In year 2017, the demand analysis suggested that the ridership of high
speed train in all routes would be as high as 153,000 trips per day or
as similar to the ordinary train service presently.
Technologies:
Trackwork: UIC60 Standard Gauge (1.435 m)
Communication: Fiber Optic and Wireless Technologies (at least STM16 Level)
Cost VS Speed
Investment Cost
New Track
Upgrade Track
Hi Speed Train
105 kph
120 kph
160 kph
250 kph
90 kph
Speed
PPP
(.)
745
615
330
985
/
1 2 3
50 30
- 745 209,396 14,560 108,261 70,780
- ( :) (51.7%) (33.8%)
- FIRR (%) 0.93 23.53 2.25 4.66
- EIRR (%) 14.55
- 615 180,379 14,560 94,400 62,464
- ( :) (52.3%) (34.6%)
- FIRR (%) 1.85 31.93 5.58 8.41
- EIRR (%) 19.08
- 937 234,071 17,600 123,749 81,289
- ( :) (52.9%) (34.7%)
- FIRR (%) 1.61 36.15 4.73 7.30
- EIRR (%) 19.23
- 221 56,601 3,360 28,973 18,728
- ( :) (51.2%) (33.1%)
- FIRR (%) 0.14 22.49 3.25 5.54
- EIRR (%) 15.40
- 256 93,315
- 382 110,577
- 648 154,348
1,286 358,240
- 314 70,008
- 359 84,064
- 363 93,024
- - 334 92,007
- - 221 49,262
1,591 388,365
()
(.. 2553 - 2557) (.. 2558-2562) (.. 2563-2575)
. . . .
3,763 93.1 2,996 62.8 1,971 38.3 724 13.0
280 6.9 1,047 21.9 2,072 40.3 3,319 59.7
()
() 0 0.0 730 15.3 1,098 21.4 1,517 27.3
4,043 100 4,773 100 5,141 100 5,560 100
/ ()
0 1,039 1,948 2,976
0 0 548 2,256