Вы находитесь на странице: 1из 8

TEST REPORT OF 220 kV BUS BAR PROTECTION

SYSTEM TYPE MiCOM P740


( MAIN BUS-1 , MAIN BUS-2 & TRANSFER BUS )

SUBSTATION: 2X250MW GENERATING STATION


CUSTOMER: BECL
PLACE: PADVA, BHAVNAGAR
Main (PU & CU) relays

ALSTOM T&D
ALSTOM T&D India Limited, 19/1 GST Road, Pallavaram Works, Chennai-600043
Tl. +91 44 22640033 Fax : +91 44 22642068. www.alstom.com

Page 1 of 8

TOPOLOGY OF THE SCHEME (MAIN BUS-1, MAIN BUS-2 & TRANSFER BUS):

Page 2 of 8

EQUIPMENT DETAILS:

Ref

MODEL NO SERIAL NO

FEEDER DETAILS

SW VER

CTR

Aux. DC
Volts

Nom.
Freq

CU#06

P741346A6M0510K
32160009/05/12

CENTRAL UNIT

E2.3_A

------

220

------

PU#7

P743311A1M0510K
32133264/04/12

201-VARTEJ LINE

E2.3_A

1600/1A

220

50 Hz

PU#8

P743311A1M0510K
32133268/04/12

202-SAVARKUNDLA
LINE

E2.3_A

1600/1A

220

50 Hz

PU#9

P743311A1M0510K
32065361/02/12

203-GENERATOR
TRANSFORMER#1

E2.1_A

1600/1A

220

50 Hz

PU#10

P743311A1M0510K
32139773/05/12

204-STATION
TRANSFORMER#1

E2.3_A

1600/1A

220

50 Hz

PU#11

P743311A1M0510K
32139772/05/12

205-STATION
TRANSFORMER#2

E2.3_A

1600/1A

220

50 Hz

PUA#12

P743311A1M0510K
32133259/04/12

206-BUS COUPLER

E2.3_A

1600/1A

220

50 Hz

PUB#13

P743311A1M0510K
32133258/04/12

206-BUS COUPLER

E2.3_A

1600/1A

220

50 Hz

Note - PU#14 TO PU#19 is kept off (Future purpose)


MEASUREMENTS CHECK:
Applied current = 1 A, measured values are in primary.
PU REF

CT RATIO

R PH in (kA)

Y PH in(kA)

B PH in (kA)

NEUTRAL in (A)

PU#7

1600/1A

1.589

1.588

1.592

PU#8

1600/1A

1.591

1.593

1.592

PU#9

1600/1A

1.592

1.590

1.592

PU#10

1600/1A

1.587

1.592

1.589

PU#11

1600/1A

1.585

1.587

1.589

PU#12

1600/1A

1.584

1.581

1.581

PU#13

1600/1A

1.584

1.584

1.584

ID>1 (Circuitry Fault) Pick up Checks for Phase Fault Differential:


Settings:
ID>1
ID>1time delay
PU Ref

=
=

32 A in primary (20mA in secondary)


5 sec
R Phase

Y Phase

B Phase

Page 3 of 8

PICK UP
CURRENT
(mA)

Operating
Time
(sec)

PICK UP
CURRENT
(mA)

Operating
Time (sec)

PICK UP
CURRENT
(mA)

PU#7

25

5.032

28

5.030

27

5.039

PU#8

24

5.041

27

5.013

26

5.041

PU#9

26

5.032

27

5.034

28

5.029

PU#10

25

5.031

26

5.021

28

5.031

PU#11

26

5.032

27

5.034

28

5.029

PUA#12

PUB#12

Operating
Time
(sec)

Differential blocking per phase during circuitry fault is found ok


Differential tripping during circuitry fault of other phase is found ok

ID>2 CHECKS: (Phase Fault Differential Function)


Settings:
IDCZ>2
=
ID>2
=
ID>1 Time delay

0.6A,
kCZ
=
30%
0.6A,
k2
=
65%
=
600 s (To block the Circuitry Fault Operation during testing only)

DIFFERENTIAL PICK UP:


R Phase

Y Phase

B Phase

PU Ref
Time
(mSec)

Current (A)

Current (A)

Time
(mSec)

Current A)

Time
(mSec)

PU#7

0.604

18

0.605

19

0.604

20

PU#8

0.603

22

0.604

19

0.605

20

PU#9

0.604

23

0.604

19

0.606

20

PU#10

0.606

18

0.605

19

0.607

20

Pu#11

0.606

21

0.604

20

0.605

20

PUA#12

PUB#13

SLOPE CHECKS:
Settings for Phase Faults Differential Protection:
IDCZ>2
ID>2
ID>1

=
=
=

960A,
960A,
32 A

kCZ
=
K2
=
ID>1 Time delay =

30%
65%
600 s (To block the Circuitry fault)

Calculation of Ibias (t) point for checking the slope of operation for Phase faults:
slope=(ID/IB)x100 , IB=I1+I2 , ID=I1-I2
ID>2

(Ibias ()) K2

Page 4 of 8

Ibias () =

(ID>2)/K2

For testing connect I1 current reference at 0 degrees to one PU (Incomer) and I2 current reference at 180
degrees to another PU (Outgoing).
Now start the injection and vary I2 till the scheme operates.
Note both I1 & I2 values.
(I1 + I2) shall be the Bias Current and (I1 I2) shall be the Differential Current.
The slope shall be calculated by using the following formula:
k2 = (I diff current) / I bias current.

Tripping shall be observed in the coloured area as shown in the above figure.
Slope Check :
BUS BAR DIFFERENTIAL STABILITY TEST:
FEEDERS: PU#07 & PU#09 CONNECTED IN BUS-1
STABLE TEST:
Injected
Measured
Check
current(A)
Current(KA)
zone(A)
PHASE

Zone Diff
Trip

Fault

Zone

3190

NO

THROUGH
FAULT

Z1

16

3187

NO

THROUGH
FAULT

Z1

19

3197

NO

THROUGH
FAULT

Z1

PU1

PU2

PU1

PU2

Idiff

Ibias

Idiff

Ibias

1 L0

1
L -180

1.594

1.593

21

3187

19

1L-120

1 L60

1.589

1.595

17

3184

1L120

1 L300

1.592

1.589

14

3181

SLOPE TEST:
PHASE

Injected
current(A)

Measured
Current(KA)

Check
zone(A)
Idiff
Ibias
(kA)
(kA)

Idiff
(kA)

Ibias
(kA)

Zone Diff
Fault

SLOPE

9.11

IN ZONE FAULT

65.1%

5.93

9.11

IN ZONE FAULT

65.1%

5.93

9.11

IN ZONE FAULT

65.1%

PU1

PU2

PU1

PU2

4.7 L0

1L-180

7.52

1.59

5.93

9.11

5.93

4.7L-120

1 L60

7.52

1.59

5.93

9.11

4.7 L120

1 L300

7.52

1.59

5.93

9.11

FEEDERS: PU#08 & PU#10 CONNECTED IN BUS-2


STABLE TEST:

Page 5 of 8

PHASE

Injected
current(A)

Measured
Current(KA)

Check
zone(A)

Zone Diff
Trip

Fault

Zone

3191

NO

THROUGH
FAULT

Z2

16

3189

NO

THROUGH
FAULT

Z2

19

3196

NO

THROUGH
FAULT

Z2

PU1

PU2

PU1

PU2

Idiff

Ibias

Idiff

Ibias

1 L0

1
L -180

1.595

1.594

21

3191

19

1L-120

1 L60

1.592

1.597

17

3189

1L120

1 L300

1.594

1.592

14

3186

SLOPE TEST:
PHASE

Injected
current(A)
PU1

Measured
Current(KA)

PU2

Check
zone(A)
Idiff
Ibias
(kA)
(kA)

Idiff
(kA)

Ibias
(kA)

