0981492 : 2 +
/AHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD’
B. Tech IV Year If Semester Examinations, May - 2013
Automation in Manufacturing
(Mechanical Engineering - Mechatronics)
Time: 3 Hours
Answeiiny Five Questions
All Questions Carry Equal Marks
1.8) Explain various principles of Automation.
_- What are the. various production systems employed in the industries and indigate
®-sheir relative tidvantages and applications?
2.a) What are the various intermittent motion mechanisms employed in practice and
explain with a sketch the working of Geneva — Wheel mechanism’?
b) What are the various factors 10 be considered in the control of automated flow
lines? [748]
Differentiate between synchronous and asynchronous transfer systems employed
in automated assembly systems.
b) What are the various parts feeding systems used in practice and explain about
oscillatory arm type feeder? (748)
proposal-tiasbeen subi replace’a’ group of asseinibly) workers, vach:*
working individually, with an assembly line. The following table gives the
individual work elements.
Element T, (min) Immediate predecessors
aayola fe) ls
iS
8 a LLS E 3.6 Q
The demand rate for this job is 1600 units/week (assume 40 hAveek) and the
current number of operators required to meet this demand is eight using the
individual manual workers.
8) Construct the precedence diagram from the data provided on work elements.
-b) Use the:Kilbridee and Wester method to,
“What is the Balance efficie:
U5F
5.) What are the various factors to be considered in the design of material handling
system?‘What are thé basic comporiénts’ to be con:
storage and retrieval systems?
b) What are the various problems to be considered in material handling automated
storage and connecting various manufacturing functions? (7+8]
jered in the building, of automitited’
“and also quility of production’! ”
b) Sketch and explain the adaptive control system used on lathe with the constraints
of force, power and temperature. (748)
8a), What is re-engineering and.explain ite impaet.on the quality and quantity, of
“production?. nes te i
How the business process engineering packages help in the reduction of cost of
manufacturing of components? (738)