOR BETON 20 X 130 X 200 CM K. 225 DGN BERAT BESI 195,6 KG/M3
Rp.
6,377,332.73
AN.CK.B
10.
JUMLAH HARGA SATUAN POOR BETON 20 X 200 X 200 CM K. 225 DGN BERAT BESI 248,83 KG/M3
Rp.
7,509,144.10
AN.CK.B
11.
JUMLAH HARGA SATUAN POOR BETON 30 X 200 X 200 CM K. 225 DGN BERAT BESI 172,74 KG/M3
Rp.
5,871,839.80
AN.CK.B
12.
JUMLAH HARGA SATUAN POOR BETON 30 X 250 X 250 CM K. 225 DGN BERAT BESI 165,51 KG/M3
Rp.
5,503,199.10
1.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
8,023,929.40
AN.CK.B
2.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
7,689,354.60
AN.CK.B
3.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
7,333,926.80
AN.CK.B
4.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
6,857,783.30
AN.CK.B
5.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 20 CM K.225 DGN BERAT BESI 200,55 KG/M3
Rp.
8,527,413.50
AN.CK.B
6.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 172,8 KG/M3
Rp.
7,884,446.00
AN.CK.B
7.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
8,307,066.80
AN.CK.B
8.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 228,41 KG/M3
Rp.
8,544,424.70
AN.CK.B
9.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 30 CM K.225 DGN BERAT BESI 147,83 KG/M3
Rp.
6,677,386.10
AN.CK.B
10.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 40 CM K.225 DGN BERAT BESI 200,22 KG/M3
Rp.
7,891,262.40
AN.CK.B
11.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 30 X 40 CM K.225 DGN BERAT BESI 138,05 KG/M3
Rp.
5,822,278.50
AN.CK.B
12.
JUMLAH HARGA SATUAN SLOOF BETON BERTULANG 20 X 50 CM K.225 DGN BERAT BESI 179,13 KG/M3
Rp.
7,402,607.10
8,023,929.40
1.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 178,82 KG/M3
Rp.
AN.CK.B
2.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 15 CM K.225 DGN BERAT BESI 162,43 KG/M3
Rp.
7,644,173.10
AN.CK.B
3.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 184,93 KG/M3
Rp.
10,051,013.10
AN.CK.B
4.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 20 CM K.225 DGN BERAT BESI 239,18 KG/M3
Rp.
11,307,985.60
AN.CK.B
5.
JUMLAH HARGA SATUAN KOLOM BETON 15 X 30 CM K.225 DGN BERAT BESI 171,3 KG/M3
Rp.
9,106,701.00
AN.CK.B
6.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.175 DGN BERAT BESI 235,2 KG/M3
Rp.
10,587,264.00
AN.CK.B
7.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 20 CM K.225 DGN BERAT BESI 215,53 KG/M3
Rp.
10,131,510.10
AN.CK.B
8.
JUMLAH HARGA SATUAN KOLOM BETON 20 X 40 CM K.225 DGN BERAT BESI 189,01 KG/M3
Rp.
8,574,284.20
AN.CK.B
9.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 30 CM K.225 DGN BERAT BESI 148,32 KG/M3
Rp.
7,317,244.40
AN.CK.B
10.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 130,97 KG/M3
Rp.
6,600,992.40
AN.CK.B
11.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 40 CM K.225 DGN BERAT BESI 165,48 KG/M3
Rp.
7,400,589.10
AN.CK.B
12.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 50 CM K.225 DGN BERAT BESI 155,02 KG/M3
Rp.
6,969,679.40
AN.CK.B
13.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 117,78 KG/M3
Rp.
5,981,127.60
AN.CK.B
14.
JUMLAH HARGA SATUAN KOLOM BETON 30 X 60 CM K.225 DGN BERAT BESI 152,27 KG/M3
Rp.
6,780,260.90
1.
JUMLAH HARGA SATUAN RING BALOK 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
10,511,595.20
AN.CK.B
2.
JUMLAH HARGA SATUAN RING BALOK 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
8,023,929.40
AN.CK.B
3.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
7,689,354.60
AN.CK.B
4.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
7,333,926.80
AN.CK.B
5.
JUMLAH HARGA SATUAN RING BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
6,857,783.30
AN.CK.B
6.
JUMLAH HARGA SATUAN RING BALOK GANTUNG BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
11,095,527.50
AN.CK.B
7.
JUMLAH HARGA SATUAN RING BALOK 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
10,355,591.07
AN.CK.B
8.
JUMLAH HARGA SATUAN RING BALOK 20 X 40 CM K.225 DGN BERAT BESI 214,9 KG/M3
Rp.
9,521,826.75
1.
JUMLAH HARGA SATUAN BALOK BETON 12 X 12 CM K.225 DGN BERAT BESI 259,06 KG/M3
Rp.
10,511,595.20
AN.CK.B
2.
JUMLAH HARGA SATUAN BALOK BETON 15 X 15 CM K.225 DGN BERAT BESI 299 KG/M3
Rp.
8,023,929.40
AN.CK.B
3.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 164,38 KG/M3
Rp.
7,689,354.60
AN.CK.B
4.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 149,04 KG/M3
Rp.
7,333,926.80
AN.CK.B
5.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 128,49 KG/M3
Rp.
6,857,783.30
AN.CK.B
6.
JUMLAH HARGA SATUAN BALOK BETON 15 X 20 CM K.225 DGN BERAT BESI 278 KG/M3
Rp.
11,095,527.50
AN.CK.B
7.
JUMLAH HARGA SATUAN BALOK BETON 15 X 30 CM K.225 DGN BERAT BESI 191,04 KG/M3
Rp.
10,027,638.47
AN.CK.B
8.
JUMLAH HARGA SATUAN BALOK BETON 20 X 30 CM K.225 DGN BERAT BESI 232,32 KG/M3
Rp.
10,355,591.07
AN.CK.B
9.
JUMLAH HARGA SATUAN BALOK BETON 20 X 40 CM K.225 DGN BERAT BESI 197,64 KG/M3
Rp.
9,121,912.55
AN.CK.B
10.
JUMLAH HARGA SATUAN BALOK BETON 25 X 50 CM K.225 DGN BERAT BESI 211,78 KG/M3
Rp.
8,814,347.60
AN.CK.B
11.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 166,57 KG/M3
Rp.
7,773,515.65
AN.CK.B
12.
JUMLAH HARGA SATUAN BALOK BETON 30 X 40 CM K.225 DGN BERAT BESI 275 KG/M3
Rp.
8,039,970.65
AN.CK.B
13.
JUMLAH HARGA SATUAN BALOK BETON 30 X 60 CM K.225 DGN BERAT BESI 169,12 KG/M3
Rp.
7,402,456.23
AN.CK.B
1.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 113,89 KG/M3
Rp.
9,167,196.30
AN.CK.B
2.
JUMLAH HARGA SATUAN PLAT BETON T. 10 CM DGN BERAT BESI 56,95 KG/M3
Rp.
7,847,896.50
AN.CK.B
3.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 74,22 KG/M3
Rp.
7,387,756.57
AN.CK.B
4.
JUMLAH HARGA SATUAN PLAT BETON T. 12 CM DGN BERAT BESI 148,45 KG/M3
Rp.
9,107,665.67
AN.CK.B
5.
Rp.
8,183,481.67
AN.CK.B
6.
Rp.
6,757,069.17
AN.CK.B
7.
JUMLAH HARGA SATUAN LISTPLANK BETON 8/70 CM K.175 DGN BERAT BESI 134,29 KG/M3
Rp.
10,046,331.80
AN.CK.B
8.
Rp.
11,103,342.10
AN.CK.B
9.
Rp.
1,925,708.20
No
URAIAN
HARGA
A. DAFTAR UPAH
1
2
Rp.
Rp.
98,000.00 : oh/8jam
75,000.00 : oh/8jam
Pekerja terampil
Rp.
98,000.00 : oh/8jam
Rp.
75,000.00 : oh/8jam
Rp.
98,000.00 : oh/8jam
6
7
Rp.
Rp.
104,000.00 : oh/8jam
75,000.00 : oh/8jam
Rp.
98,000.00 : oh/8jam
Rp.
104,000.00 : oh/8jam
10
Rp.
75,000.00 : oh/8jam
11
12
Rp.
Rp.
98,000.00 : oh/8jam
104,000.00 : oh/8jam
13
Rp.
75,000.00 : oh/8jam
14
Rp.
98,000.00 : oh/8jam
15
Rp.
104,000.00 : oh/8jam
16
17
Rp.
Rp.
75,000.00 : oh/8jam
98,000.00 : oh/8jam
18
Rp.
104,000.00 : oh/8jam
19
Mandor
Rp.
110,000.00 : oh/8jam
20
Rp.
92,000.00 : oh/8jam
21
22
Rp.
Rp.
81,000.00 : oh/8jam
64,000.00 : oh/8jam
23
Supir truk
Rp.
87,000.00 : oh/8jam
24
Pembantu Supir
Rp.
64,000.00 : oh/8jam
25
Penjaga malam
Rp.
87,000.00 : oh/8jam
26
Tukang pipa
Rp.
98,000.00 : oh/8jam
Rp.
395,500.00 / m3
2
3
Rp.
Rp.
377,000.00 / m3
339,500.00 / m3
Rp.
320,500.00 / m3
Screen 0,5 - 1
Rp.
269,000.00 / m3
Rp.
317,500.00 / m3
7
8
Rp.
Rp.
295,000.00 / m3
247,500.00 / m3
Pasir arug
Rp.
196,000.00 / m3
10
Rp.
377,000.00 / m3
11
Pasir pasang
Rp.
214,500.00 / m3
12
13
Tanah merah
Pasir beton klas II
Rp.
Rp.
94,000.00 / m3
230,000.00 / m3
14
Rp.
194,000.00 / m3
15
Rp.
294,500.00 / m3
16
Abu batu
Rp.
155,000.00 / m3
17
18
Sirtu tersaring
Sirtu tak tersaring
Rp.
Rp.
156,500.00 / m3
137,500.00 / m3
19
Rp.
250,000.00 / m3
20
Rp.
13,500.00 / kg
21
Laston / A T B
Rp.
997,500.00 / ton
22
HRS
Rp.
1,082,000.00 / ton
No
URAIAN
HARGA
23
Solar
Rp.
8,500.00 / lt
24
25
Pelumas
Premium
Rp.
Rp.
56,500.00 / lt
8,500.00 / lt
26
Minyak tanah
Rp.
11,500.00 / lt
27
Stempet
Rp.
31,500.00 / kg
28
Alat bantu
Rp.
62,500.00 / set
29
30
Kayu bakar
Batu alam Natural
Rp.
Rp.
100,000.00 / m3
94,000.00 / m2
31
Rp.
119,000.00 / m2
32
Rp.
112,500.00 / lbr
33
Dolken dia 5 - 7 cm
Rp.
44,000.00 / btg
34
35
Rp.
Rp.
44,000.00 / btg
2,187,500.00 / m3
36
Rp.
37
Rp.
3,955,500.00 / m3
38
Rp.
3,832,000.00 / m3
39
40
Rp.
Rp.
3,705,500.00 / m3
4,705,500.00 / m3
41
Rp.
4,565,500.00 / m3
42
Rp.
4,455,500.00 / m3
43
Rp.
5,000.00 / m'
44
45
Rp.
Rp.
5,000.00 / m'
5,000.00 / m'
46
Rp.
5,000.00 / m'
47
Rp.
3,750,000.00 / m3
48
Rp.
7,187,500.00 / m3
49
50
Rp.
Rp.
1,875,000.00 / m3
15,937,500.00 / m3
51
Rp.
15,937,500.00 / m3
52
Rp.
3,500.00 / m'
53
Rp.
4,000.00 / m'
54
55
Rp.
Rp.
5,500.00 / m'
7,500.00 / m'
56
Rp.
3,000.00 / m'
57
Rp.
20,000.00 / m'
58
Rp.
16,000.00 / kg
59
60
Besi strip 3 mm - 3 cm
Besi C Clip Canal
Rp.
Rp.
10,000.00 / kg
9,500.00 / kg
61
Rp.
17,500.00 / kg
62
Rp.
17,500.00 / kg
63
Besi siku
Rp.
16,500.00 / kg
64
65
Besi L. 40.40.4
Besi L. 50.50.5
Rp.
Rp.
10,500.00 / kg
10,500.00 / kg
66
Kawat duri
Rp.
24,000.00 / m'
67
Rp.
34,000.00 / kg
68
Kawat beton
Rp.
25,000.00 / kg
69
70
Kawat bronjong
Ram kawat
Rp.
Rp.
22,500.00 / kg
23,500.00 / lbr
71
Rp.
24,500.00 / bh
72
Plat eser 4 mm
Rp.
11,000.00 / kg
73
Rp.
64,500.00 / lbr
74
75
Rp.
Rp.
61,500.00 / lbr
50,000.00 / lbr
76
Rp.
40,000.00 / m'
77
Rp.
42,500.00 / m'
78
Karpet talang 55 cm
Rp.
12,500.00 / m'
79
80
Paku biasa
Paku asbes
Rp.
Rp.
21,500.00 / kg
48,500.00 / kg
81
Semen portland
Rp.
87,500.00 / zak
82
Semen warna
Rp.
106,500.00 / zak
83
Semen putih
Rp.
131,500.00 / zak
90 x 1
2,500.00 / m'
No
URAIAN
HARGA
84
Rp.
31,500.00 / m2
85
86
Rp.
Rp.
29,000.00 / m2
27,000.00 / m2
87
Rp.
26,500.00 / m2
88
Rp.
25,000.00 / m2
89
Rp.
34,000.00 / m2
90
91
Rp.
Rp.
42,000.00 / m2
54,000.00 / m2
92
Rp.
56,500.00 / m2
93
Rp.
54,000.00 / m2
94
Rp.
56,500.00 / m2
95
96
Keramik 10/20 & 20/20 anti slip corak / warna ( setara MULIA )
Keramik 20/20 polos ( setara MULIA )
Rp.
Rp.
62,500.00 / m2
54,000.00 / m2
97
Rp.
50,000.00 / m2
98
Rp.
64,000.00 / m2
99
Rp.
64,000.00 / m2
100
101
Rp.
Rp.
54,000.00 / m2
54,000.00 / m2
102
Keramik 10/20 & 20/20 anti slip corak / warna ( setara Roman / asia tile )
Rp.
56,500.00 / m2
103
Rp.
54,000.00 / m2
104
Rp.
56,500.00 / m2
105
106
Rp.
Rp.
64,000.00 / m2
242,500.00 / m2
107
Rp.
194,000.00 / m2
108
Rp.
247,500.00 / m2
109
Rp.
402,500.00 / m2
110
111
Rp.
Rp.
359,500.00 / m2
167,500.00 / m2
112
Rp.
80,000.00 / m2
113
Rp.
496,500.00 / m2
114
Rp.
729,000.00 / m2
115
116
Rp.
Rp.
66,500.00 / lbr
85,500.00 / lbr
117
Rp.
111,000.00 / lbr
118
Rp.
75,000.00 / lbr
119
Rp.
184,000.00 / lbr
120
121
Rp.
Rp.
221,500.00 / lbr
275,000.00 / lbr
122
Rp.
54,000.00 / lbr
123
Rp.
95,500.00 / m'
124
Melamin 4 mm
Rp.
106,500.00 / lbr
125
126
Rp.
Rp.
112,500.00 / lbr
159,000.00 / lbr
127
Rp.
83,500.00 / lbr
128
Eternit polos 1 x 1
Rp.
14,500.00 / lbr
129
Rp.
8,000.00 / lbr
130
131
Rp.
Rp.
45,000.00 / lbr
21,500.00 / lbr
132
Bata blok
Rp.
1,000.00 / bh
133
Rp.
500.00 / bh
134
Roster beton
Rp.
31,500.00 / bh
135
136
Rp.
Rp.
6,500.00 / bh
26,500.00 / bh
137
Rp.
45,000.00 / lbr
138
Rp.
39,000.00 / lbr
139
Rp.
70,000.00 / lbr
140
141
Rp.
Rp.
2,500.00 / bh
5,500.00 / bh
142
Rp.
3,500.00 / bh
143
Rp.
10,000.00 / bh
144
Rp.
208,500.00 / lbr
No
URAIAN
HARGA
145
Rp.
6,000.00 / bh
146
147
Rp.
Rp.
60,000.00 / m'
47,500.00 / m'
148
Rp.
4,500.00 / bh
149
Rp.
5,000.00 / bh
150
Rp.
8,500.00 / bh
151
152
Rp.
Rp.
18,500.00 / bh
8,500.00 / bh
153
Rp.
50,000.00 / m'
154
Rp.
84,500.00 / bh
155
Rp.
162,500.00 / bh
156
157
Rp.
Rp.
169,000.00 / bh
1,225,000.00 / bh
158
Rp.
1,062,500.00 / bh
159
Rp.
4,312,500.00 / bh
160
Rp.
2,369,000.00 / unit
161
162
Rp.
Rp.
325,000.00 / bh
356,500.00 / bh
163
Drain floor
Rp.
43,000.00 / bh
164
Rp.
1,107,500.00 / bh
165
Rp.
1,400,000.00 / unit
166
167
Rp.
Rp.
1,875,000.00 / unit
172,500.00 / m2
168
Kaca polos 5 mm
Rp.
178,500.00 / m2
169
Kaca rayband 3 mm
Rp.
121,500.00 / m2
170
Kaca rayband 5 mm
Rp.
181,500.00 / m2
171
172
Kaca es 3 mm
Kaca es 5 mm
Rp.
Rp.
101,500.00 / m2
162,500.00 / m2
173
Kaca naco 5 mm
Rp.
25,000.00 / dn
174
Rp.
110,000.00 / bh
175
Rp.
247,000.00 / bh
176
177
Rp.
Rp.
241,000.00 / bh
56,500.00 / bh
178
Rp.
16,500.00 / stl
179
Rp.
21,500.00 / stl
180
Rp.
37,500.00 / stl
181
182
Rp.
Rp.
12,500.00 / stl
11,500.00 / stl
183
Engsel patrom
Rp.
10,000.00 / stl
184
Engsel kupu-kupu
Rp.
7,500.00 / stl
185
Kait angin
Rp.
10,000.00 / bh
186
187
Rp.
Rp.
15,000.00 / bh
12,500.00 / bh
188
Rp.
15,000.00 / bh
189
Rp.
18,000.00 / bh
190
Slot tanam
Rp.
77,500.00 / bh
191
192
Rp.
Rp.
10,000.00 / bh
69,000.00 / bh
193
Prime coat
Rp.
28,500.00 / lt
194
Aqua proof
Rp.
69,000.00 / kg
195
Rp.
59,000.00 / kg
196
197
Rp.
Rp.
85,500.00 / kg
25,500.00 / kg
198
Rp.
34,000.00 / kg
199
Rp.
21,000.00 / kg
200
Rp.
20,500.00 / kg
201
202
Rp.
Rp.
64,500.00 / kg
52,500.00 / kg
203
Rp.
49,000.00 / kg
204
Rp.
52,500.00 / kg
205
meni besi
Rp.
31,500.00 / kg
No
URAIAN
HARGA
206
Meni kayu
Rp.
25,000.00 / kg
207
208
Sinkromat
Tiner
Rp.
Rp.
65,000.00 / kg
27,500.00 / lt
209
Terpentin
Rp.
9,500.00 / lt
210
Spirtus
Rp.
9,500.00 / lt
211
Dempul lilin
Rp.
37,000.00 / kg
212
213
Plester gipsum
Dempul gipsum
Rp.
Rp.
31,500.00 / m'
94,000.00 / kg
214
Rp.
59,000.00 / kg
215
melamik
Rp.
78,000.00 / kg
216
Sending seler
Rp.
78,000.00 / kg
217
218
Oker putih
Oker coklat ( warna )
Rp.
Rp.
19,500.00 / kg
56,500.00 / kg
219
Rp.
68,500.00 / kg
220
Rp.
94,000.00 / kg
221
Plamur tembok
Rp.
31,500.00 / kg
222
223
Plamur kayu
Plamur kayu ( setara nipon )
Rp.
Rp.
28,000.00 / kg
37,500.00 / kg
224
Rool cat
Rp.
35,000.00 / bh
225
Hamplas besi
Rp.
6,000.00 / bh
226
hamplas kayu
Rp.
5,000.00 / bh
227
228
koas 3"
Plitur jadi
Rp.
Rp.
16,000.00 / bh
52,500.00 / kg
229
Rp.
29,000.00 / kg
230
Lem kuning
Rp.
53,000.00 / kg
231
Alumunium foil
Rp.
7,500.00 / m2
232
233
Rp.
Rp.
3,000.00 / bh
3,500.00 / bh
234
Rp.
4,500.00 / bh
235
Rp.
5,500.00 / bh
236
Ryblok 20 x 30
Rp.
8,500.00 / bh
237
238
Kanstin cetak
Buis beton dia 20"
Rp.
Rp.
51,500.00 / bh
54,500.00 / m'
239
Rp.
81,500.00 / m'
240
Rp.
92,000.00 / m'
241
Rp.
125,000.00 / m'
242
243
Rp.
Rp.
171,000.00 / m'
309,000.00 / m'
244
Rp.
356,500.00 / m'
245
Grevel U. 20"
Rp.
51,500.00 / m'
246
Grevel U. 30"
Rp.
76,500.00 / m'
247
248
Tali injuk
injuk
Rp.
Rp.
22,500.00 / kg
17,000.00 / kg
249
Rp.
26,500.00 / m'
250
Rp.
33,000.00 / m'
251
Rp.
20,000.00 / m'
252
253
Rp.
Rp.
22,000.00 / m'
39,000.00 / m'
254
Rp.
53,000.00 / m'
255
Rp.
64,000.00 / m'
256
Rp.
78,500.00 / m'
257
258
Rp.
Rp.
26,500.00 / m'
48,500.00 / m'
259
Rp.
55,500.00 / m'
260
Rp.
73,500.00 / m'
261
Rp.
94,500.00 / m'
262
263
Rp.
Rp.
103,000.00 / m'
115,500.00 / m'
264
Rp.
10,000.00 / m2
265
Rp.
5,000.00 / bh
266
Rp.
7,500.00 / bh
No
URAIAN
HARGA
267
Rp.
9,500.00 / bh
268
269
Rp.
Rp.
14,000.00 / bh
18,500.00 / bh
270
Rp.
169,000.00 / bh
271
Rp.
35,000.00 / bh
272
Rp.
11,500.00 / bh
273
274
Rp.
Rp.
537,500.00 / bh
733,500.00 / bh
275
Rp.
1,212,500.00 / bh
276
Rp.
2,519,500.00 / bh
277
Rp.
4,250,000.00 / bh
278
279
Rp.
Rp.
200,000.00 / lbr
298,500.00 / lbr
280
Rp.
373,500.00 / lbr
281
Rp.
311,000.00 / lbr
282
Rp.
34,500.00 / lbr
283
284
Rp.
Rp.
81,500.00 / bh
97,000.00 / bh
285
Rp.
109,500.00 / bh
286
Rp.
11,000.00 / m'
287
Rp.
12,000.00 / m'
288
289
Rp.
Rp.
10,000.00 / m'
9,000.00 / m'
290
Rp.
11,000.00 / m'
291
Rp.
14,000.00 / bh
292
Rp.
19,000.00 / bh
293
294
Rp.
Rp.
56,500.00 / bh
56,500.00 / bh
295
Rp.
32,000.00 / bh
296
Rp.
12,500.00 / bh
297
Rp.
19,000.00 / bh
298
299
Rp.
Rp.
9,500.00 / bh
4,000.00 / bh
300
Pipa Instalasi
Rp.
11,500.00 / m'
301
Rp.
36,500.00 / unit
302
Rp.
56,500.00 / unit
303
304
Rp.
Rp.
86,500.00 / unit
21,500.00 / btg
305
Rp.
56,500.00 / bh
306
Rp.
81,500.00 / bh
307
Rp.
81,500.00 / bh
308
309
Rp.
Rp.
11,000.00 / bh
11,500.00 / bh
310
Rp.
11,500.00 / bh
311
Rp.
7,000.00 / bh
312
Bambu dia 5
Rp.
7,500.00 / btg
313
314
Bambu dia 10
White board
Rp.
Rp.
19,000.00 / btg
106,500.00 / lbr
315
Rp.
579,000.00 / set
316
Rp.
4,000.00 / m'
317
Rp.