Zone Diff

PU1

PU2

1L-180

7.52

1.59

5.93

9.11

5.93

Fault

SLOPE

9.11

IN ZONE FAULT

65.1%

4.7 L0

4.7L-120

1 L60

7.52

1.59

5.93

9.11

5.93

9.11

IN ZONE FAULT

65.1%

4.7 L120

1 L300

7.52

1.59

5.93

9.11

5.93

9.11

IN ZONE FAULT

65.1%

FOR THROUGH FAULTS RELAY IS STABLE


FOR IN ZONE FAULTS REALY OPERATES

CIRCUIT BREAKER FAILURE (CBF) CHECKS:


Settings:
Detection function
: I<
I< = 100mA
Tbf1 =
50mS
Tbf2 =
200ms
Tbf3 =
50ms
Tbf4 =
200ms
Pick up test
INTERNAL CBF
PU
PU#7
PU#8
PU#9

PICKUP(mA)

FEEDERS
201-VARTEJ LINE
202SAVARKUNDLA
LINE
203-GENERATOR
TRANSFORMER#1

TBF1 ( mSec )

TBF2 ( mSec )

106

107

106

53

52

53

213

221

217

106

107

106

54

55

56

214

216

209

106

107

106

56

54

57

212

211

209

PU#10

204-STATION
TRANSFORMER#1

106

107

106

55

53

55

215

209

208

PU#11

205-STATION
TRANSFORMER#2

105

104

103

58

56

57

213

210

209

PUA#
12

206-BUS
COUPLER

Page 6 of 8

PUB#
13

206-BUS
COUPLER

EXTERNAL CBF
PU

TBF3 ( mSec )

FEEDERS

TBF4 ( mSec )

PU#7

201-VARTEJ LINE

55

56

59

215

219

211

PU#8

202SAVARKUNDLA
LINE

54

57

59

213

215

212

PU#9

203-GENERATOR
TRANSFORMER#1

57

57

58

213

217

209

PU#10

204-STATION
TRANSFORMER#1

58

58

52

208

209

209

PU#11

205-STATION
TRANSFORMER#2

56

58

56

207

208

210

PUA#
12

206-BUS
COUPLER

PUB#
13

206-BUS
COUPLER

DEAD ZONE PROTECTION CHECK


I>DZ Current Set
I>DZ Time Delay
PU
PU#7
PU#8

PU#9

: 960 A
: 50.00 ms
PICK UP ( A )

FEEDERS
201-VARTEJ
LINE
202SAVARKUNDLA
LINE
203GENERATOR
TRANSFORMER
#1

OPTD DELAY ( mSec )

0.605

0.607

0.605

64

65

72

0.607

0.608

0.604

58

61

59

0.607

0.607

0.607

62

60

61

PU#10

204-STATION
TRANSFORMER
#1

0.608

0.606

0.605

63

60

67

PU#11

205-STATION
TRANSFORMER
#2

0.607

0.604

0.605

58

59

60

PUA#
12

206-BUS
COUPLER

PUB#
13

206-BUS
COUPLER

Page 7 of 8

TOPOLOGY CHECKS:

During fault in bus 1 all bus 1 feeders only tripping


During fault in bus 2 all bus 2 feeders only tripping
For through fault bus 1 & bus 2 stable
For in zone fault respective zone only operated
Tripping of all Bay PUs, Bus coupler and Transfer bus coupler PUs found OK

OTHER CHECKS:
o
o
o
o
o
o
o
o
o

Protection Blocking during Circuitry Fault


Topology Checks
Fiber Optic Communication Fail Check
LED Checks
Opto input Checks
Output contact Checks
Protection IN/OUT Checks
DC Logics Checks
Trip logic check

:
:
:
:
:
:
:
:
:

OK
OK
OK
OK
OK
OK
OK
OK
OK

TEST RESULT: PASS - RELAY FOUND HEALTHY ON ALL ASPECTS.

Tested By
Witnessed By
M/s. ALSTOM GRID
M/s. BECL

R.D.BHOOPATHI

Witnessed By

Witnessed By

M/s. EMCO LTD

SHIVPOOJAN PATEL

M/s.TCE

ASWINI KUMAR BHOI

AJIT SAKHRANI

Page 8 of 8

Вам также может понравиться