STANDARD DRAINAGE NOTES: DRAINAGE LEGEND ABBREVIATIONS
1. ALL DRAINAGE PIPE U/G SHALL BE UPVC PIPE. ABBREVIATION DESIGNATION AB ABLUTION PSINK PANTRY SINK Notes SEMH SEWER MANHOLE 2. ALL DRAINAGE PIPE RUN UNDER THE BUILDING OR AT A DEPTH OF 600mm OR LESS IN PEDESTRIAN AREAS OR AT A DEPTH OF A.D AREA DRAIN RVC ROOF VENT CAP SWMH STORM WATER MANHOLE 1200mm OR LESS IN VEHICULAR AREAS SHALL BE SURROUNDED WITH 150mm THICK CONCRETE IN S.R.C. 20. FD FLOOR DRAIN AFC ABOVE FALSE CEILING RWO RAIN WATER OUTLET 3. ALL PIPE WORK FLEXIBLE JOINTS SHALL BE RETAINED BY USING FIBBER BOARDS AT EACH JOINT. CO CLEAN OUT A/S ABOVE SLAB SH SHOWER FCO FLOOR CLEAN OUT 4. ALL MANHOLES, GULLY TRAPS, INSPECTION CHAMBER, AND SLOW DOWN CHAMBERS DETAILS AND FINAL DIMENSIONS SHALL BE AS PER BD BIDET SP SOIL PIPE RWO/RD RAIN WATER OUTLET / ROOF DRAIN ADSSC REQUIREMENTS AND ADSSC DRAWING DETAILS. FG FLOOR DRAIN WITH GRATING BOS BOTTOM OF SLAB SS SOIL STACK 5. MANHOLES THAT ARE MORE THAN 1m DEEP ARE TO BE CONSTRUCTED IN MASS CONCRETE (S.R.C.). GT GULLY TRAP CDS CONDENSATE DRAIN STACK SWP STORMWATER PIPE 6. ALL MANHOLE COVERS ARE TO BE OF DOUBLE SEAL TYPE. IC INSPECTION CHAMBER CO CLEAN OUT T/A TO ABOVE 8. DESIGN AND INSTALL SEWER INSPECTION CHAMBER IN DR DRAIN ACCORDANCE WITH ADSSC OR THE SEWERAGE SERVICE PROVIDER REQUIREMENTS. U/G CDP CONDENSATE DRAIN PIPE T/B TO BELOW UNDER GROUND 10. ALL FD, FCO EXACT LOCATIONS SHALL BE AS PER THE H/L LATEST INTERIOR DESIGN DRAWINGS AND THE CONTRACTOR HIGH LEVEL D/D DROP DOWN T.D TRENCH DRAIN HAS TO FOLLOW THAT CONCEPT IN DRAINAGE SHOP DRAWINGS SP/SS SOIL PIPE/SOIL STACK SUBMISSION. DR DRAIN U/G UNDERGROUND WP/WS WASTE PIPE/WASTE STACK F/A FROM ABOVE UPVC UNPLASTICISED POLY VINYL CHLORIDE SCOPE OF WORK VP/VS VENT PIPE/VENT STACK 1. ALL OPENINGS, SLEEVES THROUGH SLABS AND BEAMS SHALL BE F/A FROM ABOVE F/B FROM BELOW U/S UNDER SLAB SUBMITTED AND APPROVED BEFORE THE WORK COMMENCING. T/A TO ABOVE FCO FLOOR CLEAN OUT VP VENT PIPE 2. ALL WORKS SHALL BE FULLY COORDINATED WITH THE EXISTING PLUMBING SYSTEMS STRUCTURAL AND ARCHITECTURAL LAYOUTS. AFC ABOVE FALSE CEILING A ISSUED FOR TENDER FV BM* AH* 08.03.15 FD FLOOR DRAIN VS VENT STACK Job Project 3. THE WORKS SHALL BE IN COMPLIANCE WITH CODES AND STANDARDS, ADM T/B TO BELOW No Revision Drawn Manager Director Date LOCAL REGULATIONS, SPECIFICATIONS AND DRAWINGS / DESIGN DRAWINGS, F.F.L FINISH FLOOR LEVEL WCO WALL CLEAN OUT SHOP DRAWINGS AND AS BUILT DRAWINGS FOR THE EXISTING NETWORKS. F/B FROM BELOW Note: * indicates signatures on original issue of drawing or last revision of drawing 4. SHOP DRAWINGS SHALL BE APPROVED BY ADM BEFORE WORK D/D DROP DOWN FG FLOOR GRATING WC WATER CLOSET Conditions of Use. This document may only be used by GHD's client (and any other COMMENCING. person who GHD has agreed can use this document) for the purpose for which it was U/S UNDER SLAB FV FLUSH VALVE WB WASH BASIN prepared and must not be used by any other person or for any other purpose.