5,500.00 / m'
318
319
Rp.
Rp.
6,500.00 / m'
32,500.00 / bh
320
Rp.
23,500.00 / bh
321
Rp.
419,000.00 / unit
322
Rp.
584,000.00 / unit
323
324
Rp.
Rp.
854,500.00 / unit
1,675,000.00 / unit
325
Rp.
2,396,500.00 / unit
326
Rasidu
Rp.
11,000.00 / kg
327
Besi plat
Rp.
16,000.00 / kg
No
URAIAN
HARGA
328
Rp.
9,000.00 / kg
329
330
Rp.
Rp.
25,500.00 / btg
56,500.00 / m2
331
Rp.
62,500.00 / m2
332
Rp.
75,000.00 / m2
333
Rp.
75,000.00 / m2
334
335
Rp.
Rp.
187,500.00 / m2
231,500.00 / m2
336
Rp.
92,500.00 / m'
337
Rp.
110,000.00 / m'
338
Rp.
195,000.00 / m'
339
340
Rp.
Rp.
179,000.00 / m'
181,500.00 / m'
341
Rp.
210,000.00 / m'
342
Rp.
220,000.00 / m'
343
Rp.
191,000.00 / m'
344
345
Rp.
Rp.
209,000.00 / m'
112,500.00 / m'
346
Rp.
112,500.00 / m'
347
Rp.
119,000.00 / m'
348
Rp.
35,000.00 / bh
349
350
Handle alumunium
Engsel jendela untuk alumunium
Rp.
Rp.
102,500.00 / bh
31,500.00 / bh
351
Rp.
29,000.00 / bh
352
Karet
Rp.
6,500.00 / m'
353
Silen
Rp.
6,500.00 / m'
354
355
Kunci alumunium
Door closer
Rp.
Rp.
150,000.00 / bh
225,000.00 / unit
356
Rp.
357
Rp.
13,750,000.00 / stel
358
Kayu lokal
Rp.
3,340,000.00 / m3
359
360
Rp.
Rp.
902,000.00 / m3
933,000.00 / m3
361
Rp.
1,046,500.00 / m3
362
Kapur padam
Rp.
228,000.00 / m3
363
Bondex
Rp.
244,000.00 / m2
364
365
Wiremesh M8
Atap sirap 4 lapis
Rp.
Rp.
150,000.00 / m2
3,500.00 / bh
366
Plstik cor
Rp.
8,500.00 / m2
367
Rolling door
Rp.
377,500.00 / m2
368
Folding gate
Rp.
575,000.00 / m2
369
370
Karpet standart
Lem vinyl
Rp.
Rp.
125,000.00 / m2
43,000.00 / kg
371
Rp.
187,500.00 / m2
372
Rp.
4,000.00 / bh
373
Rp.
51,000.00 / m2
374
375
Rp.
Rp.
61,000.00 / m2
285,000.00 / m2
376
Rp.
190,000.00 / m2
377
Rp.
210,000.00 / m2
378
Rp.
25,000.00 / lot
379
380
Formika
Paku skrup 3,5"
Rp.
Rp.
119,000.00 / lbr
1,000.00 / bh
381
Roof mes
Rp.
12,000.00 / m2
382
Glass wall
Rp.
457,500.00 / lbr
383
Rp.
6,500.00 / bh
384
385
Rp.
Rp.
2,500.00 / m'
73,500.00 / m'
386
Rupping ( 12x65 mm )
Rp.
6,500.00 / bh
387
Sliln
Rp.
31,500.00 / tub
388
Rp.
67,500.00 / m'
25,000.00 / bh
No
URAIAN
HARGA
389
Rp.
195,000.00 / m2
390
391
Tralis besi
Pagar besi holow
Rp.
Rp.
319,000.00 / m2
750,000.00 / m2
392
Rp.
500,000.00 / m2
393
Rp.
1,500,000.00 / unit
394
Rp.
1,796,500.00 / unit
395
396
Rp.
Rp.
2,087,500.00 / unit
3,059,000.00 / unit
397
Rp.
4,215,000.00 / unit
398
Rp.
5,676,000.00 / unit
399
Rp.
8,591,000.00 / unit
400
401
Rp.
Rp.
185,000.00 / bh
400,000.00 / bh
402
Rp.
264,000.00 / bh
403
Rp.
375,000.00 / bh
404
Rp.
85,000.00 / lbr
405
Rp.
150,000.00 / lbr
C. DAFTAR ALAT
1
Rp.
199,100.00 / Jam
2
3
Rp.
Rp.
145,500.00 / Jam
215,600.00 / Jam
Rp.
67,500.00 / Jam
Rp.
63,800.00 / Jam
Rp.
107,800.00 / Jam
7
8
Rp.
Rp.
33,000.00 / Jam
170,500.00 / hari
Rp.
194,300.00 / Jam
10
Rp.
132,700.00 / Jam
11
Blower
Rp.
16,500.00 / Jam
12
13
Aspal Finisher
Motor grader 100 HP
Rp.
Rp.
129,300.00 / Jam
268,100.00 / Jam
14
Rp.
3,520,000.00 / hari
AN.CK
U RAIAN
KOEF
SATUAN
SATUAN
( Rp. )
JUMLAH
( Rp. )
2
1 BH PEK. PAPAN NAMA PROYEK
6=(3X5)
0.1300
m3
3,832,000.00
498,160.00
Paku
Cat kayu
0.2500
1.0000
kg
ls
21,500.00
59,000.00
5,375.00
59,000.00
Penulisan
Ongkos pasang
0.1250
0.1250
ls
ls
440,000.00
500,000.00
55,000.00
62,500.00
Jumlah
680,035.00
68,003.50
748,038.50
0.0100
org
98,000.00
980.00
Pekerja terampil
0.0200
org
98,000.00
1,960.00
Peralatan
Jumlah
1.0000
ls
150.00
150.00
3,090.00
AN.CK
AN.CK
AN.CK
AN.CK
309.00
3,399.00
0.0360
1.4300
m3
lbr
3,705,500.00
50,000.00
133,398.00
71,500.00
Paku
Pengecatan cat minyak 2 x bag. luar
0.2000
1.8000
kg
m2
21,500.00
33,577.50
4,300.00
60,439.50
Ongkos pasang
0.2000
ls
160,000.00
32,000.00
Jumlah
Keuntungan pengusaha 10%
301,637.50
30,163.75
331,801.25
Alat bantu
1.0000
ls
240.00
240.00
Pekerja
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. STRIPING TANAH TEBAL = 20 CM
Alat bantu
Tukang gali
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. PAS. BOUWPLANK
Kayu albasiah
Paku 5-7
Ongkos pasang
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. DIREKSIKEET
Kayu balok klas II
Paku 5 - 7 cm
Seng gelombang BJLS 28 ( 80 x 180 )
Triplek 3 mm
Semen portland
Pasir pasang
Bata merah lokal
Peralatan
Ongkos pasang
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0400
0.0040
org
org
98,000.00
110,000.00
3,920.00
440.00
4,600.00
460.00
5,060.00
0.3500
0.0500
0.0050
ls
org
org
1,600.00
98,000.00
110,000.00
560.00
4,900.00
550.00
6,010.00
601.00
6,611.00
0.0100
0.0380
0.1550
m3
kg
ls
2,187,500.00
21,500.00
1,500.00
21,875.00
817.00
232.50
22,924.50
2,292.45
25,216.95
0.1000
0.2500
1.1000
0.5000
5.0000
0.2500
70.0000
0.0200
0.1500
m3
kg
lbr
lbr
kg
m3
bh
lot
ls
3,705,500.00
21,500.00
64,500.00
66,500.00
87,500.00
214,500.00
500.00
400,000.00
410,000.00
370,550.00
5,375.00
70,950.00
33,250.00
437,500.00
53,625.00
35,000.00
8,000.00
61,500.00
1,075,750.00
107,575.00
1,183,325.00
1
AN.CK
2
8
0.1000
m3
3,705,500.00
370,550.00
Paku 5 - 7 cm
Seng BJLS 30
0.2500
1.1000
kg
lbr
21,500.00
64,500.00
5,375.00
70,950.00
Triplek 3 mm
Semen portland
0.5000
5.0000
lbr
kg
66,500.00
87,500.00
33,250.00
437,500.00
Peralatan
0.0250
lot
350,000.00
8,750.00
Ongkos pasang
Jumlah
0.1250
ls
400,000.00
50,000.00
976,375.00
97,637.50
1,074,012.50
0.0500
ls
13,000.00
650.00
Tukang gali
0.4000
Mandor
0.0400
org
98,000.00
39,200.00
org
110,000.00
Jumlah
4,425.00
48,675.00
0.0500
ls
17,000.00
850.00
Tukang gali
0.5260
org
98,000.00
51,548.00
Mandor
0.0520
org
110,000.00
Jumlah
5,811.80
63,929.80
0.0500
ls
24,000.00
1,200.00
Tukang gali
0.7350
org
98,000.00
72,030.00
Mandor
0.0730
org
110,000.00
Jumlah
8,126.00
89,386.00
0.0500
ls
32,000.00
1,600.00
Tukang gali
0.9440
org
98,000.00
92,512.00
Mandor
0.0940
org
110,000.00
Jumlah
10,445.20
114,897.20
1.0000
ls
39,000.00
39,000.00
Tukang gali
1.1530
org
98,000.00
112,994.00
Mandor
0.1150
org
110,000.00
Jumlah
16,464.40
181,108.40
0.2500
ls
23,500.00
5,875.00
Tukang gali
0.6250
org
98,000.00
61,250.00
Mandor
0.1250
org
110,000.00
13,750.00
Jumlah
80,875.00
8,087.50
15
88,962.50
0.2500
ls
27,000.00
6,750.00
Tukang gali
0.7500
org
98,000.00
73,500.00
Mandor
0.1250
org
110,000.00
13,750.00
Jumlah
94,000.00
9,400.00
16
12,650.00
164,644.00
10,340.00
104,452.00
8,030.00
81,260.00
5,720.00
58,118.00
4,400.00
44,250.00
6=(3X5)
103,400.00
0.2500
ls
20,500.00
5,125.00
Tukang gali
0.5250
org
98,000.00
51,450.00
Mandor
0.1250
org
110,000.00
13,750.00
Jumlah
Keuntungan pengusaha 10%
70,325.00
7,032.50
1
AN.CK
2
17
77,357.50
0.1000
ls
9,500.00
950.00
Tukang gali
0.2500
org
98,000.00
24,500.00
Mandor
0.0500
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
3,095.00
18
34,045.00
0.2000
ls
35,000.00
7,000.00
Tukang gali
1.1500
org
98,000.00
112,700.00
Mandor
0.0250
org
110,000.00
Jumlah
12,245.00
134,695.00
1 M3 PEK. URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN ( 5000 M3 )
Pek. Galian ( 10 org ) 50%
0.6000
m3
44,250.00
26,550.00
0.6000
m3
80,875.00
48,525.00
5.0000
m3
4,000.00
20,000.00
1.2000
m3
94,000.00
112,800.00
Jumlah
207,875.00
20,787.50
20
228,662.50
0.1000
ls
6,500.00
650.00
Tukang gali
0.1920
org
98,000.00
18,816.00
Mandor
0.0190
org
110,000.00
2,090.00
Jumlah
21,556.00
2,155.60
21
23,711.60
1.2000
m3
94,000.00
112,800.00
Pekerja terampil
0.3000
org
98,000.00
29,400.00
Mandor
0.0100
org
110,000.00
Jumlah
14,330.00
157,630.00
0.1250
ls
16,500.00
2,062.50
Tukang gali
0.5000
org
98,000.00
49,000.00
Mandor
0.0500
org
110,000.00
Jumlah
AN.CK
AN.CK
23
24
25
5,500.00
56,562.50
1,100.00
143,300.00
2,750.00
122,450.00
5,500.00
30,950.00
5,656.25
62,218.75
1.2000
0.1500
0.0100
m3
org
org
196,000.00
98,000.00
110,000.00
235,200.00
14,700.00
1,100.00
251,000.00
25,100.00
276,100.00
1.0000
0.2000
0.8330
0.4160
0.0410
0.0083
m3
m3
org
org
org
org
214,500.00
228,000.00
98,000.00
75,000.00
104,000.00
110,000.00
214,500.00
45,600.00
81,634.00
31,200.00
4,264.00
913.00
378,111.00
37,811.10
415,922.10
6.0000
0.1500
0.0150
kg
org
org
17,000.00
98,000.00
110,000.00
102,000.00
14,700.00
1,650.00
118,350.00
11,835.00
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
26
27
28
29
30
31
2
3
1 M3 PAS. ANSTAMPING BATU KALI
Batu belah
1.2000
Pasir urug
0.1000
Pekerja
0.5000
Tukang batu setengah terampil
0.5625
Kepala tukang batu
0.0750
Mandor
0.0563
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. ANSTAMPING BATU CURI
Batu curi
1.2000
Pasir urug
0.4000
Pekerja
1.1250
Tukang batu setengah terampil
0.5625
Kepala tukang batu
0.0563
Mandor
0.0750
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. LANTAI KERJA ( BETON TUMBUK ) 1 PC : 3 PS : 5 KRL
Semen portland
197.8000
Pasir beton klas II
0.5500
Batu pecah tangan 2/3 cm
0.9300
Peralatan
0.0750
Pekerja
2.0000
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.0500
Mandor
0.0100
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BATU KALI / BATU BELAH 1 : 1
Batu kali / batu belah
1.2000
Semen portland
96.5000
Pasir pasang
0.3400
Pekerja
1.2500
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.1125
Mandor
0.0169
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BATU KALI / BATU BELAH 1 : 2
Batu kali / batu belah
1.2000
Semen portland
88.0000
Pasir pasang
0.3600
Pekerja
1.2500
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.1125
Mandor
0.0169
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BATU KALI / BATU BELAH 1 : 2,5
Batu kali / batu belah
1.2000
Semen portland
79.5000
Pasir pasang
0.3800
Pekerja
1.2500
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.1125
Mandor
0.0169
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
130,185.00
6=(3X5)
m3
m3
org
org
org
org
317,500.00
196,000.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
19,600.00
49,000.00
42,187.50
7,800.00
6,193.00
505,780.50
50,578.05
556,358.55
m3
m3
org
org
org
org
295,000.00
196,000.00
98,000.00
75,000.00
104,000.00
110,000.00
354,000.00
78,400.00
110,250.00
42,187.50
5,855.20
8,250.00
598,942.70
59,894.27
658,836.97
kg
m3
m3
lot
org
org
org
org
87,500.00
230,000.00
294,500.00
366,000.00
98,000.00
75,000.00
104,000.00
110,000.00
17,307,500.00
126,500.00
273,885.00
27,450.00
196,000.00
37,500.00
5,200.00
1,100.00
17,975,135.00
1,797,513.50
19,772,648.50
m3
kg
m3
org
org
org
org
317,500.00
87,500.00
214,500.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
8,443,750.00
72,930.00
122,500.00
37,500.00
11,700.00
1,859.00
9,071,239.00
907,123.90
9,978,362.90
m3
kg
m3
org
org
org
org
317,500.00
87,500.00
214,500.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
7,700,000.00
77,220.00
122,500.00
37,500.00
11,700.00
1,859.00
8,331,779.00
833,177.90
9,164,956.90
m3
kg
m3
org
org
org
org
317,500.00
87,500.00
214,500.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
6,956,250.00
81,510.00
122,500.00
37,500.00
11,700.00
1,859.00
7,592,319.00
759,231.90
8,351,550.90
1
AN.CK
AN.CK
AN.CK
AN.CK
32
33
34
35
2
3
4
1 M3 PAS. BATU KALI / BATU BELAH 1 : 3
Batu kali / batu belah
1.2000
m3
Semen portland
71.0000
kg
Pasir pasang
0.3800
m3
Pekerja
1.2500
org
Tukang batu setengah terampil
0.5000
org
Kepala tukang batu
0.1125
org
Mandor
0.0169
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BATU KALI / BATU BELAH 1 : 4
Batu kali / batu belah
1.2000
m3
Semen portland
62.5000
kg
Pasir pasang
0.4200
m3
Pekerja
1.2500
org
Tukang batu setengah terampil
0.5000
org
Kepala tukang batu
0.1125
org
Mandor
0.0169
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BATU KALI / BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARAN
Batu kali / batu belah
1.5000
m3
Semen portland
62.5000
kg
Pasir pasang
0.3480
m3
Pekerja terampil
1.2500
org
Tukang batu terampil
1.1250
org
Kepala tukang batu
0.1125
org
Mandor
0.0169
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
317,500.00
87,500.00
214,500.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
6,212,500.00
81,510.00
122,500.00
37,500.00
11,700.00
1,859.00
6,848,569.00
684,856.90
7,533,425.90
317,500.00
87,500.00
214,500.00
98,000.00
75,000.00
104,000.00
110,000.00
381,000.00
5,468,750.00
90,090.00
122,500.00
37,500.00
11,700.00
1,859.00
6,113,399.00
611,339.90
6,724,738.90
317,500.00
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
476,250.00
5,468,750.00
74,646.00
122,500.00
110,250.00
11,700.00
1,859.00
6,265,955.00
626,595.50
6,892,550.50
1.2000
m3
317,500.00
381,000.00
54.0000
kg
87,500.00
4,725,000.00
Pasir pasang
0.4400
m3
214,500.00
94,380.00
Pekerja
1.2500
org
98,000.00
122,500.00
0.5000
org
75,000.00
37,500.00
0.1125
org
104,000.00
11,700.00
Mandor
0.0169
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
537,393.90
36
5,911,332.90
1.2000
m3
317,500.00
381,000.00
47.2000
kg
87,500.00
4,130,000.00
Pasir pasang
0.4400
m3
214,500.00
94,380.00
Pekerja
1.2500
org
98,000.00
122,500.00
0.5000
org
75,000.00
37,500.00
0.1125
org
104,000.00
11,700.00
Mandor
0.0169
org
110,000.00
Jumlah
477,893.90
5,256,832.90
1.2000
m3
317,500.00
Kawat bronjong
3.5000
kg
22,500.00
78,750.00
Pekerja
1.5000
org
98,000.00
147,000.00
Pekerja terampil
0.2000
org
98,000.00
19,600.00
Mandor
0.0200
org
110,000.00
Jumlah
AN.CK
AN.CK
2
38
39
40
2,200.00
62,855.00
381,000.00
628,550.00
AN.CK
1,859.00
4,778,939.00
1,859.00
5,373,939.00
691,405.00
6=(3X5)
70.0000
27.2000
0.0470
0.4290
0.2140
0.0210
0.0110
bh
kg
m3
org
org
org
org
500.00
87,500.00
214,500.00
75,000.00
75,000.00
104,000.00
110,000.00
35,000.00
2,380,000.00
10,081.50
32,175.00
16,050.00
2,184.00
1,210.00
2,476,700.50
247,670.05
2,724,370.55
70.0000
21.0000
0.0540
0.4290
0.2140
0.0210
0.0110
bh
kg
m3
org
org
org
org
500.00
87,500.00
214,500.00
75,000.00
75,000.00
104,000.00
110,000.00
35,000.00
1,837,500.00
11,583.00
32,175.00
16,050.00
2,184.00
1,210.00
1,935,702.00
193,570.20
2,129,272.20
70.0000
16.7700
0.0580
0.3218
0.1805
0.0158
0.0083
bh
kg
m3
org
org
org
org
500.00
87,500.00
214,500.00
75,000.00
75,000.00
104,000.00
110,000.00
35,000.00
1,467,375.00
12,441.00
24,135.00
13,537.50
1,643.20
913.00
1,555,044.70
155,504.47
1,710,549.17
AN.CK
41
70.0000
bh
500.00
35,000.00
Semen portland
Pasir pasang
10.3700
0.0580
kg
m3
87,500.00
214,500.00
907,375.00
12,441.00
0.3218
org
75,000.00
24,135.00
0.1805
org
75,000.00
13,537.50
0.0158
0.0083
org
org
104,000.00
110,000.00
Jumlah
Keuntungan pengusaha 10%
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
42
43
44
45
46
2
1 M2 SIARAN 1 PC : 2 PSR
Sement portland
Pasir pasang
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLESTERAN DINDING 1 : 2 + ACIAN
Semen portland
Pasir pasang
Pekerja setengah terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLESTERAN DINDING 1 : 3 + ACIAN
Semen portland
Pasir pasang
1,643.20
913.00
995,044.70
99,504.47
1,094,549.17
70.0000
8.3200
0.0580
0.3218
0.1805
0.0158
0.0083
bh
kg
m3
org
org
org
org
500.00
87,500.00
214,500.00
75,000.00
75,000.00
104,000.00
110,000.00
35,000.00
728,000.00
12,441.00
24,135.00
13,537.50
1,643.20
913.00
815,669.70
81,566.97
897,236.67
32.0000
9.6800
0.0450
0.1000
0.0100
0.3200
0.0150
bh
kg
m3
org
org
org
org
1,000.00
87,500.00
214,500.00
75,000.00
75,000.00
104,000.00
110,000.00
32,000.00
847,000.00
9,652.50
7,500.00
750.00
33,280.00
1,650.00
931,832.50
93,183.25
1,025,015.75
6=(3X5)
5.2700
0.0085
0.3600
0.1200
0.0120
0.0180
kg
m3
org
org
org
org
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
461,125.00
1,823.25
35,280.00
11,760.00
1,248.00
1,980.00
513,216.25
51,321.63
564,537.88
11.8400
0.0190
0.2860
0.2140
0.0210
0.0200
kg
m3
org
org
org
org
87,500.00
214,500.00
75,000.00
98,000.00
104,000.00
110,000.00
1,036,000.00
4,075.50
21,450.00
20,972.00
2,184.00
2,200.00
1,086,881.50
108,688.15
1,195,569.65
8.0000
0.0190
kg
m3
87,500.00
214,500.00
700,000.00
4,075.50
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
AN.CK
47
48
49
50
51
52
0.2860
0.2140
0.0210
0.0200
org
org
org
org
75,000.00
98,000.00
104,000.00
110,000.00
21,450.00
20,972.00
2,184.00
2,200.00
750,881.50
75,088.15
825,969.65
7.0200
0.0190
0.2860
0.2140
0.0210
0.0200
kg
m3
org
org
org
org
87,500.00
214,500.00
75,000.00
98,000.00
104,000.00
110,000.00
614,250.00
4,075.50
21,450.00
20,972.00
2,184.00
2,200.00
665,131.50
66,513.15
731,644.65
5.0000
0.0190
0.2860
0.2140
0.0210
0.0200
kg
m3
org
org
org
org
87,500.00
214,500.00
75,000.00
98,000.00
104,000.00
110,000.00
437,500.00
4,075.50
21,450.00
20,972.00
2,184.00
2,200.00
488,381.50
48,838.15
537,219.65
4.0000
0.1430
0.1070
0.0105
0.0100
kg
org
org
org
org
87,500.00
75,000.00
75,000.00
104,000.00
110,000.00
350,000.00
10,725.00
8,025.00
1,092.00
1,100.00
370,942.00
37,094.20
408,036.20
1.1000
6.0000
0.0310
0.0250
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
lot
org
org
org
org
94,000.00
87,500.00
214,500.00
82,000.00
98,000.00
98,000.00
104,000.00
110,000.00
103,400.00
525,000.00
6,649.50
2,050.00
18,375.00
22,050.00
3,900.00
3,718.00
685,142.50
68,514.25
753,656.75
2
1 M2 PAS. DINDING BATU ALAM NATURAL
Batu alam natural
Sement porland
Pasir pasang
Peralatan
Pekerja termapil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. DINIDING BATU ALAM WARNA
Batu alam warna
Sement portland
Pasir pasang
peralatan
Pekerja terampil
Tukang batu temapil
Kepala tukang batu
Mandor
Jumlah
6=(3X5)
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
ls
org
org
org
org
94,000.00
87,500.00
214,500.00
600.00
98,000.00
98,000.00
104,000.00
110,000.00
103,400.00
525,000.00
6,649.50
600.00
18,375.00
22,050.00
3,900.00
3,718.00
683,692.50
68,369.25
752,061.75
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m3
kg
m3
ls
org
org
org
org
119,000.00
87,500.00
214,500.00
600.00
98,000.00
98,000.00
104,000.00
110,000.00
130,900.00
525,000.00
6,649.50
600.00
18,375.00
22,050.00
3,900.00
3,718.00
711,192.50
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
AN.CK
53
54
55
56
57
58
2
1 M2 PAS. LANTAI BATU SIKAT WARNA
Batu sikat warna
Sement portland
Pasir pasang
Peralatan
Pekerjan terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI BATU ALAM ANDESIT
Batu alam andesit
Sement portland
Pasir pasang
Peralatan
Pekerjan terampil
Tukang batu terampil
Kepala tukang batu
Mandor
71,119.25
782,311.75
1.0100
8.0000
0.0300
0.0130
0.3750
0.0750
0.1875
0.0188
m2
kg
m3
kg
org
org
org
org
94,000.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
94,940.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
867,752.50
86,775.25
954,527.75
1.0100
8.0000
0.0300
0.0130
0.3750
0.0750
0.1875
0.0188
m2
kg
m3
kg
org
org
org
org
119,000.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
120,190.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
893,002.50
89,300.25
982,302.75
