PAR

NBC

IS CODE

PLINTH AREA
The total plinth area of a building
shall be sum total of the plinth area
at every floor including basement.

PLINTH AREA
The built up covered area measured at
the floor level of the basement or of any
storey.

PLINTH AREA
Plinth area shall mean the built-up covered measured
at the floor level of the basement or of any Storey .

-Internal sanitary shafts not included in


case of residential building
- In non-residential, shafts, lifts, ducts are
included at all floors
- mumty, towers and domes not included

COVERED AREA
Ground area covered by the building
immediately above the plinth level.

The plinth area of the ground floor shall


be calculated at the plinth level excluding
the plinth off sets.
In case where building consist of columns
projecting beyond cladding, plinth area
shall be taken upto external face of
cladding and shall not be including the
projection of columns.
-Plinth area of the first and higher floors
shall be calculated at the same relevant
floor levels. Vertical sun breakers or box
louvers projecting out also shall not be
included in plinth area.
-In case of projecting balconies protected
to their full width 100% is included
-For unprotected balconies 50% area is
included.

The area covered by the following in the open


spaces is excluded from covered area.
area
-Garden, rockery, well and well structures,
plant nursery, waterpool, swimming pool (if
uncovered), platform round a tree, tank,
fountain, bench,
- Drainage culvert, conduit, catch-pit,
pit, gully pit,
chamber, gutter and the like;
- Compound wall, gate, unstoreyed porch and
portico, canopy, slide, swing, uncovered
staircase, ramps areas covered by CHHAJJA
and the like; and
-Watchmens booth, pump house, garbage
shaft, electric cabin or sub-stations,
stations, and such
other utility structures meant for the services
of the building under consideration.
consideration
For the purpose of this Part, covered area
equals the plot area minus the area due for
open spaces.

For the purpose of plinth area, following shall be included:


- Area of the wall at the floor level excluding plinth offsets, if
any; when the building consists of columns projecting beyond
cladding, the plinth area shall be taken up to the external face
of cladding ( in case of corrugated sheet cladding outer edge of
corrugation shall be considered );
- Shafts for sanitary, water supply installations,
garbage chute, telecommunication, electrical,
fire fighting, air-conditioning and lifts;
- Stair case;
In case of open verandah with parapets:
1) 100percent areas for the portion protected by the
projections above, and
2) 50 percent area for the portion unprotected from above.
-100 percent area of the balcony protected by projection above
and 50 percent area of the unprotected balcony;
The following shall not be included in the plinth area:
a) Area of loft;
b) Area of architectural band, cornice, etc;
c) Area of vertical sun breaker or box louver
projecting out and other architectural features,
d) Open platform;
e) Terrace;
f) Open spiral/service stair cases; and
g) Area of mumty, machine room, towers, turrets, domes
projecting above terrace level.

NBC

IS CODE

CARPET AREA
The covered area of the usable rooms
at any floor level (excluding the area of
the wall).

CARPET AREA
Carpet area shall mean the floor area of the usable
rooms at any floor level
The following shall be included in the wall area:
- Door and other openings in the wall;
- Pillars, intermediate pillars, supports or any other such
obstruction within the plinth area irrespective of their location;
- Pilaster along wall exceeding 300 cm2 in area;
- Built-in cupboard, almirah and shelf appearing within a height
of 2.2 m from floor; and
-Fire place projecting beyond the face of the wall in living or bed
room.
The carpet area shall be the area worked out excluding the area
of the following portion:
- Verandah;
- Corridor and passage;
- Entrance hall and porch;
- Staircase and stair-cover ( mumty )
- Shaft and machine room for lift;
- Bathroom and lavatory;
- Kitchen and pantry;
-Store;
- Air-conditioning duct and plant room; and
- Shaft for sanitary/water supply installations and garbage chute,
electrical and fire fighting, air-conditioning, telecommunication,
lift.