POWER HOUSE D-30

FUNCTION

TO GENERATE STEAM FOR ELECTRIC


PROCESS AND SPACE HEATING.

POWER GENERATION,

OPERATION
/
MAINTENANCE
OF
BOILERS,
ALTERNATOR & RECIPROCATING ENGINES.

TO MANAGE THE 11KV POWER DISTRIBUTION


CENTRALLY THROUGH SCADA SYSTEM.

DISTRIBUTION OF STEAM AND MAINTENANCE OF STEAM LINE.

TURBINES,

NETWORK

POWER HOUSE D-30


MAN POWER STATUS
CATEGORY

IN POSITION

MANAGER

01

A.M

01

T.O

09

ATO / CMAN

40

Staff (Aux)

02

REs

189

POWER HOUSE D-30


MODE OF POWER GENERATION
STEAM THERMAL POWER PLANT
RECIPROCATING ENGINES FIRED ON NATURAL GAS I.E. GENSETS

ELECTRIC POWER GENERATION


INSTALLED CAPACITY
RUNNING CAPACITY @ 80% OUTPUT
PRESENT GENERATION

=
=
=

25MW
19-20 MW
10-12 MW

(GENERATION IS ACCORDING TO AVAILABILITY OF NATURAL GAS)

PEAK LOAD IN SUMMER


PEAK LOAD IN WINTER
PRESENT SHORT FALL
FUTURE REQUIREMENTS
AVG. CONSUMPTION / MONTHLY SUMMER
AVG. CONSUMPTION / MONTHLY WINTER
AVG. GENERATION / MONTHLY SUMMER
AVG. GENERATION / MONTHLY WINTER
RATIO OF GEN VS CONSUMPTION (WINTER)
RATIO OF GEN VS CONSUMPTION (SUMMER)
CURRENT AVG GEN VS CONS MAR-2015
CURRENT AVG GEN VS CONS FOR HOLIDAYS

=
=
=
=
=
=
=
=
=
=
=
=

30-32 MW
23-24 MW
10-12 MW
10 MW
143,93,771 KWH
103,52,497 KWH
71,50,911 KWH
58,17,197 KWH
49.60%
56.19%
64.62 %
87.62 %
4

POWER HOUSE D-30


POWER GENERATION UNITS
DESCRIPTION
TURBO ALTERNATOR 6/8 MW

QTY
02 NOS.

(MAKE AEG GERMANY)


TURBO ALTERNATOR 8.5/10.3MW

YEAR OF INSTALLATION
1974
1988

01 NO

1992

5 NOS.

2002

(MAKE B & V GERMANY)


GAS FIRED ENGINE GENERATORS
2 MW EACH (PRESENT GENERATION
CAPACITY 1 MW EACH)
(MAKE WARTSILA FRANCE)

POWER HOUSE D-30


BOILERS
DESCRIPTION

QTY

CAPACITY

YEAR OF
INSTALLATION

06 Nos

27
Ton / Hr Each

1958-1986

01 No

30
Ton /Hr

16 Nos

0.25-8.0
Ton / Hr Each

MAIN BOILER

SMALL BOILERS

2002

1952-1994

TOTAL STEAM GENERATION CAPACITY

200 TPH

TOTAL LENGTH OF STEAM LINE

22 KM

POWER HOUSE D-30


STEAM GENERATION
DESCRIPTION

QTY

LOCATION

YEAR OF
INSTALLATION

MAIN BOILER
a.

27 Ton / Hr (Each)

06

P.H

1958-1986

b.

30 Ton / Hr

01

P.H

2002

8 Ton / Hr ( Each)

02

Clothing

1988

2.5 Ton / Hr (Each)

02

1.5 Ton / Hr (Each)

02

A-50/1- WW

1955-1976

1 Ton / Hr

01

2.5 Ton / Hr (Each)

02

5 Ton / Hr

01

0.50 Ton / Hr

01

HOSPITAL

1955-1982

1 Ton / Hr

01

4 Ton / Hr

02

Brass Mill

1976

0.5 Ton / Hr

01

0.25 Ton / Hr

01

Hotel

1955

SMALL BOILER
a.

b.

c.

d.
e.

