Вы находитесь на странице: 1из 10

RESUME OF ANGEL DISTOR PARAGAS

PERSONAL DATA
Position Desired
Sex
Address

:
:
:

Telephone No.
Mobile No.
Date of Birth
Place of Birth
Civil Status
Height
Weight
Age
Citizenship
Religion
Language Spoken
Hobbies
Skills
Name of Spouse
Number of Children
Their Names and
Date of Birth

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

Contact Person In case of


Emergency
Address
Fathers Name
Mothers Name
S.S.S No.
T.I.N No.
Passport No.
Date of Issue
Valid Until
Seaman Book No.
Date of Issue
Valid Until
Seafarers Registration Cert. No.
Date of Issue
U.S.A Visa
Date of Issue
Valid Until
VISA Type
U.S.A Visa
Date of Issue
Valid Until
VISA Type
PAG-IBIG No.
PHILHEALTH No.

Offshore /Onshore Rigger/ Rigger Foreman


Male
253-D P.Rosales St.
Philippines
(632)643-5975
March 29, 1956
Paco Manila
Married
55
150 lbs.
56 yrs. old
Filipino
Iglesia Ni Cristo
English & Tagalog
Playing chess/basketball and watching movies
Instrument Fitter,Plumber, Millwright & Erector
Elvira S. Paragas
Three

Eloisa S. Paragas
Herman S. Paragas
Jocelyn S. Paragas

May 29, 1975


July 19, 1978
March 13, 1981

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

Elvira S. Paragas
253-D P. Rosales St. Sta Ana Pateros M.Mla
Pascual Paragas Sr.
Adelaida Paragas
03-3265936-5
139-326-587
XX1679597
July 25, 2008
July 24, 2013
1529276 BO605266
August 28, 2008
August 27, 2013
0540887-06
June 29, 2006
C0176137
Nov. 20, 2009
Nov. 18, 2014
R C1/D
89607469
June 06, 2007
June 04, 2012
R B1
1301-0007-3934
19-025821769-5

EDUCATIONAL BACKGROUND
Secondary
Rizal High School
Caniogan Pasig City

(1970-1974)

Primary
San Joaquin Elem. School
San Joaquin Pasig City

(1964-1970)

TRAINING AND SAFETY SEMINAR ATTENDED

BAM/CLOUGH
BAM Clough Jetty Construction Site
Papua New Guinea
Certificate of Training
Date of Issue

July 16, 2012

BAM/CLOUGH
BAM Clough Jetty Construction Site
Papua New Guinea
SAFE SPINE LEADER Award
Date of Issue

March 29, 2012

Sun Coast Training and Accreditation


Statement of Attainment
OHSCER222A (RB)
Perform Basic Rigging Operations
30497QLD Course in Operating Cranes,
Rigging and Scaffolding Equipment
Date of Issue
Certificate Number

December 07, 2011


03245

Maritime Training Council


DOLE
Basic Safety Training & Instruction
Date of Issue
Certificate Number

Nov. 12, 2009


14-394816B

Southern Institute of Maritime


Studies Manila Inc.
Ratings Forming Part of Navigational Watch
(MTC Standards) Regulations II/4 of the 1978
STCW Convention, as amended)
Date of Issue
Registration Number
Certificate Number

Oct. 22-24 & 26, 2009


October 26, 2009
MDWK-063-09-12
MDWK-063-09-1454

Southern Institute of Maritime


Studies Manila Inc.
Proficiency In Survival Craft And Rescue Boats
(Other than Fast Rescue Boats)
IMO Model Course 1.23
Date of Issue
Registration Number
Certificate Number

Aug. 15,16,19 & 20, 2008


August 20, 2008
MPSC-012-08-07
MPSC-012-08-0252

Technical Education And Skills Development Authority


Certificate of Competency (Deck Rating)
Certificate No. 0713110019166
Date of Issue
Valid Until

May 22, 2007

Consolidated Training System, Inc.


Basic Offshore Safety Induction & Emergency Training
Certificate Number
Registration Number
Date of Issue
Expiry Date

June 15, 2006 to June 17, 2006

Executive Technical Consultants Trade Test


& Training Center Inc.
Trade Test Specialist*Training & Skills Upgrading*
Technical Services
Control Number

October 18, 2005

The International Development &


Environmental Shipping School
Date of Issue
Valid Until
Certificate Number
Registration Number
Basic Offshore Safety Induction & Emergency Training
A. Training Course
1.) Basic Offshore Safety Induction & Emergency Training
A.) Safety Induction
B.) Helicopter Safety & Escape including
Emergency Breathing System
C.) Sea Survival and TEMPSC
D.) Fire Fighting and Self Rescue

