Introduction
TTI Consulting Engineers (India) Pvt. Ltd. was awarded the Consultancy Services for Preparation of
Detailed Project Report (DPR) for Sewerage System of Rourkela Town by Orissa Water Supply and
Sewerage Board (OWSSB). The DPR submitted by them was last revised during March 2015.
The broader objective of the project is to provide a sewerage system for Rourkela town for improving
the quality of life, environmental sustainability, health and safety of the people in the town and
abatement of pollution of river Brahmani.
Project Area
Rourkela is a municipality and located north-western tip of the Indian State of Odisha, at the heart of
rich mineral belt. It is the third largest city in Odisha, beside Bhubaneswar and Cuttack. It is
surrounded by a range of hills and encircled by rivers, namely Koel River on the north, Sankha /
Brahamani River on the South West.
Rourkela is located about 550 km from capital city of Bhubaneswar. One of the largest steel plants of
the Steel Authority of India Limited (SAIL) is situated in this city. It also has National Institute of
Technology, Rourkela, one of the NITs of the country which is located in the Sundargarh District.
It has an average elevation of 219m. The city is developed around the SAIL. The city comprises two
townships, namely SAIL Town ship and Municipality Township. The total area of the city is about
80sqkm of which the Municipality is about 33sqkm. The total population of Rourkela town is
4,31,167 as per year 2001 census details of which the population in the SAIL township is about
2,06,180 and the Municipality town ship is about 2,24,987.
Population Projections
The population projections have been estimated using the various population forecast methods, viz
Arithmetical Increase method, Geometrical Increase method, Incremental Increase method,
Regression method and FAR based Density method
The present DPR is prepared based on FAR based population projections as it provides realistic
estimation of the population based on Land use pattern and Floor Area Ratio of the town. Thus, the
projected population for base year 2015, intermediate year 2030 and design year 2045 are 419,903,
586,263 and 687,820 respectively.
The water supply system is maintained by Public Health Engineering Department (PHED) Rourkela.
Most of the area is covered by a piped water supply network except slums which are covered with
public stand posts and some areas are covered with tube wells. The source of water is from river
Brahmani and river Koel. There are two intake works which caters the supply to the Rourkela town
for a population of approximately 2.72 lakhs (2009 population data from PHED) people within the
Rourkela municipality area with a total supply of 42 MLD. The present supply rate is about 150 lpcd.
There is no sewerage system within the municipal area of Rourkela except Koel Nagar and National
Institute of Technology (NIT) campus. The existing sewerage system in Koel Nagar is not functioning
well, it has served its design life and it cannot be integrated to the proposed sewerage system. Hence,
a new sewerage system has been proposed in the Koel Nagar area.
Since, there is no proper sewerage system exists in the city, River Koel and River Brahmani gets
polluted due to direct sewage discharge to the storm water drains.
1
Abatement of pollution to River Koel and River Brahmani will be achieved by providing Sewerage
System (Core Component) to the Rourkela Town and by addressing non-point sources of pollution
(non-core components: Community Toilets, Dhobi Ghat, Crematorium, River Front Development
etc.), the balance pollution will be controlled.
The proposed sewerage system consists of three major Sewerage Zones with 12 sewerage catchments.
The sewerage system consists of sewer network of pipe of diameters varying from 150-1800mm of
about total length of 272.0 Kilometres, eight intermediate Sewage Pumping Stations, three Terminal
Sewage Pumping Stations and three Sewage Treatment Plants.
The Rourkela town was built and developed by Rourkela Steel Plant (RSP) since 1970s and RSP
owns major portion of land in and around the town. Due to this reason, there were several constraints
faced in selecting Sewage Treatment Plant (STP) sites at Koel Nagar, Bandamunda and Ruputola
areas. The land belongs to Government department has been given preference for selecting the site for
STP. RSP has not given permission to lay the pumping mains along the Ring Road (the road belongs
to RSP) to pump the Koel Nagar and Bandamunda sewage flows to centralized STP at Ruputola. Due
to these constraints, three STPs are being considered to treat the sewage to river disposal standards.
The catchment area 3F, Tharpur area, is located at South of the town and is very far from the city.
This area is about 3.5Km south of STP-3 at Ruputola. The techno-economic analysis of providing
STP vs. Proving a Sewage Pumping Station to pump to STP-3 at Ruputola has been analysed and
based on the analysis results, a 1.0 MLD package treatment plant has been proposed at Tharpur area,
which meets year 2025 requirement.
In addition to the above proposed works, a gravity outfall sewer, about 2.5Km length, is proposed
from the Ruputola STP to the downstream of Tarkera water intake to discharge the treated effluent.
