Вы находитесь на странице: 1из 10

RUNNING BILL

Kholam khola irrigation project


Dudpokhari,4 dolakha

S.N. Discription of work Unit Quantity Rate(Rs)


1 Earth work excavation Cu.m. 321.07 367.5
2 Stone soling Cu.m. 3.82 4033
3 PCC (1:3:6) Cu.m. 5.26 8850.916
4 Stone masonary Cu.m. 10.56 8323.3
5 Gate valve and fittings Nos 1 5000
6 plastering of wall Cu.m. 32.16 321.15
8 Transpotation charikot to site
9 Pipe line Rm 600 173.97
Total

Estamate By : Checked By :
LL

Amount (Rs) Remarks


117,993.23
15,406.06
46,555.82
87,894.05
5,000.00 edit
10,328.18
42950 edit
104,382.00
430,509.34

Approved By :
Running Bill
Kholam khola irrigation project
Dudpokhari,4 dolakha

S.N. Description Unit No. Length Breath Height


1 Earth work Excavation Cu.m 1 5.30 5.30 0.75
Excavation fof pipe Line Cu.m 1 1,200.00 0.50 0.50
Total excavation work
2 Stone Soling
Stone Soling In foundation Cu.m 1 17.60 0.90 0.15
Stone soling for inside area Cu.m 1 3.80 3.80 0.10
Total stone soling work Cu.m
3 PCC (1:3:6)
In foundation of collection tank Cu.m 1 17.60 0.90 0.15
In interior of collection tank Cu.m 2 3.80 3.80 0.10
Total PCC work
4 Stone masonry work
In foundation step of collection tank Cu.m 1 17.60 0.60 0.20
In wall of collection tank Cu.m 1 17.60 0.40 1.20
Total stone masonary work
5 Gate valv Nos 1
6 Plastering Sq.m
Wall Interior Sq.m 1 16.00 1.20
Wall exterior 3 14.40 0.90
Total plastering work
Pipe line Rm 1,260.00
Transport

Estamate By : Checked By : App


Quantity Rate Amount Remerks
21.07
300.00
321.07 367.50 117993.225

2.38
1.44
3.82 4033.00 15406.06

2.38
2.89
5.26 8850.92 46555.8182

2.11
8.45
10.56 8323.30 87894.048
5,000 Edit

19.20
12.96
32.16 321.15 10328.184
1260.00 173.97 219202.2
42950 42950 Edit
540329.535

Approved By :
Discription of work Unit Quantity Rate(Rs) Amount (Rs)
S.N
1 cement Bags 53.00 990 52,470.00
cement Bags 32.00 990 31,680.00
84,150.00
Vat 13% 115,830.00
2 Sand Cu.m 28.8 130 3,744.00
Aggregate Cu.m 42.2 145 6,119.00
9,863.00
Remarks
RUNNING BILL
KHHAHARE KHOLA IRRIGATION PROJECT
BHUSAFEDA ,DOLAKHA

S.N Description No Length Breath


1 Earth work in excavation 1 2.1
Earth work in pipe line excavation 1 1260 0.3
Total excavation work
2 Stone soling 1 2.6 2.1
3 P.C.C (1:3:6) 1 2.6 2.1
PCC for speration 1 1.5 0.1
Total PCC work 1
4 Stone masonary work 1 8.2 0.3
5 Plastering of wall 1
Interior 4 wall 1 7 NA
Exterior 4 wall 1 9.4 NA
Interior base 1 2.5 1.5
Total plastering work
Pipe line 1 1260 0.5
7 Transpotation Doc To Copy pest here file
Gatevalb and fitting
Total
ROJECT

Hight Quantity Unit


0.5 0 Cu.m
0.5 189 Cu.m
189 Cu.m
0.2 1.092 Cu.m
0.1 0.546 Cu.m
0.9 0.135 Cu.m
0.681 Cu.m
0.6 1.476 Cu.m
Cu.m
0.9 6.3 Sq.m
0.7 6.58 Sq.m
3.75 Sq.m
16.63 Sq.m
0.5 315 Cu.m
6000
5000
RUNNING BILL

KHHAHARE KHOLA IRRIGATION PROJECT

S.N Description Unit Quantity Amount Rate


1 Earth work in excavation Cu.m 189 367.5 69457.5
2 Stone soling Cu.m 1.092 4033 4404.036
3 P.C.C work Cu.m 0.681 8850.916 6027.4738
4 Stone masonary work Cu.m 1.476 8323.3002 12285.1911
5 Plastering work Cu.m 16.63 321.15 5340.7245
6 Pipe line Cu.m 315 173.97 54800.55
7 Transpotation
8 Gatevalb and fitting
Total 152315.48
Remerks

Edit
Edit

Вам также может понравиться