Вы находитесь на странице: 1из 1

How do u create RFDS?

2 MAIN PROCEDURES YOU CAN USE


- CREATE THE SITE AND CELLS IN ATOLL, THEN CREATE RFDS FOR THE SITE IN
AUTOFORMS, REFRESH CSSng, PACE, IPLAN and ATOLL in AUTOFORMS to populate
the various fields. Then use visio to draw the plumbing diagram and upload the
plumbing diagram in Autoforms. you can then validate the RFDS and promote to
C&E.
- Manually create the RFDS in AUTOFORMS and populate the various fields in the
various sections manually. Create the plumbing diagram in Visio. Validate RFDS
and promote to C&E.

How do u review and update Zoning diagram Plumbing


diagram
Every market has its way of creating zoning diagram. Mainly take snapshots from
Atoll showing how coverage would improve before and after the site is built.
For plumbing diagram, you collect various existing info (squid, RRUS, BASEBAND
UNITS AND ANTENNA). Draw what is existing and add the antenna or rrus for the
new carrier. You can simply export the existing diagram in autoforms and update
it accordingly.

what are the processes involved in using ATOLL


export (site,cell or transmitter table) into excel, edit it, import it and archive the
changes.

How do u CIQ (LED)

- It's been a long time since i did this. But the


process should be the same.
Basically use data from the RFDS to fill up a template for the integration engineers
to generate the scripts.(BW, , BAND, FREQ, RRU TYPE, BBU type, losses,
attenuation values, neighbors)

Вам также может понравиться