Вы находитесь на странице: 1из 4

Planning and Design WS

Water Catchment Design

Annex 2
Name of Sub-Project
Sub-project Type
Municipality
Province
Region
I

Water Catchment Source WS

DESIGN OF RESERVOIR:

A. Annual and Monhtly Water Demand


Criteria:
Particular
Number of Household
Average Household Member
Total Population
Average Population Growth Rate
Design Lifespan
Design Population
Average Daily Water Demand
per Capita per Day
Annual Demand in liters
Average Monthly Demand in liters

Description
Actual number of household benef
6 members
(No. of HH)(Ave. HH Member)
Percent annualy
No. of years
(No. of HH)(1+PGR)^life span
liters per capita per day
(Design population)(ADWD/capita/
AD/12

Data

Unit

16
5.125
82
0.02
10
100
7

HH
No.
No.
%
Years
No.
Liter

255,391.52 Liter
21,282.63 Liters
21.28 CuM

B. Available Water Assessment from Rainfall Data

Month
January
February
March
April
May
June
July
August
September
October
November
December
Total

Roof Area (19


Rainfall Data in mm m x 10.5m)
115.8
199.5
50.5
199.5
38.1
199.5
45
199.5
86.7
199.5
185.6
199.5
197.9
199.5
174
199.5
182.7
199.5
229.9
199.5
178.5
199.5
120.2
199.5

% to be
collected
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

C. Demand Supply Analysis (Mass Curve Method)


Monthly
Cumulative
Cumulative
Demand Less
Month
Available Water
Demand
Supply
January
18,481.68
21,282.63
2,800.95
February
26,541.48
42,565.25
16,023.77
March
32,622.24
63,847.88
31,225.64
April
39,804.24
85,130.51
45,326.27
May
53,641.56
106,413.13
52,771.57
June
83,263.32
127,695.76
44,432.44
July
114,848.16
148,978.39
34,130.23
August
142,618.56
170,261.01
27,642.45
September
171,777.48
191,543.64
19,766.16
October
208,469.52
212,826.27
4,356.75
November
236,958.12
234,108.89
(2,849.23)
December
256,142.04
255,391.52
(750.52)

KALAHI-CIDSS PROJECT

Total Available Water


18,481.68
8,059.80
6,080.76
7,182.00
13,837.32
29,621.76
31,584.84
27,770.40
29,158.92
36,692.04
28,488.60
19,183.92
256,142.04

Remarks

Basis for Reservoir Size

Reservoir Sizing for Annex 1----1of 2

Planning and Design WS

Water Catchment Design


D. ECONOMICAL STORAGE CAPACITY
Reservoir dimension
(r.cap.)^
1/3

Length
3.75
Breadth
3.75
Height
3.75
Freeboard
Dead vol. Ht.

=
=
=
0.20
0.10

Dimension

Therefore
Use reservoir dimension
Actual reservoir capacit

=
=

3.75 cum
3.75 m.
3.75 m.
4.05 m.

use
4.00 m.
4.00 m.
5.00 m.

width
length
height
4.00
4.00
5.00
75.20 cu.m.

D. Demand Supply Analysis (Iterative Method)


Trial 1
Available Water Monthly Water Surplus/Defic
(liters)
Demand (liters)
it (cum)
18,481.68
21,282.63
(2,800.95)
8,059.80
21,282.63
(13,222.83)
6,080.76
21,282.63
(15,201.87)
7,182.00
21,282.63
(14,100.63)
13,837.32
21,282.63
(7,445.31)
29,621.76
21,282.63
8,339.13
31,584.84
21,282.63
10,302.21
27,770.40
21,282.63
6,487.77
29,158.92
21,282.63
7,876.29
36,692.04
21,282.63
15,409.41
28,488.60
21,282.63
7,205.97
19,183.92
21,282.63
(2,098.71)

Month
January
February
March
April
May
June
July
August
September
October
November
December

Trial 2

42,565.25
39,764.31
26,541.48
11,339.61
(2,761.01)
(10,206.32)

(1,867.19)
8,435.03
14,922.80
22,799.09
38,208.51
45,414.48
43,315.77

Remarks

55,963.97
53,163.02
39,940.19
24,738.33
10,637.70
3,192.39 Surplus
11,531.53
21,833.74
28,321.51
36,197.81
51,607.22
58,813.19
56,714.49

Trial 1 Assume volume to be twice the average monthly required volume which is 21.28 cum x 2 equals 42.56 cum.
Trial 2 Assume volume would be the defcit in May plus the desired retention volume of about 10 to 15% and the sum
is then added to the frst trial volume. Trial 2 assume volume = 10.21 + 3.19 + 42.56 equals 55.96 cum.
Retention Volume

21,282.63

15%

3,192.39

Reservoir dimension
(r.cap.)^
1/3

Length
3.83
Breadth
3.83
Height
3.83
Freeboard
Dead vol. Ht.

=
=
=
0.20
0.10

Dimension

Therefore
Use reservoir dimension
Actual reservoir capacit

KALAHI-CIDSS PROJECT

=
=

3.83 cum
3.83 m.
3.83 m.
4.13 m.

use
4.00 m.
4.00 m.
5.00 m.

width
length
height
4.00
4.00
5.00
75.20 cu.m.

Reservoir Sizing for Annex 1----2of 2

Water Catchment Design

KALAHI-CIDSS PROJECT

Planning and Design WS

Reservoir Sizing for Annex 1----3of 2

Water Catchment Design

Planning and Design WS

m x 2 equals 42.56 cum.


t 10 to 15% and the sum

KALAHI-CIDSS PROJECT

Reservoir Sizing for Annex 1----4of 2

Вам также может понравиться