Summary of Proposed Sewer Network
Description
Catchment
1B
Location
1C
Jhirpani Jagda
2A
2B
3A
3C
3D
3E
Diesel
Colony
Chudi
Basti
Kalinga
Vihar
Udit
Nagar
Naya Pulpolo
Bazar
Basti
SPS1
SPS2
SPS3
SPS4
SPS5
SPS6
SPS7
SPS8
4.0
3.0
3.0
5.0
4.0
14 x10
5.0
4.0
Effective
Depth, m
1.45
1.75
0.44
1.25
1.4
2.0
1.2
1.55
5.03
8.71
5.36
8.13
6.99
8.79
6.92
6.08
Total No of Pumps
No of working Pumps
No of stand by pumps
Type of Pumps
10
Pump Capacity
10a
10b
Head, m
10c
Side
Water
Submersible
32.88
21.72
6.14
50.49
27.28
179.39
38.86
27.39
23
24
25
18.63
24
19
Installed Capacity, HP
60.5
41.7
12.3
32.3
17.5
532.0
74.6
41.6
11
30.17
20.8
6.12
16.11
8.70
264.53
29.45
20.76
12
13
Other Units
S.
No.
Catchment
Pumping Main
Pipe
Material
Size,
mm
Total
Length, m
From
To
1B
SPS1
DI,K-9
300
1125
1C
SPS2
DI,K-9
250
945
2A
SPS3
MH-1925 of Catchment - 2B
DI,K-9
150
1825
2B
SPS4
DI,K-9
350
172
3A
SPS5
DI,K-9
300
375
3C
SPS6
DI,K-9
800
2005
3D
SPS7
DI,K-9
300
1680
3E
SPS8
Inlet of STP-3
DI,K-9
300
1415
10
Three sewage treatment plants have been proposed under this project in Rourkela to treat the sewage
and discharge into River Brahamani and River Koel. These treatment plants include:
i) STP-1: 10 MLD Capacity STP, at Koel Nagar (Sequential Batch Reactor, SBR Technology)
ii) STP-2: 5 MLD Capacity STP, at Bandamunda Area, (Extended Aeration, EA Technology)
iii) STP-3: 53 MLD Capacity STP, at Ruputola, (Activated Suldge Process, ASP Technology)
All the STPs are designed to discharge the treated sewage to Rivers / Water bodies as follows:
S. No.
Parameters
Unit
mg/l
250
< 30
BOD5 at 200C
mg/l
200
< 20
11
Non-Core Components
Apart from the Core Components (Sewerage System), several other components were looked at,
improvement of which will lead to a holistic improvement of environmental quality in Rourkela Town
and its surroundings, the water bodies in and around Rourkela, including Koel, Shank and Brahmani
Rivers. Non-Core Components proposed include Low Cost Sanitation, Dhobi ghats, crematorium,
River Front Development, afforestation and environmental education.
12
Institutional Arrangements
The resources required for proper implementation of the construction of project components and
O&M requirements after the construction have been assessed and suitable provisions have been made
in the project.
13
Two types of impacts are assessed viz Impacts during Construction phase and Post Construction
Impacts. The majority of the impacts identified are temporary and restricted to the construction phase.
However, proper mitigation measures have been proposed.
14
Cost Estimates
The Cost Estimates have been worked out based on Detailed Rate Analysis, using PWD Schedule of
Rates and market rates have been considered for the items not included in the PWD Schedule of
Rates.
The Summary of Project Cost for Municipal area is given below details have been given at Table 1.
S. No.
Amount,
Item
Rs. in Crores
Core Components
482.10
II
12.32
III
494.42
IV
Add Centage 8%
39.55
49.44
VI
121.21
Grand Total
704.62
The cost of Sewerage System for the Master plan area which is outside the Municipality area is
estimated as Rs.68.09 Crores. Since, it is noticed that the development outside municipality area is
limited (localised development) and the proposed sewerage system in this area will not be connected
to the Municipality area, it is recommended that the sewerage system is to be considered in Phase-2,
when substantial development is witnessed.
15
The project is proposed for financial assistance from Odisha Urban Infrastructure Development Fund
(OUIDF), Govt. of India from Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Fund and Govt of Odisha in Housing and Urban Development Department. OUIDF had sanctioned
Rs. 40.00 crores. During 2014-15 Govt of Odisha have released Rs. 25.00 crores & OUIDF have
released Rs. 30.00 crores.
The annual financial burden imposed by the project comprises the annual recurring cost and payment
towards loan and interest (debt servicing). This has to be met from the operational revenue which
shall be realized by imposing sewerage cess on domestic as well as non domestic connections.
However existing sewerage cess of Rs. 20 is unable to meet the annual recurring cost and payment
towards debt servicing. The same would need to be borne by the State Government budgetary support.
