PLANILLA DE METRADOS - ESTRUCTURAS

RECONSTRUCCION DE LA INFAESTRUCTURA DE LA I.E. N 20741 SEOR DE LOS MILAGROS II Etapa


PROYECTO :

DISTRITO DE COTAHUASI - PROVINCIA DE YAUYOS-DEPARTAMENTO DE LIMA


UBICACIN
FECHA:
Mayo 2009
REGIN:
LIMA
PROVINCIA:YAUYOS
DISTRITO: COTAHUASI
CIMENTACIONES:
MOV. TIERRA
SOLADO
Long(m)

Ancho(m)

Vol(m3)

CIMIENTO
Vol.Conc.(m3)

SOBRECIMIENTO

Encof.(m2)

Vol.Conc.(m3)

Acero (kg)

Excavacin de

Encof.(m2)

zanja(m3)

1/2"
Longit.

3/8"

Eje

Seccin

Long. Hor.

1-1
2-2

1-1
1-1

11.400
11.400

1.400
1.600

1.596
1.824

11.628
12.996

20.52
20.52

0.445
0.445

6.84
6.84

27.132 31.008 -

E-E

2-2

8.700

1.000

0.870

6.890

13.92

0.626

5.22

14.790

34.556

I-I

2-2

8.700

1.000

0.870

6.890

13.92

0.626

5.22

14.790

34.556

5.160

38.405

68.880

2.142

24.120

87.720

69.113
228.787

Longit.

45.281
45.281

Transv.

38.236
38.236

Estr. Vert
94.320
94.320

50.981
50.981

34.556 -

19.118

69.025

38.906

34.556 -

19.118

69.025

38.906

326.691

179.774

159.674

76.471

114.427
697.364

926.15
Zapatas
Acero (kg)
Eje

Seccion

Cant. de
Element.

1-1

1-1

Dimensiones
a(m)

b(m)
1.800

Solado
Ar.Transv.(m2)

2.000

Cimiento

Vol.Conc.(m3)

1.380

Vol.Conc(m3)

0.720

4.968

6.480

0.720

4.968

6.480

Longit.
39.323

Primer Piso
Para 1 Hilera

METRADO

Long. refuerzo(m)
3/8"

Longitudes Seccin (m)

1/2"

1-2.1;E-I

0.00

L. Transv
22.10

L. Longitud.

14.46

8.90

LAD(Unid)

CONC(m3)

Num. Ladri

V. Conc.(m3)

ACERO(Kg)
3/8"

1/2"

ENCOF(m2)
1/4"

Area(m2)

1072.45

12.87

0.00

793.32

130.14

94.98

1072.45

12.87

0.00

793.32

130.14

94.98

923.46
Segundo Piso
Para 1 Hilera

METRADO

Long. refuerzo(m)
Ubicacin

3/8"

1-2.1;E-I

Longitudes Seccin (m)

1/2"
2.00

L. Transv
18.12

15.46

L. Longitud.
10.98

LAD(Unid)

CONC(m3)

ACERO(Kg)

Num. Ladri

V. Conc.(m3)

3/8"

ENCOF(m2)
1/2"

16.98

43.21

695.44

170.06

116.54

1414.59

16.98

43.21

695.44

170.06

116.54

TOTALES

Acero(kg)

211.52

29.84

Area(m2)

1414.59

908.71

Encofrado (m2) Concreto (m3)

1/4"

3/8"

1/2"

43.21

1488.76
1832.17

1/4"

Ladr.(und.)

300.20

2488.00

Transv.

Excavac.
Estr. Vert

31.776 -

71.099

LOSA ALIGERADA:

Ubicacin

MOV TIERRA

1/2"

Encof.(m2)

Long. Hor.

