The final degree project deals with trigeneration, which consists of the
joint production of heat, cold and electricity. The main objective is to carry
out a new generation system at a hospital which at the moment buys
electricity to supply itself of lighting, power and electrical compressors for
air conditioning, and also gas for heating and boilers. By using the new
technology, it will only be necessary to buy gas to feed the engines that will
generate electricity. The heat given off by the engines in its circuit of shirts
and high temperatures from the exhaust gases will be used for heating in
winter passing through a heat exchanger and cooling in summer thanks to
an absorption machine.
This machine uses the properties of certain substances that are able to
absorb heat when changing from liquid to gaseous state. Typically lithium
water-bromide is used. In this case the water which will act like coolant is
driven through a circuit of low pressure is evaporated in a heat exchanger
(evaporator), where it cools another fluid, that will be used for cooling
rooms. Later, this water steam will be absorbed by the absorbent, in this
case lithium bromide, in the absorbent area forming a solution. This solution
is conduced to the heater where dissolvent and solute are separated by
means of heat coming from outside. The water returns to the evaporator,
and the bromide to the absorbent area.
Instalacin de Trigeneracin mediante motores de gas vi
four years reaching a net profit of 800,000 at the end of the 10 th year.
All in all, trigeneration has enormous advantages since the residual heats
are not spilled to the atmosphere at high temperature. On the other hand,
this kind of generation promotes the distributed generation. Electricity is
consumed where it is generated, which helps not to overload the electrical
lines and gives great security in the provision.
Instalacin de Trigeneracin mediante motores de gas viii
ndice
1. MEMORIA DESCRIPTIVA
1 INTRODUCCIN............................................................................................................................ 14
1. Objetivos del proyecto 14
1 .....................................................................................
1. Generalidades sobre la cogeneracin 14
2 ............................................................
1.2.1 Definicin de cogeneracin 14
1.2.2 Ventajas 14
1. Tecnologas aplicables en 15
3 cogeneracin........................................................
1.3.1 Cogeneracin con motor alternativo 16
1.3.2 Cogeneracin con turbina de gas 16
1.3.3 Cogeneracin con turbina de vapor 17
1.3.4 Cogeneracin con microturbinas 17
1. Trigeneracin ................................................................................................. 20
6 ...
1.6.1 Introduccin 20
1.6.2 Refrigeracin por absorcin 21
1.6.3 Variables de diseo de los sistemas de refrigeracin por absorcin 23
1.6.4 Aspectos econmicos de la trigeneracin 23
2 DATOS DEL 24
HOSPITAL................................................................................................................
2. Datos 24
1 generales.................................................................................................
2. Consumos ......................................................................................................... 24
2 .
2.2.1 Demanda elctrica 24
2.2.2 Demanda trmica 26
2.2.2.1 Demanda trmica para 26
calefaccin.......................................................................................
Instalacin de Trigeneracin mediante motores ix
de gas
2.2.2.2 Demanda trmica para 26
climatizacin...................................................................................
2.2.2. Tabla de 27
3 datos..........................................................................................................................
2.2.3 Demanda diarias de calor, fro y electricidad 27
3 DESCRIPCIN DE LA INSTALACIN 41
.....................................................................................
3.1 Eleccin de los 41
equipos....................................................................................
3.1.1 Eleccin del tipo de fuente de energa primaria 41
3.1.2 Eleccin del sistema de recuperacin de calor 42
3.1.3 Tipos de combustibles 42
3.1.4 Solucin adecuada 43
2. CLCULOS
1 ELECCIN DEL MOTOR 65
..............................................................................................................
1. Eleccin del nmero de motores y de la potencia 65
1 .......................................
1. Rgimen horario de 65
2 funcionamiento.............................................................
1. Cumplimiento del rgimen 66
3 especial..............................................................
1.3.1 Condicin de autogenerador 67
1.3.2 Rendimiento elctrico equivalente 68
2 CLCULO DE LA CALDERA DE 70
RECUPERACIN...............................................................
2. Clculo del caudal del circuito de 70
1 camisas...................................................
2. Calor aprovechable de los gases de escape 70
2 ..................................................
2. Clculo del circuito de refrigeracin 71
3 .............................................................