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
lot
org
org
org
org
62,500.00
87,500.00
214,500.00
10,000.00
98,000.00
98,000.00
104,000.00
110,000.00
68,750.00
525,000.00
6,649.50
10,000.00
18,375.00
22,050.00
3,900.00
3,718.00
658,442.50
65,844.25
724,286.75
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
lot
org
org
org
org
75,000.00
87,500.00
214,500.00
10,000.00
98,000.00
98,000.00
104,000.00
110,000.00
82,500.00
525,000.00
6,649.50
10,000.00
18,375.00
22,050.00
3,900.00
3,718.00
672,192.50
67,219.25
739,411.75
6=(3X5)
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
lot
org
org
org
org
75,000.00
87,500.00
214,500.00
10,000.00
98,000.00
98,000.00
104,000.00
110,000.00
82,500.00
525,000.00
6,649.50
10,000.00
18,375.00
22,050.00
3,900.00
3,718.00
672,192.50
67,219.25
739,411.75
1.1000
6.0000
0.0310
1.0000
0.1875
0.2250
0.0375
0.0338
m2
kg
m3
lot
org
org
org
org
187,500.00
87,500.00
214,500.00
10,000.00
98,000.00
98,000.00
104,000.00
110,000.00
206,250.00
525,000.00
6,649.50
10,000.00
18,375.00
22,050.00
3,900.00
3,718.00
AN.CK
AN.CK
59
60
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN WAFEL ABU-ABU 20/20 CM
Lantai ubin wafel abu-abu 20/20 cm
Semen portland
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN WAFEL WARNA 20/20 CM
Ubin wafel warna 20/20 cm
Semen portland
795,942.50
79,594.25
875,536.75
1.0100
8.0000
0.0300
0.3750
0.0750
0.1875
0.0188
m2
kg
m3
org
org
org
org
29,000.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
29,290.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
800,718.00
80,071.80
880,789.80
1.0100
8.0000
m2
kg
27,000.00
87,500.00
27,270.00
700,000.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
61
62
63
64
65
66
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN ABU-ABU 20/20 CM
Ubin ABU-ABU 20/20 cm
Semen portland
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN WARNA 20/20 CM
Ubin 20/20 cm
Semen portland
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0300
0.3750
0.0750
0.1875
0.0188
m3
org
org
org
org
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
798,698.00
79,869.80
878,567.80
1.0100
8.0000
0.0300
0.3750
0.0750
0.1875
0.0188
m2
kg
m3
org
org
org
org
26,500.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
26,765.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
798,193.00
79,819.30
878,012.30
1.0100
8.0000
0.0300
0.3750
0.0750
0.1875
0.0188
m2
kg
m3
org
org
org
org
25,000.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
25,250.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
796,678.00
79,667.80
876,345.80
2
3
1 M2 PAS. LANTAI UBIN ABU-ABU 30/30 CM
Ubin abu-abu 30/30 cm
1.0100
Semen portland
8.0000
Pasir pasang
0.0300
Tukang batu terampil
0.3750
Kepala tukang batu
0.0750
Pekerja terampil
0.1875
Mandor
0.0188
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN WARNA 30/30 CM
Ubin warna 30/30 cm
1.0100
Semen portland
8.0000
Pasir pasang
0.0300
Tukang batu terampil
0.3750
Kepala tukang batu
0.0750
Pekerja terampil
0.1875
Mandor
0.0188
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI UBIN BADAK 30/30 CM
Ubin badak 30/30 cm
1.0100
Semen portland
8.0000
Pasir pasang
0.0300
Tukang batu terampil
0.3750
Kepala tukang batu
0.0750
Pekerja terampil
0.1875
Mandor
0.0188
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI KERAMIK 30/30 CM POLOS ( SETARA MULIA )
Keramik 30/30 cm putih ( setara mulia )
1.0100
Semen portland
8.0000
Pasir pasang
0.0300
6=(3X5)
m2
kg
m3
org
org
org
org
34,000.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
34,340.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
805,768.00
80,576.80
886,344.80
m2
kg
m3
org
org
org
org
31,500.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
31,815.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
803,243.00
80,324.30
883,567.30
m2
kg
m3
org
org
org
org
42,000.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
42,420.00
700,000.00
6,435.00
36,750.00
7,800.00
18,375.00
2,068.00
813,848.00
81,384.80
895,232.80
m2
kg
m3
54,000.00
87,500.00
214,500.00
54,540.00
700,000.00
6,435.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
67
68
69
70
71
Sement warna
0.0130
kg
Tukang batu terampil
0.3750
org
Kepala tukang batu
0.0750
org
Pekerja terampil
0.1875
org
Mandor
0.0188
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI KERAMIK 30/30 CM WARNA/CORAK ( SETARA MULIA )
Keramik 30/30 cm warna /corak ( setara mulia )
1.0100
m2
Semen portland
8.0000
kg
Pasir pasang
0.0300
m3
Sement warna
0.0130
kg
Tukang batu terampil
0.3750
org
Kepala tukang batu
0.0750
org
Pekerja terampil
0.1875
org
Mandor
0.0188
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI KERAMIK 10/20 & 20/20 CM CORAK / WARNA ( SETARA MULIA )
Keramik 10/20 cm warna ( setara mulia )
1.0100
m2
Semen portland
8.0000
kg
Pasir pasang
0.0300
m3
Sement warna
0.0130
kg
Tukang batu terampil
0.3750
org
Kepala tukang batu
0.0750
org
Pekerja terampil
0.1875
org
Mandor
0.0188
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
827,352.50
82,735.25
910,087.75
56,500.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
57,065.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
829,877.50
82,987.75
912,865.25
56,500.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
57,065.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
829,877.50
82,987.75
912,865.25
2
3
4
5
1 M2 PAS. LANTAI KERAMIK 20/20 CM POLOS ( SETARA MULIA )
Keramik 20/20 cm putih ( setara mulia )
1.0100
m2
54,000.00
Semen portland
8.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Sement warna
0.0130
kg
106,500.00
Tukang batu terampil
0.3750
org
98,000.00
Kepala tukang batu
0.0750
org
104,000.00
Pekerja terampil
0.1875
org
98,000.00
Mandor
0.0188
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI KERAMIK KM/WC 10/20 & 20/20 CM ANTI SLIP CORAK / WARNA ( SETARA MULIA )
Keramik 20/20 cm anti slip warna/corak ( setara mulia )
1.0100
m2
62,500.00
Semen portland
12.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Sement warna
0.0130
kg
106,500.00
Tukang batu terampil
0.3750
org
98,000.00
Kepala tukang batu
0.1125
org
104,000.00
Pekerja terampil
0.1875
org
98,000.00
Mandor
0.0282
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI KERAMIK KM/WC 20/20 CM ( SETARA MULIA )
Keramik KM/WC 20/20 cm corak,( setara mulia )
1.0100
m2
50,000.00
Semen portland
12.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Sement warna
0.0130
kg
106,500.00
Tukang batu terampil
0.5625
org
98,000.00
Kepala tukang batu
0.1125
org
104,000.00
Pekerja terampil
0.2813
org
98,000.00
Mandor
0.0282
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
54,540.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
827,352.50
82,735.25
910,087.75
63,125.00
1,050,000.00
6,435.00
1,384.50
36,750.00
11,700.00
18,375.00
3,102.00
1,190,871.50
119,087.15
1,309,958.65
50,500.00
1,050,000.00
6,435.00
1,384.50
55,125.00
11,700.00
27,567.40
3,102.00
1,205,813.90
120,581.39
1,326,395.29
AN.CK
AN.CK
AN.CK
72
73
74
1
AN.CK
75
AN.CK
76
AN.CK
77
64,640.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
837,452.50
83,745.25
921,197.75
64,640.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
837,452.50
83,745.25
921,197.75
54,540.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
827,352.50
82,735.25
910,087.75
2
3
4
5
6=(3X5)
1 M2 PAS. LANTAI KERAMIK 20/20 CM POLOS ( SETARA ROMAN / ASIA TILE )
Keramik 20/20 cm putih ( setara roman / asia tile )
1.0100
m2
54,000.00
54,540.00
Semen portland
8.0000
kg
87,500.00
700,000.00
Pasir pasang
0.0300
m3
214,500.00
6,435.00
Sement warna
0.0130
kg
106,500.00
1,384.50
Tukang batu terampil
0.3750
org
98,000.00
36,750.00
Kepala tukang batu
0.0750
org
104,000.00
7,800.00
Pekerja terampil
0.1875
org
98,000.00
18,375.00
Mandor
0.0188
org
110,000.00
2,068.00
Jumlah
827,352.50
Keuntungan pengusaha 10%
82,735.25
jumlah + keuntungan Pengusaha 10%
910,087.75
1 M2 PAS. LANTAI KERAMIK KM/WC 10/20 & 20/20 CM ANTI SLIP CORAK / WARNA ( SETARA ROMAN / ASIA TILE )
1.0100
m2
56,500.00
57,065.00
Keramik 10/20, 20/20 cm anti slip warna/corak ( setara roman / asia tile )
Semen portland
12.0000
kg
87,500.00
1,050,000.00
Pasir pasang
0.0300
m3
214,500.00
6,435.00
Sement warna
0.0130
kg
106,500.00
1,384.50
Tukang batu terampil
0.3750
org
98,000.00
36,750.00
Kepala tukang batu
0.1125
org
104,000.00
11,700.00
Pekerja terampil
0.1875
org
98,000.00
18,375.00
Mandor
0.0282
org
110,000.00
3,102.00
Jumlah
1,184,811.50
Keuntungan pengusaha 10%
118,481.15
jumlah + keuntungan Pengusaha 10%
1,303,292.65
1 M2 PAS. LANTAI KERAMIK KM/WC 20/20 CM ( SETARA ROMAN / ASIA TILE )
Keramik KM/WC 20/20 cm corak,( setara roman /asia tile )
1.0100
m2
56,500.00
57,065.00
Semen portland
12.0000
kg
87,500.00
1,050,000.00
Pasir pasang
0.0300
m3
214,500.00
6,435.00
Sement warna
0.0130
kg
106,500.00
1,384.50
Tukang batu terampil
0.5625
org
98,000.00
55,125.00
Kepala tukang batu
0.1125
org
104,000.00
11,700.00
Pekerja terampil
0.2813
org
98,000.00
27,567.40
Mandor
0.0282
org
110,000.00
3,102.00
Jumlah
1,212,378.90
Keuntungan pengusaha 10%
121,237.89
AN.CK
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
78
79
80
81
82
83
2
3
1 M2 PAS. LANTAI GRANITO TILE ESENZA 60/60 CM POLISHED
Granito tile esenza 60/60 polished
1.0000
Semen portland + campuran khusus
13.0000
Pasir pasang
0.0300
Campuran kedap air
1.0000
Alat bantu
0.0240
Tukang batu terampil
0.6000
Kepala tukang batu
0.0500
Pekerja terampil
0.2500
Mandor
0.0250
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI GRANITO TILE ESENZA 40/40 CM KASAR
Granito tile esenza 40/40 kasar
1.0000
Semen portland + campuran khusus
13.0000
Pasir pasang
0.0300
Campuran kedap air + perekat lain
1.0000
Alat bantu
1.0000
Tukang batu terampil
0.6000
Kepala tukang batu
0.0500
Pekerja terampil
0.2500
Mandor
0.0250
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. LANTAI GRANITO TILE ESENZA 60/60 CM KASAR
Granito tile esenza 60/60 kasar
1.0000
Semen portland + campuran khusus
13.0000
Pasir pasang
0.0300
Campuran kedap air
1.0000
Alat bantu
0.0240
1,333,616.79
m2
kg
m3
kg
org
org
org
org
64,000.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
64,640.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
837,452.50
83,745.25
921,197.75
m2
kg
m3
kg
org
org
org
org
80,000.00
87,500.00
214,500.00
106,500.00
98,000.00
104,000.00
98,000.00
110,000.00
80,800.00
700,000.00
6,435.00
1,384.50
36,750.00
7,800.00
18,375.00
2,068.00
853,612.50
85,361.25
938,973.75
m2
kg
m3
lot
lot
org
org
org
org
247,500.00
87,500.00
214,500.00
25,000.00
5,000.00
98,000.00
104,000.00
98,000.00
110,000.00
247,500.00
1,137,500.00
6,435.00
25,000.00
120.00
58,800.00
5,200.00
24,500.00
2,750.00
1,507,805.00
150,780.50
1,658,585.50
6=(3X5)
m2
kg
m3
lot
lot
org
org
org
org
402,500.00
87,500.00
214,500.00
25,000.00
5,000.00
98,000.00
104,000.00
98,000.00
110,000.00
402,500.00
1,137,500.00
6,435.00
25,000.00
120.00
58,800.00
5,200.00
24,500.00
2,750.00
1,662,805.00
166,280.50
1,829,085.50
m2
kg
m3
ls
ls
org
org
org
org
359,500.00
87,500.00
214,500.00
106,500.00
5,000.00
98,000.00
104,000.00
98,000.00
110,000.00
359,500.00
1,137,500.00
6,435.00
106,500.00
5,000.00
58,800.00
5,200.00
24,500.00
2,750.00
1,706,185.00
170,618.50
1,876,803.50
m2
kg
m3
lot
lot
167,500.00
87,500.00
214,500.00
25,000.00
5,000.00
167,500.00
1,137,500.00
6,435.00
25,000.00
120.00
AN.CK
84
0.6000
0.0500
org
org
98,000.00
104,000.00
58,800.00
5,200.00
Pekerja terampil
Mandor
0.2500
0.0250
org
org
98,000.00
110,000.00
24,500.00
2,750.00
Jumlah
1,427,805.00
142,780.50
1,570,585.50
1.0000
m2
496,500.00
496,500.00
13.0000
kg
87,500.00
1,137,500.00
Pasir pasang
Alat bantu
0.0300
0.0320
m3
lot
214,500.00
5,000.00
6,435.00
160.00
1.0000
1.5000
lot
org
25,000.00
98,000.00
25,000.00
147,000.00
0.1000
org
104,000.00
10,400.00
Pekerja terampil
Mandor
0.5000
0.0250
org
org
98,000.00
110,000.00
49,000.00
2,750.00
AN.CK
85
Jumlah
Keuntungan pengusaha 10%
1,874,745.00
187,474.50
2,062,219.50
1.0000
m2
729,000.00
729,000.00
13.0000
0.0300
kg
m3
87,500.00
214,500.00
1,137,500.00
6,435.00
Alat bantu
0.0320
lot
5,000.00
160.00
1.0000
1.5000
lot
org
25,000.00
98,000.00
25,000.00
147,000.00
0.0500
0.5000
org
org
104,000.00
98,000.00
5,200.00
49,000.00
Mandor
0.0250
org
110,000.00
1
AN.CK
AN.CK
AN.CK
86
87
88
2,750.00
Jumlah
Keuntungan pengusaha 10%
2,102,045.00
210,204.50
2,312,249.50
2
3
1 M2 PAS. DINDING BATU CANDI
Batu Candi
1.1000
Sement porland
6.0000
Pasir pasang
0.0310
Peralatan
1.0000
Pekerja termapil
0.1875
Tukang batu terampil
0.2250
Kepala tukang batu
0.0375
Mandor
0.0338
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING BATU ANDESIT
Batu alam andesit
1.1000
Sement porland
6.0000
Pasir pasang
0.0310
Peralatan
1.0000
Pekerja termapil
0.1875
Tukang batu terampil
0.2250
Kepala tukang batu
0.0375
Mandor
0.0338
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING KERAMIK 20/25 CORAK / WARNA ( SETARA MULIA )
Keramik 10/20 & 20/25 cm corak / warna ( setara mulia )
1.0100
Semen portland
8.0000
Pasir pasang
0.0300
Semen warna
0.0130
Pekerja terampil
0.1875
6=(3X5)
m2
kg
m3
ls
org
org
org
org
231,500.00
87,500.00
214,500.00
600.00
98,000.00
98,000.00
104,000.00
110,000.00
254,650.00
525,000.00
6,649.50
600.00
18,375.00
22,050.00
3,900.00
3,718.00
834,942.50
83,494.25
918,436.75
m2
kg
m3
ls
org
org
org
org
187,500.00
87,500.00
214,500.00
600.00
98,000.00
98,000.00
104,000.00
110,000.00
206,250.00
525,000.00
6,649.50
600.00
18,375.00
22,050.00
3,900.00
3,718.00
786,542.50
78,654.25
865,196.75
m2
kg
m3
kg
org
61,000.00
87,500.00
214,500.00
106,500.00
98,000.00
61,610.00
700,000.00
6,435.00
1,384.50
18,375.00
0.3750
0.0750
org
org
98,000.00
104,000.00
36,750.00
7,800.00
Mandor
Jumlah
0.0188
org
110,000.00
2,068.00
834,422.50
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
89
90
91
92
93
94
83,442.25
917,864.75
1.0100
8.0000
m2
kg
54,000.00
87,500.00
54,540.00
700,000.00
Pasir pasang
0.0300
m3
214,500.00
6,435.00
Semen warna
Pekerja terampil
0.0130
0.1875
kg
org
106,500.00
98,000.00
1,384.50
18,375.00
0.3750
0.0750
org
org
98,000.00
104,000.00
36,750.00
7,800.00
Mandor
0.0188
org
110,000.00
2,068.00
Jumlah
Keuntungan pengusaha 10%
827,352.50
82,735.25
910,087.75
m2
kg
m3
kg
org
org
org
org
56,500.00
87,500.00
214,500.00
106,500.00
98,000.00
98,000.00
104,000.00
110,000.00
57,065.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
829,877.50
82,987.75
912,865.25
m2
kg
m3
kg
org
org
org
org
54,000.00
87,500.00
214,500.00
106,500.00
98,000.00
98,000.00
104,000.00
110,000.00
54,540.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
827,352.50
82,735.25
910,087.75
2
3
4
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CORAK / WARNA ( SETARA MULIA )
Keramik 10/20 & 20/20 cm corak / warna ( setara mulia )
1.0100
m2
Semen portland
8.0000
kg
Pasir pasang
0.0300
m3
Semen warna
0.0130
kg
Pekerja terampil
0.1875
org
Tukang batu terampil
0.3750
org
Kepala tukang batu
0.0750
org
Mandor
0.0188
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING KERAMIK 30/30 CM POLOS ( SETARA ROMAN / ASIA TILE )
keramik 30/30 cm putih ( setara roman / asia tile )
1.0100
m2
Semen portland
8.0000
kg
Pasir pasang
0.0300
m3
Semen warna
0.0130
kg
Pekerja terampil
0.1875
org
Tukang batu terampil
0.3750
org
Kepala tukang batu
0.0750
org
Mandor
0.0188
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING KERAMIK 30/30 CM WARNA,CORAK ( SETARA ROMAN / ASIA TILE )
keramik 30/30 cm warna, corak ( setara roman / asia tile )
1.0100
m2
Semen portland
8.0000
kg
Pasir pasang
0.0300
m3
Semen warna
0.0130
kg
6=(3X5)
56,500.00
87,500.00
214,500.00
106,500.00
98,000.00
98,000.00
104,000.00
110,000.00
57,065.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
829,877.50
82,987.75
912,865.25
64,000.00
87,500.00
214,500.00
106,500.00
98,000.00
98,000.00
104,000.00
110,000.00
64,640.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
837,452.50
83,745.25
921,197.75
64,000.00
87,500.00
214,500.00
106,500.00
64,640.00
700,000.00
6,435.00
1,384.50
AN.CK
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
95
96
97
98
99
100
Pekerja terampil
0.1875
org
98,000.00
Tukang batu terampil
0.3750
org
98,000.00
Kepala tukang batu
0.0750
org
104,000.00
Mandor
0.0188
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CM POLOS ( SETARA ROMAN / ASIA TILE )
Keramik 10/20 & 20/20 cm polos ( setara roman / asia tile )
1.0100
m2
54,000.00
Semen portland
8.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Semen warna
0.0130
kg
106,500.00
Pekerja terampil
0.1875
org
98,000.00
Tukang batu terampil
0.3750
org
98,000.00
Kepala tukang batu
0.0750
org
104,000.00
Mandor
0.0188
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING KERAMIK 10/20 & 20/20 CORAK / WARNA ( SETARA ROMAN / ASIA TILE )
Keramik 10/20 & 20/20 cm corak / warna ( setara roman / asia
1.0100
m2
54,000.00
Semen portland
8.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Semen warna
0.0130
kg
106,500.00
Pekerja terampil
0.1875
org
98,000.00
Tukang batu terampil
0.3750
org
98,000.00
Kepala tukang batu
0.0750
org
104,000.00
Mandor
0.0188
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING GANITO ESENZA 40/40 CM POLISHED
Keramik Granito 40/40 cm polished
1.0100
m2
247,500.00
Semen portland + campuran khusus
13.0000
kg
87,500.00
Pasir pasang
0.0300
m3
214,500.00
Campuran kedap air
1.0000
lot
25,000.00
Alat bantu
0.0400
lot
5,000.00
Pekerja terampil
0.2500
org
98,000.00
Tukang batu terampil
0.7000
org
98,000.00
Kepala tukang batu
0.0500
org
104,000.00
Mandor
0.0250
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
2
1 M2 PAS. DINDING GANITO ESENZA 60/60 CM POLISHED
Keramik Granito 60/60 cm polished
Semen portland + campuran khusus
Pasir pasang
Campuran kedap air
Alat bantu
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING MARMER UK. KECIL ( SETARA CITATAH )
Marmer Uk. Kecil ( setara citatah )
Semen portland + campuran khusus
Pasir pasang
Alat bantu
Campuran kedap air
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING MARMER UK. BESAR ( SETARA CITATAH )
Marmer Uk. Besar ( setara citatah )
Semen portland + campuran khusus
18,375.00
36,750.00
7,800.00
2,068.00
837,452.50
83,745.25
921,197.75
54,540.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
827,352.50
82,735.25
910,087.75
54,540.00
700,000.00
6,435.00
1,384.50
18,375.00
36,750.00
7,800.00
2,068.00
827,352.50
82,735.25
910,087.75
249,975.00
1,137,500.00
6,435.00
25,000.00
200.00
24,500.00
68,600.00
5,200.00
2,750.00
1,520,160.00