UPVC UNPLASTICISED POLY VINYL CHLORIDE
GT GULLY TRAP WP WASTE PIPE SWP STORMWATER PIPE Master Developper / Owner GW GRAY WATER WS WASTE STACK R.T RUNING TRAP Abu Dhabi Airports Company PJSC T.D TRENCH DRAIN H/L HIGH LEVEL ADM ABU DHABI MUNICIPALITY Planning & Development DESIGN CRITERIA PO Box 94449, Abu Dhabi, U.A.E A.D AREA DRAIN T: +971 (0) 2 505 5000 HS HAND SPRAY CD CURB DRAIN F: +971 (0) 2 575 8300 1. THE DRAINAGE SYSTEM SHALL BE TWO PIPING SYSTEM. WASTE, SOIL AND VENT AS PER LOCAL REGULATION. F.F.L FINISH FLOOR LEVEL IC INSPECTION CHAMBER MH MANHOLE 2. THE SLOPE OF DRAINAGE PIPES INSIDE THE BUILDING SHALL BE 2/100 SMRPS SEWAGE SUBMERSIBLE PUMP FOR PIPE SIZES 2 1/2 INCH DIAMETER ( 65mm) OR LESS & 1/100 FOR PIPE JS JANITOR SINK PD PLANTER DRAIN SMRP WASTE WATER SUBMERSIBLE PUMP SIZES 3 INCH DIAMETER ( 80mm) TO 6 INCH DIAMETER ( 150mm). Lead Consultant 3. THE DESIGN FLOW RATE AND PIPE SIZING SHALL BE BASED ON RVC ROOF VENT CAP KS KITCHEN SINK RD ROOF DRAIN SANITARY FIXTURE UNIT METHOD AS PER UPC - ABU DHABI. R.D-1 MIDDLE ROOF DRAIN LAV LAVATORY UR URINAL 4. ALL WASTE FROM WASH BASINS, JANITOR, KITCHEN AND PANTRY SINKS SHALL BE CONNECTED TO WASTE SYSTEM VIA TRAPPED AND ENTED R.D-2 SIDE ROOF DRAIN FLOOR DRAIN. DRG. NO. DRAWING NO. FC FALSE CEILING RWO RAIN WATER OUTLET GHD GLOBAL PTY LTD 5. ALL SOIL COLLECTED FROM THE WC'S AND URINALS SHALL BE PCO PIPE CLEAN OUT FRP FIBERGLASS REINFORCED PLASTIC 3rd Floor, Guardian Tower, Danet Community COLLECTED TO SOIL STACK OF THE BUILDING. CP CONDENSATE WATER PIPE PO Box 45921 Abu Dhabi United Arab Emirates T 971 2 6968700 F 971 2 4472915 6. THE MAXIMUM LOADING UNIT AND MAXIMUM LENGTH OF DRAINAGE AND SWR STORMWATER RISER E abumail@ghd.com W www.ghd.com VENT PIPING SHALL BE AS PER TABLE 7-4, UPC OF ABU DHABI. BD BALCONY DRAIN CODES AND STANDARD PIPE LEGEND : Specialist Consultant CDS CONDENSATE DRAIN STACK 1. INTERNATIONAL BUILDING CODE 2006. 2. INTERNATIONAL MECHANICAL CODE 2006. SWS STORMWATER STACK SOIL & WASTE PIPE 3. BRITISH STANDARD 2006. 