Chapters

1. Geology and modelling Orebody modelling

2. Geostadistic Kriging y and geological resource estimation

3. Final Pit Mineral resource and Ore reserve estimation

4. Phase design Phase design theory

5. Scheduling Life of mine and dump design

6. Mining equipment Haul Road design by MineHaul

7. NPV Scheduler Sequential extraction optimal (optional)

8. Whittle Four X Milawa algorithm (optional)

9. Conditional Simulation Modelling Under Uncertainty

1
AEGMIN
1. GEOLOGY AND MODELLING OREBODY MODELLING
1.1 Project creation

The base of mining business begins with drillholes and orebody modelling, so we are going to create our
project.

2
AEGMIN
3
AEGMIN
4
AEGMIN
5
AEGMIN
6
AEGMIN
:

1.2 Database

So we have 4 basics files: Header, Assays, Litho and Survey.

7
AEGMIN
8
AEGMIN
9
AEGMIN
10
AEGMIN
11
AEGMIN
We create file DAT201.IA with main data, then we create file 11 and 12 with 10211

12
AEGMIN
13
AEGMIN
We load data to file 11 and 12 with 20101

14
AEGMIN
15
AEGMIN
Is very important to have information of rock, alteration and mineralization.

El modelo clsico de Lowell y Gilbert (1970) Economic Geology V.65, p. 373-407;


Basado en el estudio de los depsitos de San Manuel - Kalamazoo.

Zonacin de tipos de alteracin hidrotermal relacionados a intrusiones gneas:

Zona potsica, en el ncleo del sistema: biotita, ortoclasa y cuarzo.


Zona Flica (Serictica), envuelve al ncleo potsico: cuarzo, sericita
y pirita (hasta 20% del volumen).
Zona arglica, externa a la serictica: minerales de arcilla,
montmorillonita, clorita, pirita.
Zona propiltica, halo de alteracin ms externo, normalmente fuera
del cuerpo de mena econmica: clorita, epidota, albita, calcita.
A niveles profundos reconocen un ncleo de cuarzo, sericita, clorita,
feldespato potsico y una zona externa de clorita, sericita, epidota,
magnetita.
Zonacin de mineralizacin hipgena (primaria):

Ncleo de baja ley: bajo contenido de calcopirita, pirita,


molibdenita; magnetita en porcin profunda.
Zona de mena, formando un cilindro en la parte externa de la zona
de alteracin potsica e interna de la zona de alteracin serictica:
calcopirita (1-3%), pirita (1%), molibdenita (0,03%).
Zona de Pirita, corresponde ~ zona flica: pirita (10%), calcopirita
(0.1-3%), trazas de molibdenita.
Zona de baja pirita, ~ coincidente con zona propiltica: 2% pirita.
Zona Perifrica: calcopirita, galena, esfalerita, Au, Ag.

16
AEGMIN
Esquema general de prfido cuprfero indicando la zona de mena (ore zone) en
torno a un ncleo de baja ley (low grade core), el halo de pirita diseminada
(pyrite halo) y la aureola de alteracin hidrotermal hipgena.

Distribucin de zonas de alteracin hidrotermal en un prfido cuprfero de


acuerdo al modelo clsico de Lowell y Gilbert (1970). Ncleo de alteracin
potsica rodeado de alteracin flica (cuarzo-serictica), alteracin arglica local
en torno a zona flica y halo externo de alteracin propiltica.

17
AEGMIN
Distribucin de minerales de mena en un prfido cuprfero tpico. py
= pirita, cpy = calcopirita , mo = molibdenita , mt = magnetita.

Zonacin por efectos supergenos en un prfido cuprfero: Gossan o sombrero de


hierro en la parte superior (minerales oxidados de hierro), seguido en
profundidad por una zona lixiviada (leached zone), luego de una zona oxidada
(minerales oxidados de cobre), luego una zona de enriquecimiento supergeno
(sulfuros secundarios) y la zona primaria o hipgena en profundidad.

18
AEGMIN
1.3 Drillhole view

19
AEGMIN
20
AEGMIN
21
AEGMIN
1.4 Load Topography

22
AEGMIN
23
AEGMIN
So we have contour of topography each 1 m, then we triangulate.

24
AEGMIN
1.5 Grid set creation

We have drillholes with a peuso mesh of 50x50m.