152,016.00
1,672,176.00
6=(3X5)
1.0000
13.0000
0.0300
1.0000
0.0400
0.2500
0.7000
0.0500
0.0250
m2
kg
m3
lot
lot
org
org
org
org
402,500.00
87,500.00
214,500.00
25,000.00
5,000.00
98,000.00
98,000.00
104,000.00
110,000.00
402,500.00
1,137,500.00
6,435.00
25,000.00
200.00
24,500.00
68,600.00
5,200.00
2,750.00
1,672,685.00
167,268.50
1,839,953.50
1.0000
13.0000
0.0300
0.0480
1.0000
1.0000
3.0000
0.2000
0.0250
m2
kg
m3
lot
lot
org
org
org
org
496,500.00
87,500.00
214,500.00
5,000.00
25,000.00
98,000.00
98,000.00
104,000.00
110,000.00
496,500.00
1,137,500.00
6,435.00
240.00
25,000.00
98,000.00
294,000.00
20,800.00
2,750.00
2,081,225.00
208,122.50
2,289,347.50
1.0000
13.0000
m2
kg
729,000.00
87,500.00
729,000.00
1,137,500.00
AN.CK
AN.CK
AN.CK
1
AN.CK
101
102
103
104
Pasir pasang
Alat bantu
Campuran kedap air
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING ROSTER BETON 20/20 CM
Roster beton 20/20 cm
Semen portland
Pasir pasang
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. DINDING ROSTER 12/11/24 CM ( KARAWANG )
Bata roster ( karawang )
Semen portland
Pasir pasang
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0300
0.0480
1.0000
1.0000
3.0000
0.2000
0.0250
m3
lot
lot
org
org
org
org
214,500.00
5,000.00
25,000.00
98,000.00
98,000.00
104,000.00
110,000.00
6,435.00
240.00
25,000.00
98,000.00
294,000.00
20,800.00
2,750.00
2,313,725.00
231,372.50
2,545,097.50
25.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
m2
kg
m3
org
org
org
org
31,500.00
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
787,500.00
1,120,000.00
7,507.50
29,400.00
9,800.00
1,040.00
1,650.00
1,956,897.50
195,689.75
2,152,587.25
36.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
m2
kg
m3
org
org
org
org
6,500.00
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
234,000.00
1,120,000.00
7,507.50
29,400.00
9,800.00
1,040.00
1,650.00
1,403,397.50
140,339.75
1,543,737.25
1.0100
8.0000
m2
kg
8,500.00
87,500.00
8,585.00
700,000.00
Pasir pasang
Semen warna
0.0300
0.0130
m3
kg
214,500.00
106,500.00
6,435.00
1,384.50
Pekerja terampil
0.2500
org
98,000.00
24,500.00
0.5000
0.1000
org
org
98,000.00
104,000.00
49,000.00
10,400.00
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0250
org
110,000.00
2,750.00
803,054.50
80,305.45
883,359.95
2
1 M2 PAS. DINDING GLASBLOCK 20/20 CM
Dinding Glasbolck 20/20 cm
Semen portland
Pasir pasang
Pekerja terampil
Tukang batu terampil
Kepala tukang batu
Mandor
25.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
4
m2
kg
m3
org
org
org
org
5
26,500.00
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
6=(3X5)
662,500.00
1,120,000.00
7,507.50
29,400.00
9,800.00
1,040.00
1,650.00
AN.CK
105
Jumlah
Keuntungan pengusaha 10%
1,831,897.50
183,189.75
2,015,087.25
0.0195
m3
3,705,500.00
72,257.25
0.0070
0.2000
kg
kg
3,955,500.00
21,500.00
27,688.50
4,300.00
0.5000
0.7000
kg
lbr
29,000.00
85,500.00
14,500.00
59,850.00
0.6000
org
98,000.00
58,800.00
0.0600
0.2000
org
org
104,000.00
98,000.00
6,240.00
19,600.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
264,335.75
106
26,433.58
290,769.33
0.0195
0.0070
m3
kg
3,705,500.00
3,955,500.00
0.2000
kg
21,500.00
4,300.00
0.5000
0.7000
kg
lbr
29,000.00
111,000.00
14,500.00
77,700.00
0.6000
0.0600
org
org
98,000.00
104,000.00
58,800.00
6,240.00
Pekerja terampil
0.2000
org
98,000.00
19,600.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
282,185.75
107
72,257.25
27,688.50
28,218.58
310,404.33
0.0195
0.0070
m3
kg
4,455,500.00
4,705,500.00
86,882.25
32,938.50
0.2000
0.5000
kg
kg
21,500.00
29,000.00
4,300.00
14,500.00
0.7000
lbr
85,500.00
59,850.00
0.6000
0.0600
org
org
98,000.00
104,000.00
58,800.00
6,240.00
Pekerja terampil
Mandor
0.2000
0.0100
org
org
98,000.00
110,000.00
19,600.00
1,100.00
AN.CK
108
Jumlah
Keuntungan pengusaha 10%
284,210.75
28,421.08
312,631.83
0.0195
m3
4,455,500.00
86,882.25
0.0070
0.2000
kg
kg
4,705,500.00
21,500.00
32,938.50
4,300.00
0.5000
0.7000
kg
lbr
29,000.00
111,000.00
14,500.00
77,700.00
0.6000
org
98,000.00
58,800.00
0.0600
0.2000
org
org
104,000.00
98,000.00
6,240.00
19,600.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
302,060.75
30,206.08
1
AN.CK
AN.CK
AN.CK
AN.CK
2
109
110
111
112
332,266.83
6=(3X5)
3,705,500.00
72,257.25
0.0070
kg
3,955,500.00
27,688.50
0.2000
0.5000
kg
kg
21,500.00
29,000.00
4,300.00
14,500.00
0.7000
0.6000
lbr
org
112,500.00
98,000.00
78,750.00
58,800.00
0.0600
org
104,000.00
6,240.00
Pekerja terampil
Mandor
0.2000
0.0100
org
org
98,000.00
110,000.00
19,600.00
1,100.00
Jumlah
Keuntungan pengusaha 10%
283,235.75
28,323.58
311,559.33
4,455,500.00
4,705,500.00
21,500.00
29,000.00
112,500.00
98,000.00
104,000.00
98,000.00
110,000.00
86,882.25
32,938.50
4,300.00
14,500.00
78,750.00
58,800.00
6,240.00
19,600.00
1,100.00
303,110.75
30,311.08
333,421.83
3,705,500.00
21,500.00
29,000.00
98,000.00
98,000.00
104,000.00
110,000.00
4,076,050.00
26,875.00
29,000.00
392,000.00
1,519,000.00
280,800.00
55,000.00
6,378,725.00
637,872.50
7,016,597.50
4,455,500.00
21,500.00
29,000.00
98,000.00
98,000.00
104,000.00
110,000.00
4,901,050.00
26,875.00
29,000.00
392,000.00
1,519,000.00
280,800.00
55,000.00
7,203,725.00
AN.CK
113
720,372.50
7,924,097.50
1.1000
1.2500
m3
kg
15,937,500.00
21,500.00
17,531,250.00
26,875.00
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
114
115
116
117
118
119
1.0000
4.0000
15.5000
2.7000
0.5000
kg
org
org
org
org
29,000.00
98,000.00
98,000.00
104,000.00
110,000.00
29,000.00
392,000.00
1,519,000.00
280,800.00
55,000.00
19,833,925.00
1,983,392.50
21,817,317.50
0.0500
0.7500
4.0000
0.6000
2.6000
0.2600
0.0260
m3
kg
m'
org
org
org
org
4,705,500.00
29,000.00
3,000.00
98,000.00
98,000.00
104,000.00
110,000.00
235,275.00
21,750.00
12,000.00
58,800.00
254,800.00
27,040.00
2,860.00
612,525.00
61,252.50
673,777.50
2
3
4
5
1 M2 DAUN PINTU PANEL KAYU KLAS II
Rangka + panel kayu klas II
0.0500
m3
3,955,500.00
Lem putih ( setara Fox )
0.7500
kg
29,000.00
List kayu
4.0000
m'
3,000.00
Pekerja terampil
0.6000
org
98,000.00
Tukang kayu terampil
2.6000
org
98,000.00
Kepala tukang kayu
0.2600
org
104,000.00
Mandor
0.0260
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU PANEL TEACKWOOD T. 4 MM RANGKA KAYU KLAS II
Rangka kayu klas II
0.0500
m3
3,955,500.00
Teackwood 4 mm 120 x 240
1.0000
lbr
112,500.00
Lem putih ( setara Fox )
0.0050
kg
29,000.00
Paku
0.2000
kg
21,500.00
Pekerja setengah terampil
0.3000
org
75,000.00
Tukang kayu terampil
1.5000
org
98,000.00
Kepala tukang kayu
0.2000
org
104,000.00
Mandor
0.0200
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU PANEL TEACKWOOD T. 4 MM RANGKA KAYU KAMPER
Rangka kayu kamper
0.0500
m3
4,705,500.00
Teackwood 4 mm 120 x 240
1.0000
lbr
112,500.00
Lem putih ( setara Fox )
0.0050
kg
29,000.00
Paku
0.2000
kg
21,500.00
Pekerja setengah terampil
0.3000
org
75,000.00
Tukang kayu terampil
1.5000
org
98,000.00
Kepala tukang kayu
0.2000
org
104,000.00
Mandor
0.0200
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU TRIPLEK UK. PINTU LAPIS ALUMUNIUM ( u/KM/WC ) RANGKA KAYU KLAS II
Rangka kayu Klas II
0.0150
m3
3,955,500.00
Triplek 3 mm uk. pintu
2.0000
lbr
54,000.00
Alumunium plat 0,3 mm
1.8000
m2
95,500.00
Lem fox
0.5000
kg
29,000.00
Paku
0.2000
kg
21,500.00
Pekerja setengah terampil
0.3000
org
75,000.00
Tukang kayu terampil
1.3000
org
98,000.00
Kepala tukang kayu
0.1300
org
104,000.00
Mandor
0.0130
org
110,000.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU TRIPLEK UK. PINTU LAPIS ALUMUNIUM ( u/KM/WC )RANGKA KAYU KLAS I
Rangka kayu klas I
0.0150
m3
4,705,500.00
Triplek 4 mm uk. pintu
2.0000
lbr
75,000.00
6=(3X5)
197,775.00
21,750.00
12,000.00
58,800.00
254,800.00
27,040.00
2,860.00
575,025.00
57,502.50
632,527.50
197,775.00
112,500.00
145.00
4,300.00
22,500.00
147,000.00
20,800.00
2,200.00
507,220.00
50,722.00
557,942.00
235,275.00
112,500.00
145.00
4,300.00
22,500.00
147,000.00
20,800.00
2,200.00
544,720.00
54,472.00
599,192.00
59,332.50
108,000.00
171,900.00
14,500.00
4,300.00
22,500.00
127,400.00
13,520.00
1,430.00
522,882.50
52,288.25
575,170.75
70,582.50
150,000.00
1
AN.CK
AN.CK
AN.CK
AN.CK
120
121
122
123
1.8000
0.5000
0.5000
0.2000
0.3000
1.3000
0.1300
0.0130
m2
kg
kg
kg
org
org
org
org
2
3
4
1 M2 DAUN PINTU TRIPLEK LAPIS FORMIKA ( u/KM/WC ) RANGKA KAYU KLAS II
Rangka kayu klas II
0.0150
m3
Triplek untuk uk. pintu 3 mm
2.0000
lbr
Formika Uk. Pintu
1.0000
lbr
Lem putih ( setara Fox )
0.5000
kg
Lem kuning ( ICA AIBON )
1.0000
kg
Paku
0.2000
kg
Pekerja setengah terampil
0.3000
org
Tukang kayu terampil
1.3000
org
Kepala tukang kayu
0.1300
org
Mandor
0.0130
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU TRIPLEK LAPIS SENG PLAT
Rangka kayu Klas II
0.0150
m3
Triplek 4 mm uk. pintu
2.0000
lbr
Seng plat BJLS 30
1.8000
lbr
Paku
0.2000
kg
Lem putih ( setara Fox )
0.5000
kg
Lem kuning
1.0000
kg
Pekerja setengah terampil
0.3000
org
Tukang kayu terampil
1.3000
org
Kepala tukang kayu
0.1300
org
Mandor
0.0130
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU PANEL JATI JABAR
Rangka + panel jati jabar
0.0500
m3
Lem putih ( setara Fox )
0.7500
kg
List kayu
4.0000
m'
Pekerja terampil
0.6000
org
Tukang kayu terampil
2.6000
org
Kepala tukang kayu
0.2600
org
Mandor
0.0260
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU KACA ( TANPA KACA ) RANGKA KAYU KLAS II
Rangka kayu klas II
0.0200
m3
Lem putih ( Fox )
0.6000
kg
List kayu
4.0000
m'
Pekerja setengah terampil
0.4000
org
Tukang kayu terampil
1.4000
org
Kepala tukang kayu
0.1400
org
Mandor
0.0140
org
Jumlah
95,500.00
29,000.00
29,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
5
3,955,500.00
54,000.00
119,000.00
29,000.00
53,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
3,955,500.00
75,000.00
64,500.00
21,500.00
29,000.00
53,000.00
75,000.00
98,000.00
104,000.00
110,000.00
171,900.00
14,500.00
14,500.00
4,300.00
22,500.00
127,400.00
13,520.00
1,430.00
590,632.50
59,063.25
649,695.75
6=(3X5)
59,332.50
108,000.00
119,000.00
14,500.00
53,000.00
4,300.00
22,500.00
127,400.00
13,520.00
1,430.00
522,982.50
52,298.25
575,280.75
59,332.50
150,000.00
116,100.00
4,300.00
14,500.00
53,000.00
22,500.00
127,400.00
13,520.00
1,430.00
562,082.50
56,208.25
618,290.75
15,937,500.00
29,000.00
3,000.00
98,000.00
98,000.00
104,000.00
110,000.00
796,875.00
21,750.00
12,000.00
58,800.00
254,800.00
27,040.00
2,860.00
1,174,125.00
117,412.50
1,291,537.50
3,955,500.00
29,000.00
3,000.00
75,000.00
98,000.00
104,000.00
110,000.00
79,110.00
17,400.00
12,000.00
30,000.00
137,200.00
14,560.00
1,540.00
291,810.00
AN.CK
124
125
29,181.00
320,991.00
m3
4,705,500.00
94,110.00
0.6000
kg
29,000.00
17,400.00
List kayu
Pekerja setengah terampil
4.0000
0.4000
m'
org
3,000.00
75,000.00
12,000.00
30,000.00
1.4000
0.1400
org
org
98,000.00
104,000.00
137,200.00
14,560.00
Mandor
0.0140
org
110,000.00
306,810.00
30,681.00
337,491.00
0.0200
m3
15,937,500.00
318,750.00
0.6000
4.0000
kg
m'
29,000.00
3,000.00
17,400.00
12,000.00
0.4000
1.4000
org
org
75,000.00
98,000.00
30,000.00
137,200.00
0.1400
org
104,000.00
14,560.00
Mandor
Jumlah
0.0140
org
110,000.00
1,540.00
531,450.00
1
AN.CK
2
126
53,145.00
584,595.00
AN.CK
AN.CK
127
128
129
6=(3X5)
0.0150
m3
3,955,500.00
59,332.50
2.0000
lbr
54,000.00
108,000.00
0.0050
0.2000
kg
kg
29,000.00
21,500.00
145.00
4,300.00
0.3000
1.5000
org
org
75,000.00
98,000.00
22,500.00
147,000.00
0.2000
org
104,000.00
20,800.00
Mandor
Jumlah
0.0200
org
110,000.00
2,200.00
364,277.50
1,540.00
Jumlah
Keuntungan pengusaha 10%
36,427.75
400,705.25
m3
lbr
kg
kg
org
org
org
org
4,705,500.00
54,000.00
29,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
70,582.50
108,000.00
145.00
4,300.00
22,500.00
147,000.00
20,800.00
2,200.00
375,527.50
37,552.75
413,080.25
m3
lbr
kg
kg
org
org
org
org
3,955,500.00
159,000.00
29,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
59,332.50
318,000.00
145.00
4,300.00
22,500.00
147,000.00
20,800.00
2,200.00
574,277.50
57,427.75
631,705.25
m3
lbr
kg
kg
org
org
org
org
4,705,500.00
159,000.00
29,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
70,582.50
318,000.00
145.00
4,300.00
22,500.00
147,000.00
20,800.00
2,200.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
130
131
132
133
134
135
136
Jumlah
Keuntungan pengusaha 10%
585,527.50
58,552.75
644,080.25
2
3
1 M2 DAUN JENDELA KACA ( TANPA KACA ) RANGKA KAYU JATI JABAR
Rangka kayu jati jabar
0.0170
Lem putih ( setara Fox )
0.3000
List kayu
4.0000
Pekerja setengah terampil
0.3000
Tukang kayu terampil
1.2000
Kepala tukang kayu
0.1200
Mandor
0.0200
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. JALUSI MATI PADA KUSEN KAYU KLAS II
Papan kayu klas II
0.0600
Paku
0.1500
Tukang kayu terampil
2.0000
Kepala tukang kayu
0.2000
Pekerja
0.5000
Mandor
0.0250
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. JALUSI MATI PADA KUSEN KAYU KLAS I
Papan kayu klas I
0.0600
Paku
0.1500
Tukang kayu terampil
2.0000
Kepala tukang kayu
0.2000
Pekerja
0.5000
Mandor
0.0250
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. JALUSI MATI PADA KUSEN KAYU JATI JABAR
Kayu papan kayu jati jabar
0.0600
Paku
0.1500
Tukang kayu terampil
2.0000
Kepala tukang kayu
0.2000
Pekerja
0.5000
Mandor
0.0250
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PAS. JALUSI KAYU KLAS II
Papan kayu klas II
0.0060
Paku
0.0250
Tukang kayu terampil
0.1320
m3
kg
m'
org
org
org
org
3,955,500.00
29,000.00
3,000.00
75,000.00
98,000.00
104,000.00
110,000.00
67,243.50
8,700.00
12,000.00
22,500.00
117,600.00
12,480.00
2,200.00
242,723.50
24,272.35
266,995.85
m3
kg
m'
org
org
org
org
4,705,500.00
29,000.00
3,000.00
75,000.00
98,000.00
104,000.00
110,000.00
79,993.50
8,700.00
12,000.00
22,500.00
117,600.00
12,480.00
2,200.00
255,473.50
25,547.35
281,020.85
6=(3X5)
m3
kg
m'
org
org
org
org
15,937,500.00
29,000.00
3,000.00
75,000.00
98,000.00
104,000.00
110,000.00
270,937.50
8,700.00
12,000.00
22,500.00
117,600.00
12,480.00
2,200.00
446,417.50
44,641.75
491,059.25
m3
kg
org
org
org
org
3,955,500.00
21,500.00
98,000.00
104,000.00
98,000.00
110,000.00
237,330.00
3,225.00
196,000.00
20,800.00
49,000.00
2,750.00
509,105.00
50,910.50
560,015.50
m3
kg
org
org
org
org
4,705,500.00
21,500.00
98,000.00
104,000.00
98,000.00
110,000.00
282,330.00
3,225.00
196,000.00
20,800.00
49,000.00
2,750.00
554,105.00
55,410.50
609,515.50
m3
kg
org
org
org
org
15,937,500.00
21,500.00
98,000.00
104,000.00
98,000.00
110,000.00
956,250.00
3,225.00
196,000.00
20,800.00
49,000.00
2,750.00
1,228,025.00
122,802.50
1,350,827.50
m3
kg
org
3,955,500.00
21,500.00
98,000.00
23,733.00
537.50
12,936.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
137
138
139
140
141
142
143
0.0130
0.0330
0.0010
org
org
org
104,000.00
98,000.00
110,000.00
1,352.00
3,234.00
110.00
41,902.50
4,190.25
46,092.75
0.0060
0.0250
0.1320
0.0130
0.0330
0.0010
m3
kg
org
org
org
org
4,705,500.00
21,500.00
98,000.00
104,000.00
98,000.00
110,000.00
28,233.00
537.50
12,936.00
1,352.00
3,234.00
110.00
46,402.50
4,640.25
51,042.75
0.0060
0.0250
0.1320
0.0130
0.0330
0.0010
m3
kg
org
org
org
org
15,937,500.00
21,500.00
98,000.00
104,000.00
98,000.00
110,000.00
95,625.00
537.50
12,936.00
1,352.00
3,234.00
110.00
113,794.50
11,379.45
125,173.95
2
3
1 M2 DAUN PINTU/JENDELA JALUSI KAYU KLAS II
Lem putih ( setara Fox )
0.3000
Jalusi kayu klas II
15.0000
Pekerja setengah terampil
0.7000
Tukang kayu terampil
1.8000
Kepala tukang kayu
0.2600
Mandor
0.0150
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU/JENDELA JALUSI KAYU KLAS I
Lem putih ( setara Fox )
0.3000
Jalusi kayu klas I
15.0000
Pekerja setengah terampil
0.7000
Tukang kayu terampil
1.8000
Kepala tukang kayu
0.2600
Mandor
0.0150
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 DAUN PINTU/JENDELA JALUSI KAYU JATI JABAR
Lem putih ( setara Fox )
0.3000
Jalusi kayu jati jabar
15.0000
Pekerja setengah terampil
0.7000
Tukang kayu terampil
1.8000
Kepala tukang kayu
0.2600
Mandor
0.0150
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 KUDA-KUDA OVERSTEK/KONSOL KAYU KLAS II ( EXPOSE )
Kayu balok klas II
1.2000
Paku
5.8000
Pekerja setengah terampil
3.0000
Tukang kayu setengah terampil
9.0000
Kepala tukang kayu
3.0000
Mandor
0.5000
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 KUDA-KUDA OVERSTEK/KONSOL KAYU KLAS I ( EXPOSE )
Kayu balok klas I
1.2000
Paku
5.8000
Pekerja setengah terampil
3.0000
6=(3X5)
kg
m'
org
org
org
org
29,000.00
24,270.50
75,000.00
98,000.00
104,000.00
110,000.00
8,700.00
364,057.50
52,500.00
176,400.00
27,040.00
1,650.00
630,347.50
63,034.75
693,382.25
kg
m'
org
org
org
org
29,000.00
28,770.50
75,000.00
98,000.00
104,000.00
110,000.00
8,700.00
431,557.50
52,500.00
176,400.00
27,040.00
1,650.00
697,847.50
69,784.75
767,632.25
kg
m'
org
org
org
org
29,000.00
96,162.50
75,000.00
98,000.00
104,000.00
110,000.00
8,700.00
1,442,437.50
52,500.00
176,400.00
27,040.00
1,650.00
1,708,727.50
170,872.75
1,879,600.25
m3
kg
org
org
org
org
3,955,500.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
4,746,600.00
124,700.00
225,000.00
675,000.00
312,000.00
55,000.00
6,138,300.00
613,830.00
6,752,130.00
m3
kg
org
4,705,500.00
21,500.00
75,000.00
5,646,600.00
124,700.00
225,000.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
144
145
146
147
148
149
9.0000
3.0000
0.5000
org
org
org
75,000.00
104,000.00
110,000.00
675,000.00
312,000.00
55,000.00
7,038,300.00
703,830.00
7,742,130.00
1.1000
5.8000
3.0000
5.0000
2.0000
0.4000
m3
kg
org
org
org
org
2,187,500.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
2,406,250.00
124,700.00
225,000.00
375,000.00
208,000.00
44,000.00
3,382,950.00
338,295.00
3,721,245.00
1.1000
5.8000
3.0000
5.0000
2.0000
0.4000
m3
kg
org
org
org
org
3,705,500.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
4,076,050.00
124,700.00
225,000.00
375,000.00
208,000.00
44,000.00
5,052,750.00
505,275.00
5,558,025.00
2
3
1 M3 KUDA-KUDA KAYU KLAS I
Kayu balok klas I
1.1000
Paku
5.8000
Pekerja setengah terampil
3.0000
Tukang kayu setengah terampil
5.0000
Kepala tukang kayu
2.0000
Mandor
0.4000
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. RANGKA ATAP GENTENG PELENTONG KAYU ALBASIAH
Kayu kaso 5/7 albasiah
0.0168
Reng kayu 2/3 tisuk
4.0000
Paku
0.2500
Pekerja setengah terampil
0.1500
Tukang kayu terampil
0.1500
Kepala tukang kayu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. RANGKA ATAP GENTENG PELENTONG KAYU KLAS II
Kayu kaso klas II 5/7 cm
0.0168
Reng kayu klas II 2/3 cm
4.0000
Paku
0.2500
Pekerja setengah terampil
0.1500
Tukang kayu terampil
