Вы находитесь на странице: 1из 42

Date

S/N Location

1 ZONE 5

2 ZONE 5

3 ZONE 5
4 ZONE 1

5 ZONE 3

6 ZONE 4

7 ZONE 1

8 ZONE 4
Prepared by RTO Representative:
Remark: Photo attached (1 page )

Photos taken on

RD259 PROPOSED BUS DEPOT AT LO

RESUME CUTTING AND OF SOIL AT


LTA DESIGNATED DISPOSAL GROUN

RD259 PROPOSED BUS DEPOT AT LO


ON-GOING CAPPING BEAM REBAR IN

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING CASTING OF (IC) INSPECT


BUILDING AT ZONE 3 PHASE 2
RD259 PROPOSED BUS DEPOT AT LO

ON-GOING RETAINING WALL REBAR


ROAD JUNCTION
RD276 Appointm

22/7/2014 TUESDAY

Chainage
RTO Representative: ALFREDO JR
to attached (1 page )

22/7/2014 TUESDAY

OSED BUS DEPOT AT LOYANG

TTING AND OF SOIL AT ZONE 5 PHASE 2 AND SOIL DISP


ATED DISPOSAL GROUND

OSED BUS DEPOT AT LOYANG


APPING BEAM REBAR INSTALLATION AT ZONE 5 PHASE

OSED BUS DEPOT AT LOYANG

ASTING OF (IC) INSPECTION CHAMBER FOR TOILETS O


ZONE 3 PHASE 2
OSED BUS DEPOT AT LOYANG

ETAINING WALL REBAR WORKS AT ZONE 1 PHASE 1 NE


TION
C & V ENGINEER
Project Consultant Engineers GS
Maxwell House, # 09-04/05. 20, Max
Tel: 62260828 Fax:
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Super


DAILY SITE R

Nature of works

RESUME CUTTING AND OF SOIL AT ZONE 5


PHASE 2 AND SOIL DISPOSAL TO LTA
DESIGNATED DISPOSAL GROUND

ON-GOING WORKS FOR TEMPORARY SITE


OFFICE BESIDES TOA PEK KHONG

ON-GOING CAPPING BEAM REBAR


INSTALLATION AT ZONE 5 PHASE 1
ON-GOING HACKING AND TRIMMING TO
DESIRED CUT-OFF LEVEL OF CBP AT ZONE 5
PHASE 1

ON-GOING CASTING OF (IC) INSPECTION


CHAMBER FOR TOILETS OF MAIN BUILDING AT
ZONE 3 PHASE 2

ON-GOING TURFING WORKS AT ZONE 4 PHASE


2

ON-GOING RETAINING WALL REBAR WORKS AT


ZONE 1 PHASE 1 NEAR NEW ROAD JUNCTION

ON-GOING 1200MM WIDE RCU DRAIN WALL AND


TOP SLAB FORMWORKS AT ZONE 4 PHASE 2
ALFREDO JR. ARIOS CLARO
(Name & signature)
SE 2 AND SOIL DISPOSAL TO
N AT ZONE 5 PHASE 1

ER FOR TOILETS OF MAIN


ZONE 1 PHASE 1 NEAR NEW
NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy


AILY SITE REPORT

Time (Hrs) Weather


8-12AM

0800-1800
Condition 1-6PM
RE

0800-1800 RTO

Total

0800-1800

VISITOR AT SITE:
0800-1800

0800-1800
SITE MEETING (IF ANY)

0800-1800

0800-1800 HTC MANPOWER

Project Manager 1

0800-1800 Project Coordinator 1

Site Manager 1

Project Engineer 2

Planning Engineer 1

Architect

Consultant
QECP

Site Supervisor 3

Rigger Signalman

Checked by RE R
RD259 PROPO

ON-GOING WO
KHONG

RD259 PROPO
ON-GOING HA
AT ZONE 5 PH

RD259 PROPO

ON-GOING TU
RD259 PROPO

ON-GOING 120
AT ZONE 4 PH
SS ISO 9001:2008
FS 500171

at Loyang

Fine Drizzle Rain

Fine FINE Rain


WSHO 2

ECO 1

Safety Supervisor 1

Quantity Surveyor 1

SPRO 1

Surveyor 1

Tipper Truck Operator 1


Excavator Operator 6

Volvo Truck Operator 2

General Worker 56

TOTAL 81

d by RE Representative: Muthu Senthi


(Name & sign
9 PROPOSED BUS DEPOT AT LOYANG

OING WORKS FOR TEMPORARY SITE OFFICE BESIDES T


G

9 PROPOSED BUS DEPOT AT LOYANG


OING HACKING AND TRIMMING TO DESIRED CUT-OFF LE
NE 5 PHASE 1

9 PROPOSED BUS DEPOT AT LOYANG

OING TURFING WORKS AT ZONE 4 PHASE 2


9 PROPOSED BUS DEPOT AT LOYANG

OING 1200MM WIDE RCU DRAIN WALL AND TOP SLAB F


NE 4 PHASE 2
S ISO 9001:2008 Certificate No:
FS 500171

3
MACHINERY

EXCAVATOR 6

GENERATOR 5

ROLLER (1&10
1
TONS)
BORED PILE
1
MACHINE

VOLVO TRUCK 2

TIPPER TRUCK 1

MOBILE CRANE 1
BOBCAT 1

TOTAL 18

Muthu Senthil Kumar


(Name & signature)