We create grid set NS

25
AEGMIN
The same way for EW and Bench

26
AEGMIN
27
AEGMIN
1.6 File 13 creation

28
AEGMIN
29
AEGMIN
30
AEGMIN
31
AEGMIN
32
AEGMIN
33
AEGMIN
34
AEGMIN
1.7 File 08 and 09 composite files.

Create file 08 and 09 with this procedure 10209

35
AEGMIN
After of that follow the procedure 50101

36
AEGMIN
37
AEGMIN
38
AEGMIN
39
AEGMIN
1.8 Geologic modelling

We model the ore body, with cross section NS, EW and by benches.

We start EW cross sections.

40
AEGMIN
41
AEGMIN
42
AEGMIN
And finally we have EW sections of primary zone

43
AEGMIN
Now we continue with NS sections

44
AEGMIN
Now we continue with bench sections but before create a guide with triangulation of each section

Only in this way you can see where is the section in every bench.

45
AEGMIN
46
AEGMIN
47
AEGMIN
PZ 201 Primary zone
SZ 202 Secondary zone
LZ 203 Leach zone
DYKE 204 Dyke
SILL 205 Sill

We have designed primary, secondary and leach zone.

We create material for each zone

48
AEGMIN
49
AEGMIN
The same for each zone

1.9 Block model creation

50
AEGMIN
51
AEGMIN
We add topography

We are going to codify in the block model primary, secondary and leach zone.

52
AEGMIN
53
AEGMIN
54
AEGMIN
55
AEGMIN
56
AEGMIN
1.10 Backload composites

57
AEGMIN
We clone 8 and 9 file with new item called MIN2, where will save backload mineral zones from block model.

58
AEGMIN
59
AEGMIN
60
AEGMIN
2. GEOSTATISTIC KRIGING AND GEOLOGY RESOURCE ESTIMATION
2.1 Variograms

This analysis should be very detailed; we are going to use the next software called MSDA

61
AEGMIN
62
AEGMIN
63
AEGMIN
64
AEGMIN
We choose Variograms 0;0, 150;0, 240;30 and 330;0

65
AEGMIN
66
AEGMIN
67
AEGMIN
68
AEGMIN
69
AEGMIN
70
AEGMIN
The same way for estimation domain 02

We choose Variograms 180;30, 210;60, 240;60, 270;30, 300;30, 330;0,

71
AEGMIN
You have to remember the elements: Au, Ag, PB, Zn, As and Mo, but for RMR and SG is not necessary to do a
variografic analysis because youll use inverse distance weighted method for interpolation.

2.2 Kriging

We use procedure 62401

72
AEGMIN
73
AEGMIN
74
AEGMIN
75
AEGMIN
76
AEGMIN
The same for primary zone but you have to use variograma VCU201.

2.3 Inverse Distance Weighted

77
AEGMIN
78
AEGMIN
79
AEGMIN
2.4 Geological Resource classification

80
AEGMIN
81
AEGMIN
82
AEGMIN
83
AEGMIN
84
AEGMIN
Adems necesitamos clasificar nuestras reservas en probadas, probables y posibles. Con respecto a las
restricciones del clculo de los Recursos, anteriormente se han tomado como parmetros distancias mnimas
de cierre krigeados y nmero de compsitos (comp. de 15 m.) para la estimacin de los bloques de 20x20x15
m. por el mtodo geoestadstico (Kriging Ordinario):

Para recursos Geolgicos se haba considerado Probado, Probable y Posible de acuerdo al siguiente criterio:

Probado: La distancia de cierre de los compsitos al centro del bloque est dentro de los 60 m. y el nmero de
compsitos debe ser mayor o igual a 3 compsitos en los clculos de kriging ordinario.

Probable: Criterio 1: La distancia de cierre de los compsitos al centro del bloque est dentro de los 60 m. y el
nmero de compsitos es igual a 2 compsitos en los clculos de kriging ordinario.

Criterio 2: La distancia de cierre de los compsitos al centro del bloque est entre los 60 m y 110 m. y el
nmero de compsitos es igual o mayor a 2 compsitos en los clculos de kriging ordinario.

Posible: La distancia de cierre de los compsitos al centro del bloque estn de 110 m. a 200 m. y el nmero de
compsitos es mayor o igual a 2 compsitos de los clculos de kriging ordinario.