A summary of the financial analysis is presented below:
(Rs in Crores)
Item
Year 5
Year 10
Year 15
1.44
2.22
2.92
Total Revenue
3.94
5.25
6.25
22.75
30.44
40.74
91.08
84.04
79.60
Deficit / Surplus
(87.14)
(78.80)
(73.35)
O&M Recovery
6.3%
7.3%
7.2%
16
Project Implementation
The construction of all project activities will be completed within 3 years after award of works.
Construction of Sewerage system within Rourkela Municipal area is scheduled in Phase-1 and
outside Municipality is scheduled in Phase-2. The core components of the project will be
implemented by Orissa Water Supply and Sewerage Board (OWSSB). The non-core components will
be implemented through Rourkela Municipal Corporation (RMC), Irrigation Autherity and other
Govt. & Non-Govt. Organisations.
Amount,
Rs. in Crores
Item
Core Components
Sewerage
345.81
13.48
Rising Mains
9.58
71.76
23.14
1.60
Land Cost
16.05
0.68
Sub-Total (I)
II
482.10
Community Toilets
6.38
Dhobi Ghats
0.044
Crematoria
1.78
IEC Activities
1.509
2.612
Sub-Total (II)
12.32
III
494.42
IV
39.55
49.44
VI
583.41
VII
121.21
Grand Total
704.62
Amount in Rs.
Dismantling Koel
Nagar Sewerage
Outfall Structure
Catchment 3D
Catchment 3C
Catchment 3B
Catchment 3A
Catchment 2C
Catchment 2B
Catchment 2A
Catchment 1C
Catchment 1B
Outfall Sewer
Construction
of Manholes
and drop
manholes
House service
Connections
and Inspection
chambers
Miscellaneous
like
dismantling
and reinstating
utilities like
water supply
and drainage
Total of
Sewerage
Works in Rs.
Catchment 3F
Pipe line
laying and
bedding
Catchment 3E
Earth work
excavation and
related works
Core Components
I. Abstract of Cost Estimate for Sewer Network
Catchment 1A
Item
A.
148807992
81080277
37080282
36932004
113744928
109743275
41887739
521267524
404387861
34815479
26539330
15481592
72,908,436
1644676720
28150438
10215579
5935389
4323399
14457282
13859783
9812184
172840932
86602729
6657096
3272298
3272071
124683692
484082871
55008783
24987525
17737408
17589327
38848658
42074734
43117408
221158637
185561104
22145803
11609802
10768935
1,192,359
691800481
38211877
19576762
12162281
4462932
28724190
15454089
8720126
125064965
99669644
21278057
7287873
5776490
4,217,498
2,337,406
1,046,091
909,969
2,630,791
1,581,101
1,255,147
22,851,098
20,629,079
4,652,435
1,411,107
1,459,514
175500000
6,481,719
4206231
251169186
274396588
138197550
73961450
64217631
198405849
182712982
104792604
1063183155
796850418
89548870
50120410
36758603
374284487
6481719
4206231
3458118544
345.81
386389286
B.
Sl.
1.
2.
3.
4.
5.
Description
6.
7.
Construction of DG Room
8.
C.
SPS1
SPS2
SPS3
SPS4
SPS5
SPS6
SPS7
SPS8
911455
871154
789144
1788764
1026282
6243062
1452003
1114053
14195917
80134
76383
66932
116426
45632
363349
100035
101298
950189
303718
553339
307110
648807
399796
1492389
503515
394082
4602756
9726932
9023752
8205832
9678739
7151330
37000774
9080252
8998211
98865823
450885
267642
269667
814888
281023
360664
484599
459715
3389084
381984
381169
381169
600521
388395
454831
420051
380928
3389049
447325
404379
447325
447325
453495
449427
483423
447325
3580024
685771
725641
786201
763545
748996
763545
692535
685771
5852005
12988204
12303459
11253380
14859015
10494950
47128041.
3
13216413
12581383
134824845
S.
N
Description
o
1
Amount in
Rs.
Construction of DI
K-9, Rising Main
Amount in Rs.
SPS1
SPS2
SPS3
SPS4
SPS5
SPS6
SPS7
SPS8
6574872
4578855
6048404
1229881
2840922
62232024
3383467
8938151
95073467
D.
S. No.
Description
Capital Cost
Civil Works
Mechanical, Piping,
Electrical and
Instrumentation
Treated Water Pumping
Station, Rising Main and
Gravity Sewer
Capital Cost (a+b+c)
E.
STP-1 (SBR)
Koel Nagar
Rs. in Lakhs
STP-2 (EA)
Bondamund
a
Rs. in Lakhs
STP-3 (ASP)
Ruputola
Rs. in Lakhs
Total Amount
Rs. Lakhs
726.57
447.84
2028.34
3202.74
1346.76
323.67
1852.62
3523.05
450.21
450.21
2523.54
771.51
3880.96
7176.01
150000
Amount
Rs. in
Crores
0.68
540
150000
8.10
110
150000
1.65
315
150000
4.73
400 mm
165
150000
2.48
6.
