Per data provided by the City and County of Honolulu, the first Accessory Dwelling Unit (ADU) permit
issued was in January 2016 to convert an existing Ohana Unit in Kaimuki into an ADU, allowing the unit
to be legally rented to non-relatives. Although ADUs were first allowed in September 2015, no ADU
permits were issued that year. In the first nine months since the ADU ordinance passed, only nine ADU
permits were issued. Dismal. Seeing the results, the City Council passed another bill 1 to waive building
permit and sewer connection fees for new ADUs.
HOW MANY: In total, there were 100 new ADUs permitted in 2016, based on data provided by the City.
All ADUs were mapped to identify which City Council District had the most and least ADUs (Figure 1).
WHERE: Ikaika Anderson's district tops the list; almost 1 out of every 3 ADUs created in 2016 was in
Kailua. Specifically, building permit data shows that 29 ADUs were permitted in Kailua, 2 in Waimanalo,
and 5 in Kaneohe. Trevor Ozawa's district of Hawaii Kai ranked second with 20% of all ADUs. Perhaps a
surprise, Brandon Elefante's district that includes Pearl City and Waipahu, had the 3rd lowest rate, adding
just 4 new ADUs. At the bottom of the list: Ron Menor's district that includes Kapolei and Mililani, did
not have any ADUs (Figures 1 and 2).
1
Ordinance 15-41 allowing ADUs, 9/14/2015. Ordinance 16-19 waived certain fees for ADUs, 7/21/2016.
1 of 3
Honolulu ADU 2016 Update
May 02, 2017
WAIT TIMES:
Median 2 permit
processing time
(from application to 37 ADUs 63 ADUs
permit issuance) for
all 100 ADU permits Fees Waived
was 120 calendar (eff 7/21/2016)
days. #ofADU
ADUPermits
Permitsin in
2016
2016
16
The 7 design 14 15
professionals 3 12
12
13
10
highest number of 8
8
ADUs in 2016 are 6
7
ranked in Table 1. 4 4
4
Each produced more 2 3
1
than 3 ADUs each. 0
July
September
June
December
April
May
August
February
November
January
October
March
Of these
professionals with
# New ADU Permits
the highest number
of ADU permits, 43% Figure 3: The number of ADU permits increased after fees were waived (dashed orange line).
(3 out of 7) had
median processing times that exceeded median time to get an ADU permit (120 calendar days) red
numbers in Table 1. This suggests that incomplete submittals are not what delays permit processing;
even experienced professionals have above average permit processing times.
2
Median: 50% of permits took longer and 50% had shorter processing time than the median value.
3
For smaller projects, while a design professional may be involved, it may not have been documented in the
permit record, since a design professional is not required to assume responsibility for small projects, like ADUs.
2 of 3
Honolulu ADU 2016 Update
May 02, 2017
NEXT STEPS: As permit data is readily available to at least 2005, it can be used to identify patterns in
urban growth. Do large developers get their permits faster than individual homeowners? How much do
permit delays cost the average homeowner? How has ePlans (electronic filing system) affected permit
issuance times?
Regardless of who or what is causing the delay in building permit issuance, homeowners thinking about
installing an ADU should act before ADU fee waivers expire in 6/20/2018.
4
Data provided by the City and County of Honolulu.
5
Construction valuation, as reported on the permit application. Likely includes additional work besides the ADU.