Вы находитесь на странице: 1из 1

Key Plan

STANDARD DRAINAGE NOTES: DRAINAGE LEGEND ABBREVIATIONS


1. ALL DRAINAGE PIPE U/G SHALL BE UPVC PIPE. ABBREVIATION DESIGNATION
AB ABLUTION PSINK PANTRY SINK Notes
SEMH SEWER MANHOLE
2. ALL DRAINAGE PIPE RUN UNDER THE BUILDING OR AT A DEPTH OF
600mm OR LESS IN PEDESTRIAN AREAS OR AT A DEPTH OF A.D AREA DRAIN RVC ROOF VENT CAP
SWMH STORM WATER MANHOLE
1200mm OR LESS IN VEHICULAR AREAS SHALL BE SURROUNDED
WITH 150mm THICK CONCRETE IN S.R.C. 20.
FD FLOOR DRAIN AFC ABOVE FALSE CEILING RWO RAIN WATER OUTLET
3. ALL PIPE WORK FLEXIBLE JOINTS SHALL BE RETAINED BY USING
FIBBER BOARDS AT EACH JOINT. CO CLEAN OUT
A/S ABOVE SLAB SH SHOWER
FCO FLOOR CLEAN OUT
4. ALL MANHOLES, GULLY TRAPS, INSPECTION CHAMBER, AND SLOW
DOWN CHAMBERS DETAILS AND FINAL DIMENSIONS SHALL BE AS PER BD BIDET SP SOIL PIPE
RWO/RD RAIN WATER OUTLET / ROOF DRAIN
ADSSC REQUIREMENTS AND ADSSC DRAWING DETAILS.
FG FLOOR DRAIN WITH GRATING BOS BOTTOM OF SLAB SS SOIL STACK
5. MANHOLES THAT ARE MORE THAN 1m DEEP ARE TO BE
CONSTRUCTED IN MASS CONCRETE (S.R.C.). GT GULLY TRAP
CDS CONDENSATE DRAIN STACK SWP STORMWATER PIPE
6. ALL MANHOLE COVERS ARE TO BE OF DOUBLE SEAL TYPE.
IC INSPECTION CHAMBER
CO CLEAN OUT T/A TO ABOVE
8. DESIGN AND INSTALL SEWER INSPECTION CHAMBER IN DR DRAIN
ACCORDANCE WITH ADSSC OR THE SEWERAGE SERVICE
PROVIDER REQUIREMENTS. U/G CDP CONDENSATE DRAIN PIPE T/B TO BELOW
UNDER GROUND
10. ALL FD, FCO EXACT LOCATIONS SHALL BE AS PER THE H/L
LATEST INTERIOR DESIGN DRAWINGS AND THE CONTRACTOR HIGH LEVEL D/D DROP DOWN T.D TRENCH DRAIN
HAS TO FOLLOW THAT CONCEPT IN DRAINAGE SHOP DRAWINGS SP/SS SOIL PIPE/SOIL STACK
SUBMISSION. DR DRAIN U/G UNDERGROUND
WP/WS WASTE PIPE/WASTE STACK
F/A FROM ABOVE UPVC UNPLASTICISED POLY VINYL CHLORIDE
SCOPE OF WORK VP/VS VENT PIPE/VENT STACK
1. ALL OPENINGS, SLEEVES THROUGH SLABS AND BEAMS SHALL BE F/A FROM ABOVE F/B FROM BELOW U/S UNDER SLAB
SUBMITTED AND APPROVED BEFORE THE WORK COMMENCING.
T/A TO ABOVE FCO FLOOR CLEAN OUT VP VENT PIPE
2. ALL WORKS SHALL BE FULLY COORDINATED WITH THE EXISTING PLUMBING
SYSTEMS STRUCTURAL AND ARCHITECTURAL LAYOUTS. AFC ABOVE FALSE CEILING A ISSUED FOR TENDER FV BM* AH* 08.03.15
FD FLOOR DRAIN VS VENT STACK
Job Project
3. THE WORKS SHALL BE IN COMPLIANCE WITH CODES AND STANDARDS, ADM T/B TO BELOW No Revision Drawn Manager Director Date
LOCAL REGULATIONS, SPECIFICATIONS AND DRAWINGS / DESIGN DRAWINGS, F.F.L FINISH FLOOR LEVEL WCO WALL CLEAN OUT
SHOP DRAWINGS AND AS BUILT DRAWINGS FOR THE EXISTING NETWORKS. F/B FROM BELOW
Note: * indicates signatures on original issue of drawing or last revision of drawing
4. SHOP DRAWINGS SHALL BE APPROVED BY ADM BEFORE WORK D/D DROP DOWN FG FLOOR GRATING WC WATER CLOSET Conditions of Use. This document may only be used by GHD's client (and any other
COMMENCING. person who GHD has agreed can use this document) for the purpose for which it was
U/S UNDER SLAB FV FLUSH VALVE WB WASH BASIN prepared and must not be used by any other person or for any other purpose.