3 CLCULO DE LA MQUINA DE ABSORCIN 72
.....................................................................
3. Clculo de la potencia frigorfica 73
1 ...................................................................
3. Clculo de la carga del 74
2 generador..................................................................
3. Clculo de la carga del 74
3 condensador.............................................................
3. Clculo de la carga del evaporador 75
4 ...............................................................
3. Caractersticas de la mquina de absorcin 75
5 .................................................
4 CLCULO DEL SISTEMA DE CALEFACCIN 76
.......................................................................
4. Clculo de la potencia de calefaccin 76
1 ............................................................
Instalacin de Trigeneracin mediante motores de gas xi
3. ESTUDIO ECONMICO
1 INTRODUCCIN.......................................................................................................................... 101
2 SITUACIN SIN COGENERACIN 101
........................................................................................
2. Factura elctrica 102
1 ..............................................................................................
2. Factura de gas 103
2 .................................................................................................
2. Gasto total sin trigeneracin 105
3 .........................................................................
3 PREVISIONES CON TRIGENERACIN 105
.................................................................................
3. Factura de gas 105
1 .................................................................................................
3. Factura elctrica 108
2 ..............................................................................................
3.2.1 Compra de electricidad de la red elctrica 108
3.2.2 Ingresos por venta de electricidad a la red 109
4. ANLISIS MEDIOAMBIENTAL
1 INTRODUCCIN.......................................................................................................................... 117
2 EMISIONES 117
ATMOSFRICAS...................................................................................................
2. Monxido de 117
1 carbono....................................................................................
2. xidos de 118
2 nitrgeno.......................................................................................
2.2.1 EGR 118
2.2.2 Convertidores catalticos 118
2.2.3 Lean Burn 119
3 RESIDUOS 119
SLIDOS...................................................................................................................
4 CONTAMINACIN ACSTICA ............................................................................................... 119
ANEXOS
A BIBLIOGRAFA...............................................................................................................................123
1
Memoria
Descriptiva
Instalacin de Trigeneracin mediante motores de gas 14
1 Introduccin
1.2.2 Ventajas
Elevados rendimientos.
Instalacin de Trigeneracin mediante motores de gas 15
La cogeneracin con turbina de gas resulta muy adecuada para los procesos en
los que se requiere de una gran cantidad de energa trmica, o en relaciones de
calor/electricidad mayores a 2.
Instalacin de Trigeneracin mediante motores de gas 17
metano, gases de bajo poder calorfico (tan bajo como 350 Btu) emanados
de digestores de rellenos sanitarios.
En la tabla anterior se ven las las eficiencias energticas, tanto elctricas como
trmicas, de las diferentes alternativas existentes en el mercado. Dependiendo de la
naturaleza de la instalacin a disear se seleccionar una u otra. Adems, entran en
juego otros factores como los costes de capital, costes de operacin y
mantenimiento, combustible a utilizar, el funcionamiento a cargas parciales,
tamao, disponibilidad, factores ambientales, que sern analizados
posteriormente.
Instalacin de Trigeneracin mediante motores de gas 19
REE = E
Q V
0.9
1.6 Trigeneracin
1.6.1 Introduccin
uno con absorcin no es rentable por debajo de los 10.000 m 2, salvo que
tengan algn consumo especial de calor o fro, como es el caso que nos
ocupa.
2.2 Consumos
Se han tomado los datos de la factura elctrica del hospital a lo largo del ao
2005, durante el cual la energa elctrica se suministr a 20 KV, transformndola a
380 V segn distintos usos (alumbrado, fuerza, compresores, etc.), ascendiendo la
potencia contratada a 2600 KW. Un dato a sealar, es el factor de potencia de la
instalacin, de un 0,95.
