Sultanate of Oman
Kaskta A..
1.
Introduction
This work shall consist of construction of stone columns being part of the ground
improvement works to treat the in-situ soils beneath part of the access roads and high
embankment areas as well as Sultan Qaboos Interchange and Distributor Interchange. The
objective is to improve the stability of embankments, to increase the rate of settlement and to
reduce long term settlements and to mitigate the risk of seismic induced liquefaction. Ground
treatment work shall be carried out by the dry bottom feed stone column method.
2.
3.
Soilmec SR 40
: 1 no
: 1 no
: 1 no.
Welding Machines
: 1 no.
Construction Method
The stone column locations will be arranged so as to accommodate varying combinations of
loads and foundation configurations. The configuration of the columns will be subjected to
change depending on foundation load and local soil conditions and in accordance to the
Engineers design. The nominal stone column diameter is 850 mm. However, the column
diameter depends on the existing soil conditions. The diameter is larger when the soil is looser
and softer.
4.
Sequence of Works:
Immediately before treatment, each treatment position (stone column) shall be marked by the
contractor with suitable identifiable marker pins.
After the site is leveled and compacted at working platform level, stone column locations
will be staked out.
The probe is positioned at the selected stone column location. Air is used to aid initial
penetration of the probe and to facilitate movement of the gravel through the tube to the
probe tip (Fig.1, Fig.2) . Upon reaching the design depth, the charging material of coarse
gravel and/or crushed stone is added from the top and conveyed to the tip of the probe
using an eccentric tube attached adjacent to the probe. Then, the probe gradually raised,
compacting the ground as it is withdrawn. The probe is raised in stages while a pressure
is attained. (Fig.3 to Fig.5)
During the compaction process, an electronic measuring device shall be used in order to
collect and control the compaction data. (such as; pressure, depth, time)
A daily report for each stone column will be prepared and submitted daily. The records
shall comprise the following information for each stone column:
5.
Verify the installation process, including duration of probe penetration and time required
to construct vibro-compacted stone columns.
Determine the consumption of stone during column installation and the following
vibrocompaction, by measuring volume of consumed stone as a function of the depth of
probe.
Propose a production schedule for stone column installation, comprising the time
required to set up the equipment, complete the installation of the stone column, which
meet the specified compaction criteria, and moving the equipment to the next installation
point.
Establish criteria which can be used to assure that the required depth with respect to the
given penetration criteria have been achieved. For this purpose, CPTU tests shall be
performed.