POWER HOUSE D-30


STEAM GENERATION
Year

Total Steam
Generation
(KG)

Steam Used for


Elect. Gen
(KG)

Steam used for


Process
(KG)

2010-11

611,179,788

460,126,006

151,053,782

2011-12

521,606,669

348,636,348

172,970,321

2012-13

601,815,271

439,956,948

161,858,323

2013-14

448,997,883

293,717,225

155,280,658

2014-15

305,823,337

195,795,400

110,027,937

POWER HOUSE D-30


700,000,000

600,000,000
601,815,271

300,000,000

200,000,000

July 14 March 15
305,823,337

448,997,883

400,000,000

521,606,669

611,179,788

500,000,000

100,000,000

2010-11

2011-12

2012-13

2013-14

2014-15

POWER HOUSE D-30


ELECTRIC GENERATION
Year

Total Elect.
Generation
(KWH)

PP-I Generation
(KWH)

PP-II Generation
(KWH)

2010-11

99,771,155

90,611,940

9,159,215

2011-12

84,857,361

66,002,620

18,854,741

2012-13

102,192,963

84,617,300

17,575,663

2013-14

73,213,938

56,188,520

17,025,418

2014-15

51,398,397

41,630,500

9,767,897

POWER HOUSE D-30


120,000,000

73,213,938

60,000,000

84,857,361

99,771,155

80,000,000

102,192,963

100,000,000

51,398,397

40,000,000

July 14 March 15

20,000,000

2010-11

2011-12

2012-13

2013-14

2014-15

POWER HOUSE D-30


GAS CONSUMPTION
Year

Gas Consumption
(HM3)

Total Amount
(Rs.)

Gas Rate
(HM3)

2010-11

682,346

1,137,843,586

1,667.55

2011-12

616,805

1,270,915,412

2,060.48

2012-13

696,250

1,506,210,805

2,163.32

2013-14

529,612

1,342,174,581

2,534.26

2014-15

374,782

1,037,052,396

2,767.08

POWER HOUSE D-30

529,612

400,000

696,250

500,000

616,805

600,000

682,346

700,000

300,000

374,782

200,000

July 14 March 15

100,000
0
2010-11

2011-12
2012-13

2013-14
2014-15

POWER HOUSE D-30


JOBS IN HAND
INSTALLATION/COMMISSIONING OF SCADA SYSTEM
FOR 25 SUBSTATIONS

CONTRACT NO

0092-DS-LP-CAPT-43, Dt.26-05-2014

SUPPLIER

M/s. SCHNEIDER ELECTRIC PAKISTAN (Pvt) Ltd.

COST (RS)

145.57 MILLION

PRESENT STATUS

DELIVERY OF STORE

P.D.C

COMPLETED

31.05.2015.

POWER HOUSE D-30


PRESENT STATUS
STORE

TOTAL

INSTALLED

109

102

LINE DIFFERENTIAL PROTECTION


RELAYS (MiCOM P521)

83

04

BATTERY CHARGER 110V & 30V DC


56Ah (FITTED WITH BATTERIS)

25

25

REMOTE TERMINAL UNIT


(RTU T2001)

25

NIL

FEEDER PROTECTION RELAYS


(MiCOM P122)

POWER HOUSE D-30


CONSTRAINTS
NON AVAILABILITY OF NATURAL GAS
SANCTIONED

12 -13 MMCFD

AVAILABLE

5 6 MMCFD

SNGPL AUTHORITIES HAVE BEEN APPROACHED TO PROVIDE THE


SANCTIONED GAS PRESSURE/SUPPLY BUT THE GAS PRESSURE
COULD NOT BE MAINTAINED BY SNGPL DUE CURRENT GAS CRISES
IN THE COUNTRY.