Instalacin de Trigeneracin mediante motores de gas 25
1800000
1600000
1400000
1200000
1000000
Fro (KWh)
800000
600000 Alumbrado+ Fuerza
(KWh)
400000
200000
0
Enero Abril Julio Octubre
Instalacin de Trigeneracin mediante motores de gas 26
Dte=Dts/0.7
Dts=COPW
Instalacin de Trigeneracin mediante motores de gas 27
Donde:
Consumo
Mes electrico Frio Calefaccin Dts (KWh) Dte (KWh) ACS
(KWh) (KWh) (KWh) (KWh)
Enero 1130599 0 1945749 0 0 194707
Febrero 1032759 0 1657675 0 0 175866
Marzo 1130599 0 1140401 0 0 194707
Abril 1027322 0 974284 0 0 188428
Mayo 1149613 116499 0 308722 441032 194707
Junio 1319096 262124 0 694629 992327 183429
Julio 1442605 436872 0 1157711 1653873 144571
Agosto 1609817 582496 0 1543614 2205163 147598
Septiembre 1287329 291248 0 771807 1102582 225472
Octubre 1036059 87375 281193 231544 330777 194707
Noviembre 1006395 0 627886 0 0 188428
Diciembre 1050152 0 1453857 0 0 194706
2 1110 2214 0
3 1038 2078 0
4 996 1999 0
5 974 1854 0
6 947 1806 0
7 944 1799 0
8 960 1792 0
9 1211 2308 0
10 1645 3134 0
11 1956 3499 0
12 2079 3961 0
13 2182 4158 0
14 2252 4291 0
15 2247 4282 0
16 2208 4206 0
17 2043 3896 0
18 1941 3501 0
19 1455 2774 0
20 1426 2716 0
21 1442 2748 0
22 1453 2770 0
23 1458 2778 0
24 1324 2523 0
Instalacin de Trigeneracin mediante motores de gas 30
2 1124 1857 0
3 1050 1735 0
4 1009 1666 0
5 984 1624 0
6 961 1587 0
7 956 1638 0
8 971 1655 0
9 1225 2071 0
10 1664 2750 0
11 1978 3269 0
12 2102 3354 0
13 2209 3379 0
14 2279 3391 0
15 2273 3457 0
16 2234 3493 0
17 2069 3417 0
18 1967 3249 0
19 1474 2637 0
20 1420 2546 0
21 1458 2561 0
22 1470 2579 0
23 1477 2550 0
24 1341 2316 0
Instalacin de Trigeneracin mediante motores de gas 31
2 1147 1353 0
3 1073 1266 0
4 1030 1216 0
5 1006 1188 0
6 980 1157 0
7 974 1151 0
8 991 1172 0
9 1252 1478 0
10 1700 2008 0
11 2022 1506 0
12 2147 2537 0
13 2255 2663 0
14 2327 2748 0
15 2323 2743 0
16 2282 2693 0
17 2113 2495 0
18 2008 2370 0
19 1504 1776 0
20 1473 1739 0
21 1490 1760 0
22 1503 1773 0
23 1506 1779 0
24 1368 1616 0
Instalacin de Trigeneracin mediante motores de gas 32
2 1147 1298 0
3 1075 1216 0
4 1031 1167 0
5 1006 1137 0
6 980 1110 0
7 975 1105 0
8 1217 1122 0
9 1126 1274 0
10 1610 1822 0
11 1898 2148 0
12 1947 2204 0
13 2033 2300 0
14 2022 2289 0
15 1820 2059 0
16 1667 1888 0
17 1416 1602 0
18 1391 1574 0
19 1451 1641 0
20 1499 1697 0
21 1525 1725 0
22 1546 1749 0
23 1509 1706 0
24 1370 1551 0
Instalacin de Trigeneracin mediante motores de gas 33
2 1289 91 492
3 1209 91 457
4 1158 91 436
5 1131 91 423
6 1137 91 426
7 1098 91 410
2 1618 88 1199
3 1519 88 1121
4 1455 88 1070
5 1420 88 1044
6 1386 88 1017
7 1379 88 1011
2 1272 68 1446
3 1137 68 1376
4 1274 68 1347
5 1226 68 1388
6 1179 68 1329
7 1171 68 1418
2 1351 68 2118
3 1213 68 1895
4 1229 68 1920
5 1178 68 1941
6 1132 68 1765
7 1124 68 1852
2 1023 712 0
3 956 666 0
4 916 638 0
5 896 624 0
6 873 608 0
7 867 606 0
8 883 616 0
9 1114 777 0
10 1514 1055 0
11 1800 1255 0
12 1912 1334 0
13 2007 1400 0
14 2071 1445 0
15 2066 1442 0
16 2030 1415 0
17 1880 1311 0
18 1788 1246 0
19 1340 935 0
20 1313 916 0
21 1327 925 0
22 1335 931 0
23 1343 937 0
24 1218 849 0
Instalacin de Trigeneracin mediante motores de gas 40
2 1031 1618 0