En nuestro caso clasificaremos las reservas por distancias del bloque a la muestra y por el nmero de
muestras que toma el bloque para obtener su contenido de cobre. Asi que haremos un multirun

85
AEGMIN
86
AEGMIN
87
AEGMIN
88
AEGMIN
89
AEGMIN
90
AEGMIN
91
AEGMIN
92
AEGMIN
93
AEGMIN
94
AEGMIN
95
AEGMIN
96
AEGMIN
3. FINAL PIT - MINERAL RESOURCE AND ORE RESERVE ESTIMATION
3.1 Model Preparation

Before to find the final pit, we have to prepare the model. We are going to codify MAT1 = 1 Primary zone,
MAT1 = 2 Secondary Zone and MAT1 = 3 Waste,

Model Preparation MAT1 = 1 Primary sulphide

97
AEGMIN
98
AEGMIN
99
AEGMIN
Model Preparation MAT1 = 2 Secondary sulphide

100
AEGMIN
101
AEGMIN
3.2 GSF creation

102
AEGMIN
103
AEGMIN
3.3 Geotechnical Parameters

We have four geotechnical zones with the following slope angles

104
AEGMIN
We codify in the model MAT2, but first we create materials for each Structural Domain or Geotechnical Zone

105
AEGMIN
106
AEGMIN
Then the solids of geotechnical zones we put the code

Then we codify in the item MAT2

107
AEGMIN
108
AEGMIN
After we extract Slope Code from Model, with this procedure you add information of geotechnical zones for
MSOPIT, so we are going to use complex angles.

109
AEGMIN
110
AEGMIN
3.4 MSOPIT Economic Planner Mineral Resource Estimation

111
AEGMIN
112
AEGMIN
113
AEGMIN
Primary zone

114
AEGMIN
Secondary zone

Waste

115
AEGMIN
116
AEGMIN
117
AEGMIN
118
AEGMIN
119
AEGMIN
We suppose our cutoff grade is 0.14% Cut

Then we obtain a solid with the original topography.

120
AEGMIN
Then we get the final report

121
AEGMIN
122
AEGMIN
123
AEGMIN
124
AEGMIN
Mineral Resourse Estimation Cutoff 0.14% CUT
Tonnage CUT MO AU AG
Measured 374,483,852 0.418 0.017 0.017 5.988
Indicated 203,501,367 0.408 0.017 0.017 5.471
Inferred 77,618,502 0.420 0.017 0.016 5.019
Total 655,603,721 0.415 0.017 0.017 5.713

125
AEGMIN
3.5 MSOPIT Economic Planner Pit shell for Ore Reserve Estimation

126
AEGMIN
127
AEGMIN
3.6 Final Pit Design Ore Reserve Estimation

We use Pit Expansion Tools

128
AEGMIN
129
AEGMIN
130
AEGMIN
131
AEGMIN
132
AEGMIN
133
AEGMIN
134
AEGMIN
135
AEGMIN
136
AEGMIN
137
AEGMIN
138
AEGMIN
139
AEGMIN
4. PHASE DESIGN - THEORY
4.1 Phase Design Economic Planner

TM
Mineral 541,994,498
Desmonte 598,236,010
SR 1.10
Total Material 1,140,230,508

Mineral por Fase aos por fase


135,498,624.50 3.7

Material por Fase


285,057,627

Mill dia Planta ao Vida


120,000 43,800,000 12.37430361 aos
100,000 36,500,000 14.84916433 aos 4 fases que abastesca 3.7 aos
80,000 29,200,000 20.48753459 aos

Mining by year daily mining real mining by year real daily mining
76,787,520 210,376.77 82,125,000.00 225,000.00
2 palas 4100 o 495HR
1 cargadorLT 2350 o excavadora CAT 6060

mineral waste Total daily Shovel 495HR 4100 XPC Hydraulic Shovel CAT 6060
ao 1 36,500,000 12,775,000 49,275,000 135,000 90,000 45,000
ao 2 - 15 36,500,000 45,625,000 82,125,000 225,000 180,000 45,000

140
AEGMIN
141
AEGMIN
142
AEGMIN
143
AEGMIN
144
AEGMIN
145
AEGMIN
146
AEGMIN
147
AEGMIN
148
AEGMIN
149
AEGMIN
4.2 Operative Phase Design

Based on nested pits from different copper price, so we design operative phase using Pit Expansion Tools

150
AEGMIN
151
AEGMIN
Total min lastre Total REM Aos Cu Fino % Ingreso Costo Cu Fino Indice
kt cut au ag recu reau reag kt kt Mineral kt Fino por Cu MUS$ MUS$ (Lb) (US$/lb)
Phase 01 113,461 0.59 0.02 6.4 86.4 39.2 64 45,564 159,025 0.40 3.1 579.7 29.5 2,940 1,145 1,278,048,821 1.40
Phase 02 101,173 0.37 0.02 6.4 87.5 39.7 64 46,373 147,546 0.46 2.8 329.5 16.8 1,671 1,032 726,452,815 0.88
Phase 03 158,196 0.37 0.02 5.6 85.2 38.7 63 168,423 326,619 1.06 4.3 499.6 25.4 2,533 1,784 1,101,396,427 0.68
Phase 04 170,515 0.37 0.02 5.3 87.7 39.9 65 314,037 484,552 1.84 4.7 557.6 28.4 2,827 2,158 1,229,299,321 0.54
Total 543,345 0.418 0.01694 5.817713 574,397 1,117,742 1.06 14.9 1,966.4 100 9,971 6,119 4,335,197,385