35.469
40.723

Est. Horiz.
-

(m3)
11.52

11.52

VIGAS
Cantidad Refuerzo Longit.
Seccin

3/8"

1/2"

Estribos de 1/4"

3/4"

5/8"

a 0.05m

VSol
V-1

0
0

4
0

0
0

0
6

V-2
V-3

0
0

1
0

0
4

4
2

V-4
1-1

0
0

0
4

0
0

4
0

2-2
3-3

4
0

0
4

0
0

0
0

4-4
5-5

2
2

0
0

0
0

2
0

6-6

7-7

c/ 0.10

c/ 0.15

Estribos de 3/8"
c/ 0.20

c/ 0.25

1
0

3
0

0
0

Resto
0

0
Resto

1
1
0

3
0
0

0
2
0

0
0
0

Resto
0
Resto

c/ 0.10

c/ 0.20

c/ 0.25

Resto

1
1

8
6

1
0

0
Resto

1
1

8
8

1
Resto

0
0

1
0

Dimensiones(m)

a 0.05m

Resto

Primer Piso
Acero(Kg)
Longitudinal
Eje
1-1

Seccin
V-1

1-1
2-2

1-1
V-1

2-2
E-E

Long(m)
14.46

Concreto(m3)
1.30

Encofrado(m2)
15.91

14.46
14.46

0.32
1.30

2-2
VSol

14.46
8.90

F-F
G-G

3-3
VSol

H-H

3-3

I-I

VSol

3/8"

1/2"

Estribos
3/4"

5/8"

1/4"

3/8"

0.00

0.00

0.00

134.65

26.85

60.05

6.80
15.91

0.00
0.00

57.44
0.00

0.00
0.00

0.00
134.65

12.39
26.85

27.71 Intermedio
60.05

0.22
0.53

5.06
6.59

32.33
0.00

0.00
35.35

0.00
0.00

0.00
0.00

10.33
12.46

23.09
27.86

8.90
8.90

0.67
0.53

7.12
6.59

0.00
0.00

35.35
35.35

0.00
0.00

0.00
0.00

13.99
12.46

31.27
27.86

8.90

0.67

7.12

0.00

35.35

0.00

0.00

13.99

31.27

8.90

0.53

6.59

0.00

35.35

0.00

0.00

12.46

27.86

6.08

77.67

141.78

317.03

32.33

234.19

0.00

269.30
994.63

Segundo Piso
Acero(Kg)
Longitudinal
Eje

Seccin

1-1
1-1

5-5
V-2

1-1
2-2

Long(m)

3/8"

1/2"

Estribos
3/4"

5/8"

1/4"

3/8"

Concreto(m3)

Encofrado(m2)

15.46
15.46

0.77
1.39

10.82
17.01

18.40
0.00

0.00
16.34

0.00
0.00

0.00
102.18

19.88
28.71

44.45
64.20

6-6
V-2

15.46
15.46

1.93
1.39

15.46
17.01

0.00
0.00

65.38
16.34

0.00
0.00

0.00
102.18

33.13
28.71

74.08
64.20

2-2
2-2

5-5
2-2

15.46
18.46

0.77
0.28

10.82
6.46

18.40
43.51

0.00
0.00

0.00
0.00

0.00
0.00

19.88
13.19

44.45
29.48 Parapetos

E-E
E-E

7-7
VSol

10.98
18.38

0.55
1.10

7.69
13.60

0.00
0.00

23.79
76.98

0.00
0.00

0.00
0.00

14.12
25.73

31.57
57.54

F-F
G-G

3-3
V-4

10.98
15.22

0.82
1.90

8.78
19.03

0.00
0.00

47.58
0.00

0.00
0.00

0.00
100.69

17.25
32.61

38.58
72.93

G-G
H-H
I-I

VSol
3-3
VSol

3.14
10.98
18.38

0.19
0.82
1.10

2.32
8.78
13.60

0.00
0.00
0.00

16.44
47.58
76.98

0.00
0.00
0.00

0.00
0.00
0.00

4.40
17.25
25.73

9.83
38.58
57.54

I-I

7-7

10.98

0.55

7.69

13.58

159.07

0.00
80.32

23.79
411.22

0.00
0.00

0.00
305.06

1750.28

TOTALES

Acero(kg)
Encof.m2)

236.74

Concreto (m3)

19.66

1/4"
436.49

3/8"

1088.64

1/2"