3 964 1514 0
4 925 1452 0
5 907 1423 0
6 881 1383 0
7 877 1376 0
8 893 1402 0
9 1126 1767 0
10 1530 2401 0
11 1818 2853 0
12 1931 3030 0
13 2028 3182 0
14 2092 3283 0
15 2085 3273 0
16 2051 3219 0
17 1898 2980 0
18 1804 2832 0
19 1351 2122 0
20 1324 2078 0
21 1338 2100 0
22 1349 2118 0
23 1353 2126 0
24 1230 1930 0
Instalacin de Trigeneracin mediante motores de gas 41
3 Descripcin de la instalacin
Motores alternativos:
Turbinas de gas:
Motor
106,65C 82C
106,65C
Equipo de Recuperador
12,2C 84,3C
80C
70C
6,7C
ACS
Instalacin de Trigeneracin mediante motores de gas 45
Los equipos han sido elegidos de manera que cubran el mximo anual
de potencia elctrica, y funcionen de la manera ms econmicamente
rentable, siempre respetando la normativa vigente.
3.2.4 Mantenimiento
Disposicin: en V a 90;
N metano: >70.
3.3.1.3 Aeroenfriador
Ventiladores
Las bombas de solucin y de refrigerante sern del tipo autnomo hermtico sin
sellos. La lubricacin y refrigeracin de la bomba de solucin se realizarn por la
solucin de bromuro de litio. La bomba de refrigerante ser lubricada y refrigerada
por el mismo refrigerante. Las tuberas de agua de la red urbana no se aceptan para
refrigeracin, lubricacin o funcionamiento de la mquina. Los conjuntos moto
bombas
Instalacin de Trigeneracin mediante motores de gas 54
3.3.5.3 Distribucin
3.3.5.4 Protecciones
Obras complementarias:
Est situado entres los dos recintos auxiliares, siendo las otras dos
fachadas de bloques huecos armados de 20 cm de espesor, que garantizan
una resistencia al fuego de RF = 180 minutos.
Est formado por muros de bloques armados de 20 cm de espesor con una altura
libre aproximada de 3,20 m.
Instalacin de Trigeneracin mediante motores de gas 60
La solera apoyar un falso suelo flotante para una carga de 250 Kg/cm 2.
El hueco del falso suelo comunica con el recinto auxiliar y con el recinto de
motogeneradores a travs de conductos con las canaletas de la sala de
instalaciones elctricas.
3.4.6 Cimentacin
3.4.7 Acabados
3.4.7.1 Motogeneradores
- Techo flotante.
Madrid, Junio
2007
Guillermo
Surez
2
Clculo
s
Instalacin de Trigeneracin mediante motores de gas 65
Enero 31 64 1984
Febrero 28 64 1792
Marzo 31 58 1798
Abril 30 56 1680
Mayo 31 48 1488
Junio 30 48 1440
Julio 31 64 1984
Agosto 31 72 2232
Septiembre 30 56 1680
Octubre 31 56 1736
Noviembre 30 64 1920
Diciembre 31 64 1984
14222345 21023024
Autoconsumo 68,35%
Instalacin de Trigeneracin mediante motores de gas 68
REE = E
V
Q 0,9
Donde:
Trmica
Elctrica combustible Utilizada
Mes (Kwh.) (Kwh.) (Kwh.)
Temperatura de entrada: 82 C
Temperatura de salida: 92
necesario:
m= Q = 474 = 11,33 Kg s
CpT 4,18(92 82)
5623
Q1 = mC p T1 = 3600 1,098(516 + 273) = 1353,1KW
5623
Q2 = mC p T2 = 3600 1,0123(120 + 273) = 621,39KW
Q1 Q2 = 731,7KW
Temperatura de entrada: 92 C
T = Q = 694 = 14,65 C
mC p 11,334,18
T = 92+14,65 = 106,65 C
Term (Dte)
= =
6725753
Demanda _ de _ frio(%) 83,06% 8097430
Caudal: 34Kg/s
T = Q = 3172 = 22,32 C
mC p 344,18
m= Q = 5552 = 147,6Kg / s
C p T 4,18(38,4 29,4)
m= Q = 2221 = 96,6Kg / s
C p T 4,18(12,2 6,7)
Esta potencia ser aprovechada para calentar el agua que circula por los
radiadores mediante el circuito secundario que se detalla a continuacin.
