Vendor document review (GA &MDC)

Mechanical data sheet need to be prepared

CCD PS need to be preppared


(Preliminary & Final)

Interface with other displine


Vendor document review (GA &MDC)
Mechanical data sheet need to be prepared
GSP PS need to be preppared
(Preliminary & Final)
Interface with other displine
please note, vendor document review for glycol seal pot has to be
Note
considered for (6" & 8") separatley
No work

Vendor document review (GA &MDC)


Interface with other displine

please note, vendor document review for glycol seal pot has to be considered for
(6" , 8" &10") separatley