Page : 11 of 39
contact all necessary agencies to obtain permits after notification to Contractor and
Employer.
All vendor documentation, design, etc. shall be approved by Employer.
4.2
AMBIENT CONDITIONS
The overhead line shall be suitable for outdoor installation with typical atmosphere of gas
storage plant (dusty, marine and corrosive). Additionally all equipment shall be
tropicalised and UV resistant.
The design of electrical system will comply with the following environmental conditions
(a)
: - 5 C
(b)
: +55 C
(c)
: + 5 C
(d)
: +40 C
(e)
: 81% max at 20 C
(f)
: 31.9 m / s
(g)
Altitude
: 66 m a. S.L.
(h)
Atmosphere
(i)
Seismic conditions
- Seismic zone 3 (Acc. to UBC)
- Importance Factor: Ip= 1.25,
- Factor for non Building Factor as per table 16-P UBC
- Soil Factor Type SC
All equipment shall be designed heavy duty and for continuous operation to work at -5 C
up to + 55 C. The system will be in continuous operation during the varying atmospheric
and climatic conditions occurring at all seasons. The Vendor shall ensure that all
equipment supplied and installed is selected to suit these conditions.
4.3
Frequency
+/- 5%
The total harmonic distortion (THD) of the supply network voltage will not exceed 5%.
The relevant system voltage is 33 kV, 3 phases, with neutral resistance earthed. The fault
level at the source 33 kV is according to as calculation in Power System Study Report for
short circuit (Doc. No. GB090-2614-250-EL-RP-0001).
4.4
GB090-2614-250-EL-SP-0015
Rev. : 0
Page : 12 of 39
(b)
Design of the distribution, installed loads and short circuit levels shall determine the
characteristics of the electrical equipment. The line conductors including all fixing
components shall be rated to withstand the short circuit currents stated in the
Contractor data sheets with peak make and RMS break values compliant with the
IEC publications.
(c)
All electrical components and equipment operation shall be consistent with these
characteristics including :
(d)
Dielectric strength,
Electrodynamic stresses,
Circuit breaker peak make, RMS break and DC offset capability.
GB090-2614-250-EL-SP-0015
DEGREE OF PROTECTION
RATED VOLTAGE
MAX VOLTAGE
RATED FREQUENCY
RATED CURRENT
SHORT CIRCUIT CURRENT
BASIC IMPULSE WITH STAND
VOLTAGE LEVEL (BIL)
SURGE ARRESTER
TYPE
RATED VOLTAGE
MAX VOLTAGE
RATED DISCHARGE
CURRENT
SHORT CIRCUIT CURRENT
DEGREE OF PROTECTION
Rev. : 0
Page : 13 of 39
IP 55
33kV
36kV
50 Hz
MIN. 400A
MIN. 25kA
175kV
OUTDOOR USE
33kV
36kV
10kA
MIN. 20kA
IP 55
CONTROL CABINET
CONTROLLER TYPE
PROTECTION RELAY
CONTROL AND
COMMUNICATIONS
MICROPROCESSOR BASED
CONTROLLER
DIRECTIONAL OVER-CURRENT, EARTH
FAULT AND SENSITIVE EARTH FAULT
RELAY, AUTO RECLOSING RELAY
1. RECLOSER OPEN/CLOSE
2. AUTOMATIC RECLOSING FUNCTION
ON/OFF
3. BATTERY AND UPS STATUS AND
MONITORING
4. CHANGING PROTECTION SETTINGS
5. ENABLING / DISABLING PROTECTION
FUNCTION
6. ACTIVE TROUP CHANGING
7. REMOTE MODE / LOCAL MODE
1. SWITCH POSITION OPEN / CLOSED
2. BATTERY VOLTAGE
3. PERCENTAGE OF BATTERY CAPACITY
4. UPS MONITORING
5. EXTERNAL LOAD ON/OFF
6. PROTECTION STATUS AND ACTIVE
GROUP NUMBER
7. PHASE AND EARTH CURRENTS
8. PHASE AND LINE VOLTAGE
9. PHASE SEQUENCE
10. MODE (LOCAL / REMOTE)
11. FAULT INDICATION, TYPE AND
MAGNITUDE OF FAULT
12. DATA AND TIME
13. MALFUNCTIONS
14. WARNINGS
GB090-2614-250-EL-SP-0015
Rev. : 0
Page : 14 of 39
4.5
(e)
The Blocking and metering device shall be equipped to cut-off power when power
consumption of Badra city is over 10MW. (without cut-off at EMPLOYER camp)
(f)
The ratings for components to build the overhead lines shall be as specified in the
Contractor data sheets.
(g)
Data sheets for all OHL package electrical equipment shall be provided by
Contractor for Employer review.
(h)
Short circuit rating and other parameters shall be updated as per data sheets for
equipment
4.6
Power feeding cables from 33 kV switchgears to overhead lines and from overhead
lines to downstream consumers.
These cable connections are included from Vendors scope of supply. All required material
and supports for installation and fixing of these items to overhead lines poles / towers are
part of Vendors scope.
4.7
GB090-2614-250-EL-SP-0015
Rev. : 0
Page : 15 of 39
The earth conductor shall be located to provide a minimum shielding angle to the phase
conductors of 30 at the structure. In addition, the earth conductor shall be erected so its
sag is 20 less than that of the conductor at everyday temperature, still air.
It shall be assumed for design purposes, that jumper loops will swing transversely. The
minimum clearance to steelwork has to be calculated according to related conductor
specification.
The minimum clearance between line conductors and ground or other objects shall be as
specified as follows and in tables below (chapter 4.8). These clearances shall be obtained
under conditions corresponding to the 60 C, still-air sag of the line conductors and with
any angle of swing of the conductors from the vertical between zero and 35 , with the
assumption (for simplicity) that the aforementioned sag is always applicable:
Situation:
Normal ground and minor road crossing or track, road level
Minimum Clearance
7m
Where an overhead line erected under this agreement crosses an asphalt road or
designated rig crossing, the overhead line shall be routed underground. For asphalt roads
ducts shall be employed.
Where obstructions of other types are met, the clearances shall be approved.
4.8
Normal Ground
7m
7.5m
Clearance to Pipeline
13.5m
15m
30m
4.6m
GB090-2614-250-EL-SP-0015
Rev. : 0
Page : 16 of 39
3.5m
3.5m
Any point on a support of the lower line on which a person can stand
3.6m
Horizontal Clearances:
From tower structure to nearest conductor of any power line running parallel 25m
30m
Secondary roads
20m
Communication circuits
20m
100m
250m
30m
25m
100m
150m
100m
No structure will be positioned so that any excavation or erection work will be closer than
30 m to a pipeline.
Right way shall be minimum 15m either side from OHL.
The effect of electromagnetic field (EMF) from overhead line shall be considered to design
of cathodic protection system for buried pipeline. AC mitigation calculation and facility
shall be provided by pipeline Contractor.
4.9