Вы находитесь на странице: 1из 2

Thermax Engineering Construction Co.

Ltd
Format No OHS/F/
Issue Date 15/12/2010
Revision
20/06/2013
Crane Inspection checklist Date
Revision
01
No.
Page 1 of 2

CRANE INSPECTION CHECKLIST

Sl. No. Points Observation Remark


1 Hook and Hook Latch
2 Over-Hoist Limit Switch
3 Boom Angle indicator
4 Boom-Limit cut-off switch
5 Over load limit switch
6 Condition of boom
7 Condition of Ropes
8 No. of load lines
9 Size and condition of the wire rope and pulley.
10 Stability of crane
11 Soil Condition
12 Swing Brake & Lock
13 Propel Brake & Lock
14 Hoist Brake & Lock
15 Boom Brake & Lock
16 Main clutch
17 Leakage in hydraulic cylinders
18 Out riggers fully extendible
19 Tyre pressure & guard
20 Digital load indicator display
21 Swing horn/alarm
22 Condition of Battery and Lamps
23 Guards of moving and rotating parts
24 Load chart provided/displayed.
25 Year of manufacturing.
26 Reverse horn & Rear view mirror
27 Preventive maintenance details
28 Insurance of crane & Operators Fitness
29 Fire Extinguisher in operators cabin
30 Availability of the competent persons test certificates
(local)
Thermax Engineering Construction Co. Ltd
Format No OHS/F/
Issue Date 15/12/2010
Revision
20/06/2013
Crane Inspection checklist Date
Revision
01
No.
Page 2 of 2

Checked by: Name & Sign

Вам также может понравиться