645.41
2744.91

5/8"
574.36

3/4"

0.00

14.12

31.57

294.71

658.97

Resto

b(m)

h(m)
0.24
0.20

0.25
0.45

0.20
0.30

0.45
0.60

0.25
0.13

0.50
0.17

0.15
0.30

0.10
0.25

0.20
0.20

0.25
0.25

0.50

0.25

0.20

0.25

COLUMNAS:
Nmero Fierros
Tipo

b(m)

h(m)

Ar.Transv.(m2)

3/8"

1/2"

5/8"

P1
P2

0.20
0.85

0.80
0.24

0.16
0.20

0
0

4
0

6
10

P3
PL - 1

0.24
1.40

0.25
0.20

0.06
0.28

0
4

4
0

0
12

PL - 2
Pa

1.40
0.13

0.70
0.20

0.43
0.03

4
0

6
2

14
0

Pa'
Pb

0.13
0.13

0.20
0.20

0.03
0.03

0
2

2
0

0
0

Ducto

0.36

0.69

0.16

Eje
1-1

Tipo
P1

Longitud(m)
4.09

Cantidad
4.00

Encofrado(m2)
32.72

Conc. (m3)
2.62

3/8"

1/2"

5/8"

1/4"

3/8"

0.00

71.34

167.24

94.50

0.00

1-1
1-1

PL - 1
Pa

4.09
2.49

4.00
4.00

52.35
6.57

4.58
0.26

40.16
0.00

0.00
22.96

334.49
0.00

76.95
6.27

202.25
0.00

2-2
2-2

Pa
Pa'

4.09
1.70

2.00
2.00

5.40
2.24

0.21
0.09

0.00
0.00

17.83
8.34

0.00
0.00

4.46
2.48

0.00
0.00

1-1
E-E

PL - 2
Ducto

4.09
4.09

2.00
1.00

34.36
8.59

8.02
1.02

20.08
5.02

53.50
0.00

195.12
0.00

0.00
10.53

264.13
0.00

E-E

P2

4.09

2.00

Primer Piso
Fierro(Kg)

Estribos(Kg)

Anclaje (ml)

17.83

1.67

0.00

0.00

139.37

51.57

0.00

160.07

18.46

65.26

173.97

836.22
1788.57

246.75

466.37

Alamb. N8
OBS
27.27 Con eje 2-2
27.27 Con eje 2-2
16.60
27.27
11.33
27.27 Con eje 2-2
27.27
27.27 Con eje I-I

191.53

Segundo Piso
Fierro(Kg)

Estribos(Kg)

Anclaje (ml)

Eje

Tipo

Longitud(m)

Cantidad

Encofrado(m2)

Conc. (m3)

3/8"

1/2"

5/8"

1/4"

3/8"

1-1
1-1

P1
PL - 1

2.74
2.74

4.00
6.00

21.92
52.61

1.75
4.60

0.00
42.13

49.89
0.00

116.96
350.88

70.00
85.50

0.00
224.72

1-1
2-2

Pa
Pa

1.74
2.74

4.00
2.00

4.59
3.62

0.18
0.14

0.00
0.00

17.00
12.47

0.00
0.00

4.95
3.30

0.00
0.00

11.60
18.27

2-2
2-2

Pa'
Pb

1.10
1.05

2.00
12.00

1.45
8.32

0.06
0.33

0.00
19.45

5.96
0.00

0.00
0.00

1.98
11.88

0.00
0.00

7.33
7.00

E-E

Ducto

4.24

1.00

8.90

1.05

5.19

0.00

0.00

10.92

0.00

28.27

E-E

P3

4.24

2.00

8.31

0.51

0.00

36.86

0.00

15.82

0.00

109.72

8.63

66.77

122.18

467.83

204.35

224.72

1085.85

Anclaje
TOTALES

Alambre No 8

Acero(kg)
Encof.(m2)

Concreto (m3)

269.79

1/4"

27.09

3/8"

451.10

823.12
2874.42

1/2"

5/8"

296.15

1304.05

ml

328.80

ALBAILERIA
Primer Piso
Eje

h (m)

2.89
1.89
1.1

E-E
1-1
2-2

Long(m)

Cant.