152
AEGMIN
4.3 Pre Scheduling MSVALP

Before MSVALP, we introduce phase design topography in File from PIT30 (initial) to PIT34

153
AEGMIN
154
AEGMIN
155
AEGMIN
156
AEGMIN
157
AEGMIN
158
AEGMIN
159
AEGMIN
160
AEGMIN
161
AEGMIN
162
AEGMIN
5. SCHEDULING LIFE OF MINE AND DUMP DESIGN
5.1 Phase preparation

For phase preparation we have to follow the steps.

Create this csv file with 20 classes called ZONE.CSV

163
AEGMIN
164
AEGMIN
165
AEGMIN
166
AEGMIN
167
AEGMIN
Then we create partial files of every operative phase design

168
AEGMIN
169
AEGMIN
170
AEGMIN
171
AEGMIN
172
AEGMIN
With this last run we create scd files from partial files.

173
AEGMIN
5.2 MSSP Scheduling

174
AEGMIN
175
AEGMIN
176
AEGMIN
177
AEGMIN
178
AEGMIN
179
AEGMIN
180
AEGMIN
181
AEGMIN
182
AEGMIN
183
AEGMIN
184
AEGMIN
185
AEGMIN
186
AEGMIN
187
AEGMIN
Now we need to see the scheduling 3D.

188
AEGMIN
189
AEGMIN
190
AEGMIN
Period 01

191
AEGMIN
Period 02

Period 03

192
AEGMIN
Period 04

Period 05

193
AEGMIN
Period 06

Period 07

194
AEGMIN
Period 08

Period 09

195
AEGMIN
Period 10

Period 11

196
AEGMIN
Period 12

Period 13

197
AEGMIN
Period 14

Period 15

198
AEGMIN
5.3 Final waste dump design

199
AEGMIN
200
AEGMIN
6. MINING EQUIPMENT - HAUL ROAD DESIGN BY MINEHAUL
6.1 Data preparation

We do contours from every solid phase each 15 m.

And original topography 15m and 3m.

201
AEGMIN
202
AEGMIN
203
AEGMIN
6.2 Mine Haul

204
AEGMIN
205
AEGMIN
206
AEGMIN
207
AEGMIN
208
AEGMIN
209
AEGMIN
210
AEGMIN
211
AEGMIN
212
AEGMIN
213
AEGMIN
214
AEGMIN
215
AEGMIN
216
AEGMIN
217
AEGMIN
v

218
AEGMIN
v

219
AEGMIN
v

220
AEGMIN
v

221
AEGMIN
222
AEGMIN
223
AEGMIN
224
AEGMIN
225
AEGMIN
226
AEGMIN
Fix these periods for simulation, find a destination for these tonnages.

Our first calculation of number of trucks is

227
AEGMIN
After correction we have this

228
AEGMIN
And theorical number trucks are

229
AEGMIN
7. NPV SCHEDULER SEQUENTIAL EXTRACTION OPTIMAL
7.1 New Project

For NPV Scheduler we have to follow the steps.

We create a new model with extension npv, with MAT3 and MAT4 added.

Where MAT3 is only mineral from secondary and primary zone, MINN = 201 and 202 and CONF=1 and 2

230
AEGMIN
231
AEGMIN
232
AEGMIN
233
AEGMIN
234
AEGMIN
235
AEGMIN
236
AEGMIN
237
AEGMIN
7.2 Economic Model

238
AEGMIN
239
AEGMIN
240
AEGMIN
241
AEGMIN
242
AEGMIN
243
AEGMIN
7.3 Pit Final

244
AEGMIN
245
AEGMIN
246
AEGMIN
247
AEGMIN
7.3 Phase Design

248
AEGMIN
249
AEGMIN
250
AEGMIN
251
AEGMIN
7.4 Scheduling

252
AEGMIN
253
AEGMIN
254
AEGMIN
255
AEGMIN
256
AEGMIN
257
AEGMIN
258
AEGMIN
259
AEGMIN
260
AEGMIN
261
AEGMIN
262
AEGMIN
263
AEGMIN
8. WHITTLE FOUR-X - MILAWA ALGORITHM
8.1 New Model from Minesight for Whittle FX