m= Q = 3176 = 75,98Kg / s
C p T 4,18(80 70)
Instalacin de Trigeneracin mediante motores de gas 77
Caudal: 34Kg/s
m= Q = 326,9 = 2,6Kg / s
C p T 4,18(40 10)
6.1 Aeroenfriadores
2
1137 1376 68 2033 1936 2336 799 303 2
3
1274 1347 68 1992 1936 2336 662 344 2
4
1226 1388 68 2051 1936 2336 710 285 2
5
1179 1329 68 1967 1936 2336 757 369 2
6
1171 1418 68 2093 1936 2336 765 243 2
7
1204 1271 338 2153 1936 2336 732 183 2
8
1314 1388 338 2321 1936 2336 622 15 2
9
1594 1759 338 2851 2904 3504 1310 653 3
10
2135 2205 338 3488 2904 3504 769 16 3
11
1680 1914 270 3004 2904 3504 1224 500 3
12
1838 2111 270 3285 2904 3504 1067 219 3
13
1819 2135 203 3252 2904 3504 1085 252 3
14
1442 1662 203 2577 2904 3504 1462 927 3
15
988 1294 203 2051 2904 3504 1916 1453 3
16
769 1019 203 1658 2904 3504 2135 1846 3
17
857 1031 203 1676 2904 3504 2047 1828 3
18
970 1076 270 1807 2904 3504 1934 1697 3
19
1058 1176 270 1950 2904 3504 1846 1554 3
20
1106 1205 270 1991 2904 3504 1798 1513 3
21
1803 2116 203 3225 2904 3504 1101 279 3
22
1734 2076 135 3101 2904 3504 1170 403 3
23
1473 1749 135 2634 2904 3504 1431 870 3
24
Instalacin de Trigeneracin mediante motores de gas 88
ENERO
3500
3000
2500
500
1 2 3 4 5 6 7 89 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
FEBRERO
3500
3000
2500
500
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
Instalacin de Trigeneracin mediante motores de gas 92
MARZO
3500
3000
2500
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ABRIL
3500
3000
2500
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MAYO
2500
2000
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Instalacin de Trigeneracin mediante motores de gas 93
JUNIO
2500
2000
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
JULIO
3500
3000
2500
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
AGOSTO
3500
3000
2500
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Instalacin de Trigeneracin mediante motores de gas 94
SEPTIEMBRE
3500
3000
2500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
OCTUBRE
3500
3000
2500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOVIEMBRE
3500
3000
2500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Instalacin de Trigeneracin mediante motores de gas 95
DICIEMBRE
3500
3000
2500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ENERO
5000
4500
4000
3500
3000 Dem. Trm
2500
Gen Term
2000
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
FEBRERO
4000
3500
3000
2500 Dem. Trm
2000
Gen Term
1500
1000
500
0
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
Instalacin de Trigeneracin mediante motores de gas 96
MARZO
4000
3500
3000
2500 Dem. Trm
2000
Gen Term
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ABRIL
4000
3500
3000
2500 Dem. Trm
2000
Gen Term
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MAYO
2500
2000
500
1 3 5 7 9 11 13 15 17 19 21 23
Instalacin de Trigeneracin mediante motores de gas 97
JUNIO
2500
2000
500
1 3 5 7 9 11 13 15 17 19 21 23
JULIO
4000
3500
3000
2500 Dem term motor
2000
Gen Term
1500
1000
500
0
1 3 5 7 9 11 13 15 17 19 21 23
AGOSTO
5000
4500
4000
3500
3000 Dem term motor
2500
Gen Term
2000
1500
1000
500
0
1 3 5 7 9 11 13 15 17 19 21 23
Instalacin de Trigeneracin mediante motores de gas 98
SEPTIEMBRE
4000
3500
3000
2500 Dem term motor
2000
Gen Term
1500
1000
500
0
1 3 5 7 9 11 13 15 17 19 21 23
OCTUBRE
4000
3500
3000
2500 Dem term motor
2000
Gen Term
1500
1000
500
0
1 3 5 7 9 11 13 15 17 19 21 23
NOVIEMBRE
4000
3500
3000
2500 Dem. Trm
2000
Gen Term
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Instalacin de Trigeneracin mediante motores de gas 99
DICIEMBRE
4000
3500
3000
2500
2000 Dem. Trm
1500 Gen
1000 Term
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Instalacin de Trigeneracin mediante motores de gas 100
3
Estudio
econmico
Instalacin de Trigeneracin mediante motores de gas 101
1 Introduccin
(/KWmes) (/KWh)
