DESIGN CRITERIA POTABLE WATER LEGEND
1. THE DESIGN FLOW RATE AND PIPE SIZING FOR FIT OUT AND WET SYMBOLS ABBR. DESIGNATION
AREAS PIPE SIZING SHALL BE CALCULATED BASED ON SANITARY
FIXTURE UNIT METHOD AS PER UPC OF ABU DHABI TABLES 6-7 & HS HOSE SPRAY
6-9.
2. THE FIXTURES WATER FLOW RATE SHALL BE MATCHED WITH
ESTIDAMA BASED DESIGN AND NOT LESS THAN THE RATES IV ISOLATION VALVE
SHOWN IN IPC.
WHA WATER HAMMER ARRESTOR
CODES AND STANDARD
EWH ELECTRICAL WATER HEATER
1. INTERNATIONAL BUILDING CODE 2006.
GV GATE VALVE
2. INTERNATIONAL MECHANICAL CODE 2006.
HB HOSE BIB
3. BRITISH STANDARD 2006.
F. CON. FLEXIBLE CONNECTION
4. INTERNATIONAL PLUMBING CODE 2009.
10. THE DRAWINGS ARE ISSUED FOR PLUMBING WORKS ONLY AND CW COLD WATER
SHALL NOT BE USED FOR ARCHITECTURAL, STRUCTURAL OR GHD GLOBAL PTY LTD
OTHER WORKS. 3rd Floor, Guardian Tower, Danet Community
HW HOT WATER PO Box 45921 Abu Dhabi United Arab Emirates
11. DRAWINGS SHALL NOT BE SCALED FOR EXECUTING THE WORKS. T 971 2 6968700 F 971 2 4472915
ALL MEASUREMENTS SHALL BE MADE FROM ESTABLISHED LINES, AFC ABOVE FALSE CEILING E abumail@ghd.com W www.ghd.com
LEVELS & BENCH MARKS.
CWTP COLD WATER TRANSFER PUMP Specialist Consultant
12. THE DRAWINGS ARE ONLY DIAGRAMMATIC. THE CONTRACTOR
SHALL EXECUTE ALL WORK IN ACCORDANCE WITH APPROVED
SHOP AND INSTALLATION DRAWING AS PER THE PROVISIONS OF CWBP COLD WATER BO0STER PUMP
THE SPECIFICATION.
F.C FLEXIBLE CONNECTION Fire Life Safety, Planning
13. PIPE MATERIAL WHEN NOT SHOWN ON DRAWINGS SHALL BE AS
PER SPECIFICATION. and Regulatory Specialist
FRP FIBERGLASS REINFORCED PLASTIC
14. THE EXACT LOCATION FOR ACCESS PANEL IN FALSE
CEILING SHALL BE AS PER ID DRAWINGS. A.V AIR VENT
15. THE CONTRACTOR HAS TO SUBMIT SHOP DRAWINGS, WHA WATER HAMMER ARRESTOR
CALCULATIONS AND MATERIALS FOR APPROVAL AS PER DESIGN Specialist Consultant
DRAWINGS, SPECIFICATIONS AND LOCAL REGULATION.
NO NORMAL OPEN
16. WATER HAMMER ARRESTOR WILL BE PROVIDED AS PER
DRAWINGS, SPECIFICATION AND AS PER MANUFACTURER NC NORMAL CLOSE
RECOMMENDATION.
Third Party
H/L HIGH LEVEL
Operational Advisor
17. ALL CONTRACTOR SHOP DRAWINGS SHALL BE FULLY
COORDINATED WITH ALL MEP SERVICES, STRUCTURE, ID AND
ARCHITECTURAL DRAWINGS. AND COMPLY WITH THE EXISTING PRV PRESSURE REDUCING VALVE
BUILDERS WORKS, COORDINATED SHOP DRAWINGS AND
AS-BUILT DRAWINGS FOR EXTERNAL NETWORKS. FRP FIBER GLASS REINFORCED PLASTIC