For Whittle FX we clone a model to make some modifications

264
AEGMIN
265
AEGMIN
266
AEGMIN
267
AEGMIN
Then, export the model with this run

268
AEGMIN
269
AEGMIN
8.2 Whittle Four X

270
AEGMIN
271
AEGMIN
272
AEGMIN
273
AEGMIN
Reblock the model 2x2x1

274
AEGMIN
275
AEGMIN
276
AEGMIN
277
AEGMIN
278
AEGMIN
279
AEGMIN
280
AEGMIN
281
AEGMIN
282
AEGMIN
283
AEGMIN
284
AEGMIN
285
AEGMIN
8.3 Milawa algorithm

286
AEGMIN
287
AEGMIN
288
AEGMIN
According to Milawa Algorithm Pit 24 is the highest NPV, then this is the Optimum Pit, and the Pit36 with RF =1
is the Ultimate Pit, you can see graphic difference between this two PITS

289
AEGMIN
9. CONDITIONAL SIMULATION - MODELLING UNDER UNCERTAINTY
9.1 Conditional Simulation

We create a new model call min15.sim, where we are going to save simulations only 25 of CU, but we can
save 50, 100 or more.

290
AEGMIN
We do declustering

291
AEGMIN
292
AEGMIN
We create the normal score with thee information of composites

293
AEGMIN
294
AEGMIN
295
AEGMIN
296
AEGMIN
297
AEGMIN
Then we do Gaussian transformation with MSDA

298
AEGMIN
299
AEGMIN
300
AEGMIN
301
AEGMIN
Then model variograms for 201 and 202 zone

302
AEGMIN
Then we model the variogram 3D for 201 and 202

303
AEGMIN
304
AEGMIN
305
AEGMIN
306
AEGMIN
307
AEGMIN
308
AEGMIN
309
AEGMIN
310
AEGMIN
311
AEGMIN
312
AEGMIN
9.2 Post - Simulation

 

Mean,   Where number of simulations



Variance,    

Standard deviation,  

Coefficient of variation  


Likelihood of each block was calculated above 0.14% de CU


"# $%&'($" .)%
.%  *"('& "# $%&'($"  

313
AEGMIN
314
AEGMIN
315
AEGMIN
Likelihood 80% above 0.14% CU

316
AEGMIN
REFERENCES

W. Hustrulid, M. Kuchta and R.K. Martin (2013). Open Pit Mine Planning and Design, Netherlands -
Estados Unidos, Tomo 2, Tercera Edicin.

Ratan Raj Tatiya (2013). Surface and Underground Excavations, 2nd Edition: Methods, Techniques
and Equipment

Gustavo. A. Garca (2012). Uso de la Incertidumbre de Leyes para Cuantificar Riesgo en el Diseo de
Pit Final Grueso Antapaccay, Cusco Per.

R. Dimitrakopoulos (2010). Advances in Orebody Modelling and Strategic Mine Planning I, Old and
New Dimensions in a Changing World, Australia.

Oy Leuangthong y Clayton Deutsch (2004). Geostatistics Banff 2004, Estados Unidos.

Margaret Armstrong (2011). Plurigaussian Simulations in Geosciences, Berlin Alemania.

R. Dimitrakopoulos (2010). Advances in Orebody Modelling and Strategic Mine Planning I, Old and
New Dimensions in a changing world, Australia.

Christian Lantujoul (2010). Geostatistical Simulation Models and Algorithms, Berlin Alemania.

Hans Wackernagel (2010). Multivariate Geostatistics, Berlin Alemania.

M. Armstrong, P. A. Dowd (2010). Geostatistical Simulations, Fontainebleau Francia.

Gustavo. A. Garca (2009). Optimizacin en el Planeamiento a Largo Plazo en Yacimientos de


prfidos cuprferos, con la aplicacin de secuencia de extraccion optima de Minado, Arequipa Per.

R. Dimitrakopoulos (2007). Orebody Modelling and Strategic Mine Planning, Uncertainty and Risk
Management Models, Australia.

Marco Alfaro (2008). La Simulacion Condicional en un Deposito Minero, Chile.

Marco Alfaro (2007). Estimacin De Recursos Mineros, Chile.

A. G. Journel, Ch. J. Huijbregts (2003). Mining Geostatistics, New Jersey Estados Unidos.

Margaret Armstrong (1998). Basic Linear Geostatistics, Berlin Alemania.

Pierre Goovaerts (1997). Geostatistics for Natural Resources Evaluation, New York Estados
Unidos.

317
AEGMIN

Вам также может понравиться