Академический Документы
Профессиональный Документы
Культура Документы
Ancho(m)
Vol(m3)
CIMIENTO
Vol.Conc.(m3)
SOBRECIMIENTO
Encof.(m2)
Vol.Conc.(m3)
Acero (kg)
Excavacin de
Encof.(m2)
zanja(m3)
1/2"
Longit.
3/8"
Eje
Seccin
Long. Hor.
1-1
2-2
1-1
1-1
11.400
11.400
1.400
1.600
1.596
1.824
11.628
12.996
20.52
20.52
0.445
0.445
6.84
6.84
27.132 31.008 -
E-E
2-2
8.700
1.000
0.870
6.890
13.92
0.626
5.22
14.790
34.556
I-I
2-2
8.700
1.000
0.870
6.890
13.92
0.626
5.22
14.790
34.556
5.160
38.405
68.880
2.142
24.120
87.720
69.113
228.787
Longit.
45.281
45.281
Transv.
38.236
38.236
Estr. Vert
94.320
94.320
50.981
50.981
34.556 -
19.118
69.025
38.906
34.556 -
19.118
69.025
38.906
326.691
179.774
159.674
76.471
114.427
697.364
926.15
Zapatas
Acero (kg)
Eje
Seccion
Cant. de
Element.
1-1
1-1
Dimensiones
a(m)
b(m)
1.800
Solado
Ar.Transv.(m2)
2.000
Cimiento
Vol.Conc.(m3)
1.380
Vol.Conc(m3)
0.720
4.968
6.480
0.720
4.968
6.480
Longit.
39.323
Primer Piso
Para 1 Hilera
METRADO
Long. refuerzo(m)
3/8"
1/2"
1-2.1;E-I
0.00
L. Transv
22.10
L. Longitud.
14.46
8.90
LAD(Unid)
CONC(m3)
Num. Ladri
V. Conc.(m3)
ACERO(Kg)
3/8"
1/2"
ENCOF(m2)
1/4"
Area(m2)
1072.45
12.87
0.00
793.32
130.14
94.98
1072.45
12.87
0.00
793.32
130.14
94.98
923.46
Segundo Piso
Para 1 Hilera
METRADO
Long. refuerzo(m)
Ubicacin
3/8"
1-2.1;E-I
1/2"
2.00
L. Transv
18.12
15.46
L. Longitud.
10.98
LAD(Unid)
CONC(m3)
ACERO(Kg)
Num. Ladri
V. Conc.(m3)
3/8"
ENCOF(m2)
1/2"
16.98
43.21
695.44
170.06
116.54
1414.59
16.98
43.21
695.44
170.06
116.54
TOTALES
Acero(kg)
211.52
29.84
Area(m2)
1414.59
908.71
1/4"
3/8"
1/2"
43.21
1488.76
1832.17
1/4"
Ladr.(und.)
300.20
2488.00
Transv.
Excavac.
Estr. Vert
31.776 -
71.099
LOSA ALIGERADA:
Ubicacin
MOV TIERRA
1/2"
Encof.(m2)
Long. Hor.
35.469
40.723
Est. Horiz.
-
(m3)
11.52
11.52
VIGAS
Cantidad Refuerzo Longit.