600 mm
25
150000
0.38
7.
800 mm
25
150000
0.38
8.
900 mm
90
150000
1.35
9.
1200 mm
65
195000
1.27
10.
1800 mm
110
195000
2.15
Total
1490
S. No
Dia
Unit
No.
Length
in m
1.
150 mm
45
2.
200 mm
3.
300 mm
4.
350 mm
5.
Rate in
Rs./m
19.28
F.
S. No
1
2
Item
Rate, Rs.
Crores
0.220
No
Amount Rs.
in Crores
0.879
0.330
0.330
0.020
0.098
0.016
0.081
Pull Through
0.010
0.020
CCTV Equipment
0.065
0.065
0.104
0.104
Miscellaneous Equipment
0.026
0.026
1.602
STP
N
o
.
STP1
N
o
.
Land type
Govt. or
Private
Land in ha
Land to be
acquired,
ha
Land cost
Crores
per ha
Private (RSP)
0.04
0.04
3.75
Govt.
1.58
Govt.
1.62
Govt.
10.12
Private
3.24
3.24
3.75
0.16
0.16
3.75
0.16
0.16
3.75
STP2
STP3
SPS1
Govt.
0.16
SPS2
0.16
SPS3
SPS4
SPS5
Govt.
East Coast
Railway
East Coast
Railway
Govt.
SPS6
Private (RSP)
0.36
0.36
3.75
10
SPS7
Private (RSP)
0.16
0.16
3.75
11
SPS8
Private (RSP)
0.16
0.16
3.75
Amount Rs.
in Crores
0.15
12.15
0.60
0.60
0.16
1.35
0.60
0.60
16.05
Amount
Rs.
Item
No of Community toilets
Cost per 1 no
34
18,75,000
63,750,000
Total Rs. in Crores
6.375
12
0.2
0.5
1.2
10049
Amount
Rs.
12059
Construction of Drain
12
1.2
0.6
4.32
10049
43411
Grease Trap
1.5
2.4
3.6
10500
37800
Sand filter
1.5
2.4
3.6
12000
43200
Pump 2hp
15000
30000
Water Tank
7500
Piping
7500
Miscellaneous
37500
218969
S. No. Item
Quantity
Unit Rate
220000
440000
Amount
in Rs.
Item
Transformer-150 kva
337500
LT Panel,HT Switchgear
525000
900000
11
0.044
S. No.
Amount
in Rs.
60000
Item
Heating elements
Chimney 30 m long
75000
Changing Trolley
90000
Pyre
225000
Trays-4 no
120000
Hood
Chimney 11 m long
Building(20 x 30 m)
Rate /sqft
Compound wall
No. of crematoria
375000
112500
112500
225000
2812500
90000
60000
180000
675000
3333
1500
5000000
100
400000
5404933
8892433
2
17784867
12
1.48
Item
(in Rs.)
Amount
Unit
Quantity
Rate
525000
1575000
per telecast
incl service
tax
36
37500
1350000
per spot
incl service
tax
75000
450000
per telecast
incl service
tax
144
15000
2160000
per 100
sqcm incl
service tax
108
6000
648000
72
3750
270000
72
30000
2160000
per annum
750000
1500000
per 2 years
625000
1250000
Mass Media
Television
Spot (Advertisement)
Print Media
Publicity in local newspapers,100
sqcm,one/month during 3 years
a Local newspapers-3 no
Hoarding
Hoarding at strategic points in city including
materials, installation and service
About 5 points
10143000
Sub Total
13
Sl.
Item
II
Events
Unit
Quantity
Rate
Amount
per annum
300000
900000
per annum
300000
900000
1800000
Sub Total
III
per annum
300000
900000
per annum
450000
1350000
per annum
300000
900000
3150000
Sub Total
15093000
1.50
No
Qty
Rate
Amount
In Rs.
a Platforms
m3
10
10
0.3
120
15000
1800000
b Steps
m3
150
10
0.4
0.2
120
15000
1800000
m2
7500
270000
S. No
Item
Sitting Benches
Landscaping
36
225000
no.
10
7500
75000
112500
14
S. No
Item
Unit
No
Approach Roads
100
no.
15
15
Cost of land
m2
100
20
0.5
Qty
225
2000
6000
Amount
In Rs.
600000
3000
675000
3750
7500000
Rate
13057500
Grand Total
River Front Development
at 2 Bathing Ghats
26115000
2
Total Cost Rs. in Crores
15
2.165