0.1500
Kepala tukang kayu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. RANGKA ATAP GENTENG PELENTONG KAYU KLAS I
Kayu kaso klas I 5/7 cm
0.0168
Reng kayu klas I 2/3 cm
4.0000
Paku
0.2500
Pekerja setengah terampil
0.1500
Tukang kayu terampil
0.1500
Kepala tukang kayu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
m3
kg
org
org
org
org
4,455,500.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
4,901,050.00
124,700.00
225,000.00
375,000.00
208,000.00
44,000.00
5,877,750.00
587,775.00
6,465,525.00
m3
m'
kg
org
org
org
org
2,187,500.00
2,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
36,750.00
10,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
79,665.00
7,966.50
87,631.50
m3
m'
kg
org
org
org
org
3,705,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
62,252.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
115,167.40
11,516.74
126,684.14
m3
m'
kg
org
org
org
org
4,455,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
74,852.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
127,767.40
12,776.74
140,544.14
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
150
151
152
153
154
155
2
1 M2 PEK. RANGKA ATAP GENTENG KERAMIK KAYU KLAS II
Kayu kaso klas II 5/7 cm
Reng kayu klas II 3/4 cm
Paku
Pekerja setengah terampil
Tukang kayu terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. RANGKA ATAP GENTENG KERAMIK KAYU KLAS I
Kayu kaso klas I 5/7 cm
Reng kayu klas I 3/4 cm
Paku
Pekerja setengah terampil
Tukang kayu terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. LISPLANK KAYU KLAS II, 3/20 CM
Kayu papan klas II
Paku
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. LISPLANK KAYU KLAS I, 3/20 CM
Kayu papan klas I
Paku
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
0.0168
4.0000
0.2500
0.1500
0.1500
0.0100
0.0050
m3
m'
kg
org
org
org
org
3,705,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
62,252.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
115,167.40
11,516.74
126,684.14
0.0168
4.0000
0.2500
0.1500
0.1500
0.0100
0.0050
m3
m'
kg
org
org
org
org
4,455,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
74,852.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
127,767.40
12,776.74
140,544.14
6=(3X5)
0.0168
4.0000
0.2500
0.1500
0.1500
0.0100
0.0050
m3
m'
kg
org
org
org
org
3,705,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
62,252.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
115,167.40
11,516.74
126,684.14
0.0168
4.0000
0.2500
0.1500
0.1500
0.0100
0.0050
m3
m'
kg
org
org
org
org
4,455,500.00
5,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
74,852.40
20,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
127,767.40
12,776.74
140,544.14
0.0074
0.0100
0.0700
0.2000
0.0200
0.0040
m3
kg
org
org
org
org
3,832,000.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
28,356.80
215.00
5,250.00
15,000.00
2,080.00
440.00
51,341.80
5,134.18
56,475.98
0.0074
0.0100
0.0700
0.2000
0.0200
0.0040
m3
kg
org
org
org
org
4,565,500.00
21,500.00
75,000.00
75,000.00
104,000.00
110,000.00
33,784.70
215.00
5,250.00
15,000.00
2,080.00
440.00
56,769.70
5,676.97
AN.CK
156
62,446.67
0.0100
0.0100
m3
kg
3,955,500.00
21,500.00
0.0700
org
75,000.00
5,250.00
0.2000
0.0200
org
org
75,000.00
104,000.00
15,000.00
2,080.00
Mandor
Jumlah
0.0040
org
110,000.00
440.00
62,540.00
157
6,254.00
68,794.00
0.0100
0.0100
m3
kg
4,705,500.00
21,500.00
0.0700
org
75,000.00
5,250.00
0.2000
0.0200
org
org
75,000.00
104,000.00
15,000.00
2,080.00
Mandor
Jumlah
0.0040
org
110,000.00
440.00
70,040.00
158
0.7500
0.0500
kg
bh
11,000.00
16,000.00
Pekerja
0.0500
org
98,000.00
AN.CK
AN.CK
AN.CK
161
162
163
4,900.00
13,950.00
1,395.00
15,345.00
6=(3X5)
bh
org
2,500.00
98,000.00
62,500.00
5,880.00
0.0060
0.1200
org
org
104,000.00
98,000.00
624.00
11,760.00
Mandor
0.0060
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. ATAP GENTENG MORANDO
Genting morando
20.0000
Tukang batu terampil
0.0600
Kepala tukang batu
0.0060
Pekerja terampil
0.1200
Mandor
0.0060
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. ATAP GENTENG PRES GLAZUR ( SETARA JATIWANGI )
Genting pres glazur ( setara jatiwangi )
25.0000
Tukang batu terampil
0.0600
Kepala tukang batu
0.0060
Pekerja terampil
0.1200
Mandor
0.0060
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. ATAP GENTENG KERAMIK GLAZUR ( SETARA KIA )
Genting keramik glazur ( setara KIA )
14.5000
Tukang batu terampil
0.0600
Kepala tukang batu
0.0060
Pekerja terampil
0.1200
Mandor
0.0060
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEK. ATAP GENTENG GLAZUR MORANDO
Genting glazur morando
20.0000
org
110,000.00
160
8,250.00
800.00
Jumlah
Keuntungan pengusaha 10%
AN.CK
77,044.00
Rasidu
Koas 3"
2
159
47,055.00
215.00
7,004.00
1
AN.CK
39,555.00
215.00
660.00
81,424.00
8,142.40
89,566.40
bh
org
org
org
org
5,500.00
98,000.00
104,000.00
98,000.00
110,000.00
110,000.00
5,880.00
624.00
11,760.00
660.00
128,924.00
12,892.40
141,816.40
bh
org
org
org
org
3,500.00
98,000.00
104,000.00
98,000.00
110,000.00
87,500.00
5,880.00
624.00
11,760.00
660.00
106,424.00
10,642.40
117,066.40
bh
org
org
org
org
10,000.00
98,000.00
104,000.00
98,000.00
110,000.00
145,000.00
5,880.00
624.00
11,760.00
660.00
163,924.00
16,392.40
180,316.40
bh
6,000.00
120,000.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
164
165
166
167
168
169
org
org
org
org
98,000.00
104,000.00
98,000.00
110,000.00
5,880.00
624.00
11,760.00
660.00
138,924.00
13,892.40
152,816.40
lbr
org
org
org
org
208,500.00
98,000.00
104,000.00
98,000.00
110,000.00
212,670.00
9,800.00
1,040.00
19,600.00
110.00
243,220.00
24,322.00
267,542.00
m3
m'
bh
kg
org
org
org
org
3,705,500.00
5,000.00
3,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
40,760.50
20,000.00
280,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
373,675.50
37,367.55
411,043.05
2
3
1 M2 PEK. PENUTUP ATAP SIRAP ( 4 LAPIS ) + RANGKA ATAP KAYU KLAS I
Kayu kaso 5/7 kayu klas I
0.0110
Reng kayu 2/3 kayu klas I
4.0000
Atap sirap 4 lapis
80.0000
Paku
0.2500
Pekerja setengah terampil
0.1500
Tukang kayu terampil
0.1500
Kepala tukang kayu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. BUBUNGAN GENTENG PRESS ( SETARA JATIWANGI )
Genteng bubungan ( setara Jatiwangi )
4.0000
Semen portland
6.5200
Pasir pasang
0.2100
Peralatan
0.0650
Pekerja setengah terampil
0.1500
Tukang batu terampil
0.2000
Kepala tukang batu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. BUBUNGAN GENTENG MORANDO
Genteng bubung morando
4.0000
Semen portland
6.5200
Pasir pasang
0.2100
Peralatan
0.0650
Pekerja setengah terampil
0.1500
Tukang batu terampil
0.2000
Kepala tukang batu
0.0100
Mandor
0.0050
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. BUBUNGAN GENTENG PRES GLAZUR ( SETARA JATIWANGI )
Bubungan genteng pres glazur ( setara Jatiwangi )
5.0000
6=(3X5)
m3
m'
bh
kg
org
org
org
org
4,455,500.00
5,000.00
3,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
49,010.50
20,000.00
280,000.00
5,375.00
11,250.00
14,700.00
1,040.00
550.00
381,925.50
38,192.55
420,118.05
bh
kg
m3
ls
org
org
org
org
4,500.00
87,500.00
214,500.00
300.00
75,000.00
98,000.00
104,000.00
110,000.00
18,000.00
570,500.00
45,045.00
19.50
11,250.00
19,600.00
1,040.00
550.00
666,004.50
66,600.45
732,604.95
bh
kg
m3
ls
org
org
org
org
5,000.00
87,500.00
214,500.00
300.00
75,000.00
98,000.00
104,000.00
110,000.00
20,000.00
570,500.00
45,045.00
19.50
11,250.00
19,600.00
1,040.00
550.00
668,004.50
66,800.45
734,804.95
bh
8,500.00
42,500.00
AN.CK
170
Semen portland
Pasir pasang
Peralatan
Pekerja setengah terampil
Tukang batu terampil
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. BUBUNGAN GENTENG KERAMIK
Genteng bubung keramik
Semen portland
Pasir pasang
Peralatan
6.5200
0.2100
0.0650
0.1500
0.2000
0.0100
0.0050
kg
m3
ls
org
org
org
org
87,500.00
214,500.00
300.00
75,000.00
98,000.00
104,000.00
110,000.00
570,500.00
45,045.00
19.50
11,250.00
19,600.00
1,040.00
550.00
690,504.50
69,050.45
759,554.95
3.0000
6.5200
0.2100
0.1090
bh
kg
m3
ls
18,500.00
87,500.00
214,500.00
300.00
55,500.00
570,500.00
45,045.00
32.70
AN.CK
1
AN.CK
AN.CK
171
172
173
0.1500
0.2000
0.0100
0.0050
org
org
org
org
75,000.00
98,000.00
104,000.00
110,000.00
11,250.00
19,600.00
1,040.00
550.00
703,517.70
70,351.77
773,869.47
4.0000
6.5200
0.2100
0.0650
0.1500
0.2000
0.0100
0.0050
bh
kg
m3
ls
org
org
org
org
8,500.00
87,500.00
214,500.00
300.00
75,000.00
98,000.00
104,000.00
110,000.00
34,000.00
570,500.00
45,045.00
19.50
11,250.00
19,600.00
1,040.00
550.00
682,004.50
68,200.45
750,204.95
2
3
1 M' PEK. BUBUNGAN GENTENG METAL ( SETARA SURYAROOF )
Genteng bubung metal ( setara rainbow )
1.1000
Paku skrup 3,5"
6.0000
Pekerja
0.0840
Tukang kayu terampil
0.1250
Kepala tukang kayu
0.0130
Mandor
0.0040
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PAS. NOK STEEL GELOMBANG 1050 MM
4
m'
bh
org
org
org
org
5
50,000.00
1,000.00
98,000.00
98,000.00
104,000.00
110,000.00
6=(3X5)
55,000.00
6,000.00
8,232.00
12,250.00
1,352.00
440.00
83,274.00
8,327.40
91,601.40
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
174
175
176
177
178
lbr
bh
org
org
org
org
39,000.00
48,500.00
98,000.00
98,000.00
104,000.00
110,000.00
81,900.00
291,000.00
8,232.00
12,250.00
1,352.00
440.00
395,174.00
39,517.40
434,691.40
lbr
bh
org
org
org
org
45,000.00
48,500.00
98,000.00
98,000.00
104,000.00
110,000.00
22,950.00
5,820.00
13,720.00
6,566.00
728.00
770.00
50,554.00
5,055.40
55,609.40
lbr
bh
org
org
org
org
70,000.00
48,500.00
98,000.00
104,000.00
98,000.00
110,000.00
48,650.00
97,000.00
7,350.00
832.00
14,700.00
880.00
169,412.00
16,941.20
186,353.20
lbr
m3
m3
kg
org
org
org
org
14,500.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
15,950.00
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
155,586.25
15,558.63
171,144.88
lbr
m3
m3
kg
org
org
org
org
14,500.00
2,187,500.00
2,187,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
15,950.00
30,625.00
7,656.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
129,021.25
12,902.13
141,923.38
2
3
4
1 M2 PAS. BAHAN PLAPOND ETERNIT 1 x 1 PADA RANGKANYA / TANPA RANGKA
eternit 1 X 1
1.1000
lbr
Paku
0.0200
kg
Pekerja setengah terampil
0.0473
org
Tukang kayu terampil
0.1125
org
Kepala tukang kayu
0.0098
org
Mandor
0.0030
org
Alat bantu
0.0850
lot
Jumlah
Keuntungan pengusaha 10%
5
14,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
15,000.00
6=(3X5)
15,950.00
430.00
3,547.50
11,025.00
1,019.20
330.00
1,275.00
33,576.70
3,357.67
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
179
180
181
182
183
184
2
3
1 M2 PAS. PLAPOND TRIPLEK 4 MM BERIKUT RANGKA KAYU ALBASIAH
Triplek 4 mm
0.3472
Kaso-kaso 5/7 albasiah
0.0140
Kayu 5/10 albasiah
0.0035
Paku
0.2200
Pekerja setengah terampil
0.2800
Tukang kayu terampil
0.4000
Kepala tukang kayu
0.0800
Mandor
0.0140
36,934.37
lbr
m3
m3
kg
org
org
org
org
8,000.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
16,800.00
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
156,436.25
15,643.63
172,079.88
lbr
m3
m3
kg
org
org
org
org
8,000.00
2,187,500.00
2,187,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
16,800.00
30,625.00
7,656.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
129,871.25
12,987.13
142,858.38
lbr
m3
m3
kg
org
org
org
org
21,500.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
23,650.00
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
163,286.25
16,328.63
179,614.88
lbr
kg
org
org
org
org
lot
21,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
20,000.00
23,650.00
430.00
4,725.00
14,700.00
1,352.00
440.00
1,000.00
46,297.00
4,629.70
50,926.70
lbr
m3
m3
kg
org
org
org
org
85,500.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
29,685.60
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
169,321.85
16,932.19
186,254.04
4
lbr
m3
m3
kg
org
org
org
org
5
85,500.00
2,187,500.00
2,187,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
6=(3X5)
29,685.60
30,625.00
7,656.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
185
186
187
188
189
190
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLAPOND TRIPLEK 6 MM BERIKUT RANGKA KAYU KLAS II
Triplek 6 mm
0.3470
Kaso-kaso klas II, 5/7 cm
0.0140
Kayu klas II, 5/10 cm
0.0070
Paku
0.2200
Pekerja setengah terampil
0.2800
Tukang kayu terampil
0.4000
Kepala tukang kayu
0.0800
Mandor
0.0140
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLAPOND GIPSUM 9 MM BERIKUT RANGKA KAYU KLAS II
Gipsum 9 mm ( 120 x 240 )
0.3470
Kaso-kaso klas II, 5/7 cm
0.0140
Kayu klas II, 5/10 cm
0.0035
Paku
0.2200
Pekerja setengah terampil
0.2800
Tukang kayu terampil
0.4000
Kepala tukang kayu
0.0800
Mandor
0.0140
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. RANGKA PLAPOND KAYU KLAS I ) DIMENI ( HANYA RANGKA )
Kaso-kaso klas I, 5/7 cm
0.0140
Kayu klas I, 5/10 cm
0.0035
Paku
0.2200
Meni kayu
0.1670
Pekerja setengah terampil
0.2500
Tukang kayu terampil
0.1000
Kepala tukang kayu
0.0500
Mandor
0.0140
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. RANGKA PLAPOND KAYU KLAS II HANYA RANGKA
Kaso-kaso klas II, 5/7 cm
0.0140
Kayu klas II, 5/10 cm
0.0035
Paku
0.2200
Pekerja setengah terampil
0.1875
Tukang kayu terampil
0.1000
Kepala tukang kayu
0.0375
Mandor
0.0105
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLAPOND ASBES PLAT / HARPLEK TANPA RANGKA
Asbes plat 1 X 1
1.1000
Paku
0.0200
Pekerja setengah terampil
0.0630
Tukang kayu terampil
0.1500
Kepala tukang kayu
0.0130
Mandor
0.0040
Alat bantu
0.0500
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
2
1 M2 PAS. PLAPOND ASBES PLAT 1,2 X 2,4 TANPA RANGKA
Asbes plat 1,2 X 2,4 M
Paku
Pekerja setengah terampil
Tukang kayu terampil
Kepala tukang kayu
Mandor
3
0.3470
0.0200
0.0630
0.1500
0.0130
0.0040
142,756.85
14,275.69
157,032.54
lbr
m3
m3
kg
org
org
org
org
111,000.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
38,517.00
51,877.00
25,938.50
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
191,122.50
19,112.25
210,234.75
lbr
m3
m3
kg
org
org
org
org
83,500.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
28,974.50
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
168,610.75
16,861.08
185,471.83
m3
m3
kg
kg
org
org
org
org
7,187,500.00
7,187,500.00
21,500.00
25,000.00
75,000.00
98,000.00
104,000.00
110,000.00
100,625.00
25,156.25
4,730.00
4,175.00
18,750.00
9,800.00
5,200.00
1,540.00
169,976.25
16,997.63
186,973.88
m3
m3
kg
org
org
org
org
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
51,877.00
12,969.25
4,730.00
14,062.50
9,800.00
3,900.00
1,155.00
98,493.75
9,849.38
108,343.13
lbr
kg
org
org
org
org
Lot
21,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
5,000.00
23,650.00
430.00
4,725.00
14,700.00
1,352.00
440.00
250.00
45,547.00
4,554.70
50,101.70
4
lbr
kg
org
org
org
org
5
45,000.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
6=(3X5)
15,615.00
430.00
4,725.00
14,700.00
1,352.00
440.00
Alat bantu
Jumlah
0.0450
Lot
5,000.00
AN.CK
191
192
3,748.70
41,235.70
1.1000
0.0200
lbr
kg
14,500.00
21,500.00
15,950.00
430.00
0.0473
0.1125
org
org
75,000.00
98,000.00
3,547.50
11,025.00
0.0098
org
104,000.00
1,019.20
Mandor
Alat bantu
0.0030
0.0850
org
Lot
110,000.00
5,000.00
330.00
425.00
Jumlah
Keuntungan pengusaha 10%
32,726.70
3,272.67
35,999.37
lbr
85,500.00
29,685.60
Paku
Pekerja setengah terampil
0.0200
0.0630
kg
org
21,500.00
75,000.00
430.00
4,725.00
0.1500
org
98,000.00
14,700.00
0.0130
0.0040
org
org
104,000.00
110,000.00
1,352.00
440.00
Alat bantu
Jumlah
0.0450
Lot
5,000.00
225.00
51,557.60
AN.CK
AN.CK
AN.CK
1
AN.CK
193
194
195
196
197
225.00
37,487.00
5,155.76
56,713.36
0.3472
0.0200
lbr
kg
111,000.00
21,500.00
38,539.20
430.00
0.0630
org
75,000.00
4,725.00
0.1500
0.0130
org
org
98,000.00
104,000.00
14,700.00
1,352.00
Mandor
Alat bantu
0.0040
0.0450
org
Lot
110,000.00
5,000.00
440.00
225.00
Jumlah
60,411.20
6,041.12
66,452.32
1.0000
m'
22,924.50
22,924.50
Galian tanah
0.4500
Urugan pasir 10 cm
0.0800
Pasang aanstamping
0.1200
Pas. batu belah 1 : 5
0.2000
Plesteran & acian 1 : 5
0.4100
Beton tulang
0.0563
Pagar tralis
1.5000
Pengecatan meni besi
1.0000
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. SALURAN GREVEL BETON 1/2 DIA 20 CM + PASANGAN
Galian tanah
0.1500
Grevel beton dia 20 cm
1.0000
Pas. bata merah lokal 1:4 + plesteran 1:4
0.5000
Upah kerja
0.3500
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PEK. SALURAN GREVEL BETON 1/2 DIA 30 CM + PASANGAN
Galian tanah
0.2000
Grevel beton dia 30 cm
1.0000
Pas. bata merah lokal 1:4 + plesteran 1:4
0.6000
Upah kerja
0.1500
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
2
3
1 M2 PAS. PAVING BLOCK NATURAL 6 CM
Paving blok natural 6 cm
1.0100
Pasir beton klas II
0.1000
Peralatan
1.0000
Pekerja setengah terampil
0.2500
m3
m3
m3
m3
m2
m3
m2
m2
44,250.00
251,000.00
505,780.50
5,373,939.00
488,381.50
35,980,619.63
75,000.00
33,577.50
19,912.50
20,080.00
60,693.66
1,074,787.80
200,236.42
2,025,708.89
112,500.00
33,577.50
3,570,421.27
357,042.13
3,927,463.40
m3
bh
m2
ls
44,250.00
51,500.00
2,220,176.20
19,500.00
6,637.50
51,500.00
1,110,088.10
6,825.00
1,175,050.60
117,505.06
1,292,555.66
m3
bh
m2
ls
44,250.00
76,500.00
2,220,176.20
102,000.00
8,850.00
76,500.00
1,332,105.72
15,300.00
1,432,755.72
143,275.57
1,576,031.29
6=(3X5)
4
m2
m3
ls
org
5
3,000.00
230,000.00
2,750.00
75,000.00
3,030.00
23,000.00
2,750.00
18,750.00
0.5000
0.0250
org
org
75,000.00
104,000.00
37,500.00
2,600.00
Mandor
Jumlah
0.0030
org
110,000.00
330.00
87,960.00
198
8,796.00
96,756.00
1.0100
m2
3,500.00
3,535.00
0.1000
1.0000
m3
ls
230,000.00
2,750.00
23,000.00
2,750.00
0.2500
0.5000
org
org
75,000.00
75,000.00
18,750.00
37,500.00
0.0250
org
104,000.00
2,600.00
Mandor
Jumlah
0.0030
org
110,000.00
330.00
88,465.00
AN.CK
199
200
8,846.50
97,311.50
1.0100
0.1000
m2
m3
4,500.00
230,000.00
4,545.00
23,000.00
Peralatan
Pekerja setengah terampil
1.0000
0.2500
ls
org
2,750.00
75,000.00
2,750.00
18,750.00
0.5000
org
75,000.00
37,500.00
0.0250
0.0030
org
org
104,000.00
110,000.00
2,600.00
330.00
Jumlah
Keuntungan pengusaha 10%
89,475.00
8,947.50
98,422.50
1.0100
m2
5,500.00
5,555.00
0.1000
1.0000
m3
ls
230,000.00
2,750.00
23,000.00
2,750.00
0.2500
org
75,000.00
18,750.00
0.5000
0.0250
org
org
75,000.00
104,000.00
37,500.00
2,600.00
Mandor
Jumlah
0.0030
org
110,000.00
330.00
90,485.00
201
AN.CK
1
AN.CK
202
203
9,048.50
99,533.50
1.0000
7.0000
bh
bh
84,500.00
500.00
84,500.00
3,500.00
10.0000
kg
87,500.00
875,000.00
Pasir pasang
Tukang batu terampil
0.0100
1.5000