May 22, 2007


May 22, 2012

06 BOJIET-037A-015
171323/06
June 17, 2006
June 16, 2010

05101161

Dec. 12, 2005 to Dec. 14, 2005


Dec. 14, 2005
Dec. 13, 2009
8051-0446-05
APIE-03305

Philippine Seafarers Training Center

July 03, 2004 to July 10, 2004

Date of Issue
Certificate Number
Registration Number

July 10, 2004


B/PSSR-2215-07-2004
REG. 0054999

A.) Training Course


A.) Basic Safety Training Regulation (VI-I of the 1978 STCW convention as amended)
B.) Personal survival techniques (IMO Model course 1.19)
C.) Fire prevention and fire fighting (IMO model course 1.20)
D.) Elementary first aid (IMO model course 1.13)

E.) Personal safety and social responsibility (IMO model 1.21)

ABB Safety Training Aruba


A.) Ladder Safety Training
B.) Basic Fall Protection
C.) Basic Rigging Training
D.) Confined Space Entry

Builders Technical Services Trade Test &


Training Center Inc.
National Skills Standards Testing & Certification
Program Skill
Test for Job Readiness
PTC Control Number
Certificate Number

Litwin Aruba Inc. ABB Lummus Overseas Corp.


LLCJV-Aruba
Coastal Aruba Refining Company Delayed Coker Project
LLCJV Scaffold Training Program
E.E.I Altameer Safety Trining Seminar Kuwait
Rigging & Lifting Safety

May 7, 1999 to May 8, 1999


July 20, 1999 to July 21, 1999
July 23, 1999 to July 24, 1999
July 27, 1999 to July 28, 1999

September 21, 1994

21-9412-283
14-5-94-19107

April 21, 1995


April 21, 1995
June 15, 1992 to June 16, 1992

EMPLOYMENT RECORD
Company
Project Client
Type of Vessel
Location
Rank
Date of Employment
Job Description

:
:
:
:
:
:
:

Orion Group Project Services PNG LTD.


BAM/ CLOUGH
DMS DUMMOOK
Sub-Station
Rigger Offshore
January 19, 2012 to July 25, 2012
Hook-up job. Material handling and rigging.
Loading & unloading of materials and equipments in substation. Preparation of materials and equipment to be use in
rigging. Erection and installation of scaffold frame and walk
ways. Erection of telescopic bracing and T-Beam. Erection,
installation setting and alignment of pile cap and concrete TBeam. Lifting 15 tons pile cap. Lifting 60 tons concrete TBeam. Lifting erection, setting and alignment of concrete slab.
Housekeeping.

Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

HELIX ENERGY SOLUTIONS


PLV CAESAR
DP Class II Pipe Laying Vessel CAESAR
Able Seaman / Rigger
November 21, 2009 to February 01, 2010
General vessel maintenance, including safe handling of tools
and equipment for surface presentation and the applications
of paints and solvents.
Maintenance of emergency equipment and assisting in the
maintenance of lifesaving and fire fighting equipment as
directed by the Chief Officer.
Assisting in the launch, recovery and routine daily
maintenance of rescue craft.
Undertaking the duty of the Helideck Attendant as directed.
Assisting in all matters related to the marine operations,
including Watch keeping duties as required.
Hook-up job, material handling and lifting.
Loading & unloading of materials and equipment.
Preparation of materials and equipment to be use in rigging.
Assembling ladder and handrill.
Operating tagger.
Rolling cable in drums.
Handling shackles, hooks, slings and movement of heavy
objects by crane.
Assisting personnel basket transport.
Loading and unloading basket.
Moring line job.
Housekeeping.

Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

J.Ray Mc Dermott International


Mc Dermott DB50
Construction of platforms,pipelaying barge with J-Lay System
Offshore Rigger Foreman
September 27, 2008 to January 02, 2009
Hook-up job, material handling and lifting.
Loading & unloading of materials and equipment.
Preparation of materials and equipment to be use in rigging.
Erection of 1680 tons jacket.
Lifting 65 tons hydraulic hammer.

Lifting 25 tons walk way from barge to platform.


