Вы находитесь на странице: 1из 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.75
9.30
16.73
17.53
18.24
16.33
16.87
15.85
18.24
7.28

18.452
9.008
16.439
17.241
17.951
16.036
16.580
15.563
17.929
6.969

0
3,183
559
248
0
728
504
808
9
357

0
20,019
3,518
1,557
0
4,578
3,172
5,080
59
2,248

Nil
18.135
Nil
Nil
Nil
18.102
NIL
NIL
18.510
12.060

6,396

40,229
985

SL.S

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

CU.M.

VOL.(BBLS)

BBLS

17.845

17.443

0
110

17.813

35.216

18.204
11.749

0.6
204.58

222
0
0
4
1,287

0
19,909
3,518
1,557
0
4,357
3,172
5,080
55
961

31.0
32.5
31.2
31.0
30.6
34.0
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
93.2
87.6
87.3
85.6
87.4

1,622
64

38,607
921

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98343
0.98625
0.98638
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
19,606
3,468
1,535
0
4,285
3,128
5,010
54
948

0.000
39.212
5.202
3.071
0.000
8.57
6.256
7.516
0.135
2.370

0
19,567
3,463
1,532
0
4,276
3,122
5,003
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

258

38,035
900

37,962
898

PRODUCTION LOADING IN TO 6C
INTERNAL TRANSFER COT 4C IN TO COT 8C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

40,229
1,622
38,607
38,035
4,771
4,848
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

38,035

DRAFT FWD

7.30 m

Capt. Saiful Bahri

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
4-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
2,459.356
435.032
192.592
0.000
537.472
392.616
628.512
6.783
118.907

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

4,771

8.30 m

0.000
2498.764
442.003
195.678
0.000
546.084
398.903
638.583
6.892
120.813
4,848

TRIM
LIST

Capt. Ihwan Asrul

1.00 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

4-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Saiful Bah

Lifting

24 Hours Total (bbls)

985

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

38,607

Storage Net / G.S.V (Nbbls)

38,035

Storage Net / N.S.V (Nbbls)

37,962

Days to Tank Tops

295

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

38,035

Water

Offtake

Water Received 24hrs (bbls)

64

Total Water in Cargo (bbls)

1,622

Total P/W Received (bbls)

83,596

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

34.0

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C


INTERNAL TRANSFER COT 4C IN TO COT 8C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

234,612

### 71,278

###
3,000

231,612

Service Vessel
MDO
0
0

1,808

69,470

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment

1. Review previous day activity


2. Maintenance LSA & FFA
3. Continue Internal Cargo Transferred COT 1C & 5C In To
4. Preparation for tank cleaning COT 1C & 5C
5. Internal Cargo Transferred COT 1C & 5C In To 8C
6. Continue General Overhaul Auxiliary Engine No.2
7. Maintenance RO No.1
8. Repaire Control Panel Crew Air Compressor
9. Running Auxiliary Boiler For Stripping COT & Heating C

1. Review deck, engine and galley dept. activity


2. Marking Label On Deck
3. Maintenance on deck
4. Closing finding work place inspection

5. Continue Preparation for tank cleaning COT 1C, 4C & 5


6. House keeping

Incidents

Type
NIL

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 22
The details see SPKK sheet *)
###

Reference

Time

Comments

Comment

Capt. Saiful Bahri

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C
T 4C IN TO COT 8C

4184 / 37936

e Vessel

Comment

COT 1C & 5C In To 8C
C & 5C
& 5C In To 8C
y Engine No.2

mpressor
ng COT & Heating Cargo

t. activity

ng COT 1C, 4C & 5C

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
INTERNAL TRANSFER COT 4C IN TO COT 8C

Mooring/Unmooring :
5.30 : AHT. Tegap Jaya Cast Off

Bunkering/Debunkering :
00.10 : Complated Transferred Fresh Water 30T To AHT. Tegap Jaya

Personnel & Material Transfer :


09.15 : 1 Person Oryx By Frederick ( In )
11.10 : 1 Person Oryx By Frederick ( Out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Oryx Personnel's
2. Maintenance LSA & FFA
3. 2nd Coating Middle Windlass Starboard Side
4. Continued Internal Cargo Transferred COT 4C In To 8C
5. Preparation for tank cleaning COT 4C ( Stripping COT 4C in to COT 8C )
6. Closing finding work place inspection
7. Heating cargo tank
8. House Keeping

ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Maintenance RO No.1
3. Repaired Control Panel Crew Air Compressor
4. Running Up Auxiliary Boiler For Stripping COT & Heating Cargo
5. Running up A/E 1 & 3:
08.00 - 16.00 - Internal Cargo Transferred

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

PW

MW

HW

CSE

IP

VAL

434

1658
1658

374

168

901

374

168

901

M.F.O
M.D.O

CONS
3,000
1,808

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
30

0
16

OSD
200

REC
0

CONS
0

434

4. FRESH WATER (MT)


BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE

6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

210792
264
211056

Days W/O LTI

1133

IN

OUT

Since

211056
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

04-Jan-17

@2400 HRS

TOTAL
3542
3540

TRANS
0
0
ROB

45
116
ROB
200

ROB
231,612
69,470
`

POB

22
28-Nov-13

Previous

Today

Total

0
0
0
0
1599
2642
3
0
41

0
0
0
0
2
22
0
0
0

0
0
0
0
1601
2664
3
0
41

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612

3,000

231,612

Internal Cargo Transferred

07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

48

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

30

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954

TOTAL 19,840
Averag
e/Day

JUL AUG SEP OCT NOV DEC

640

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80

365

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017

22
22
22
22

0
0
0
0

0
0
0
0

22
22
22
22

TOTAL

88

88

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
4/Jan/17
Reported by

1 IHWAN ASRUL

Rank

Location

Description

Action/Commen
t

Positive /
Negative

Total

Positive

Preparation Tank
Cleaning Scheduled

Positive

Advice About Internal Cargo Transferred For Tank

Master Meeting Room Cleaning Preparation

2 IYYANG

C/O

CCR

3 ANDI A UNIT

2/O

Boat Deck
Portside

Provision Crane Not In Good Condition

Seepage

Negative

4 INDRA

3/O

Main Deck

Assisted C/O Internal Cargo Transferred

Preparation Tank
Cleaning Scheduled

Positive

5 JULY MANGIRI

C/E

Internal Cargo
Transferred

Positive

6 ACO AKBAR

2/E

Positive

7 IRVAN TAHIR

3/E

Engine Room General Overhaul Auxiliary Engine No.2

Positive

8 HENDRA PRATAMA

4/E

Engine Room Assisted C/E Operated Auxiliary Boiler

Internal Cargo
Transferred

Positive

9 NIKO

E/E

Done

Positive

10 AANG

Bosun

Internal Cargo
Transferred

Positive

Stanby Checked
Ullage

Positive

Done

Positive

Running Well

Positive

Sounding All Ballast


Tank

Positive

Positive

Positive

Positive

Continued Internal Cargo Transferred

Engine Room Continued Operated Auxiliary Boiler As Leader


RO Room

Starboard
Quarter

Maintenance RO No.1

Repaired Control Panel Screw Compressor

Pump Room In Charged Stripping Pump Operation

11 ACHMAD NURUL HUDA

AB

Main Deck

Assisted C/O Internal Cargo Transferred

12 UDIYANTO

AB

Main Deck

Fabrication Mark Valve Line Symbol Close &


Open

13 BAYU SEGARA

AB

14 DEDI

OS

Main Deck

15 SAIFUL IMAM

FTR

Engine Room

16 ELIK BUDIANTO

FTR

Engine Room Assisted C/E Operated Auxiliary Boiler

17 SUAIB

MTM

Engine Room

18 NUR ALI

MTM

RO Room

19 MASRUDI

C/Cook

Galley

20 ROCHIM

COOK

21 RANGGUN JAWI
22 BOBI MANGOTO

Pump Room Stripping Pump In Good Condition


Check All Ballast Tank Condition
Assisted 3/E General Overhaul Auxiliary Engine
No.2

Internal Cargo
Transferred

Assisted 3/E General Overhaul Auxiliary Engine


No.2
Assisted 2/E Maintenance RO No.1

Done

Positive

Prepared Provision Requisition

Good

Positive

Crew Mess
Room

Crew Mess Room Look Clean & Tidy

Good

Positive

STWD

Deck A & B

House Keeping in Deck A & Deck B

Done

Positive

STWD

Galley

Daily Cleaning In Galley

Done

Positive

TOTAL 22

Вам также может понравиться