Seccin
3/8"
1/2"
Estribos de 1/4"
3/4"
5/8"
a 0.05m
VSol
V-1
0
0
4
0
0
0
0
6
V-2
V-3
0
0
1
0
0
4
4
2
V-4
1-1
0
0
0
4
0
0
4
0
2-2
3-3
4
0
0
4
0
0
0
0
4-4
5-5
2
2
0
0
0
0
2
0
6-6
7-7
c/ 0.10
c/ 0.15
Estribos de 3/8"
c/ 0.20
c/ 0.25
1
0
3
0
0
0
Resto
0
0
Resto
1
1
0
3
0
0
0
2
0
0
0
0
Resto
0
Resto
c/ 0.10
c/ 0.20
c/ 0.25
Resto
1
1
8
6
1
0
0
Resto
1
1
8
8
1
Resto
0
0
1
0
Dimensiones(m)
a 0.05m
Resto
Primer Piso
Acero(Kg)
Longitudinal
Eje
1-1
Seccin
V-1
1-1
2-2
1-1
V-1
2-2
E-E
Long(m)
14.46
Concreto(m3)
1.30
Encofrado(m2)
15.91
14.46
14.46
0.32
1.30
2-2
VSol
14.46
8.90
F-F
G-G
3-3
VSol
H-H
3-3
I-I
VSol
3/8"
1/2"
Estribos
3/4"
5/8"
1/4"
3/8"
0.00
0.00
0.00
134.65
26.85
60.05
6.80
15.91
0.00
0.00
57.44
0.00
0.00
0.00
0.00
134.65
12.39
26.85
27.71 Intermedio
60.05
0.22
0.53
5.06
6.59
32.33
0.00
0.00
35.35
0.00
0.00
0.00
0.00
10.33
12.46
23.09
27.86
8.90
8.90
0.67
0.53
7.12
6.59
0.00
0.00
35.35
35.35
0.00
0.00
0.00
0.00
13.99
12.46
31.27
27.86
8.90
0.67
7.12
0.00
35.35
0.00
0.00
13.99
31.27
8.90
0.53
6.59
0.00
35.35
0.00
0.00
12.46
27.86
6.08
77.67
141.78
317.03
32.33
234.19
0.00
269.30
994.63
Segundo Piso
Acero(Kg)
Longitudinal
Eje
Seccin
1-1
1-1
5-5
V-2
1-1
2-2
Long(m)
3/8"
1/2"
Estribos
3/4"
5/8"
1/4"
3/8"
Concreto(m3)
Encofrado(m2)
15.46
15.46
0.77
1.39
10.82
17.01
18.40
0.00
0.00
16.34
0.00
0.00
0.00
102.18
19.88
28.71
44.45
64.20
6-6
V-2
15.46
15.46
1.93
1.39
15.46
17.01
0.00
0.00
65.38
16.34
0.00
0.00
0.00
102.18
33.13
28.71
74.08
64.20
2-2
2-2
5-5
2-2
15.46
18.46
0.77
0.28
10.82
6.46
18.40
43.51
0.00
0.00
0.00
0.00
0.00
0.00
19.88
13.19
44.45
29.48 Parapetos
E-E
E-E
7-7
VSol
10.98
18.38
0.55
1.10
7.69
13.60
0.00
0.00
23.79
76.98
0.00
0.00
0.00
0.00
14.12
25.73
31.57
57.54
F-F
G-G
3-3
V-4
10.98
15.22
0.82
1.90
8.78
19.03
0.00
0.00
47.58
0.00
0.00
0.00
0.00
100.69
17.25
32.61
38.58
72.93
G-G
H-H
I-I
VSol
3-3
VSol
3.14
10.98
18.38
0.19
0.82
1.10
2.32
8.78
13.60
0.00
0.00
0.00
16.44
47.58
76.98
0.00
0.00
0.00
0.00
0.00
0.00
4.40
17.25
25.73
9.83
38.58
57.54
I-I
7-7
10.98
0.55
7.69
13.58
159.07
0.00
80.32
23.79
411.22
0.00
0.00
0.00
305.06
1750.28
TOTALES
Acero(kg)
Encof.m2)
236.74
Concreto (m3)
19.66
1/4"
436.49
3/8"
1088.64
1/2"
645.41
2744.91
5/8"
574.36
3/4"
0.00
14.12
31.57
294.71
658.97
Resto
b(m)
h(m)
0.24
0.20
0.25
0.45
0.20
0.30
0.45
0.60
0.25
0.13
0.50
0.17
0.15
0.30
0.10
0.25
0.20
0.20
0.25
0.25
0.50
0.25
0.20
0.25
COLUMNAS:
Nmero Fierros
Tipo
b(m)
h(m)
Ar.Transv.(m2)
3/8"
1/2"
5/8"
P1
P2
0.20
0.85
0.80
0.24
0.16
0.20
0
0
4
0
6
10
P3
PL - 1
0.24
1.40
0.25
0.20
0.06
0.28
0
4
4
0
0
12
PL - 2
Pa
1.40
0.13