m3
org
214,500.00
98,000.00
2,145.00
147,000.00
0.3000
1.0000
org
org
104,000.00
98,000.00
31,200.00
98,000.00
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 BH PAS. CLOSET JONGKOK ( SETARA INA ) PUTIH
Closet jongkok ( setara ina ) putih
Bata merah
Sement portland
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.1100
org
110,000.00
2
1 BH PAS. CLOSET JONGKOK ( SETARA INA ) WARNA
Closet jongkok ( setara ina ) warna
Bata merah
Sement portland
Pasir pasang
Tukang batu terampil
Kepala tukang batu
Pekerja terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
12,100.00
1,253,445.00
125,344.50
1,378,789.50
1.0000
7.0000
6.0000
0.0100
1.5000
1.5000
1.0000
0.1600
3
1.0000
7.0000
6.0000
0.0100
1.5000
1.5000
1.0000
0.1600
bh
bh
kg
m3
org
org
org
org
4
bh
bh
kg
m3
org
org
org
org
162,500.00
500.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
5
169,000.00
500.00
87,500.00
214,500.00
98,000.00
104,000.00
98,000.00
110,000.00
162,500.00
3,500.00
525,000.00
2,145.00
147,000.00
156,000.00
98,000.00
17,600.00
1,111,745.00
111,174.50
1,222,919.50
6=(3X5)
169,000.00
3,500.00
525,000.00
2,145.00
147,000.00
156,000.00
98,000.00
17,600.00
1,118,245.00
111,824.50
AN.CK
204
1,230,069.50
1.0000
1.0000
bh
ls
1,062,500.00
63,750.00
1,062,500.00
63,750.00
Pekerja
3.3000
org
98,000.00
323,400.00
1.1000
0.0010
org
org
98,000.00
104,000.00
107,800.00
104.00
Mandor
Jumlah
0.1600
org
110,000.00
17,600.00
1,575,154.00
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
205
206
207
208
209
210
157,515.40
1,732,669.40
Urinoir
Perlengkapan 30% harga urinoir
1.0000
1.0000
Sement portland
6.0000
Pasir pasang
Pekerja
0.0100
1.0000
1.0000
0.1000
Mandor
0.1000
bh
ls
1,107,500.00
332,250.00
1,107,500.00
332,250.00
kg
87,500.00
525,000.00
m3
org
214,500.00
98,000.00
2,145.00
98,000.00
org
org
98,000.00
104,000.00
98,000.00
10,400.00
org
110,000.00
11,000.00
Jumlah
Keuntungan pengusaha 10%
2,184,295.00
218,429.50
2,402,724.50
2
1 M2 PENGECATAN BETON ICI ESKTERIOR
Cat tembok ( setara ICI )
Alkali ICI sebelum pengecatan
Rol cat
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Steger werk
1.0000
1.0000
6.0000
0.0100
1.2000
1.4500
0.1500
0.1000
bh
ls
kg
m3
org
org
org
org
1,400,000.00
168,000.00
87,500.00
214,500.00
98,000.00
98,000.00
104,000.00
110,000.00
1,400,000.00
168,000.00
525,000.00
2,145.00
117,600.00
142,100.00
15,600.00
11,000.00
2,381,445.00
238,144.50
2,619,589.50
1.0000
1.0000
0.0750
0.7500
0.2500
bh
ls
org
org
org
2,369,000.00
473,800.00
98,000.00
104,000.00
110,000.00
2,369,000.00
473,800.00
7,350.00
78,000.00
27,500.00
2,955,650.00
295,565.00
3,251,215.00
1.0000
0.2800
1.2800
bh
m2
m2
325,000.00
2,476,700.50
834,422.50
325,000.00
693,476.14
1,068,060.80
2,086,536.94
208,653.69
2,295,190.63
1.0000
0.2800
1.2800
bh
m2
m2
356,500.00
2,476,700.50
834,422.50
356,500.00
693,476.14
1,068,060.80
2,118,036.94
211,803.69
2,329,840.63
3
0.2500
0.1250
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0250
4
kg
kg
bh
bh
org
org
org
org
lot
5
85,500.00
85,500.00
35,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
19,000.00
6=(3X5)
21,375.00
10,687.50
350.00
2,500.00
12,000.00
21,000.00
3,120.00
1,100.00
475.00
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
211
212
213
214
215
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN DINDING DAN PLAPOND INTERIOR ICI
Cat tembok ( setara ICI )
Cat dasar semeblum pengecatan
Rol cat
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Steger werk
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN DINDING BARU ( SETARA METROLIT )
Cat tembok ( setara metrolit )
Plamur tembok
Rol cat
Steger werk
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN DINDING BARU 3X ( SETARA VINILEX )
72,607.50
7,260.75
79,868.25
0.2500
0.1250
0.0100
0.5000
0.2000
0.3000
0.0300
0.0100
0.0250
kg
kg
bh
bh
org
org
org
org
lot
85,500.00
85,500.00
35,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
19,000.00
21,375.00
10,687.50
350.00
2,500.00
15,000.00
22,500.00
3,120.00
1,100.00
475.00
77,107.50
7,710.75
84,818.25
0.1750
0.1600
0.0100
0.0450
0.5000
0.1600
0.2800
0.0300
0.0100
kg
kg
bh
lot
bh
org
org
org
org
25,500.00
31,500.00
35,000.00
19,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
4,462.50
5,040.00
350.00
855.00
2,500.00
12,000.00
21,000.00
3,120.00
1,100.00
50,427.50
5,042.75
55,470.25
0.1750
kg
34,000.00
5,950.00
Plamur tembok
Rol cat
0.1600
0.0100
kg
bh
31,500.00
35,000.00
5,040.00
350.00
Steger werk
Hampelas
0.0450
0.5000
lot
bh
19,000.00
5,000.00
855.00
2,500.00
0.1600
org
75,000.00
12,000.00
0.2800
0.0300
org
org
75,000.00
104,000.00
21,000.00
3,120.00
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN DINDING BARU 3X ( SETARA ROMATEX )
Cat tembok ( setara Romatek )
Plamur tembok
Rol cat
Steger werk
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0100
org
110,000.00
1,100.00
51,915.00
5,191.50
57,106.50
0.1750
0.1600
0.0100
0.0450
0.5000
0.1040
0.1720
0.0195
0.0100
kg
kg
bh
lot
bh
org
org
org
org
21,000.00
31,500.00
35,000.00
19,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
3,675.00
5,040.00
350.00
855.00
2,500.00
7,800.00
12,900.00
2,028.00
1,100.00
36,248.00
3,624.80
39,872.80
2
1 M2 PENGECATAN KANSTIN
Cat kanstin
Kwas 3"
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
3
0.1750
0.0500
0.1040
0.1820
0.0195
0.0100
0.0450
4
kg
bh
lbr
org
org
org
org
5
64,500.00
16,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
6=(3X5)
11,287.50
800.00
520.00
13,650.00
1,462.50
1,040.00
4,950.00
AN.CK
216
Jumlah
Keuntungan pengusaha 10%
33,710.00
3,371.00
37,081.00
0.1750
kg
85,500.00
14,962.50
Plamur tembok
Rol cat
0.1600
0.0100
kg
bh
31,500.00
35,000.00
5,040.00
350.00
Steger werk
Hampelas
0.0450
0.5000
lot
bh
19,000.00
5,000.00
855.00
2,500.00
0.1600
org
75,000.00
12,000.00
0.2800
0.0300
org
org
75,000.00
104,000.00
21,000.00
3,120.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
60,927.50
217
6,092.75
67,020.25
0.2000
0.1600
kg
kg
25,500.00
31,500.00
Rol cat
0.0100
bh
35,000.00
350.00
Steger werk
Hampelas
1.0000
0.5000
lot
bh
20,000.00
5,000.00
20,000.00
2,500.00
0.1040
0.1820
org
org
75,000.00
75,000.00
7,800.00
13,650.00
0.0195
org
104,000.00
2,028.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
57,568.00
AN.CK
1
AN.CK
218
219
220
5,100.00
5,040.00
5,756.80
63,324.80
0.2000
0.1600
kg
kg
34,000.00
31,500.00
6,800.00
5,040.00
Rol cat
Steger werk
0.0100
0.0425
bh
lot
35,000.00
20,000.00
350.00
850.00
Hampelas
0.5000
bh
5,000.00
2,500.00
0.2000
0.2800
org
org
75,000.00
75,000.00
15,000.00
21,000.00
0.0300
0.0100
org
org
104,000.00
110,000.00
3,120.00
1,100.00
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN PLAPOND BARU 3X ( SETARA SANLEX )
Cat tembok ( setara Sanlex )
Plamur tembok
Rol cat
Steger werk
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
55,760.00
5,576.00
61,336.00
0.2000
0.1600
0.0100
1.0000
0.5000
0.1040
0.1820
0.0195
0.0100
2
3
1 M2 PENGECATAN PLAPOND BARU 3X ( SETARA ROMATEX )
Cat tembok ( setara Romatek )
0.2000
Plamur tembok
0.1600
Rol cat
0.0100
Steger werk
1.0000
Hampelas
0.5000
kg
kg
bh
lot
bh
org
org
org
org
4
kg
kg
bh
lot
bh
20,500.00
31,500.00
35,000.00
20,000.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
5
21,000.00
31,500.00
35,000.00
20,000.00
5,000.00
4,100.00
5,040.00
350.00
20,000.00
2,500.00
7,800.00
13,650.00
2,028.00
1,100.00
56,568.00
5,656.80
62,224.80
6=(3X5)
4,200.00
5,040.00
350.00
20,000.00
2,500.00
AN.CK
AN.CK
221
222
0.1040
0.1720
org
org
75,000.00
75,000.00
7,800.00
12,900.00
0.0195
0.0100
org
org
104,000.00
110,000.00
2,028.00
1,100.00
Jumlah
55,918.00
5,591.80
61,509.80
0.2000
kg
85,500.00
17,100.00
Plamur tembok
0.1600
kg
31,500.00
5,040.00
Rol cat
Steger werk
0.0100
0.0425
bh
lot
35,000.00
20,000.00
350.00
850.00
Hampelas
Pekerja setengah terampil
0.5000
0.2000
bh
org
5,000.00
75,000.00
2,500.00
15,000.00
0.2800
org
75,000.00
21,000.00
0.0300
0.0100
org
org
104,000.00
110,000.00
3,120.00
1,100.00
Jumlah
Keuntungan pengusaha 10%
66,060.00
6,606.00
72,666.00
kg
25,000.00
4,175.00
Plamour kayu
Cat kayu ( setara glotek )
0.0830
0.2000
kg
kg
28,000.00
59,000.00
2,324.00
11,800.00
Hamplas kayu
0.4000
bh
5,000.00
2,000.00
0.1500
0.0500
lt
bh
9,500.00
16,000.00
1,425.00
800.00
0.2000
0.3000
org
org
75,000.00
98,000.00
15,000.00
29,400.00
0.0300
org
104,000.00
3,120.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
71,144.00
AN.CK
1
AN.CK
223
224
225
7,114.40
78,258.40
0.1700
0.4000
kg
bh
31,500.00
6,000.00
5,355.00
2,400.00
Kwas 3"
Minyak cat terpentin
0.0500
0.0750
bh
lt
16,000.00
9,500.00
800.00
712.50
0.1000
0.1500
0.0150
0.0050
org
org
org
org
75,000.00
98,000.00
104,000.00
110,000.00
0.1670
0.2000
0.4000
0.0500
0.1500
0.2000
0.3000
0.0300
0.0100
kg
kg
bh
bh
lt
org
org
org
org
31,500.00
52,500.00
6,000.00
16,000.00
9,500.00
98,000.00
98,000.00
104,000.00
110,000.00
2
1 M2 PENGECATAN GENTENG BARU 3X ( SETARA GAMA )
Cat dasar genteng ( setara gama )
Cat penutup genteng ( setara gama ) 2 X
Hamplas
0.1000
0.1460
0.5000
kg
kg
bh
5
49,000.00
49,000.00
6,000.00
7,500.00
14,700.00
1,560.00
550.00
33,577.50
3,357.75
36,935.25
5,260.50
10,500.00
2,400.00
800.00
1,425.00
19,600.00
29,400.00
3,120.00
1,100.00
73,605.50
7,360.55
80,966.05
6=(3X5)
4,900.00
7,154.00
3,000.00
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
1
AN.CK
226
227
228
229
230
231
Rol cat
Pekerja setengah terampil
0.0100
0.0280
bh
org
35,000.00
75,000.00
350.00
2,100.00
0.0630
0.0063
org
org
75,000.00
104,000.00
4,725.00
655.20
22,884.20
2,288.42
25,172.62
0.1000
0.1460
0.5000
0.0100
0.0280
0.0630
0.0063
kg
kg
bh
bh
org
org
org
52,500.00
52,500.00
6,000.00
35,000.00
75,000.00
75,000.00
104,000.00
5,250.00
7,665.00
3,000.00
350.00
2,100.00
4,725.00
655.20
23,745.20
2,374.52
26,119.72
0.1170
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
kg
bh
ls
bh
org
org
org
org
25,500.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
2,983.50
350.00
250.00
520.00
13,650.00
1,462.50
1,040.00
4,950.00
25,206.00
2,520.60
27,726.60
0.0585
0.0050
0.2500
0.0520
0.0910
0.0098
0.0050
0.0225
kg
bh
ls
bh
org
org
org
org
25,500.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
1,491.75
175.00
125.00
260.00
6,825.00
735.00
520.00
2,475.00
12,606.75
1,260.68
13,867.43
0.1170
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
kg
bh
ls
bh
org
org
org
org
34,000.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
3,978.00
350.00
250.00
520.00
13,650.00
1,462.50
1,040.00
4,950.00
26,200.50
2,620.05
28,820.55
0.1170
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
kg
bh
ls
bh
org
org
org
org
21,000.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
2,457.00
350.00
250.00
520.00
13,650.00
1,462.50
1,040.00
4,950.00
24,679.50
2,467.95
27,147.45
2
1 M2 PENGECATAN DINDING LAMA 2X ( SETARA ICI )
Cat tembok ( setara ICI )
Rol cat
0.1170
0.0100
kg
bh
5
85,500.00
35,000.00
6=(3X5)
10,003.50
350.00
AN.CK
AN.CK
232
233
Steger werk
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PENGECATAN PLAPOND LAMA 2X ( SETARA METROLIT )
Cat tembok ( setara metrolit )
Rol cat
Steger werk
Hampelas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
ls
bh
org
org
org
org
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
250.00
520.00
13,650.00
1,462.50
1,040.00
4,950.00
32,226.00
3,222.60
35,448.60
0.1330
0.0100
1.0000
0.5000
0.1040
0.1820
0.0195
0.0100
kg
bh
ls
bh
org
org
org
org
25,500.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
3,391.50
350.00
500.00
2,500.00
7,800.00
13,650.00
2,028.00
1,100.00
31,319.50
3,131.95
34,451.45
0.1330
kg
34,000.00
4,522.00
Rol cat
0.0100
bh
35,000.00
350.00
Steger werk
Hampelas
1.0000
0.5000
ls
bh
500.00
5,000.00
500.00
2,500.00
0.1040
0.1820
org
org
75,000.00
75,000.00
7,800.00
13,650.00
0.0195
org
104,000.00
2,028.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
32,450.00
AN.CK
AN.CK
1
AN.CK
234
235
236
237
3,245.00
35,695.00
0.1330
0.0100
kg
bh
21,000.00
35,000.00
2,793.00
350.00
Steger werk
Hampelas
1.0000
0.5000
ls
bh
500.00
5,000.00
500.00
2,500.00
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
7,800.00
13,650.00
2,028.00
1,100.00
30,721.00
3,072.10
33,793.10
kg
bh
ls
bh
org
org
org
org
85,500.00
35,000.00
500.00
5,000.00
75,000.00
75,000.00
104,000.00
110,000.00
11,371.50
350.00
500.00
2,500.00
7,800.00
13,650.00
2,028.00
1,100.00
39,299.50
3,929.95
43,229.45
kg
bh
lt
bh
org
org
org
org
59,000.00
5,000.00
9,500.00
16,000.00
75,000.00
98,000.00
104,000.00
110,000.00
7,847.00
2,000.00
1,425.00
800.00
15,000.00
29,400.00
3,120.00
1,100.00
60,692.00
6,069.20
66,761.20
2
1 M2 PENGECATAN BESI LAMA 2X ( SETARA GLOTEK )
6=(3X5)
0.1330
0.4000
kg
bh
52,500.00
6,000.00
6,982.50
2,400.00
Kwas 3"
Minyak cat terpentin
0.0500
0.1500
bh
lt
16,000.00
9,500.00
800.00
1,425.00
0.2000
org
75,000.00
15,000.00
0.3000
0.0300
org
org
98,000.00
104,000.00
29,400.00
3,120.00
Mandor
Jumlah
0.0100
org
110,000.00
1,100.00
60,227.50
AN.CK
AN.CK
AN.CK
238
239
240
241
6,022.75
66,250.25
0.2000
0.0300
kg
kg
59,000.00
37,000.00
11,800.00
1,110.00
Oker putih
0.0200
kg
19,500.00
390.00
0.0100
0.1000
kg
kg
56,500.00
68,500.00
565.00
6,850.00
0.2000
0.0100
kg
bh
94,000.00
16,000.00
18,800.00
160.00
Spirtus
0.2000
lt
9,500.00
1,900.00
Hampelas kayu
Pekerja setengah terampil
0.1000
0.2500
bh
org
5,000.00
75,000.00
500.00
18,750.00
0.2850
0.0400
org
org
75,000.00
104,000.00
21,375.00
4,160.00
Mandor
0.0200
org
110,000.00
2,200.00
Jumlah
Keuntungan pengusaha 10%
88,560.00
8,856.00
97,416.00
0.2000
kg
59,000.00
11,800.00
Dempul
Oker putih
0.0300
0.0200
kg
kg
37,000.00
19,500.00
1,110.00
390.00
0.0100
0.1000
kg
kg
56,500.00
68,500.00
565.00
6,850.00
0.2000
kg
94,000.00
18,800.00
Melamik
Kwas 3"
0.3500
0.0100
kg
bh
78,000.00
16,000.00
27,300.00
160.00
Spirtus
Hampelas kayu
0.2000
0.1000
lt
bh
9,500.00
5,000.00
1,900.00
500.00
0.2500
0.2850
0.0400
0.0200
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
18,750.00
21,375.00
4,160.00
2,200.00
115,860.00
11,586.00
127,446.00
1.0000
0.0200
0.2500
0.0200
0.0020
0.0200
dn
kg
kg
org
org
org
25,000.00
21,500.00
17,500.00
98,000.00
104,000.00
98,000.00
25,000.00
430.00
4,375.00
1,960.00
208.00
1,960.00
33,933.00
3,393.30
37,326.30
1.0000
0.0150
0.0096
0.2500
0.4000
0.0250
0.1500
m'
kg
m3
lt
org
org
org
40,000.00
21,500.00
2,187,500.00
28,500.00
98,000.00
104,000.00
98,000.00
40,000.00
322.50
21,000.00
7,125.00
39,200.00
2,600.00
14,700.00
124,947.50
12,494.75
137,442.25
6=(3X5)
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
242
243
244
245
246
247
248
249
250
251
252
1.0000
0.0150
0.0190
0.3000
0.4000
0.0250
0.1500
m'
kg
m3
lt
org
org
org
40,000.00
21,500.00
2,187,500.00
28,500.00
98,000.00
104,000.00
98,000.00
40,000.00
322.50
41,562.50
8,550.00
39,200.00
2,600.00
14,700.00
146,935.00
14,693.50
161,628.50
1.0000
0.5000
bh
org
110,000.00
98,000.00
110,000.00
49,000.00
159,000.00
15,900.00
174,900.00
1.0000
0.5000
bh
org
247,000.00
98,000.00
247,000.00
49,000.00
296,000.00
29,600.00
325,600.00
1.0000
0.5000
bh
org
241,000.00
98,000.00
241,000.00
49,000.00
290,000.00
29,000.00
319,000.00
1.0000
0.1500
stl
org
16,500.00
98,000.00
16,500.00
14,700.00
31,200.00
3,120.00
34,320.00
1.0000
0.1500
stl
org
21,500.00
98,000.00
21,500.00
14,700.00
36,200.00
3,620.00
39,820.00
1.0000
0.1500
stl
org
37,500.00
98,000.00
37,500.00
14,700.00
52,200.00
5,220.00
57,420.00
1.0000
0.1000
stl
org
12,500.00
98,000.00
12,500.00
9,800.00
22,300.00
2,230.00
24,530.00
1.0000
0.1000
stl
org
11,500.00
98,000.00
11,500.00
9,800.00
21,300.00
2,130.00
23,430.00
1.0000
0.1000
stl
org
10,000.00
98,000.00
10,000.00
9,800.00
19,800.00
1,980.00
21,780.00
1.0000
0.1000
stl
org
10,000.00
98,000.00
10,000.00
9,800.00
19,800.00
1,980.00
21,780.00
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
253
254
255
256
257
258
259
260
261
2
3
4
1 BH PAS. KAIT ANGIN DORONG
kait angin dorong
1.0000
stl
Tukang kayu terampil
0.1000
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 BH PAS. KAIT ANGIN LAMSKAM
kait angin lamskam
1.0000
stl
Tukang kayu terampil
0.1000
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
I M2 PAS. KACA POLOS TEBAL 3 MM
Kaca polos 3 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. KACA POLOS TEBAL 5 MM
Kaca polos 5 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. KACA RAYBAN TEBAL 3 MM
Kaca rayban 3 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. KACA RAYBAN TEBAL 5 MM
Kaca rayban 5 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. KACA ES TEBAL 3 MM
Kaca ES 3 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. KACA ES TEBAL 5 MM
Kaca ES 5 mm
1.1000
m2
Tukang kayu terampil
0.1500
org
Pekerja terampil
0.1300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 UNIT SEPTICTANK 2,5 X 1,5 X 2 M + REMBESANNYA ( KANTOR TYPE BESAR )
Galian tanah
7.5000
m3
Pasir urug
0.3570
m3
Lantai kerja ( beton tumbuk ) 1 : 3 : 5
3.7500
m2
Pas bata 1 Pc : 4 Ps + plesteran 1 : 4
25.0000
m2
Plat beton penutup + balok
0.5000
m3
Pipa GIP 1,5"
2.0000
m'
Galian tanah untuk rembesan
5.6250
m3
Pas. injuk
9.0000
kg
Urugan kerikil 3,5 cm
1.7500
m3
Pipa PVC 4" berlobang jenis pinilon
6.0000
m'
Pipa PVC 4" jenis AW + sambungan
9.0000
m'
Urugan kembali perataan tanah
1.8750
m3
Tambahan upah
0.0850
ls
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
15,000.00
98,000.00
15,000.00
9,800.00
24,800.00
2,480.00
27,280.00
12,500.00
98,000.00
12,500.00
9,800.00
22,300.00
2,230.00
24,530.00
172,500.00
98,000.00
98,000.00
189,750.00
14,700.00
12,740.00
217,190.00
21,719.00
238,909.00
178,500.00
98,000.00
98,000.00
196,350.00
14,700.00
12,740.00
223,790.00
22,379.00
246,169.00
121,500.00
98,000.00
98,000.00
133,650.00
14,700.00
12,740.00
161,090.00
16,109.00
177,199.00
181,500.00
98,000.00
98,000.00
199,650.00
14,700.00
12,740.00
227,090.00
22,709.00
249,799.00
101,500.00
98,000.00
98,000.00
111,650.00
14,700.00
12,740.00
139,090.00
13,909.00
152,999.00
162,500.00
98,000.00
98,000.00
178,750.00
14,700.00
12,740.00
206,190.00
20,619.00
226,809.00
44,250.00
251,000.00
17,975,135.00
2,220,176.20
37,634,786.50
26,500.00
44,250.00
17,000.00
294,500.00
78,500.00
83,500.00
21,556.00
4,000,000.00
331,875.00
89,607.00
67,406,756.25
55,504,405.00
18,817,393.25
53,000.00
248,906.25
153,000.00
515,375.00
471,000.00
751,500.00
40,417.50
340,000.00
144,723,235.25
14,472,323.53
159,195,558.78
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
262
263
264
265
266
267
268
269
2
3
4
1 UNIT SEPTICTANK 2,5 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )
Galian tanah
4.5000
m3
Pasir urug
0.2142
m3
Lantai kerja ( beton tumbuk ) 1 : 3 : 5
2.2500
m2
Pas bata 1 Pc : 4 Ps + plesteran 1 : 4
15.0000
m2
Plat beton penutup + balok
0.3000
m3
Pipa GIP 1,5"
1.2000
m'
Galian tanah untuk rembesan
3.3750
m3
Pas. injuk
5.4000
kg
Urugan kerikil 3,5 cm
1.0500
m3
Pipa PVC 4" berlobang jenis pinilon
9.0000
m'
Pipa PVC 4" jenis AW + sambungan
5.4000
m'
Urugan kembali perataan tanah
1.1250
m3
Tambahan upah
0.0920
ls
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 UNIT SEPTICTANK 1,5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL )
Galian tanah
2.2500
m3
Pasir urug
0.1071
m3
Lantai kerja ( beton tumbuk ) 1 : 3 : 5
1.1250
m2
Pas bata 1 Pc : 4 Ps + plesteran 1 : 4
7.5000
m2
Plat beton penutup + balok
0.1500
m3
Pipa GIP 1,5"
0.6000
m'
Galian tanah untuk rembesan
1.6875
m3
Pas. injuk
2.7000
kg
Urugan kerikil 3,5 cm
0.5250
m3
Pipa PVC 4" berlobang jenis pinilon
9.0000
m'
Pipa PVC 4" jenis AW + sambungan
9.0000
m'
Urugan kembali perataan tanah
0.5625
m3
Tambahan upah
0.0650
ls
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' PAS. KANSTIN 60 X 30 X 18
Kanstin
1.6600
bh
Pekerja setengah terampil
0.4300
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 BONGKARAN BETON BERTULANG
Pekerja
6.6670
org
Mandor
0.3330
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 MEMBONGKAR PLESTERAN DINDING
Pekerja setengah terampil
0.0500
org
Mandor
0.0250
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR DINDING BATA
( Jika bongkaran di pakai lagi )
Pekerja setengah terampil
2.0000
org
Mandor
0.0900
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR DINDING BATA
( Jika bongkaran tidak dipakai lagi )
Pekerja setengah terampil
1.0000
org
Mandor
0.0900
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 MEMBONGKAR PLESTERAN DINDING
Pekerja setengah terampil
0.0500
org
Mandor
0.0250
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
44,250.00
251,000.00
17,975,135.00
2,220,176.20
37,634,786.50
26,500.00
44,250.00
17,000.00
294,500.00
78,500.00
83,500.00
21,556.00
2,750,000.00
199,125.00
53,764.20
40,444,053.75
33,302,643.00
11,290,435.95
31,800.00
149,343.75
91,800.00
309,225.00
706,500.00
450,900.00
24,250.50
253,000.00
87,306,841.15
8,730,684.12
96,037,525.27
44,250.00
251,000.00
17,975,135.00
2,220,176.20
37,634,786.50
26,500.00
44,250.00
17,000.00
294,500.00
78,500.00
83,500.00
21,556.00
2,750,000.00
99,562.50
26,882.10
20,222,026.88
16,651,321.50
5,645,217.98
15,900.00
74,671.88
45,900.00
154,612.50
706,500.00
751,500.00
12,125.25
178,750.00
44,584,970.59
4,458,497.06
49,043,467.65
51,500.00
75,000.00
85,490.00
32,250.00
117,740.00
11,774.00
129,514.00
98,000.00
110,000.00
653,366.00
36,630.00
689,996.00
68,999.60
758,995.60
75,000.00
110,000.00
3,750.00
2,750.00
6,500.00
650.00
7,150.00
75,000.00
110,000.00
150,000.00
9,900.00
159,900.00
15,990.00
175,890.00
75,000.00
110,000.00
75,000.00
9,900.00
84,900.00
8,490.00
93,390.00
75,000.00
110,000.00
3,750.00
2,750.00
6,500.00
650.00
7,150.00
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
270
271
272
273
274
275
276
277
278
2
1 M2 MEMBONGKAR GENTENG/SIRAP
( Jika bongkaran tidak dipakai lagi )
Pekerja setengah terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 MEMBONGKAR GENTENG/SIRAP
( Jika bongkaran dipakai lagi )
Pekerja setengah terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR RANGKA ATAP/RENG KASO
( Jika bongkaran tidak dipakai lagi )
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR RANGKA ATAP/RENG KASO
( Jika bongkaran dipakai lagi )
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR KUDA-KUDA, GORDING/BALOK-BALOK
( Jika bongkaran dipakai lagi )
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 MEMBONGKAR KUDA-KUDA, GORDING/BALOK-BALOK
( Jika bongkaran tidak dipakai lagi )
Pekerja
Tukang kayu setengah terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 MEMBONGKAR PLAPOND
( Jika bongkaran tidak dipakai lagi )
Pekerja
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 MEMBONGKAR PLAPOND
( Jika bongkaran dipakai lagi )
Pekerja setengah terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 PAS. BETON CYCLOOF + 40% BATU KALI
Beton site mix K. 175
Batu kali/batu belah
Upah kerja
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
0.0200
0.0100
org
org
75,000.00
110,000.00
1,500.00
1,100.00
2,600.00
260.00
2,860.00
0.0400
0.0200
org
org
75,000.00
110,000.00
3,000.00
2,200.00
5,200.00
520.00
5,720.00
0.1000
0.0250
0.0025
0.0050
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
7,500.00
1,875.00
260.00
550.00
10,185.00
1,018.50
11,203.50
0.2000
0.0500
0.0050
0.0100
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
15,000.00
3,750.00
520.00
1,100.00
20,370.00
2,037.00
22,407.00
4.0000
6.0000
0.6000
0.2000
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
300,000.00
450,000.00
62,400.00
22,000.00
834,400.00
83,440.00
917,840.00
4.0000
3.0000
0.2000
org
org
org
98,000.00
75,000.00
110,000.00
392,000.00
225,000.00
22,000.00
639,000.00
63,900.00
702,900.00
0.1250
0.0050
org
org
98,000.00
110,000.00
12,250.00
550.00
12,800.00
1,280.00
14,080.00
0.1000
0.2500
0.0025
0.0050
org
org
org
org
75,000.00
75,000.00
104,000.00
110,000.00
7,500.00
18,750.00
260.00
550.00
27,060.00
2,706.00
29,766.00
0.6000
0.4800
0.0400
m3
m3
ls
30,323,435.00
317,500.00
317,000.00
18,194,061.00
152,400.00
12,680.00
18,359,141.00
1,835,914.10
20,195,055.10
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
279
280
281
282
283
284
2
3
1 M3 COR BETON SITE MIX K.175
Semen portland
340.0000
Pasir beton klas II
0.5400
Batu pecah tangan 2/3 cm
0.8300
Peralatan
0.0700
Pekerja
1.5000
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.0500
Mandor
0.0100
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 COR BETON SITE MIX K.225
Semen portland
394.8000
Pasir beton klas I
0.4900
Batu pecah mesin 2/3 cm
0.8100
Peralatan
0.0700
Pekerja
1.5000
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.0500
Mandor
0.0100
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 COR BETON SITE MIX K.300
Semen portland
434.8000
Pasir beton klas I
0.4900
Split 2/3
0.8100
Peralatan
0.0700
Pekerja
1.5000
Tukang batu setengah terampil
0.5000
Kepala tukang batu
0.0500
Mandor
0.0100
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 COR BETON K. 175 REDY MIX MIN 6 M3 BERIKUT SLANG
Adukan K. 175 ready mix
1.0000
Pekerja
2.5000
Tukang batu setengah terampil
0.2500
Kepala tukang batu
0.1000
Mandor
0.0100
Alat bantu ( slang + tes lab )
0.0450
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 COR BETON K. 225 REDY MIX MIN 6 M3 BERIKUT SLANG
Adukan K. 225 ready mix
1.0000
Pekerja
2.5000
Tukang batu setengah terampil
0.2500
Kepala tukang batu
0.1000
Mandor
0.0100
Alat bantu ( slang + tes lab )
0.0450
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M3 COR BETON K. 300 REDY MIX MIN 6 M3 BERIKUT SLANG
Adukan K. 300 ready mix
1.0000
Pekerja
2.5000
Tukang batu setengah terampil
0.2500
Kepala tukang batu
0.1000
Mandor
0.0100
Alat bantu ( slang + tes lab )
0.0450
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
kg
m3
m3
lot
org
org
org
org
87,500.00
230,000.00
294,500.00
200,000.00
98,000.00
75,000.00
104,000.00
110,000.00
29,750,000.00
124,200.00
244,435.00
14,000.00
147,000.00
37,500.00
5,200.00
1,100.00
30,323,435.00
3,032,343.50
33,355,778.50
kg
m3
m3
lot
org
org
org
org
87,500.00
194,000.00
377,000.00
200,000.00
98,000.00
75,000.00
104,000.00
110,000.00
34,545,000.00
95,060.00
305,370.00
14,000.00
147,000.00
37,500.00
5,200.00
1,100.00
35,150,230.00
3,515,023.00
38,665,253.00
kg
m3
m3
lot
org
org
org
org
87,500.00
194,000.00
377,000.00
468,000.00
98,000.00
75,000.00
104,000.00
110,000.00
38,045,000.00
95,060.00
305,370.00
32,760.00
147,000.00
37,500.00
5,200.00
1,100.00
38,668,990.00
3,866,899.00
42,535,889.00
m3
org
org
org
org
lot
902,000.00
98,000.00
75,000.00
104,000.00
110,000.00
3,520,000.00
902,000.00
245,000.00
18,750.00
10,400.00
1,100.00
158,400.00
1,335,650.00
133,565.00
1,469,215.00
m3
org
org
org
org
lot
933,000.00
98,000.00
75,000.00
104,000.00
110,000.00
3,520,000.00
933,000.00
245,000.00
18,750.00
10,400.00
1,100.00
158,400.00
1,366,650.00
136,665.00
1,503,315.00
m3
org
org
org
org
lot
1,046,500.00
98,000.00
75,000.00
104,000.00
110,000.00
3,520,000.00
1,046,500.00
245,000.00
18,750.00
10,400.00
1,100.00
158,400.00
1,480,150.00
148,015.00
1,628,165.00
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
285
286
287
288
289
290
2
1 KG BESI BETON TERPASANG U.24 FUL ( KS )
Besi beton rata-rata
Kawat beton
Peralatan, spencer
Tukang besi beton setengah terampil
Tukang besi beton terampil
Kepala tukang besi beton
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 KG BESI BETON TERPASANG U.39 FUL ( KS )
Besi beton rata-rata
Kawat beton
Peralatan, spencer
Tukang besi beton setengah terampil
Tukang besi beton terampil
Kepala tukang besi beton terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 albasiah (dihitung 2x pakai) 75%
Papan kayu albasiah (dihitung 2x pakai) 50%
Paku
Pekerja
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Tk. kayu 1/2 terampil (bongkar cetakan)
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 BEKISTING DENGAN MULTIPLEX 9 MM
Kaso 5/7 kayu klas II, dihitung 2x pakai 50%
Multiplex 9 mm (dihitung 2x pakai) 75%
Paku
Pekerja
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Tk. kayu 1/2 terampil (bongkar cetakan)
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 BEKISTING DENGAN MULTIPLEX 12 MM
Kaso 5/7 kayu klas II, dihitung 2x pakai 50%
Multiplex 12 mm (dihitung 2x pakai) 75%
Paku
Pekerja
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Tk. kayu 1/2 terampil (bongkar cetakan)
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. STOOT WERK KAYU ALBASIAH
Kayu stoot albasiah dinding 2x pakai 50 %
Papan kayu albasiah dihitung 2x pakai 75 %
Paku
Pekerja
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
1.0500
0.0100
0.0200
0.0250
0.0150
0.0100
0.0050
kg
kg
lot
org
org
org
org
16,000.00
25,000.00
7,500.00
75,000.00
98,000.00
104,000.00
110,000.00
16,800.00
250.00
150.00
1,875.00
1,470.00
1,040.00
550.00
22,135.00
2,213.50
24,348.50
1.0500
0.0100
0.0200
0.0360
0.0160
0.0110
0.0050
kg
kg
lot
org
org
org
org
16,000.00
25,000.00
7,900.00
75,000.00
98,000.00
104,000.00
110,000.00
16,800.00
250.00
158.00
2,700.00
1,568.00
1,144.00
550.00
23,170.00
2,317.00
25,487.00
0.0170
0.0240
0.4000
0.1200
0.1500
0.1500
0.0500
0.1200
m3
m3
kg
org
org
org
org
org
2,187,500.00
2,187,500.00
21,500.00
98,000.00
75,000.00
104,000.00
110,000.00
75,000.00
37,187.50
52,500.00
8,600.00
11,760.00
11,250.00
15,600.00
5,500.00
9,000.00
151,397.50
15,139.75
166,537.25
0.0170
0.3470
0.4000
0.1200
0.1500
0.1500
0.0500
0.1200
m3
lbr
kg
org
org
org
org
org
3,705,500.00
184,000.00
21,500.00
98,000.00
75,000.00
104,000.00
110,000.00
75,000.00
62,993.50
63,848.00
8,600.00
11,760.00
11,250.00
15,600.00
5,500.00
9,000.00
188,551.50
18,855.15
207,406.65
0.0170
0.3470
0.4000
0.1200
0.1500
0.1500
0.0500
0.1200
m3
lbr
kg
org
org
org
org
org
3,705,500.00
221,500.00
21,500.00
98,000.00
75,000.00
104,000.00
110,000.00
75,000.00
62,993.50
76,860.50
8,600.00
11,760.00
11,250.00
15,600.00
5,500.00
9,000.00
201,564.00
20,156.40
221,720.40
9.0000
0.0160
0.5000
0.1500
0.2000
0.2000
0.0170
bt
m3
kg
org
org
org
org
25,500.00
2,187,500.00
21,500.00
98,000.00
75,000.00
104,000.00
110,000.00
229,500.00
35,000.00
10,750.00
14,700.00
15,000.00
20,800.00
1,870.00
327,620.00
32,762.00
360,382.00
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
291
292
293
294
295
296
2
1 M2 PAS. STOOT WERK KAYU KLAS II
Kayu stoot klas II dinding 2x pakai 50 %
Papan kayu klas II dihitung 2x pakai 75 %
Paku
Pekerja
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 KG PEK. ERECTION KONST. KUDA-KUDA BESI
Bahan bakar solar
Pelumas
Alat bantu
Sewa alat
Pekerja terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Operator alat besar
Pembantu operator
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 KG PEK. KONST. BESI IWF / PROFIL EX DN/S.I.I
Besi IWF/PROFIL ex DN/SII
Peralatan ( oksigen, solar dll )
Pekerja terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 KG PEK. KONST. BESI SIKU / PROFIL EX DN
Besi SIKU / profil ex DN
Peralatan ( oksigen, solar dll )
Pekerja terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 CM PENGELASAN DENGAN LAS LISTRIK
Kawat las listrik
Bahan bakar solar
Pelumas
Alat bantu
Pekerja terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 TTK. MELOBANG KONST. BESI DENGAN BOR
Alat bantu
Pekerja terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
9.0000
0.0160
0.5000
0.1500
0.2000
0.2000
0.0170
bt
m3
kg
org
org
org
org
44,000.00
3,832,000.00
21,500.00
98,000.00
75,000.00
104,000.00
110,000.00
396,000.00
61,312.00
10,750.00
14,700.00
15,000.00
20,800.00
1,870.00
520,432.00
52,043.20
572,475.20
0.0100
0.0010
0.0002
0.0002
0.0010
0.0010
0.0002
0.0001
0.0002
0.0200
lt
lt
lot
ls
org
org
org
org
org
org
8,500.00
56,500.00
600.00
10,000.00
98,000.00
98,000.00
104,000.00
110,000.00
92,000.00
64,000.00
85.00
56.50
0.12
2.00
98.00
98.00
20.80
11.00
18.40
1,280.00
1,669.82
166.98
1,836.80
1.0500
0.1250
0.0600
0.0040
0.0010
0.0002
kg
lot
org
org
org
org
17,500.00
25,000.00
98,000.00
98,000.00
104,000.00
110,000.00
18,375.00
3,125.00
5,880.00
392.00
104.00
22.00
27,898.00
2,789.80
30,687.80
1.0500
0.1250
0.0600
0.0040
0.0010
0.0002
kg
lot
org
org
org
org
16,500.00
25,000.00
98,000.00
98,000.00
104,000.00
110,000.00
17,325.00
3,125.00
5,880.00
392.00
104.00
22.00
26,848.00
2,684.80
29,532.80
0.0400
0.0300
0.0040
0.2500
0.0040
0.0020
0.0020
0.0010
kg
lt
lt
lot
org
org
org
org
34,000.00
8,500.00
56,500.00
1,000.00
98,000.00
98,000.00
104,000.00
110,000.00
1,360.00
255.00
226.00
250.00
392.00
196.00
208.00
110.00
2,997.00
299.70
3,296.70
0.2500
0.0500
0.0200
0.0030
0.0010
lot
org
org
org
org
2,300.00
98,000.00
98,000.00
104,000.00
110,000.00
575.00
4,900.00
1,960.00
312.00
110.00
7,857.00
785.70
8,642.70
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
297
298
299
300
301
302
303
2
1 M2 PEKERJAAN BONDEX
Bondek
Kawat las listrik
Pekerja terampil
Tukang besi profil setengah terampil
Mandor
shear connector
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8
Kawat las listrik
Pekerja terampil
Tukang besi profil setengah terampil
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 BH TITIK CAHAYA ( KABEL 1,5 MM )
Kabel NYM 1,5 mm
Saklar
Plapond fiting
Pipa instalasi
Upah
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 BH TITIK CAHAYA ( KABEL 2,5 MM )
Kabel NYM 2,5 mm
Saklar
Plapond fiting
Pipa instalasi
Upah
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 BH STOP KONTAK ( KABEL 2,5 MM )
Kabel NYM 2,5 mm
Stop kontak
Pipa instalasi
Upah
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PEKERASAN SIRTU DIPADATKAN SETIAP 20 CM
Sirtu
Tukang gali
Mandor
alat bantu ( pek. Pemadatan tanah 1 m3 )
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. ONDERLAAGH BATU BELAH T. 20 CM
Pasir pasang
Batu belah
Pekerja terampil
Peralatan
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
6=(3X5)
1.0100
0.1000
0.0500
0.0300
0.0100
1.0000
m2
kg
org
org
org
ls
244,000.00
34,000.00
98,000.00
75,000.00
110,000.00
8,000.00
246,440.00
3,400.00
4,900.00
2,250.00
1,100.00
8,000.00
266,090.00
26,609.00
292,699.00
1.0100
0.1000
0.1000
0.0750
0.0100
m2
kg
org
org
org
150,000.00
34,000.00
98,000.00
75,000.00
110,000.00
151,500.00
3,400.00
9,800.00
5,625.00
1,100.00
171,425.00
17,142.50
188,567.50
9.0000
0.3000
1.0000
0.5000
1.0000
m'
bh
bh
m'
ls
12,000.00
14,000.00
19,000.00
11,500.00
10,000.00
108,000.00
4,200.00
19,000.00
5,750.00
10,000.00
146,950.00
14,695.00
161,645.00
9.0000
0.3000
1.0000
0.5000
1.0000
m'
bh
bh
m'
ls
11,000.00
14,000.00
19,000.00
11,500.00
10,000.00
99,000.00
4,200.00
19,000.00
5,750.00
10,000.00
137,950.00
13,795.00
151,745.00
7.5000
0.3000
0.5000
1.0000
m'
bh
m'
ls
11,000.00
32,000.00
11,500.00
10,000.00
82,500.00
9,600.00
5,750.00
10,000.00
107,850.00
10,785.00
118,635.00
1.2000
0.2500
0.0250
0.1000
m3
org
org
lot
137,500.00
98,000.00
110,000.00
56,562.50
165,000.00
24,500.00
2,750.00
5,656.25
197,906.25
19,790.63
217,696.88
0.1500
0.2500
0.1500
0.1200
m3
m3
org
lot
214,500.00
317,500.00
98,000.00
34,000.00
32,175.00
79,375.00
14,700.00
4,080.00
130,330.00
13,033.00
143,363.00
1
AN.CK
304
2
1 M3 LAPIS PONDASI ( LPB ) BRANGKAL CURI ( ALAT )
Brangkal curi
Alat bantu
1.2220
0.0016
m3
set
247,500.00
62,500.00
302,445.00
100.00
0.0780
m3
137,500.00
10,725.00
0.0333
0.0333
jam
jam
199,100.00
132,700.00
6,630.03
4,418.91
Mandor
Operator terlatih
0.0067
0.0067
oh
oh
110,000.00
92,000.00
737.00
616.40
Pembantu Operator
0.0067
oh
64,000.00
428.80
Supir truck
Pembantu Supir
0.0067
0.0067
oh
oh
87,000.00
64,000.00
582.90
428.80
Pekerja
Jumlah
0.0400
oh
98,000.00
3,920.00
331,032.84
AN.K.636
AN.K.620
305
306
307
6=(3X5)
33,103.28
364,136.12
0.1111
0.0010
ton
m3
997,500.00
155,000.00
110,822.25
155.00
Aspal
0.4000
kg
13,500.00
5,400.00
0.1000
0.0005
ltr
set
11,500.00
62,500.00
1,150.00
31.25
0.0056
0.0056
jam
jam
199,100.00
145,500.00
1,114.96
814.80
0.0056
jam
215,600.00
1,207.36
0.0033
0.0056
jam
jam
67,500.00
129,300.00
222.75
724.08
0.0044
0.0011
jam
oh
107,800.00
110,000.00
474.32
121.00
Operator terlatih
0.0056
oh
92,000.00
515.20
Pembantu Operator
Buruh tak terlatih ( pekerja )
0.0056
0.0167
oh
oh
64,000.00
98,000.00
358.40
1,636.60
0.0111
oh
98,000.00
1,087.80
125,835.77
12,583.58
138,419.35
0.0667
0.4000
0.1000
0.0003
0.0033
0.0033
0.0033
0.0033
0.0027
0.0007
0.0027
0.0027
0.0080
0.0053
ton
kg
set
set
jam
jam
jam
jam
jam
oh
oh
oh
oh
oh
1,082,000.00
13,500.00
11,500.00
62,500.00
145,500.00
215,600.00
67,500.00
129,300.00
107,800.00
110,000.00
92,000.00
64,000.00
98,000.00
98,000.00
72,169.40
5,400.00
1,150.00
18.75
480.15
711.48
222.75
426.69
291.06
77.00
248.40
172.80
784.00
519.40
82,671.88
8,267.19
90,939.07
0.1633
0.0483
0.0001
0.0050
0.0017
0.0050
0.0008
0.0017
0.0017
0.0033
kg
ltr
set
jam
jam
jam
oh
oh
oh
oh
13,500.00
11,500.00
62,500.00
63,800.00
107,800.00
16,500.00
110,000.00
92,000.00
64,000.00
98,000.00
2,204.55
555.45
6.25
319.00
183.26
82.50
88.00
156.40
108.80
323.40
Jumlah
Keuntungan pengusaha 10%
4,027.61
402.76
4,430.37
1
AN.K.619
AN.K.618
AN.K.521
AN.K.520
2
308
309
310
311
6=(3X5)
0.5100
kg
13,500.00
6,885.00
Minyak tanah
Alat bantu
0.5990
0.0002
ltr
set
11,500.00
62,500.00
6,888.50
12.50