4. INTERNATIONAL PLUMBING CODE 2009. L/L LOW LEVEL 5. INTERNATIONAL FIRE CODE 2006. SOIL PIPE Fire Life Safety, Planning 6. UNIFORM PLUMBING CODE OF ABU DHABI. LS LAUNDRY SINK and Regulatory Specialist 7. UAE DEPARTMENT OF CIVIL DEFENCE REQUIREMENTS. STORM WATER PIPE 8. ADM REGULATION. WM WASHING MACHINE 9. ESTIDAMA VENT PIPE DW DISH WASHING MACHINE GENERAL NOTES LAV/WB LAVATORY/WASH BASIN WASTE PIPE Specialist Consultant 1. THE FINAL LOCATION FOR FCO, WCO & FD SHALL BE FULLY COORDINATED WITH THE ID TILING LAYOUTS AND HAS TO BE BD BIDET SUBMITTED IN THE SHOP DRAWING BY CONTRACTOR. CONDENSATE DRAIN PIPE BT BATH TUB Third Party 2. THE SLOPE OF DRAINAGE PIPES INSIDE THE BUILDING SHALL BE 20mm /m (1/4 INCH / FOOT) FOR PIPE SIZES 2 1/2 INCH DIAMETER Operational Advisor (65mm) OR LESS & 10mm / m (1/8 INCH / FOOT) FOR PIPE SIZES 3 WC WATER CLOSET INCH DIAMETER (80mm) TO 6 INCH DIAMETER (150mm). SH SHOWER 3. ALL VENT AND DRAINAGE PIPES (SOIL, WASTE & CONDENSATE) IN WET AREAS FALSE CEILING OR UNDERGROUND AND/OR OUTSIDE THE KS KITCHEN SINK BUILDING SHALL BE UPVC TO BS 4514 FOR PIPE SIZES 80mm AND LARGER AND TO BS 5255 FOR PIPE SIZES 50mm AND SMALLER PIPES. DM DRYER MACHINE Client ADAC 4. THE CONTRACTOR HAS TO SUBMIT SHOP DRAWINGS, CALCULATIONS HS HAND SPRAY AND MATERIALS TO LOCAL AUTHORITIES FOR APPROVAL.
5. ALL CONTRACTOR SHOP DRAWINGS SHALL BE FULLY COORDINATED
IC INSPECTION CHAMBER Project MIDFIELD TERMINAL FIRE WITH ALL SERVICES, ARCHITECTURAL AND ID DRAWINGS. TBC TO BE CONFIRMED STATION 6. ALL SIZES SHOWN ON DRAWINGS ARE IN MILLIMETRE UNLESS NOTED CS CLEANER SINK Title DRAINAGE GENERAL NOTES OTHER WISE. SDC SLOW DOWN CHAMBER ABBREVIATION LEGEND & 7. ALL MANHOLE, IC AND GT DETAILS SHALL BE AS PER THE UAE LOCAL AUTHORITIES REQUIREMENTS. BOP BOTTOM OF PIPE SYMBOLS FM FORCED MAIN Scale As indicated DO NOT SCALE FGL FINISHED GROUND LEVEL Drawn F.VILLETE Designer P. MOHD.
1 1 - DENOTES DETAIL NO. Drafting Design
H101 H101 - DENOTES DRAWING NO. WHERE THE DETAIL APPEAR Check Check Approved (Project Director) Date This Drawing must not be used for Construction unless signed as Approved Original Size Drawing No: A1 DETAIL DESIGN 76-10526- H001 Rev: A Plot Date: 7/03/2015 10:24:16 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt