10
FLOORING
i) Rates for all finished works include the removal of surplus debris, unused
material and by products.
ii) For handling of all types of material for short lead including carriage upto
3 chains (90m) nothing is to be paid as extra. Where handling and carriage
involves an extra lead beyond 3 chains, (90m) carriage for whole of the distance
should be paid
DESCRIPTION OF ITEM
1 Laying Muram flooring consisting of 1" (25m) layer of fine powdery or flakey variety of Muram
laid over 6" (150mm) good hard layer of Muram spreaded over 9" (225mm) thick sub base
comprising of hand packed rubble or broken bricks properly watered and rammed provided
over well rammed earth
MATERIAL
1 9" thick rubble or broken hard bricks 80.00 Cft 560.00 Per 100 Cft 448.00
2 6" Hard Muram 55.00 Cft 520.00 Per 100 Cft 286.00
3 1" Fine Powdery Muram 9.00 Cft. 550.00 Per 100 Cft 49.50
Total 783.50
Contractor's Profit & Overheads 20 Percent 156.70
Total 940.20
LABOUR
ITEM RATE
Page 1
DESCRIPTION OF ITEM
MATERIAL
Earth (Loose measured) 50.00 Cft 150.00 Per 100 Cft 75.00
Contractor's Profit & Overheads 20 Percent 15.00
Total 90.00
LABOUR
ITEM RATE
Page 2
DESCRIPTION OF ITEM
3 Providing, laying, watering and ramming brick ballast 1½" - 2" gauge mixed with
25% sand, for floor foundation, complete in all respects.
MATERIAL
LABOUR
ITEM RATE
Page 3
4 Mud Flooring
DESCRIPTION OF ITEM
Mud flooring consisting of 6" thick consolidated layer of moistured earth and
finished off with 1" mud plaster and gobri leeping.
MATERIAL
1 Earth for filling 50.00 Cft 150.00 Per 100 Cft 75.00
2 Earth for Mud Plaster 10.00 Cft 150.00 Per 100 Cft 15.00
3 Bhoosa 34 lbs (15.44 Kg.) 2.00 Kg. 30.88
4 Fine Clay for Gobri Leeping 0.75 Cft. 150.00 Per 100 Cft 1.13
5 Cow Dung 0.75 Cft. (5.44 Kg.) 50.00 Per 100 Kg. 2.72
Total 124.73
Contractor's Profit & Overheads 20 Percent 24.95
Total 149.67
LABOUR
ITEM RATE
Page 4
5 Brick Flooring
DESCRIPTION OF ITEM
Dry brick paving laid flat, sand grouted including preparation of bed by watering, ramming and
bringing the same to proper camber by ½" mud plaster
MATERIAL
ITEM RATE
Page 5
DESCRIPTION OF ITEM
6 Dry brick on edge paving sand grouted including preparation of bed by watering,
ramming and bringing the same to proper camber by ½ thick mud plaster
MATERIAL
1 Brick 9" (including wastage) 525 Nos. 1200.00 Per 1000 Nos. 630.00
2 ½" thick mud plaster (good earth) 6 Cft. 150.00 Per 100 Cft 9.00
2 Sand 6 Cft. 350.00 Per 100 Cft 21.00
Total 660.00
Contractor's Profit & Overheads 20 Percent 132.00
Total 792.00
LABOUR
ITEM RATE
Page 6
DESCRIPTION OF ITEM
7 Grouting 4½" dry brick work with cement mortar ratio 1:5
MATERIAL
ITEM RATE
Page 7
DESCRIPTION OF ITEM
8 Flat brick flooring laid in 1:6 cement mortar over a bed of 3/4" thick cement mortar 1:6
MATERIAL
1 Bricks 9" size 350 Nos. 1200.00 Per 1000 No. 420.00
2 Cement (for laying) 0.50 Bag 230.00 Per Bag 115.00
3 Cement (for bedding mortar) 0.80 Bag 230.00 Per Bag 184.00
4 Sand for laying 4.00 Cft. 350.00 Per 100 Cft 14.00
5 Sand for bedding mortar 6.00 Cft. 350.00 Per 100 Cft 21.00
Total 754.00
Contractor's Profit & Overheads 20 Percent 150.80
Total 904.80
ITEM RATE
Page 8
DESCRIPTION OF ITEM
9 Brick on edge flooring laid in 1:6 cement mortar over a bed of 3/4" thick cement mortar (1:6)
MATERIAL
1 Bricks 9" size 525 Nos. 1200.00 Per 1000 No. 630.00
2 Cement for laying 0.85 Bag 230.00 Per Bag 195.50
3 Cement for bedding mortar 0.88 Bag 230.00 Per Bag 202.40
4 Sand for laying 7.00 Cft. 350.00 Per 100 Cft 24.50
5 Sand for bedding mortar 6.00 Cft. 350.00 Per 100 Cft 21.00
Total 1,073.40
Contractor's Profit & Overheads 20 Percent 214.68
Total 1,288.08
ITEM RATE
Page 9
DESCRIPTION OF ITEM
10 Brick tiles (12"x6"x2") laid in (1:6) cement mortar, over a bed of 3/4" thick cement mortar (1:6)
MATERIAL
LABOUR
ITEM RATE
Page 10
DESCRIPTION OF ITEM
11 Brick tiles (9" x 4½" x 1½") laid flat in 1:3 cement mortar over a bed of 3/4" thick cement mortar (1:6)
MATERIAL
LABOUR
ITEM RATE
Page 11
DESCRIPTION OF ITEM
12 Cement tiles (8"x8"x¾") laid fiat in 1:2 cement mortar over 3/4" thick bed of cement mortar 1:2
MATERIAL
ITEM RATE
Page 12
DESCRIPTION OF ITEM
13 Cement concrete tiles laid in 1:2 cement mortar over 3/4" thick bed of cement mortar 1:2
MATERIAL
1 Cement concrete tiles (1" thick) 105 Nos 11.00 Each 1,155.00
2 Cement for bedding and laying of 1:2 ratio 1.85 Bags 230.00 Per Bag 425.50
4 Sand 4.67 Cft. 350.00 Per 100 Cft 16.35
Total 1,596.85
Contractor's Profit & Overheads 20 Percent 319.37
Total 1,916.21
ITEM RATE
Page 13
b) 9" x 9" x 3/4"
MATERIAL
ITEM RATE
Page 14
c) 6" x 6" x 3/4"
MATERIAL
ITEM RATE
Page 15
DESCRIPTION OF ITEM
14 Coloured cement tiles (8"x8"3/4") of approved dark shade laid flat in 1:2 cement
mortar over 3/4" bedding mortar of 1:2
MATERIAL
ITEM RATE
Page 16
DESCRIPTION OF ITEM
MATERIAL
LABOUR
ITEM RATE
Page 17
b) 1¼" (30mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 18
c) 1½" (40mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 19
d) 1 3/4" (45mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 20
e) 2" (50mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 21
f) 2¼" (55mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 22
g) 2½" (60mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 23
h) 2 3/4" (70mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 24
i) 3" (75mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 25
DESCRIPTION OF ITEM
16 Providing and laying conglomerate flooring (two coat work) with top layer of ½" thick
wearing surface, consisting of one part of cement and two parts of stone chips passing
3/16" sieave, over bottom layer of cement concrete 1:3:6 including surface finishing and
dividing in panels:-
MATERIAL
LABOUR
ITEM RATE
Page 26
b) 1 3/4" (45mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 27
c) 2" (50mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 28
DESCRIPTION OF ITEM
17 Add extra in cement concrete floor topping, if finished with pigment and polishing
MATERIAL
1 Grey Cement for Finishing 1/16" Thick 0.40 Bags 230.00 Per Bag 92.00
2 Pigment 4.5 Lbs (2.04 Kg.) 70.00 Per Kg. 142.80
3 Polish 0.5 Lbs (0.23 Kg.) 212.00 Per Kg. 48.76
Total 283.56
Contractor's Profit & Overheads 20 Percent 56.71
Total 340.27
ITEM RATE
Page 29
DESCRIPTION OF ITEM
18 Extra labour for each storey above ground floor for moasic, conglomerate, tiles
stone and wooden floor
Cooly for carriage of material 0.75 No. 140.00 Per day 105.00
Sundries 10 Percent 10.50
Total 115.50
Contractor's Profit & Overheads 20 Percent 23.10
Total 138.60
ITEM RATE
DESCRIPTION OF ITEM
19 Flag stone flooring laid in lime mortar 1:2 over 3/4" bedding mortar in plat forms
and floors etc.
MATERIAL
LABOUR
ITEM RATE
Page 30
b) 3" (75mm) Thick
MATERIAL
LABOUR
ITEM RATE
Page 31
DESCRIPTION OF ITEM
20 Asphalt flooring including preparation of proper base, remelting, setting out and
finishing complete
MATERIAL
LABOUR
Mason for Setting out and laying 0.25 No. 300.00 Per day 75.00
Coolies 2.00 No. 140.00 Per day 280.00
Carpenter 0.25 No. 300.00 Per day 75.00
Total 430.00
Sundries 10 Percent 43.00
Total 473.00
Contractor's Profit & Overheads 20 Percent 94.60
Total 567.60
ITEM RATE
Page 32
b) ½" Thick Topping
MATERIAL
LABOUR
ITEM RATE
Page 33
c) ¼" Thick Topping
MATERIAL
LABOUR
ITEM RATE
Page 34
DESCRIPTION OF ITEM
21 1 3/8" thick mosaic flooring consisting of 3/8" mosaic topping of one part of
cement and marble powder in the ratio 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
1 Cement For 3/8" topping 0.94 Bag 230.00 Per Bag 216.20
2 Marble Chips 3.00 Cwt (152.40 Kg.) 1.00 Per Kg. 152.40
3 Corborandom Stone 3.00 Nos. 35.00 Each 105.00
4 Wax Polish 0.5 Lbs (0.23 Kg.) 635.00 / Pack. of 3 Kg 48.68
5 Linen and Cotton 0.40 Kg. 25.00 P. Kg. 10.00
6 Marble Powder 0.31 Cwt (15.75 Kg.) 80.00 Per 100 Kg. 12.60
7 Tatric Acid 0.34 Lbs (0.15 Kg.) 65.00 Per Kg. 9.75
Total 554.63
Contractor's Profit & Overheads 20 Percent 110.93
Total 665.56
ITEM RATE
Page 35
b) Using White Cement
LABOUR
ITEM RATE
Page 36
DESCRIPTION OF ITEM
22 1½" thick mosaic flooring consisting of ½" mosaic topping of one part of
cement and marble powder in the ratio of 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
MATERIAL
1 Grey Cement for ½" Topping 1.27 Bag 230.00 Per Bag 292.10
2 Marble Chips 3.00 Cwt (152.40 Kg.) 1.00 Per Kg. 152.40
3 Carborandom Stone 2.00 Nos. 35.00 Each 70.00
4 Wax Polish 0.50 Lbs (0.23 Kg.) 635.00 Packet 3 Kg 48.68
5 Linen Cotton etc. 0.72 Kg. 25.00 P. Kg. 18.00
6 Tar Taric Acid 0.34 Lbs / (0.15 Kg.) 65.00 Per Kg. 9.75
7 Marble Poweder 0.42 Cwt (21.34 Kg.) 80.00 Per 100 Kg. 17.07
Total 608.01
Contractor's Profit & Overheads 20 Percent 121.60
Total 729.61
ITEM RATE
Page 37
b) Using White Cement
MATERIAL
ITEM RATE
Page 38
DESCRIPTION OF ITEM
23 Providing and laying floor of mosaic marble chips tiles 1" thick of approved quality and shade
laid in white cement and pigment over 3/4" bedding of cement sand mortar 1:2, incluidng
finishing and polishing complete.
MATERIAL
LABOUR
ITEM RATE
Page 39
DESCRIPTION OF ITEM
24 Laying floor of approved white glazed tile 1/4" thick in white cement 1:2 over
3/4" thick cement mortar 1:2 complete.
MATERIAL
1 Tile (Glazed) 6"x6"x¼" including 5% breakage 420 No. 9.00 Each 3,780.00
2 White Cement for laying 0.10 Bag 345.00 Per Bag 34.50
3 Grey Cement for Bed 2.16 Bag 230.00 Per Bag 496.80
4 Sand 5.20 Cft. 350.00 Per 100 Cft. 18.20
Total 4,329.50
Contractor's Profit & Overheads 20 Percent 865.90
Total 5,195.40
LABOUR
ITEM RATE
Page 40
DESCRIPTION OF ITEM
25 Laying floors of a approved coloured glazed tiles 1/4" thick laid in white
cement and pigment on a bed of 3/4" thick cement mortar 1:2
MATERIAL
1 Coloured glazed tiles 6"x6" including 5% breakage 420 No. 11.00 Each 4,620.00
2 White Cement 0.10 Bag 345.00 Per Bag 34.50
3 Grey Cement 2.16 Bag 230.00 Per Bag 496.80
4 Pigment 1.00 Lb/0.45 Kg. 70.00 Per Kg. 31.50
5 Sand 5.20 Cft 350.00 Per 100 Cft. 18.20
Total 5,201.00
Contractor's Profit & Overheads 20 Percent 1,040.20
Total 6,241.20
LABOUR
ITEM RATE
Page 41
DESCRIPTION OF ITEM
26 Rubbing and polishing old grit/mosaic floor including repairing voids, un-even
surface complete in all respects.
MATERIAL
Skilled Cooly for rubbing and polishing 1.00 No. 160.00 Per day 160.00
Cooly 1.00 No. 140.00 Per day 140.00
Bahishti 0.25 No. 160.00 Per day 40.00
Total 340.00
Sundries 10 Percent 34.00
Total 374.00
Contractor's Profit & Overheads 20 Percent 74.80
Total 448.81
ITEM RATE
Page 42
DESCRIPTION OF ITEM
27 Rubbing and Polishing grit floor, including repairing voids, uneven surface
complete in all respects.