0.0050
jam
63,800.00
319.00
Blower
Mandor
0.0050
0.0005
jam
org
16,500.00
110,000.00
82.50
55.00
Operator terlatih
Pembantu operator
0.0010
0.0010
org
org
92,000.00
64,000.00
92.00
64.00
Pekerja
0.0040
org
98,000.00
392.00
Jumlah
Keuntungan pengusaha 10%
14,790.50
1,479.05
16,269.55
0.0510
m3
339,500.00
17,314.50
0.0159
0.0089
m3
m3
395,500.00
269,000.00
6,288.45
2,394.10
Asphal bitumen
Alat bantu
4.0800
0.0058
kg
set
13,500.00
62,500.00
55,080.00
362.50
0.0107
jam
199,100.00
2,130.37
0.0214
0.0107
jam
jam
63,800.00
170,500.00
1,365.32
1,824.35
Blower
Mandor
0.0107
0.0043
jam
oh
16,500.00
110,000.00
176.55
473.00
Operator terlatih
0.0043
oh
92,000.00
395.60
Pembantu Operator
Supir truck
0.0043
0.0021
oh
oh
64,000.00
87,000.00
275.20
182.70
Pembantu sopir
Buruh tak terlatih ( pekerja )
0.0021
0.1414
oh
oh
64,000.00
98,000.00
134.40
13,857.20
421.40
102,675.64
10,267.56
112,943.20
295,825.00
2,500.00
16,585.03
11,053.91
3,663.00
1,536.40
1,068.80
1,452.90
1,068.80
98,000.00
432,753.84
43,275.38
476,029.22
325,000.00
100.00
8,847.30
6,570.30
4,379.10
737.00
1,223.60
851.20
582.90
428.80
3,920.00
352,640.20
35,264.02
387,904.22
1
AN.K.516
2
312
0.6250
m3
317,500.00
198,437.50
0.2500
m3
320,500.00
80,125.00
Pasir urug
Alat bantu
0.3750
0.0500
m3
set
196,000.00
62,500.00
73,500.00
3,125.00
0.0625
0.0375
jam
oh
199,100.00
110,000.00
12,443.75
4,125.00
Operator terlatih
0.0125
oh
92,000.00
1,150.00
1.2375
oh
98,000.00
121,275.00
494,181.25
313
49,418.13
543,599.38
1.3000
0.0016
m3
set
137,500.00
62,500.00
178,750.00
100.00
0.0333
0.0333
jam
jam
268,100.00
199,100.00
8,927.73
6,630.03
0.0333
jam
132,700.00
4,418.91
Mandor
Operator terlatih
0.0067
0.0133
oh
oh
110,000.00
92,000.00
737.00
1,223.60
Pembantu Operator
Supir truck
0.0133
0.0067
oh
oh
64,000.00
87,000.00
851.20
582.90
Pembantu Supir
0.0067
oh
64,000.00
428.80
Pekerja
Jumlah
0.0400
oh
98,000.00
3,920.00
206,570.17
AN.CK
AN.CK
314
315
316
6=(3X5)
20,657.02
227,227.19
0.0050
1.0000
0.0002
0.0021
0.0042
0.0017
0.0021
0.0004
0.0008
0.0008
0.0050
0.0008
m3
kg
set
jam
jam
jam
jam
oh
oh
oh
oh
oh
155,000.00
13,500.00
62,500.00
215,600.00
63,800.00
107,800.00
16,500.00
110,000.00
92,000.00
64,000.00
98,000.00
98,000.00
775.00
13,500.00
12.50
452.76
267.96
183.26
34.65
44.00
73.60
51.20
490.00
78.40
15,963.33
1,596.33
17,559.66
4.0800
0.0100
0.0100
0.0500
0.1000
kg
m3
set
m3
oh
9,677.42
210,000.00
62,500.00
100,000.00
98,000.00
39,483.87
2,100.00
625.00
5,000.00
9,800.00
57,008.87
5,700.89
62,709.76
0.0183
0.0083
0.0083
2.7544
0.0008
0.0083
0.0167
0.0083
m3
m3
m3
kg
set
jam
jam
jam
377,000.00
395,500.00
269,000.00
13,500.00
62,500.00
215,600.00
63,800.00
16,500.00
6,899.10
3,282.65
2,232.70
37,184.40
50.00
1,789.48
1,065.46
136.95
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
317
318
319
320
321
322
323
Mandor
Operator terlatih
Pembantu Operator
Pekerja
Pekerja terampil
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
0.0017
0.0033
0.0033
0.0200
0.0033
oh
oh
oh
oh
oh
110,000.00
92,000.00
64,000.00
98,000.00
98,000.00
2
1 M2 PENGASPALAN MANUAL
0.0050
m3
230,000.00
1,150.00
Aspal
Kayu bakar
4.0000
0.0300
kg
m3
13,500.00
100,000.00
54,000.00
3,000.00
0.0600
0.1800
org
lot
98,000.00
34,000.00
5,880.00
6,120.00
187.00
303.60
211.20
1,960.00
323.40
55,625.94
5,562.59
61,188.53
6=(3X5)
Jumlah
70,150.00
7,015.00
77,165.00
0.0120
m3
395,500.00
4,746.00
0.0100
m3
230,000.00
2,300.00
0.0500
0.9500
org
lot
98,000.00
4,000.00
4,900.00
3,800.00
Jumlah
Keuntungan pengusaha 10%
15,746.00
1,574.60
17,320.60
0.0600
m3
377,000.00
22,620.00
0.0800
0.5000
org
lot
98,000.00
9,000.00
7,840.00
4,500.00
Jumlah
34,960.00
3,496.00
38,456.00
320,500.00
98,000.00
16,000.00
38,460.00
10,780.00
5,120.00
54,360.00
5,436.00
59,796.00
54,360.00
34,960.00
15,746.00
70,150.00
54,360.00
34,960.00
15,746.00
70,150.00
175,216.00
17,521.60
192,737.60
155,000.00
13,500.00
100,000.00
75,000.00
98,000.00
110,000.00
4,000.00
5,580.00
67,500.00
800.00
6,000.00
2,940.00
1,100.00
392.00
84,312.00
8,431.20
92,743.20
220,000.00
35,000.00
102,500.00
150,000.00
225,000.00
6,500.00
10,000.00
1,232,000.00
105,000.00
102,500.00
150,000.00
225,000.00
36,400.00
56,000.00
1,906,900.00
AN.CK
324
1
AN.CK
325
AN.CK
326
AN.CK
327
AN.CK
328
AN.CK
329
AN.CK
330
190,690.00
2,097,590.00
m'
bh
set
bh
unit
m'
m'
191,000.00
35,000.00
102,500.00
150,000.00
225,000.00
6,500.00
10,000.00
1,069,600.00
105,000.00
102,500.00
150,000.00
225,000.00
36,400.00
56,000.00
1,744,500.00
174,450.00
1,918,950.00
2
3
4
5
6=(3X5)
1 UNIT DAUN PINTU ALUMUNIUM TUNGGAL COKLAT MENGKILAP TANPA KACA
Rangka pintu alumunium coklat mengkilap
5.6000
m'
209,000.00
1,170,400.00
Engsel pintu alumunium
3.0000
bh
35,000.00
105,000.00
Handle
1.0000
set
102,500.00
102,500.00
Kunci alumunium
1.0000
bh
150,000.00
150,000.00
Dorr closer
1.0000
unit
225,000.00
225,000.00
Karet
5.6000
m'
6,500.00
36,400.00
Ongkos pasang
5.6000
m'
10,000.00
56,000.00
Jumlah
1,845,300.00
Keuntungan pengusaha 10%
184,530.00
jumlah + keuntungan Pengusaha 10%
2,029,830.00
1 UNIT DAUN PINTU ALUMUNIUM DOBLE SILVER TANPA KACA ( MENGGUNAKAN ENGSEL )
Rangka pintu alumunium silver
11.2000
m'
220,000.00
2,464,000.00
Engsel pintu alumunium
6.0000
bh
35,000.00
210,000.00
Handle
4.0000
set
102,500.00
410,000.00
Kunci alumunium
1.0000
bh
150,000.00
150,000.00
Dorr closer
2.0000
unit
225,000.00
450,000.00
Karet
11.2000
m'
6,500.00
72,800.00
Spartan pintu
2.0000
bh
69,000.00
138,000.00
Ongkos pasang
11.2000
m'
10,000.00
112,000.00
Jumlah
4,006,800.00
Keuntungan pengusaha 10%
400,680.00
jumlah + keuntungan Pengusaha 10%
4,407,480.00
1 UNIT DAUN PINTU ALUMUNIUM DOBLE HITAM DOP TANPA KACA ( MENGGUNAKAN ENGSEL )
Rangka pintu alumunium hitam dop
11.2000
m'
191,000.00
2,139,200.00
Engsel pintu alumunium
6.0000
bh
35,000.00
210,000.00
Handle
4.0000
set
102,500.00
410,000.00
Kunci alumunium
1.0000
bh
150,000.00
150,000.00
Dorr closer
2.0000
unit
225,000.00
450,000.00
Karet
11.2000
m'
6,500.00
72,800.00
Spartan pintu
2.0000
bh
69,000.00
138,000.00
Ongkos pasang
11.2000
m'
10,000.00
112,000.00
Jumlah
3,682,000.00
Keuntungan pengusaha 10%
368,200.00
jumlah + keuntungan Pengusaha 10%
4,050,200.00
1 UNIT DAUN PINTU ALUMUNIUM DOBLE COKLAT MENGKILAP TANPA KACA ( MENGGUNAKAN ENGSEL )
Rangka pintu alumunium coklat mengkilap
11.2000
m'
209,000.00
2,340,800.00
Engsel pintu alumunium
6.0000
bh
35,000.00
210,000.00
Handle
4.0000
set
102,500.00
410,000.00
Kunci alumunium
1.0000
bh
150,000.00
150,000.00
Dorr closer
2.0000
unit
225,000.00
450,000.00
Karet
11.2000
m'
6,500.00
72,800.00
Spartan pintu
2.0000
bh
69,000.00
138,000.00
Ongkos pasang
11.2000
m'
10,000.00
112,000.00
Jumlah
3,883,600.00
Keuntungan pengusaha 10%
388,360.00
jumlah + keuntungan Pengusaha 10%
4,271,960.00
1 M' PAS. DAUN JENDELA ALUMUNIUM SILVER TANPA KACA ( Uk. 07 x 1 m )
Rangka jendela alumunium silver
1.1000
m'
112,500.00
123,750.00
Karet
1.1000
m'
6,500.00
7,150.00
Ongkos pasang
1.0000
ls
5,000.00
5,000.00
Jumlah
135,900.00
Keuntungan pengusaha 10%
13,590.00
jumlah + keuntungan Pengusaha 10%
149,490.00
1 M' PAS. DAUN JENDELA ALUMUNIUM HITAM DOP TANPA KACA ( Uk. 07 x 1 m )
Rangka jendela alumunium hitam dop
1.1000
m'
112,500.00
123,750.00
Karet
1.1000
m'
6,500.00
7,150.00
Ongkos pasang
1.0000
ls
5,000.00
5,000.00
Jumlah
135,900.00
AN.CK
AN.CK
1
AN.CK
AN.CK
AN.CK
331
332
333
334
335
AN.CK
AN.CK
AN.CK
336
337
338
339
130,900.00
7,150.00
5,000.00
143,050.00
14,305.00
157,355.00
97,125.00
6,500.00
10,000.00
113,625.00
11,362.50
124,987.50
6=(3X5)
1.0500
m'
110,000.00
115,500.00
Silen
Ongkos pasang
1.0000
1.0000
m'
m'
6,500.00
10,000.00
6,500.00
10,000.00
Jumlah
Keuntungan pengusaha 10%
132,000.00
13,200.00
145,200.00
1.0500
m'
195,000.00
204,750.00
Silen
Ongkos pasang
1.0000
1.0000
m'
m'
6,500.00
10,000.00
6,500.00
10,000.00
Jumlah
221,250.00
22,125.00
243,375.00
1.0500
m'
179,000.00
Silen
1.0000
m'
6,500.00
6,500.00
Ongkos pasang
Jumlah
1.0000
m'
10,000.00
10,000.00
204,450.00
13,590.00
149,490.00
187,950.00
20,445.00
224,895.00
190,575.00
6,500.00
10,000.00
207,075.00
20,707.50
227,782.50
220,500.00
6,500.00
10,000.00
237,000.00
23,700.00
260,700.00
2,464,000.00
27,500,000.00
410,000.00
150,000.00
450,000.00
72,800.00
138,000.00
112,000.00
31,296,800.00
3,129,680.00
34,426,480.00
2,139,200.00
27,500,000.00
410,000.00
150,000.00
450,000.00
72,800.00
138,000.00
112,000.00
Jumlah
Keuntungan pengusaha 10%
AN.CK
340
30,972,000.00
3,097,200.00
1
AN.CK
AN.CK
11.2000
m'
209,000.00
2,340,800.00
2.0000
4.0000
set
set
13,750,000.00
102,500.00
27,500,000.00
410,000.00
Kunci alumunium
Dorr closer
1.0000
2.0000
bh
unit
150,000.00
225,000.00
150,000.00
450,000.00
Karet
11.2000
m'
6,500.00
72,800.00
Spartan pintu
Ongkos pasang
2.0000
11.2000
bh
m'
69,000.00
10,000.00
138,000.00
112,000.00
Jumlah
Keuntungan pengusaha 10%
31,173,600.00
3,117,360.00
34,290,960.00
2
341
342
Rolling door
1.0000
m2
377,500.00
377,500.00
1.5000
1.0500
org
org
98,000.00
98,000.00
147,000.00
102,900.00
0.1050
0.0052
org
org
104,000.00
110,000.00
10,920.00
572.00
Jumlah
638,892.00
63,889.20
702,781.20
1.0000
m2
575,000.00
575,000.00
1.5000
org
98,000.00
147,000.00
Pekerja
Kepala tukang besi
1.0500
0.1050
org
org
98,000.00
104,000.00
102,900.00
10,920.00
Mandor
Jumlah
0.0052
org
110,000.00
572.00
836,392.00
AN.CK
AN.CK
AN.CK
343
344
345
346
6=(3X5)
83,639.20
920,031.20
Karpet
Lem vinyl
1.0500
0.3500
m2
kg
125,000.00
43,000.00
131,250.00
15,050.00
Pekerja
Tukang kayu tempail
Kepala tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PASANG LANTAI PARQUET LENGKAP
Parquet jati 1,2 X 5 X 30 cm
lem vinyl
Pekerja
Tukang kayu terampil
kepala Tukang kayu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 LANTAI VINYL KARET 30X30 CM
Vinyl karet 30/30 cm
Lem vinyl
Pekerja
Tukang batu tempail
Kepala tukang batu
Mandor
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. WALL COVERING LEBAR 50 CM
Vinyl wall covering lebar 50 cm
Lem vinyl
Pekerja
Tukang batu tempail
Kepala tukang batu
0.1700
0.1700
0.0170
0.0085
org
org
org
org
98,000.00
98,000.00
104,000.00
110,000.00
16,660.00
16,660.00
1,768.00
935.00
182,323.00
18,232.30
200,555.30
1.0500
0.6000
0.6500
0.3500
0.0350
0.0325
m2
kg
org
org
org
org
187,500.00
43,000.00
98,000.00
98,000.00
104,000.00
110,000.00
196,875.00
25,800.00
63,700.00
34,300.00
3,640.00
3,575.00
327,890.00
32,789.00
360,679.00
11.0500
0.3500
0.1500
0.1500
0.0150
0.0075
bh
kg
org
org
org
org
4,000.00
43,000.00
98,000.00
98,000.00
104,000.00
110,000.00
44,200.00
15,050.00
14,700.00
14,700.00
1,560.00
825.00
91,035.00
9,103.50
100,138.50
1.1000
0.2500
0.7500
0.1700
0.1700
m2
kg
org
org
org
51,000.00
43,000.00
98,000.00
98,000.00
104,000.00
56,100.00
10,750.00
73,500.00
16,660.00
17,680.00
Mandor
Jumlah
AN.CK
1
AN.CK
AN.CK
AN.CK
AN.CK
AN.CK
347
348
349
350
351
352
0.0085
org
110,000.00
935.00
175,625.00
17,562.50
193,187.50
1.0500
2.0000
0.0750
0.0080
0.1500
0.0080
2
3
1 M2 PAS. ATAP ZINCALUME T. 04 MM LENGKAP DGN PEREDAM PANAS
Penutup atap Zincalume t. 0,4 mm
1.0500
Glass wall
0.0310
Alumunium foil
1.0500
Slfdrilling scew ( 12x65 mm )
4.0000
Roof mesh
1.0500
alumunium AB tip 2"
1.1000
Alat bantu
1.0000
Pekerja
0.1875
Kepala tukang kayu
0.0200
pekerja terampil
0.3750
Mandor
0.0200
m2
bh
org
org
org
org
4
m2
lbr
m2
bh
m2
m'
ls
org
org
org
org
190,000.00
48,500.00
98,000.00
104,000.00
98,000.00
110,000.00
5
190,000.00
457,500.00
7,500.00
6,500.00
12,000.00
2,500.00
2,500.00
98,000.00
104,000.00
98,000.00
110,000.00
199,500.00
97,000.00
7,350.00
832.00
14,700.00
880.00
320,262.00
32,026.20
352,288.20
6=(3X5)
199,500.00
14,182.50
7,875.00
26,000.00
12,600.00
2,750.00
2,500.00
18,375.00
2,080.00
36,750.00
2,200.00
Jumlah
Keuntungan pengusaha 10%
324,812.50
32,481.25
357,293.75
1.0500
m'
73,500.00
77,175.00
Rupping ( 12x65 mm )
Sliln
8.0000
0.2500
bh
tub
6,500.00
31,500.00
52,000.00
7,875.00
500.00
75,000.00
75,000.00
104,000.00
110,000.00
500.00
7,500.00
13,125.00
2,080.00
550.00
160,805.00
16,080.50
176,885.50
67,500.00
6,500.00
2,500.00
98,000.00
104,000.00
98,000.00
110,000.00
70,875.00
26,000.00
2,500.00
18,375.00
2,080.00
36,750.00
2,200.00
158,780.00
15,878.00
174,658.00
85,000.00
3,705,500.00
3,705,500.00
21,500.00
75,000.00
98,000.00
104,000.00
110,000.00
29,512.00
51,877.00
12,969.25
4,730.00
21,000.00
39,200.00
8,320.00
1,540.00
169,148.25
16,914.83
186,063.08
85,000.00
21,500.00
29,512.00
4,730.00
Alat bantu
1.0000
ls
Pekerja setengah terampil
0.1000
org
Tukang kayu setengah terampil
0.1750
org
Kepala tukang kayu
0.0200
org
Mandor
0.0050
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M' LISTPLANK ZINCALUME WARNA T. 0,35 MM
Lisplank zincalume t. 0,35 m
1.0500
m'
Slfdrilling scew ( 12x65 mm )
4.0000
bh
Alat bantu
1.0000
ls
Pekerja
0.1875
org
Kepala tukang kayu
0.0200
org
pekerja terampil
0.3750
org
Mandor
0.0200
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLAPOND GRC T. 4 MM 1,2 X 2,4 MM BERIKUT RANGKA KAYU KLAS II
GRC t. 4 mm 1,2 x 2,4
0.3472
lbr
Kaso-kaso klas II, 5/7 cm
0.0140
m3
Kayu klas II, 5/10 cm
0.0035
m3
Paku
0.2200
kg
Pekerja setengah terampil
0.2800
org
Tukang kayu terampil
0.4000
org
Kepala tukang kayu
0.0800
org
Mandor
0.0140
org
Jumlah
Keuntungan pengusaha 10%
jumlah + keuntungan Pengusaha 10%
1 M2 PAS. PLAPOND GRC T. 4 MM 1,2 X 2,4 MM PADA RANGKANYA
GRC t. 4 mm 1,2 x 2,4
0.3472
lbr
Paku
0.2200
kg
AN.CK
353
0.2800
0.4000
org
org
75,000.00
98,000.00
21,000.00
39,200.00
0.0800
0.0140
org
org
104,000.00
110,000.00
8,320.00
1,540.00
Jumlah
104,302.00
10,430.20
114,732.20
0.0030
m3
3,955,500.00
11,866.50
Paku
0.2500
Kg
21,500.00
5,375.00
Lem putih
Alat Bantu
0.1000
1.0000
Kg
Ls
29,000.00
1,000.00
2,900.00
1,000.00
0.1200
0.2500
org
org
75,000.00
98,000.00
9,000.00
24,500.00
0.1200
org
104,000.00
12,480.00
Mandor
Jumlah
0.0120
org
110,000.00
1,320.00
68,441.50
AN.CK
AN.CK
AN.CK
354
355
6,844.15
75,285.65
2
3
1 M2 DINDING TRIPLEK 4 MM LAPIS SUNGKAI RANGKA KAYU KLAS II
6=(3X5)
0.0195
0.0070
m3
m3
3,705,500.00
3,955,500.00
72,257.25
27,688.50
0.2000
kg
21,500.00
4,300.00
0.5000
0.3500
kg
lbr
29,000.00
150,000.00
14,500.00
52,500.00
Triplek 4 mm
Tukang kayu terampil
0.3500
0.6000
lbr
org
85,500.00
98,000.00
29,925.00
58,800.00
0.0600
org
104,000.00
6,240.00
Pekerja terampil
Mandor
0.2000
0.0100
org
org
98,000.00
110,000.00
19,600.00
1,100.00
Jumlah
Keuntungan pengusaha 10%
286,910.75
28,691.08
315,601.83
1.0500
kg
9,500.00
9,975.00
0.1250
0.0600
lot
org
25,000.00
98,000.00
3,125.00
5,880.00
0.0040
0.0010
0.0002
org
org
org
98,000.00
104,000.00
110,000.00
392.00
104.00
22.00
19,498.00
1,949.80
21,447.80
1.0000
0.0190
0.1430
0.1070
0.0105
0.0100
kg
m3
org
org
org
org
1,100.00
101,000.00
37,500.00
44,500.00
49,750.00
44,500.00
1,100.00
1,919.00
5,362.50
4,761.50
522.38
445.00
14,110.38
1,411.04
15,521.42
2.6600
1.3400
0.0715
0.0535
0.0053
0.0050
kg
kg
org
org
org
org
1,100.00
500.00
37,500.00
41,000.00
49,750.00
44,500.00
2,926.00
670.00
2,681.25
2,193.50
261.19
222.50
8,954.44
895.44
9,849.88
25,371.30
0.3218 jadi
0.0800
zak
589,692.50
180,000.00
589,692.50 (409,692.50)
0.1600 zak
0.1600 zak
0.1500
0.075
0.2000
0.3000
0.0300
0.0100
0.15
0.015
0.005
0.1
1,335,650.00
28,987,785.00
1,366,650.00
33,783,580.00
30,323,435.00
28,987,785.00
35,150,230.00
34,217,230.00
35,150,230.00
33,783,580.00
5,200.00
(1,474,950.00)
100.0000
0.9000
900.0000
900.0000
0.1111
0.0010
(0.0000)
0.0000
360.0000
900.0000
0.4000
0.0000
90.0000
0.4800
900.0000
900.0000
0.1000
0.0005
0.0000
(0.0000)
5.0000
5.0000
900.0000
900.0000
0.0056
0.0056
0.0000
0.0000
5.0000
900.0000
0.0056
0.0000
3.0000
5.0000
900.0000
900.0000
0.0033
0.0056
(0.0000)
0.0000
4.0000
1.0000
900.0000
900.0000
0.0044
0.0011
(0.0000)
(0.0000)
5.0000
900.0000
0.0056
0.0000
5.0000
15.0000
900.0000
900.0000
0.0056
0.0167
0.0000
0.0000
10.0000
900.0000
0.0111
(0.0000)
100.0000
600.0000
150.0000
0.4800
5.0000
5.0000
5.0000
5.0000
4.0000
1.0000
4.0000
4.0000
12.0000
8.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
1,500.0000
0.0667
0.4000
0.1000
0.0003
0.0033
0.0033
0.0033
0.0033
0.0027
0.0007
0.0027
0.0027
0.0080
0.0053
0.0000
0.0000
0.0000
(0.0000)
(0.0000)
(0.0000)
(0.0000)
(0.0000)
0.0000
0.0000
0.0000
0.0000
0.0000
(0.0000)
98.0000
29.0000
0.0800
3.0000
1.0000
3.0000
0.5000
1.0000
1.0000
2.0000
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
0.1633
0.0483
0.0001
0.0050
0.0017
0.0050
0.0008
0.0017
0.0017
0.0033
(0.0000)
(0.0000)
(0.0000)
0.0000
0.0000
0.0000
(0.0000)
0.0000
0.0000
(0.0000)
510.0000
1,000.0000
0.5100
0.0000
599.0000
0.1600
1,000.0000
1,000.0000
0.5990
0.0002
0.0000
0.0000
5.0000
1,000.0000
0.0050
0.0000
5.0000
0.5000
1,000.0000
1,000.0000
0.0050
0.0005
0.0000
0.0000
1.0000
1.0000
1,000.0000
1,000.0000
0.0010
0.0010
0.0000
0.0000
4.0000
1,000.0000
0.0040
0.0000
71.4000
1,400.0000
0.0510
0.0000
22.3100
12.5000
1,400.0000
1,400.0000
0.0159
0.0089
(0.0000)
(0.0000)
5,712.0000
8.1600
1,400.0000
1,400.0000
4.0800
0.0058
0.0000
(0.0000)
15.0000
1,400.0000
0.0107
(0.0000)
30.0000
15.0000
1,400.0000
1,400.0000
0.0214
0.0107
(0.0000)
(0.0000)
15.0000
6.0000
1,400.0000
1,400.0000
0.0107
0.0043
(0.0000)
0.0000
6.0000
1,400.0000
0.0043
0.0000
6.0000
3.0000
1,400.0000
1,400.0000
0.0043
0.0021
0.0000
(0.0000)
3.0000
198.0000
1,400.0000
1,400.0000
0.0021
0.1414
(0.0000)
(0.0000)
6.0000
1,400.0000
0.0043
0.0000
71.0000
2.4000
5.0000
5.0000
2.0000
1.0000
1.0000
1.0000
1.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
60.0000
1.1833
0.0400
0.0833
0.0833
0.0333
0.0167
0.0167
0.0167
0.0167
1.0000
(0.0000)
0.0000
(0.0000)
(0.0000)
(0.0000)
0.0000
0.0000
0.0000
0.0000
0.0000
195.0000
0.2400
5.0000
5.0000
5.0000
1.0000
2.0000
2.0000
1.0000
1.0000
6.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
150.0000
1.3000
0.0016
0.0333
0.0333
0.0333
0.0067
0.0133
0.0133
0.0067
0.0067
0.0400
0.0000
0.0000
(0.0003)
(0.0003)
(0.0003)
0.0000
(0.0000)
(0.0000)
0.0000
0.0000
0.0000
50.0000
80.0000
0.6250
0.0000
20.0000
80.0000
0.2500
0.0000
30.0000
4.0000
80.0000
80.0000
0.3750
0.0500
0.0000
0.0000
5.0000
3.0000
80.0000
80.0000
0.0625
0.0375
0.0000
0.0000
1.0000
80.0000
0.0125
0.0000
99.0000
80.0000
1.2375
0.0000
195.0000
0.2400
150.0000
150.0000
1.3000
0.0016
0.0000
0.0000
5.0000
5.0000
150.0000
150.0000
0.0333
0.0333
(0.0000)
(0.0000)
5.0000
150.0000
0.0333
(0.0000)
1.0000
2.0000
150.0000
150.0000
0.0067
0.0133
0.0000
(0.0000)
2.0000
1.0000
150.0000
150.0000
0.0133
0.0067
(0.0000)
0.0000
1.0000
150.0000
0.0067
0.0000
6.0000
150.0000
0.0400
0.0000
9677.419354839