Erection of 1600 tons platform and helideck.
Assembling ladder and handrill.
Operating tagger.
Rolling cable in drums.
Make up spool piece work in platform.
Setting riser clamps and cleaning legs and setting spool.
Handling shackles, hooks, slings and movement of heavy
objects by crane.
Assisting personnel basket transport.
Loading and unloading basket.
Laying pipelines using J-Lay System.
Moring line job.
Housekeeping.
Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

J.Ray Mc Dermott International


Mc Dermott DB50
Construction of platforms,pipelaying barge with J-Lay System
Offshore Rigger Foreman
February 11, 2008 to July 18, 2008
Hook-up job, material handling and lifting.
Loading & unloading of materials and equipment.
Preparation of materials and equipment to be use in rigging.
Erection of 1680 tons jacket.
Lifting 65 tons hydraulic hammer.
Lifting 25 tons walk way from barge to platform.
Assembling ladder and handrill.
Erection of 1600 tons platform and helideck.
Operating tagger.
Rolling cable in drums.
Make up spool piece work in platform.
Setting riser clamps and cleaning legs and setting spool.
Handling shackles, hooks, slings and movement of heavy
objects by crane.
Assisting personnel basket transport.
Loading and unloading basket.
Laying pipelines using J-Lay System.
Moring line job.
Housekeeping.

Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

J.Ray Mc Dermott International


Mc Dermott DB50
Construction of platforms,pipelaying barge with J-Lay System
Offshore Rigger Foreman
June 18, 2007 to October 15, 2007
Hook-up job, material handling and lifting.
Loading & unloading of materials and equipment.
Preparation of materials and equipment to be use in rigging.
Erection of 1680 tons jacket.
Lifting 65 tons hydraulic hammer.
Lifting 25 tons walk way from barge to platform.
Assembling ladder and handrill.
Erection of 1600 tons platform and helideck.
Operating tagger.
Rolling cable in drums.
Make up spool piece work in platform.
Setting riser clamps and cleaning legs and setting spool.
Handling shackles, hooks, slings and movement of heavy
objects by crane.
Assisting personnel basket transport.
Loading and unloading basket.

Laying pipelines using J-Lay System.


Moring line job.
Housekeeping.
Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

Horizon
Lone Star
Pipe Laying Barge
Offshore Rigger
March 12, 2007 to April 21, 2007
Hook-up job, material handling and lifting.
Loading of pipe from supply material barge to fabrication
barge.
Loading & unloading of materials and equipment.
Secure pipe to barge.
Operating tagger.
Erection of 24 inches concrete pipes.
Designate placement area of materials and equipment.
Rolling cable in drums.
Tug reels pendant wire to barge.
Set bouy on barge deck.
Pull pendant wire through bouy.
Set anchor on board.
Pre use inspection of rigging equipment.
Erection and dismantling scaffold.
Install bear clamp.
Make up spool piece, work on platform.
Riser, spool piece installation.
Setting riser clamps and cleaning legs and setting spool.
Assisting personnel basket transport loading and unloading
basket.
Handling schackles, hooks, slings, and movement of heavy
objects by crane.
Assist divers.
Housekeeping.

Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:
:

V-Offshore Ltd. UK
Buzzard
Floating Production Storage Offloading
Offshore Rigger
July 29, 2006 to August 16, 2006
Hook-up job, material handling and lifting. Proper sequence of
erection of different columns, large platforms, channels
beams, handrails, ladders and gratings. Erection of
miscellaneous support for different sizes of pipes and heavy
wall piping through pipe rack. Erection and lifting of other
related works. Maintenance of oil platform.
Housekeeping.

Principal
Type of Vessel
Rank
Date of Employment
Job Description

:
:
:
:
:

DOME XPats
Floating Production Storage Offloading
Offshore Chief Engine Movement
February 01, 2006 to March 31, 2006
Hook-up job, material handling and lifting. Loading and
unloading of materials to be use for erection such as I-beams
T-beams, channels, angulars, and different sizes of pipes and
other materials. Erection and lifting of motor pumps, cooling
fin fan and turbo compressors. Having a good leadership,
writing reports and a good knowledge of safety.
Housekeeping.

Principal
Vessel
Type of Vessel
Rank
Date of Employment
Job Description

:
:

Company
Project

:
:

Position
Date of Employment
Job Description

:
:
:

Company
Project

:
:

Position
Date of Employment
Job Description

:
:
:

:
:
:

Torch Offshore Incorporated


Midnight Brave
Pipe laying Barge
Offshore Rigger Foreman
September 16, 2004 to December 11, 2004
Hook-up job, material handling and lifting
Pipe lying of PIP (Pipe in Pipe) such as:
*24 concrete coded condensate pipe
*16 12 of PIP (Pipe in Pipe) for butane and propane gas
Put umbilical line to the pipe for submerging underwater
Putting insulation on both end by painting the welded joint of
primer
Installing fiberglass inside the PIP (Pipe in Pipe)
installing half shelf of PUF (Poly Urethane Foam) in the
inner pipe were the joint has been weld
Wrapping ROCS sleeve (shrink sleeve) around the area to
be coated
Assisting technician for terminating umbilical loading
value line through umbilical termination assembly
Assisting divers for all rigging related works
Maintain good level of housekeeping on the loading or
offloading area.
Assisting of submerging the condensate, butane and propane
Plem.
Rigging and assisting mechanics mounting heavy structures
and oil rig/shipyard machineries
Cleaning, painting and greasing deck winches and crane
Performed other related job as assigned
Housekeeping.
Guam Advance Enterprise Inc.
24MW Kanudi Powerplant Project
Port Moresby, Papua New Guinea
Structural Rigger Foreman
April 6, 2003 to Oct. 15, 2003
Erection and Installation of Bunker Storage and Smoke stock
or bag filter.
Erection and installation of water cooling system and its parts.
Erection and installation of motor pump such as suction pump
and exhaust fan. Handling shackles, hooks, slings and
movement of heavy objects by crane.
Housekeeping.
ABB Lummus Global Overseas Corporation
Coastal Aruba Refining Company
Delayed Coker 2 Project
Structural Rigger Foreman
December 28, 1998 to December 9, 1999
Material expediting
Preparation of materials to be used for erection. Giving
instruction to the riggers and iron workers for structural and
rigging works.
Having a good leadership, writing report and a good
knowledge of safety.
Housekeeping.

Company
Project

:
:

Position
Date of Employment
Job Description

:
:
:

Company
Project

:
:

Position
Date of Employment
Job Description

:
:
:

Company

Project

Position
Date of Employment
Job Description

:
:
:

Company
Position
Date of Employment
Job Description

:
:
:
:

Guam Advance Enterprises Inc.


24 M.W Kanudi Power Plant Project
Port Moresby, Papua New Guinea
Millwright
April 4, 1998 to September 28, 1998
Erection and installation of heavy mechanical equipment.
Setting and alignment of mechanical equipment.
Housekeeping.
Litwin Lummus Crest Joint Venture Aruba
Coastal Aruba Refining Company Delayed
Coker 1 Project
Rigger Foreman
February 23, 1995 to December 17, 1995
Giving instruction to the riggers and iron workers to prepare
material equipment to be used for erection. Erection of
scaffolding. Handling schackles, hooks, slings, and movement
of heavy objects by crane. Supervise the workers. Always
coordinate and communicate to the supervisor.
Housekeeping.
Hyundai Doz (M) SDN.BHD Engineers and Builders
Malaysian Project
MLNG DUA Plant Project - Bintulu, Sarawak East
Malaysia
Rigger Foreman
May 11, 1993 to August 12, 1994
Giving instruction to the riggers and iron workers to
prepare material equipment to be used for erection.
Handling schackles, hooks, slings, and movement of heavy
objects by crane. As a foreman its my duty and responsibility
to implement the daily work assignments. As a foreman
Im required also to remind the workers to follow the
safety rules and regulations of the company. Supervised
the workers.
Housekeeping.
Engineering Equipment Inc. and Bechtel Kuwait Project
Rigger
April 18, 1991 to February 27, 1993
Loading and unloading of materials from stock yard to
designated places. Assist to Sta Fes drilling equipment
Installation and alignment Sta - Fes drilling

equipment
such as mud tank, water tank, transformer, container van
and other equipment used in drilling. Handling shackles,
hooks, slings, and movement of heavy objects by crane.
Housekeeping.
Company
Position
Date of Employment
Job Description

:
:
:
:

Braun Transworld Corporation


Onshore/Offshore Rigger
December 8, 1985 to January 6, 1988
Assembling of fifty toner and thirty five toner over head
crane. Erection of structural such as columns, beams
girder, horizontal and diagonal braces. Signaling to the
crane operator and proper slinging to the load is always

necessary. Assign as Rigger in South Pier and North Pier for


modernization of Berth 1 and Berth 4. Hook up job, material
handling and lifting. Proper sequence of erection of different
kinds of columns, large platforms, channels beams, handrails
ladders and gratings. Erection of miscellaneous support for
different sizes of pipes.
Erection of loading arm from Berth 1 to Berth 4. Hauling of
materials from stock yard to designated places.
Housekeeping.
Company
Position
Date of Employment
Job Description

:
:
:
:

Nippon Express Division - Saudi Arabia


Rigger
June 24, 1983 to June 25, 1984
Preparation of heavy mechanical equipment to be used
for erection. Installation and assembling bunker storage and
smoke stocks or bag filter. Installation of conveyor such as
roller belt conveyor and bucket chain conveyor.
Installation and connection of motor pump such as
suction pump and exhaust fan. Installation of water
cooling system and its parts.
Housekeeping.

I hereby attest to the validity and correctness of all facts stated hereof.