UPVC UNPLASTICISED POLY VINYL CHLORIDE


GT GULLY TRAP WP WASTE PIPE
SWP STORMWATER PIPE Master Developper / Owner
GW GRAY WATER WS WASTE STACK
R.T RUNING TRAP
Abu Dhabi Airports Company PJSC
T.D TRENCH DRAIN H/L HIGH LEVEL ADM ABU DHABI MUNICIPALITY Planning & Development
DESIGN CRITERIA PO Box 94449, Abu Dhabi, U.A.E
A.D AREA DRAIN T: +971 (0) 2 505 5000
HS HAND SPRAY CD CURB DRAIN F: +971 (0) 2 575 8300
1. THE DRAINAGE SYSTEM SHALL BE TWO PIPING SYSTEM. WASTE, SOIL
AND VENT AS PER LOCAL REGULATION. F.F.L FINISH FLOOR LEVEL
IC INSPECTION CHAMBER MH MANHOLE
2. THE SLOPE OF DRAINAGE PIPES INSIDE THE BUILDING SHALL BE 2/100 SMRPS SEWAGE SUBMERSIBLE PUMP
FOR PIPE SIZES 2 1/2 INCH DIAMETER ( 65mm) OR LESS & 1/100 FOR PIPE JS JANITOR SINK PD PLANTER DRAIN
SMRP WASTE WATER SUBMERSIBLE PUMP
SIZES 3 INCH DIAMETER ( 80mm) TO 6 INCH DIAMETER ( 150mm).
Lead Consultant
3. THE DESIGN FLOW RATE AND PIPE SIZING SHALL BE BASED ON RVC ROOF VENT CAP KS KITCHEN SINK RD ROOF DRAIN
SANITARY FIXTURE UNIT METHOD AS PER UPC - ABU DHABI.
R.D-1 MIDDLE ROOF DRAIN
LAV LAVATORY UR URINAL
4. ALL WASTE FROM WASH BASINS, JANITOR, KITCHEN AND PANTRY SINKS
SHALL BE CONNECTED TO WASTE SYSTEM VIA TRAPPED AND ENTED R.D-2 SIDE ROOF DRAIN
FLOOR DRAIN. DRG. NO. DRAWING NO. FC FALSE CEILING
RWO RAIN WATER OUTLET GHD GLOBAL PTY LTD
5. ALL SOIL COLLECTED FROM THE WC'S AND URINALS SHALL BE PCO PIPE CLEAN OUT FRP FIBERGLASS REINFORCED PLASTIC 3rd Floor, Guardian Tower, Danet Community
COLLECTED TO SOIL STACK OF THE BUILDING. CP CONDENSATE WATER PIPE PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
6. THE MAXIMUM LOADING UNIT AND MAXIMUM LENGTH OF DRAINAGE AND SWR STORMWATER RISER E abumail@ghd.com W www.ghd.com
VENT PIPING SHALL BE AS PER TABLE 7-4, UPC OF ABU DHABI.
BD BALCONY DRAIN
CODES AND STANDARD PIPE LEGEND : Specialist Consultant
CDS CONDENSATE DRAIN STACK
1. INTERNATIONAL BUILDING CODE 2006.
2. INTERNATIONAL MECHANICAL CODE 2006. SWS STORMWATER STACK SOIL & WASTE PIPE
3. BRITISH STANDARD 2006.
4. INTERNATIONAL PLUMBING CODE 2009. L/L LOW LEVEL
5. INTERNATIONAL FIRE CODE 2006. SOIL PIPE Fire Life Safety, Planning