3.10

4.00

35.836 con eje I-I

2.15

4.00

Area (m2)
16.254

3.15

2.00

6.93

59.02
Segundo Piso
Eje
E-E
1-1
2-2
2-2

h (m)

3.14
1.74
1.1
1.1

Long(m)

Cant.

3.35
2.15

4.00
4.00

Area (m2)

3.15

2.00

6.93

3.20

4.00

14.08

42.076 con eje I-I


14.964 con eje 2-2

TOTAL

Area (m2
137.07

Alamb. N8

OBS

18.27 Con eje 2-2


18.27 Con eje 2-2

28.27 Con eje I-I

137.27

78.05
LOSA DE CONCRETO(e=10cm):
Acero de 3/8" c/0.20 (Malla Centrada)

b(m)

14.00

l(m)

7.00

e(m)

0.10

Encof.(m2)
Lados

0.00

Concreto(m3)
9.80

0.00

Acero de 3/8"
Longitud(m)
Cant. Fierros
Peso(Kg)
6.95
70.00
271.95

Longitudinal
Transversal

13.95

35.00

272.93
544.89

VEREDA DE CONCRETO(e=10cm):
Acero de 3/8" c/0.20 (Malla Centrada)

b(m)

14.45

l(m)

1.50

e(m)

0.10

Encof.(m2)
Lados

Concreto(m3)
1.75
1.75

Acero de 3/8"
Longitud(m)

Cant. Fierros

Longitudinal

1.45

72.00

Transversal

14.40

8.00

Peso(Kg)
58.36
64.40
122.76

2.17

PLANILLA DE METRADOS - ESTRUCTURAS


FIERROS
PROYECTO : RECONSTRUCCION DE LA INFAESTRUCTURA DE LA I.E. N 20741 SEOR DE LOS MILAGROS II Etapa
UBICACIN : DISTRITO DE COTAHUASI - PROVINCIA DE YAUYOS-DEPARTAMENTO DE LIMA
REGIN: LIMA
PROVINCIA: YAUYOS
DISTRITO: COTAHUASI
FIERRO CORRUGADO (KG)
ITEM

DESCRIPCION

04

OBRAS DE CONCRETO ARMADO

04.01

VIGA DE CIMENTACION

04.01.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

UND

N
VECES

LONG.
(ml)

3/8"

1/2"

3/4"

5/8"

KG

EJE: FIERROS
A-A,C-C

12

15.00

178.92

1-1-,3.3,4-4,5-5

24

6.30

150.29
329.21

SUB TOTAL

EJE: ESTRIBOS
A-A ,CC

104

1.70

1-1-,3.3,4-4,5-5

94

1.70

Z-1

14.50

45.01

Z-2

13.50

20.95

Z-3

11.00

10.93

Z-4

19.00

37.77

Z-5

10.00

9.94

Z-6

21.00

Z-7

17.50

Z-8

10.50

20.87

Z-9

11.00

10.93

SUB TOTAL

04.02

ZAPATAS

04.02.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

KG

32.59
27.16

PLANILLA DE METRADOS - ESTRUCTURAS


FIERROS
PROYECTO : RECONSTRUCCION DE LA INFAESTRUCTURA DE LA I.E. N 20741 SEOR DE LOS MILAGROS II Etapa
UBICACIN : DISTRITO DE COTAHUASI - PROVINCIA DE YAUYOS-DEPARTAMENTO DE LIMA
REGIN: LIMA
PROVINCIA: YAUYOS
DISTRITO: COTAHUASI
FIERRO CORRUGADO (KG)
ITEM

DESCRIPCION

UND

N
VECES

LONG.
(ml)

COLUMNAS

04.03.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60


PRIMER PISO:

3/4"

5/8"
125.71

KG

EJE:

24.00

4.50

ESTRIBO

3.00

25.50

C2- LONGUITUD

40.00

4.50

C2- LONGUITUD

20.00

4.50

C1- LONGUITUD

P1

ESTRIBO

60.00

22.00

C3- LONGUITUD

6.00

4.50

ESTRIBO

6.00

18.00

SUB TOTAL
SEGUNDO PISO

1/2"
90.45

SUB TOTAL

04.03

3/8"

167.62

279.36
89.46

26.84

116.30

446.98

EJE:

24.00

4.50

ESTRIBO

3.00

25.50

C2- LONGUITUD

40.00

4.50

C2- LONGUITUD

20.00

4.50

ESTRIBO

60.00

22.00

C3- LONGUITUD

6.00

4.50

ESTRIBO

6.00

18.00

C1- LONGUITUD

SUB TOTAL

P1

167.62

279.36
89.46

26.84

116.30

446.98

PLANILLA DE METRADOS - ESTRUCTURAS


FIERROS
PROYECTO : RECONSTRUCCION DE LA INFAESTRUCTURA DE LA I.E. N 20741 SEOR DE LOS MILAGROS II Etapa
UBICACIN : DISTRITO DE COTAHUASI - PROVINCIA DE YAUYOS-DEPARTAMENTO DE LIMA
REGIN: LIMA
PROVINCIA: YAUYOS
DISTRITO: COTAHUASI
FIERRO CORRUGADO (KG)
ITEM

DESCRIPCION

04.04

VIGAS

04.04.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

UND

N
VECES

LONG.
(ml)

3/8"

1/2"

3/4"

5/8"

KG

PRIMER PISO
EJE:
VA-101

60.00

ESTRIBOS VA-101

105.00

VP-101

39.00

ESTRIBOS VP-101

53.00

VIGA -102

30.00

ESTRIBO- VIGA 102

52.00

VIGA-100

39.00

ESTRIBO- VIGA 102

68.00

181.58

29.82

60.53

29.82

SUB TOTAL

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

186.24

428.35

KG

SEGUNDO
EJE:
VA-201

60.00

ESTRIBOS VA-201

105.00

VP-101

39.00

ESTRIBOS VP-201

53.00

VIGA -102

30.00

186.24

181.58

29.82

PLANILLA DE METRADOS - ESTRUCTURAS


FIERROS
PROYECTO : RECONSTRUCCION DE LA INFAESTRUCTURA DE LA I.E. N 20741 SEOR DE LOS MILAGROS II Etapa
UBICACIN : DISTRITO DE COTAHUASI - PROVINCIA DE YAUYOS-DEPARTAMENTO DE LIMA
REGIN: LIMA
PROVINCIA: YAUYOS
DISTRITO: COTAHUASI
FIERRO CORRUGADO (KG)
ITEM

DESCRIPCION

UND

N
VECES

LONG.
(ml)

ESTRIBO- VIGA 202

52.00

VIGA-100

39.00

ESTRIBO- VIGA 202

68.00

ESCALERA

04.05.04

ACERO fy = 4200 KG/CM2 GRADO 60 EN LOSAS ALIGERADAS

1/2"

KG

PRIMER PISO
EJE: A-A

20

4.50

B-B,

45

1.20

89.46
53.68
143.14

SUB TOTAL

PRIMER PISO
EJE: A-A

20

4.50

B-B,

45

1.20

SUB TOTAL

3/4"

5/8"

60.53

29.82

SUB TOTAL

04.05

3/8"

89.46
53.68
143.14

428.35

A DE METRADOS - ESTRUCTURAS
FIERROS

ESTRIBOS (KG)
1/4"

3/8"

PARCIAL

TOTAL

524.44
329.21

195.23
102.54
92.68
195.23

216.17

216.17

A DE METRADOS - ESTRUCTURAS
FIERROS

ESTRIBOS (KG)
1/4"

3/8"

PARCIAL

TOTAL

1,405.79

167.62
42.84

42.84
279.36
89.46

739.20

739.20
26.84

60.48

60.48

842.52

1,405.79
167.62
42.84

42.84
279.36
89.46

739.20

739.20
26.84

60.48

842.52

60.48

A DE METRADOS - ESTRUCTURAS
FIERROS

ESTRIBOS (KG)
1/4"