0.70
0.20
0.43
0.03
4
0
6
2
14
0
Pa'
Pb
0.13
0.13
0.20
0.20
0.03
0.03
0
2
2
0
0
0
Ducto
0.36
0.69
0.16
Eje
1-1
Tipo
P1
Longitud(m)
4.09
Cantidad
4.00
Encofrado(m2)
32.72
Conc. (m3)
2.62
3/8"
1/2"
5/8"
1/4"
3/8"
0.00
71.34
167.24
94.50
0.00
1-1
1-1
PL - 1
Pa
4.09
2.49
4.00
4.00
52.35
6.57
4.58
0.26
40.16
0.00
0.00
22.96
334.49
0.00
76.95
6.27
202.25
0.00
2-2
2-2
Pa
Pa'
4.09
1.70
2.00
2.00
5.40
2.24
0.21
0.09
0.00
0.00
17.83
8.34
0.00
0.00
4.46
2.48
0.00
0.00
1-1
E-E
PL - 2
Ducto
4.09
4.09
2.00
1.00
34.36
8.59
8.02
1.02
20.08
5.02
53.50
0.00
195.12
0.00
0.00
10.53
264.13
0.00
E-E
P2
4.09
2.00
Primer Piso
Fierro(Kg)
Estribos(Kg)
Anclaje (ml)
17.83
1.67
0.00
0.00
139.37
51.57
0.00
160.07
18.46
65.26
173.97
836.22
1788.57
246.75
466.37
Alamb. N8
OBS
27.27 Con eje 2-2
27.27 Con eje 2-2
16.60
27.27
11.33
27.27 Con eje 2-2
27.27
27.27 Con eje I-I
191.53
Segundo Piso
Fierro(Kg)
Estribos(Kg)
Anclaje (ml)
Eje
Tipo
Longitud(m)
Cantidad
Encofrado(m2)
Conc. (m3)
3/8"
1/2"
5/8"
1/4"
3/8"
1-1
1-1
P1
PL - 1
2.74
2.74
4.00
6.00
21.92
52.61
1.75
4.60
0.00
42.13
49.89
0.00
116.96
350.88
70.00
85.50
0.00
224.72
1-1
2-2
Pa
Pa
1.74
2.74
4.00
2.00
4.59
3.62
0.18
0.14
0.00
0.00
17.00
12.47
0.00
0.00
4.95
3.30
0.00
0.00
11.60
18.27
2-2
2-2
Pa'
Pb
1.10
1.05
2.00
12.00
1.45
8.32
0.06
0.33
0.00
19.45
5.96
0.00
0.00
0.00
1.98
11.88
0.00
0.00
7.33
7.00
E-E
Ducto
4.24
1.00
8.90
1.05
5.19
0.00
0.00
10.92
0.00
28.27
E-E
P3
4.24
2.00
8.31
0.51
0.00
36.86
0.00
15.82
0.00
109.72
8.63
66.77
122.18
467.83
204.35
224.72
1085.85
Anclaje
TOTALES
Alambre No 8
Acero(kg)
Encof.(m2)
Concreto (m3)
269.79
1/4"
27.09
3/8"
451.10
823.12
2874.42
1/2"
5/8"
296.15
1304.05
ml
328.80
ALBAILERIA
Primer Piso
Eje
h (m)
2.89
1.89
1.1
E-E
1-1
2-2
Long(m)
Cant.
3.10
4.00
2.15
4.00
Area (m2)
16.254
3.15
2.00
6.93
59.02
Segundo Piso
Eje
E-E
1-1
2-2
2-2
h (m)
3.14
1.74
1.1
1.1
Long(m)
Cant.
3.35
2.15
4.00
4.00
Area (m2)
3.15
2.00
6.93
3.20
4.00
14.08
TOTAL
Area (m2
137.07
Alamb. N8
OBS
137.27
78.05
LOSA DE CONCRETO(e=10cm):
Acero de 3/8" c/0.20 (Malla Centrada)
b(m)
14.00
l(m)
7.00
e(m)
0.10
Encof.(m2)
Lados
0.00
Concreto(m3)
9.80
0.00
Acero de 3/8"
Longitud(m)
Cant. Fierros
Peso(Kg)
6.95
70.00
271.95
Longitudinal
Transversal
13.95
35.00
272.93
544.89
VEREDA DE CONCRETO(e=10cm):
Acero de 3/8" c/0.20 (Malla Centrada)
b(m)
14.45
l(m)
1.50
e(m)
0.10
Encof.(m2)
Lados
Concreto(m3)
1.75
1.75
Acero de 3/8"
Longitud(m)
Cant. Fierros
Longitudinal
1.45
72.00
Transversal
14.40
8.00
Peso(Kg)
58.36
64.40
122.76
2.17
DESCRIPCION
04
04.01
VIGA DE CIMENTACION
04.01.01
UND
N
VECES
LONG.