6. UNIFORM PLUMBING CODE OF ABU DHABI. LS LAUNDRY SINK and Regulatory Specialist
7. UAE DEPARTMENT OF CIVIL DEFENCE REQUIREMENTS. STORM WATER PIPE
8. ADM REGULATION. WM WASHING MACHINE
9. ESTIDAMA
VENT PIPE
DW DISH WASHING MACHINE
GENERAL NOTES
LAV/WB LAVATORY/WASH BASIN WASTE PIPE Specialist Consultant
1. THE FINAL LOCATION FOR FCO, WCO & FD SHALL BE FULLY
COORDINATED WITH THE ID TILING LAYOUTS AND HAS TO BE
BD BIDET
SUBMITTED IN THE SHOP DRAWING BY CONTRACTOR. CONDENSATE DRAIN PIPE
BT BATH TUB Third Party
2. THE SLOPE OF DRAINAGE PIPES INSIDE THE BUILDING SHALL BE
20mm /m (1/4 INCH / FOOT) FOR PIPE SIZES 2 1/2 INCH DIAMETER Operational Advisor
(65mm) OR LESS & 10mm / m (1/8 INCH / FOOT) FOR PIPE SIZES 3 WC WATER CLOSET
INCH DIAMETER (80mm) TO 6 INCH DIAMETER (150mm).
SH SHOWER
3. ALL VENT AND DRAINAGE PIPES (SOIL, WASTE & CONDENSATE) IN
WET AREAS FALSE CEILING OR UNDERGROUND AND/OR OUTSIDE THE KS KITCHEN SINK
BUILDING SHALL BE UPVC TO BS 4514 FOR PIPE SIZES 80mm AND
LARGER AND TO BS 5255 FOR PIPE SIZES 50mm AND SMALLER PIPES. DM DRYER MACHINE Client
ADAC
4. THE CONTRACTOR HAS TO SUBMIT SHOP DRAWINGS, CALCULATIONS HS HAND SPRAY
AND MATERIALS TO LOCAL AUTHORITIES FOR APPROVAL.

5. ALL CONTRACTOR SHOP DRAWINGS SHALL BE FULLY COORDINATED


IC INSPECTION CHAMBER Project
MIDFIELD TERMINAL FIRE
WITH ALL SERVICES, ARCHITECTURAL AND ID DRAWINGS. TBC TO BE CONFIRMED STATION
6. ALL SIZES SHOWN ON DRAWINGS ARE IN MILLIMETRE UNLESS NOTED CS CLEANER SINK Title DRAINAGE GENERAL NOTES
OTHER WISE.
SDC SLOW DOWN CHAMBER ABBREVIATION LEGEND &
7. ALL MANHOLE, IC AND GT DETAILS SHALL BE AS PER THE UAE
LOCAL AUTHORITIES REQUIREMENTS. BOP BOTTOM OF PIPE SYMBOLS
FM FORCED MAIN Scale As indicated DO NOT SCALE
FGL FINISHED GROUND LEVEL Drawn F.VILLETE Designer P. MOHD.

1 1 - DENOTES DETAIL NO. Drafting Design


H101 H101 - DENOTES DRAWING NO. WHERE THE DETAIL APPEAR Check Check
Approved
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- H001 Rev: A
Plot Date: 7/03/2015 10:24:16 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt

Вам также может понравиться