MATERIAL
ITEM RATE
Page 43
DESCRIPTION OF ITEM
28 Cleaning and washing mosaic or marble floor with caustic soda mixture
MATERIAL
ITEM RATE
Page 44
DESCRIPTION OF ITEM
29 Shisham wood boarding or strips flooring 3/4" thick (sawn to required sizes)
tongued and grooved or splayed rebated fixed with brass screws on deedar wood
battens 1½"x2" placed at 12" centre to centre including two coats of bitumen laid
hot on the base.
MATERIAL
Shisham Wood
ITEM RATE
Page 45
DESCRIPTION OF ITEM
MATERIAL
ITEM RATE
Page 46
DESCRIPTION OF ITEM
MATERIAL
ITEM RATE
Page 47
DESCRIPTION OF ITEM
32 Shisham wood block flooring 1" thick cut to required size, fixed on a layer of
asphalt bitumen laid on base
MATERIAL
Bitumen for laying and dipping blocks 80 Lbs (36.32 Kg.) 14.00 Per Kg. 508.48
Primer 5.00 Lbs (2.27 Kg.) 13.00 Per Kg. 29.51
Fire Wood 0.25 Md (9.33 Kg.) 2.75 Per Kg. 25.66
Sand Paper 2.00 Dozen 72.00 Per Dozen 144.00
Total 5,705.65
Contractor's Profit & Overheads 20 Percent 1,141.13
Total 6,846.78
ITEM RATE
Page 48
DESCRIPTION OF ITEM
33 Teak wood block 1" thick cut to required size fixed on a layer of asphalt bitumen laid on base
MATERIAL
ITEM RATE
Page 49
DESCRIPTION OF ITEM
34 Laying wooden paving of hard wood on edge in coal tar and asphalt
a) Shisham Wood
MATERIAL
ITEM RATE
Page 50
b) Kikar Wood
MATERIAL
ITEM RATE
Page 51
DESCRIPTION OF ITEM
35 Tile skirting laid in 1:2 cement mortar over 3/4" thick cement mortar 1:2 including
cement washing and filling joints complete.
a) Cement Tiles
MATERIAL
Cement tiles 8"x8" including 5% breakage 240 No. 7.00 Each 1,680.00
and Wastage
Cement for laying and pointing cement tiles 2.45 Bags 230.00 Per Bag 563.50
Sand 6.00 Cft. 350.00 Per 100 Cft. 21.00
Pigment 1 Lb (0.45 Kg.) 70.00 Per Kg. 31.50
Total 2,296.00
Contractor's Profit & Overheads 20 Percent 459.20
Total 2,755.20
ITEM RATE
Page 52
b) Mosaic Tiles
MATERIAL
LABOUR
ITEM RATE
Page 53
DESCRIPTION OF ITEM
36 Providing grey cement skirting or dado 3/8" thick including rounding of corner and
straightening of top edge and finishing to smooth surface after plastering
MATERIAL
ITEM RATE
Page 54
b) 1:3 Cement Sand Mortar
MATERIAL
ITEM RATE
Page 55
c) Extra if skirting or dado is finished with pigment of any colour
MATERIAL
ITEM RATE
Page 56
DESCRIPTION OF ITEM
37 White glazed tiles ¼" thick dado jointed in white cement and laid over 1:2 cement
sand mortar 3/4" thick including finishing complete
MATERIAL
LABOUR
ITEM RATE
Page 57
DESCRIPTION OF ITEM
38 Glazed tile dado ¼" thick dado laid in pigment over 1:2 cement sand mortar 3/4" thick
including finishing
MATERIAL
LABOUR
ITEM RATE
Page 58
DESCRIPTION OF ITEM
39 Masaic dado or skirting with one part of cement and marble powder in the ratio of
3:! and two parts of marble chips, laid over ½" thick cement plaster 1:3 including
rubbing and polishing complete with finishing:
MATERIAL
LABOUR
ITEM RATE
Page 59
a-ii) Using Grey Cement ½" Thick
MATERIAL
LABOUR
ITEM RATE
Page 60
b-i) Using White Cement 3/8" thick
MATERIAL
i) 3/8" Thick
LABOUR
ITEM RATE
Page 61
b-ii) Using White Cement (½" thick)
MATERIAL
i) ½ Thick
LABOUR
ITEM RATE
Page 62
DESCRIPTION ITEM
MATERIAL
LABOUR
ITEM RATE
Page 63
DESCRIPTION OF ITEM
41 Providing and Fixing Glass Strip 5mm thick and 1½" wide
for dividing mosaic flooring into panels.
MATERIAL
ITEM RATE
Note : Labour for fixing already included in item 15 & 22 of this chapter
Page 64
DESCRIPTION OF ITEM
42 Providing and fixing marble strip of any shade for dividing the mosaic flooring into pannels.
MATERIAL
ITEM RATE
Page 65
b) Size 1½" x ¼"
MATERIAL
ITEM RATE
Page 66