3/8"

PARCIAL

TOTAL

TOTAL

2,811.59

1,539.48

1,023.39
117.60

117.60
181.58

59.36

59.36
29.82

29.12

29.12
60.53

38.08

38.08

244.16

1,539.48

1,023.39
117.60

117.60
181.58

59.36

59.36
29.82

A DE METRADOS - ESTRUCTURAS
FIERROS

ESTRIBOS (KG)
1/4"

3/8"
29.12

PARCIAL

TOTAL

29.12
60.53

38.08

38.08

244.16
TOTAL

3,078.96

286.27
143.14

143.14

143.14

143.14
TOTAL

PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH

FECHA:

PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM

DESCRIPCION

UND

N
VECES

MEDI
LARGO

01

ESTRUCTURAS

01.01

TRABAJOS PRELIMINARES

01.01.01

CARTEL DE OBRA DE 4.80X 2.80 ml (Gigantografia)

01.01.02

CORTE MASIVO A MAQUINA EN TERRENO

M2

15.00

01.01.03

TRAZO Y REPLANTEO

M2

15.00

01.01.04

CORTE MASIVO A MAQUINA EN TERRENO

M3

15.00

0.1.02

MOVIMIENTO DE TIERRAS

01.02.01

EXCAVACIONES DE SANJAS
EXCAVACION DE ZANJAS
ZAPATA

CIMIENTOS

M3

1.10

4-4

1.50

3-3

1.50

3.25

2-2

3.25

2-1

0.90

1.00

1.50

15.00

EJE: 1-1,4-4,5-5

6.30

EJE: 2-2, 3-3

3.00

94.50

EJE: 5-5

EJE: A-B, CD

01.02.02

AFIRMADO DE E = 8" PARA PISOS INTERIORES

M2

01.02.03

RELLENO COMPACTADO CON MATERIAL PROPIO

M3

2.00

01.02.04

ELIMINACION DE D/MATERIAL EXCEDENTE CARGUIO MANUAL CON

M3

113.44

M2

CON VOLQUETE A 4 M3 D= 5km


01.03

OBRAS DE CONCRETO SIMPLE

01.03.01

SOLADO CONCRETO f'c = 100 KG/CM2 h = 2"


ZAPATA

1.10

4-4

1.50

3-3

1.50

3.25

2-2

3.25

2-1

0.90

1.00

1.50

15.00

EJE: 1-1,4-4,5-5

6.30

EJE: 2-2, 3-3

3.00

EJE: 5-5

CIMIENTOS VIGA DE CIMENTACION EJE: A-B, CD

01.03.02

CIMIENTOS CORRIDOS MESCLA 1:10 +30% P.G.


CIMIENTOS

01.03.03

01.03.04

M3

15.00

EJE: 1-1,4-4,5-5

6.30

EJE: 2-2, 3-3

3.00

EJE: A-B, CD

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

M2

EJE: 5-5

6.30

EJE: A-A, B-B

15.00

3.30

C-C

4.65

EJE: A-B,B-C

15.00

EJE: 5-5

6.30

3.30

C-C

4.65

CONCRETO 1:8 +25% P.M. EN SOBRECIMIENTOS

01.04

OBRAS DE CONCRETO ARMADO

01.04.01

VIGA DE CIMENTACION

M3

PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH

FECHA:

PROVINCIA: OCROS
DISTRITO: LLIPA
N
VECES

KG

524.44

EJE: A-A, C-C,1-1,2-2, 3-3,4-4,5-5

M2

51.00

CONCRETO f'c = 210 KG/CM2 EN VIGA DE CIMENTACION

M3

51.00

216.17

1.50

2.20

1.50

1.10

1.00

1.50

1.10

KG

1,405.79

SEGUNDO PISO:

KG

1,405.79

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

M2

DESCRIPCION

01.04.01.1

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

01.04.01.2

ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION

01.04.01.3

MEDI

UND

ITEM

EJE: A-A, C-C,1-1,2-2, 3-3,4-4,5-5

01.04.02

ZAPATAS

01.04.02.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

KG

01.04.02.02

CONCRETO f'c = 210 KG/CM2 PARA ZAPATA

M3

EJE: A-A

EJE: C-C

01.04.03

COLUMNAS

01.04.03.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

LARGO

PRIMER PISO:

01.04.03.02

PRIMER PISO:

SEGUNDO PISO:

01.04.03.03

EJE:
A-A

C1

1.30

A-A

C-2

1.00

A-A

C3

0.70

B-B

C2

1.00

C-C

C1

1.30

C-C

C2

1.00

2-2

C-2

1.00

1-1

P2

2.18

A-A

C1

1.30

A-A

C-2

1.00

A-A

C3

0.70

B-B

C2

1.00

C-C

C1

1.30

C-C

C2

1.00

2-2

C-2

1.00

1-1

P2

2.18

EJE:

CONCRETO f'c = 210 KG/CM2 PARA COLUMNAS


PRIMER PISO:

M3

EJE
A-A

C1

0.40

A-A

C-2

0.25

A-A

C3

0.25

B-B

C2

0.25

C-C

C1

0.40

C-C

C2

0.25

2-2

C2

0.25

1-1

P2

0.25

PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH

FECHA:

PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM
SEGUNDO PISO:

N
VECES

A-A

C1

0.40

A-A

C-2

0.25

A-A

C3

0.25

B-B

C2

0.25

C-C

C1

0.40

C-C

C2

0.25

2-2

C2

0.25

1-1

P2

0.25

1,539.48

VIGAS

01.04.04.01

ACERO CORRUGADO fy = 4200 KG/CM2 GRADO 60

KG

01.04.04.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

M2

EJE:
A-A

VA-01

15.00

C-C

VA-01

15.00

VA-101

7.26

2-2

VA-101

1.50

3-3

VA-102

5.25

4-4

VA-100

6.30

5-5

VA-101

6.30

A-A,CC

Vsolera

18

14.50

ENCOFRADO Y DESENCOFRADO EN VIGAS


PRIMER PISO

01.04.04.03

M2

EJE:
A-A

VA-01

15.00

C-C

VA-01

15.00

VA-201

7.26

2-2

VA-201

1.50

3-3

VA-202

5.25

4-4

VA-200

6.30

5-5

VA-201

6.30

A-A,CC

Vsolera

18

14.50

CONCRETO f'c = 210 KG/CM2 PARA VIGAS


PRIMER PISO

SEGUNDO PISO:

LARGO

EJE:

01.04.04

PRIMER PISO

MEDI

UND

DESCRIPCION

M3

EJE:
A-A

VA-01

15.00

C-C

VA-01

15.00

VA-101

6.30

2-2

VA-101

6.30

3-3

VA-102

5.25

4-4

VA-100

6.30

5-5

VA-101

6.30

A-A,CC

Vsolera

18

14.50

A-A

VA-01

15.00

C-C

VA-01

15.00

EJE:

PLANILLA DE METRADOS
PROYECTO : CONSTRUCCION DEL LOCAL COMUNAL DE USO MULTIPLE-PRIMERA ETAPA
UBICACIN : DISTRITO DE LLIPA- PROVINCIA DE OCROS-DEPARTAMENTO DE LIMA
REGIN: ANCASH

FECHA:

PROVINCIA: OCROS
DISTRITO: LLIPA
ITEM

DESCRIPCION

01.04.05

LOSAS ALIGERADAS

01.04.05.01

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

UND

N
VECES

MEDI
LARGO

VA-201

6.30

2-2

VA-201

6.30

3-3

VA-202

5.25

4-4

VA-200

6.30

5-5

VA-201

6.30

A-A,CC

Vsolera

18

5.80

M2

PRIMER PISO

1.00

15.00

1.00

15.00

PRIMER PISO

9.00

15.00

SEGUNDO PISO

9.00

15.00

1.00

286.27

PRIMER PISO

1.05

0.09

SEGUNDO PISO

1.05

0.09

SEGUNDO PISO

01.04.05.02

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO

UND

01.04.05.03

ACERO fy = 4200 KG/CM2 GRADO 60 EN LOSAS ALIGERADAS

KG

01.04.05.04

CONCRETO EN LOSAS ALIGERADAS f'c = 210 KG/CM2

M3

A DE METRADOS

SETIEMBRE 2012

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

6.30

94.50

94.50

6.30

94.50

94.50
47.25

6.30

0.50

47.25

1.00

2.20

7.26

1.40

2.20

9.24

1.30

2.20

4.29

1.10

2.20

7.87

1.10

2.20

7.87

2.20

1.30

2.57

0.90

2.20

1.98

1.40

2.20

9.24

0.50

2.20

33.00

0.50

2.20

27.72

0.50

0.80

2.40

113.44

94.50
2.00
113.44

54.29
1.00

2.20

3.30

1.40

2.20

4.20

1.30

2.20

1.95

1.10

2.20

3.58

1.10

2.20

3.58

2.20

1.30

1.98

0.90

2.20

0.90

1.40

2.20

4.20

0.50

2.20

15.00

0.50

2.20

12.60

0.50

0.80

3.00

0.50

0.80

12.00

0.50

0.80

10.08

0.50

0.80

2.40

1.50

37.80

1.50

180.00

1.50

19.80

1.50

13.95

0.15

1.50

6.75

0.25

1.50

4.73

0.15

1.50

1.49

0.25

1.50

1.74

12.48

251.55

14.71

A DE METRADOS

SETIEMBRE 2012

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

524.44

0.40

40.80

0.40

5.10

524.44

5.10
0.25

216.17

216.17

7.36
1.40

0.60

1.26

1.30

0.60

1.72

1.40

0.60

1.26

1.00

0.60

0.66

0.90

0.60

0.54

1.40

0.60

1.26

1.00

0.60

0.66

1,405.79

2,811.58

1,405.79
102.42
51.21
2.88

3.74

2.88

8.64

2.88

2.02

2.88

8.64

2.88

7.49

2.88

8.64

2.88

5.76

2.88

6.28

51.21
2.88

3.74

2.88

8.64

2.88

2.02

2.88

8.64

2.88

7.49

2.88

8.64

2.88

5.76

2.88

6.28

6.14
3.07
0.25

2.88

0.29

0.25

2.88

0.54

0.15

2.88

0.11

0.25

2.88

0.54

0.25

2.88

0.58

0.25

2.88

0.54

0.25

2.88

0.36

0.15

2.88

0.11

A DE METRADOS

SETIEMBRE 2012

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL
3.07

0.25

2.88

0.29

0.25

2.88

0.54

0.15

2.88

0.11

0.25

2.88

0.54

0.25

2.88

0.58

0.25

2.88

0.54

0.25

2.88

0.36

0.15

2.88

0.11

1,539.48

1,539.48

187.96
93.98
0.20

9.00

0.20

6.00

0.30

6.53

0.30

1.35

0.40

6.30

0.40

7.56

0.40

5.04

0.20

52.20

93.98
0.20

9.00

0.20

6.00

0.30

6.53

0.30

1.35

0.40

6.30

0.40

7.56

0.40

5.04

0.20

52.20

498.90
327.75
0.25

0.20

15.00

0.25

0.20

15.00

0.30

0.25

6.30

0.30

0.25

6.30

0.30

0.25

5.25

0.40

0.25

6.30

0.30

0.25

12.60

0.20

0.10

261.00
0.00

171.15
0.25

0.20

15.00

0.25

0.20

15.00

A DE METRADOS

SETIEMBRE 2012

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

0.30

0.25

6.30

0.30

0.25

6.30

0.30

0.25

5.25

0.40

0.25

6.30

0.30

0.25

12.60

0.30

0.10

104.40

174.00
87.00
5.80

87.00

87.00

5.80

87.00

87.00

5.80

783.00

783.00

5.80

783.00

783.00

87.00

1,566.00

286.27

286.27

15.99
87.00

7.99

87.00

7.99