(ml)
3/8"
1/2"
3/4"
5/8"
KG
EJE: FIERROS
A-A,C-C
12
15.00
178.92
1-1-,3.3,4-4,5-5
24
6.30
150.29
329.21
SUB TOTAL
EJE: ESTRIBOS
A-A ,CC
104
1.70
1-1-,3.3,4-4,5-5
94
1.70
Z-1
14.50
45.01
Z-2
13.50
20.95
Z-3
11.00
10.93
Z-4
19.00
37.77
Z-5
10.00
9.94
Z-6
21.00
Z-7
17.50
Z-8
10.50
20.87
Z-9
11.00
10.93
SUB TOTAL
04.02
ZAPATAS
04.02.01
KG
32.59
27.16
DESCRIPCION
UND
N
VECES
LONG.
(ml)
COLUMNAS
04.03.01
3/4"
5/8"
125.71
KG
EJE:
24.00
4.50
ESTRIBO
3.00
25.50
C2- LONGUITUD
40.00
4.50
C2- LONGUITUD
20.00
4.50
C1- LONGUITUD
P1
ESTRIBO
60.00
22.00
C3- LONGUITUD
6.00
4.50
ESTRIBO
6.00
18.00
SUB TOTAL
SEGUNDO PISO
1/2"
90.45
SUB TOTAL
04.03
3/8"
167.62
279.36
89.46
26.84
116.30
446.98
EJE:
24.00
4.50
ESTRIBO
3.00
25.50
C2- LONGUITUD
40.00
4.50
C2- LONGUITUD
20.00
4.50
ESTRIBO
60.00
22.00
C3- LONGUITUD
6.00
4.50
ESTRIBO
6.00
18.00
C1- LONGUITUD
SUB TOTAL
P1
167.62
279.36
89.46
26.84
116.30
446.98
DESCRIPCION
04.04
VIGAS
04.04.01
UND
N
VECES
LONG.
(ml)
3/8"
1/2"
3/4"
5/8"
KG
PRIMER PISO
EJE:
VA-101
60.00
ESTRIBOS VA-101
105.00
VP-101
39.00
ESTRIBOS VP-101
53.00
VIGA -102
30.00
52.00
VIGA-100
39.00
68.00
181.58
29.82
60.53
29.82
SUB TOTAL
186.24
428.35
KG
SEGUNDO
EJE:
VA-201
60.00
ESTRIBOS VA-201
105.00
VP-101
39.00
ESTRIBOS VP-201
53.00
VIGA -102
30.00
186.24
181.58
29.82
DESCRIPCION
UND
N
VECES
LONG.
(ml)
52.00
VIGA-100
39.00
68.00
ESCALERA
04.05.04
1/2"
KG
PRIMER PISO
EJE: A-A
20
4.50
B-B,
45
1.20
89.46
53.68
143.14
SUB TOTAL
PRIMER PISO
EJE: A-A
20
4.50
B-B,
45
1.20
SUB TOTAL
3/4"
5/8"
60.53
29.82
SUB TOTAL
04.05
3/8"
89.46
53.68
143.14
428.35
A DE METRADOS - ESTRUCTURAS
FIERROS
ESTRIBOS (KG)
1/4"
3/8"
PARCIAL
TOTAL
524.44
329.21
195.23
102.54
92.68
195.23
216.17
216.17
A DE METRADOS - ESTRUCTURAS
FIERROS
ESTRIBOS (KG)
1/4"
3/8"
PARCIAL
TOTAL
1,405.79
167.62
42.84
42.84
279.36
89.46
739.20
739.20
26.84
60.48
60.48
842.52
1,405.79
167.62
42.84
42.84
279.36
89.46
739.20
739.20
26.84
60.48
842.52
60.48
A DE METRADOS - ESTRUCTURAS
FIERROS
ESTRIBOS (KG)
1/4"
3/8"
PARCIAL
TOTAL
TOTAL
2,811.59
1,539.48
1,023.39
117.60
117.60
181.58
59.36
59.36
29.82
29.12
29.12
60.53
38.08
38.08
244.16
1,539.48
1,023.39
117.60
117.60
181.58
59.36
59.36
29.82
A DE METRADOS - ESTRUCTURAS
FIERROS
ESTRIBOS (KG)
1/4"
3/8"
29.12
PARCIAL
TOTAL
29.12
60.53
38.08
38.08
244.16
TOTAL
3,078.96
286.27
143.14
143.14
143.14
143.14
TOTAL
PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH
FECHA:
PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM
DESCRIPCION
UND
N
VECES
MEDI
LARGO
01
ESTRUCTURAS
01.01
TRABAJOS PRELIMINARES
01.01.01
01.01.02
M2
15.00
01.01.03
TRAZO Y REPLANTEO
M2
15.00
01.01.04
M3
15.00
0.1.02
MOVIMIENTO DE TIERRAS
01.02.01
EXCAVACIONES DE SANJAS
EXCAVACION DE ZANJAS
ZAPATA
CIMIENTOS
M3
1.10
4-4
1.50
3-3
1.50
3.25
2-2
3.25
2-1
0.90
1.00
1.50
15.00
EJE: 1-1,4-4,5-5
6.30
3.00
94.50
EJE: 5-5
EJE: A-B, CD
01.02.02
M2
01.02.03
M3
2.00
01.02.04
M3
113.44
M2
01.03.01
1.10
4-4
1.50
3-3
1.50
3.25
2-2
3.25
2-1
0.90
1.00
1.50
15.00
EJE: 1-1,4-4,5-5
6.30
3.00
EJE: 5-5
01.03.02
01.03.03
01.03.04
M3
15.00
EJE: 1-1,4-4,5-5
6.30
3.00
EJE: A-B, CD
M2
EJE: 5-5
6.30
15.00
3.30
C-C
4.65
EJE: A-B,B-C
15.00
EJE: 5-5
6.30
3.30
C-C
4.65
01.04
01.04.01
VIGA DE CIMENTACION
M3
PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH
FECHA:
PROVINCIA: OCROS
DISTRITO: LLIPA
N
VECES
KG
524.44
M2
51.00
M3
51.00
216.17
1.50
2.20
1.50
1.10
1.00
1.50
1.10
KG
1,405.79
SEGUNDO PISO:
KG
1,405.79
M2
DESCRIPCION
01.04.01.1
01.04.01.2
01.04.01.3
MEDI
UND
ITEM
01.04.02
ZAPATAS
01.04.02.01
KG
01.04.02.02
M3
EJE: A-A
EJE: C-C
01.04.03
COLUMNAS
01.04.03.01
LARGO
PRIMER PISO:
01.04.03.02
PRIMER PISO:
SEGUNDO PISO:
01.04.03.03
EJE:
A-A
C1
1.30
A-A
C-2
1.00
A-A
C3
0.70
B-B
C2
1.00
C-C
C1
1.30
C-C
C2
1.00
2-2
C-2
1.00
1-1
P2
2.18
A-A
C1
1.30
A-A
C-2
1.00
A-A
C3
0.70
B-B
C2
1.00
C-C
C1
1.30
C-C
C2
1.00
2-2
C-2
1.00
1-1
P2
2.18
EJE:
M3
EJE
A-A
C1
0.40
A-A
C-2
0.25
A-A
C3
0.25
B-B
C2
0.25
C-C
C1
0.40
C-C
C2
0.25
2-2
C2
0.25
1-1
P2
0.25
PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH
FECHA:
PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM
SEGUNDO PISO:
N
VECES
A-A
C1
0.40
A-A
C-2
0.25
A-A
C3
0.25
B-B
C2
0.25
C-C
C1
0.40
C-C
C2
0.25
2-2
C2
0.25
1-1
P2
0.25
1,539.48
VIGAS
01.04.04.01
KG
01.04.04.02
M2
EJE:
A-A
VA-01
15.00
C-C
VA-01
15.00
VA-101
7.26
2-2
VA-101
1.50
3-3
VA-102
5.25
4-4
VA-100
6.30
5-5
VA-101
6.30
A-A,CC
Vsolera
18
14.50
01.04.04.03
M2
EJE:
A-A
VA-01
15.00
C-C
VA-01
15.00
VA-201
7.26
2-2
VA-201
1.50
3-3
VA-202
5.25
4-4
VA-200
6.30
5-5
VA-201
6.30
A-A,CC
Vsolera
18
14.50
SEGUNDO PISO:
LARGO
EJE:
01.04.04
PRIMER PISO
MEDI
UND
DESCRIPCION
M3
EJE:
A-A
VA-01
15.00
C-C
VA-01
15.00
VA-101
6.30
2-2
VA-101
6.30
3-3
VA-102
5.25
4-4
VA-100
6.30
5-5
VA-101
6.30
A-A,CC
Vsolera
18
14.50
A-A
VA-01
15.00
C-C
VA-01
15.00
EJE:
PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH
FECHA:
PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM
DESCRIPCION
01.04.05
LOSAS ALIGERADAS
01.04.05.01
UND
N
VECES
MEDI
LARGO
VA-201
6.30
2-2
VA-201
6.30
3-3
VA-202
5.25
4-4
VA-200
6.30
5-5
VA-201
6.30
A-A,CC
Vsolera
18
5.80
M2
PRIMER PISO
1.00
15.00
1.00
15.00
PRIMER PISO
9.00
15.00
SEGUNDO PISO
9.00
15.00
1.00
286.27
PRIMER PISO
1.05
0.09
SEGUNDO PISO
1.05
0.09
SEGUNDO PISO
01.04.05.02
UND
01.04.05.03
KG
01.04.05.04
M3
A DE METRADOS
SETIEMBRE 2012
MEDIDAS
ANCHO
ALTURA
PARCIAL
TOTAL
6.30
94.50
94.50
6.30
94.50
94.50
47.25
6.30
0.50
47.25
1.00
2.20
7.26
1.40
2.20
9.24
1.30
2.20
4.29
1.10
2.20
7.87
1.10
2.20
7.87
2.20
1.30
2.57
0.90
2.20
1.98
1.40
2.20
9.24
0.50
2.20
33.00
0.50
2.20
27.72
0.50
0.80
2.40
113.44
94.50
2.00
113.44
54.29
1.00
2.20
3.30
1.40
2.20
4.20
1.30
2.20
1.95
1.10
2.20
3.58
1.10
2.20
3.58
2.20
1.30
1.98
0.90
2.20
0.90
1.40
2.20
4.20
0.50
2.20
15.00
0.50
2.20
12.60
0.50
0.80
3.00
0.50
0.80
12.00
0.50
0.80
10.08
0.50
0.80
2.40
1.50
37.80
1.50
180.00
1.50
19.80
1.50
13.95
0.15
1.50
6.75
0.25
1.50
4.73
0.15
1.50
1.49
0.25
1.50
1.74
12.48
251.55
14.71
A DE METRADOS
SETIEMBRE 2012
MEDIDAS
ANCHO
ALTURA
PARCIAL
TOTAL
524.44
0.40
40.80
0.40
5.10
524.44
5.10
0.25
216.17
216.17
7.36
1.40
0.60
1.26
1.30
0.60
1.72
1.40
0.60
1.26
1.00
0.60
0.66
0.90
0.60
0.54
1.40
0.60
1.26
1.00
0.60
0.66
1,405.79
2,811.58
1,405.79
102.42
51.21
2.88
3.74
2.88
8.64
2.88
2.02
2.88
8.64
2.88
7.49
2.88
8.64
2.88
5.76
2.88
6.28
51.21
2.88
3.74
2.88
8.64
2.88
2.02
2.88
8.64
2.88
7.49
2.88
8.64
2.88
5.76
2.88
6.28
6.14
3.07
0.25
2.88
0.29
0.25
2.88
0.54
0.15
2.88
0.11
0.25
2.88
0.54
0.25
2.88
0.58
0.25
2.88
0.54
0.25
2.88
0.36
0.15
2.88
0.11
A DE METRADOS
SETIEMBRE 2012
MEDIDAS
ANCHO
ALTURA
PARCIAL
TOTAL
3.07
0.25
2.88
0.29
0.25
2.88
0.54
0.15
2.88
0.11
0.25
2.88
0.54
0.25
2.88
0.58
0.25
2.88
0.54
0.25
2.88
0.36
0.15
2.88
0.11
1,539.48
1,539.48
187.96
93.98
0.20
9.00
0.20
6.00
0.30
6.53
0.30
1.35
0.40
6.30
0.40
7.56
0.40
5.04
0.20
52.20
93.98
0.20
9.00
0.20
6.00
0.30
6.53
0.30
1.35
0.40
6.30
0.40
7.56
0.40
5.04
0.20
52.20
498.90
327.75
0.25
0.20
15.00
0.25
0.20
15.00
0.30
0.25
6.30
0.30
0.25
6.30
0.30
0.25
5.25
0.40
0.25
6.30
0.30
0.25
12.60
0.20
0.10
261.00
0.00
171.15
0.25
0.20
15.00
0.25
0.20
15.00
A DE METRADOS
SETIEMBRE 2012
MEDIDAS
ANCHO
ALTURA
PARCIAL
TOTAL
0.30
0.25
6.30
0.30
0.25
6.30
0.30
0.25
5.25
0.40
0.25
6.30
0.30
0.25
12.60
0.30
0.10
104.40
174.00
87.00
5.80
87.00
87.00
5.80
87.00
87.00
5.80
783.00
783.00
5.80
783.00
783.00
87.00
1,566.00
286.27
286.27
15.99
87.00
7.99
87.00
7.99