Como se puede apreciar, hay dos costes a los que hay que hacer frente,
uno fijo y otro variable. El coste fijo es el trmino de potencia, que se aplica
sobre la potencia instalada para cada mes, que en el caso de estudio es de
2600 KW. El coste variable hace referencia a la energa mensual consumida.
En la siguiente tabla se muestran todos los consumos mensuales con sus costes
fijos y variables correspondientes:
Instalacin de Trigeneracin mediante motores de gas 103
Consumo de Consumo
alumbrado + Compresores Consumo Coste Coste fijo
Mes fuerza (KWh) (KWh) total (KWh) variable () ()
1130599 0 1130599 67485,45 32584,72
Enero
1032759 0 1032759 61645,38 32584,72
Febrero
1130599 0 1130599 67485,45 32584,72
Marzo
1027322 0 1027322 61320,85 32584,72
Abril
1033114 116499 1149613 68620,40 32584,72
Mayo
1056972 262124 1319096 78736,84 32584,72
Junio
1005733 436872 1442605 86109,09 32584,72
Julio
1027321 582496 1609817 96089,98 32584,72
Agosto
996081 291248 1287329 76840,67 32584,72
Septiembre
948684 87375 1036059 61842,36 32584,72
Octubre
1006395 0 1006395 60071,72 32584,72
Noviembre
1050152 0 1050152 62683,57 32584,72
Diciembre
12445731 1776614 14222345 848931,77 391016,6
TOTAL
(/MWh/dia/mes)
Consumo de
gas Gasto Fijo Gasto Gasto total ()
Mes (MWh/da) () variable ()
104,07 5.190,75 66641,46 71832,22
Enero
94,53 5.190,75 60536,08 65726,84
Febrero
73,50 5.190,75 47067,93 52258,68
Marzo
68,43 5.190,75 43820,24 49011,00
Abril
35,03 5.190,75 22431,23 27621,98
Mayo
34,83 5.190,75 22303,47 27494,23
Junio
33,13 5.190,75 21214,19 26404,94
Julio
33,24 5.190,75 21288,15 26478,91
Agosto
36,48 5.190,75 23359,14 28549,89
Septiembre
40,90 5.190,75 26189,94 31380,69
Octubre
54,84 5.190,75 35119,40 40310,15
Noviembre
85,40 5.190,75 54686,21 59876,96
Diciembre
694,365 62.289,04 444657,46 506946,50
TOTAL
Instalacin de Trigeneracin mediante motores de gas 105
Es posible en este momento realizar una estimacin del gasto total sin
realizar trigeneracin como la adicin del gasto elctrico y el gasto en el
consumo de gas natural.
trigeneracin ()
(/MWh/dia/mes)
Febrero
8788,24 4521970,00 1798,00 96082,82 104871,06
Marzo
8788,24 4225200,00 1680,00 89777,05 98565,29
Abril
8788,24 3742320,00 1488,00 79516,82 88305,06
Mayo
8788,24 3621600,00 1440,00 76951,76 85740,00
Junio
8788,24 4989760,00 1984,00 106022,42 114810,66
Julio
8788,24 5613480,00 2232,00 119275,22 128063,46
Agosto
8788,24 4225200,00 1680,00 89777,05 98565,29
Septiembre
8788,24 4366040,00 1736,00 92769,62 101557,86
Octubre
8788,24 4828800,00 1920,00 102602,34 111390,58
Noviembre
8788,24 4989760,00 1984,00 106022,42 114810,66
Diciembre
105458,88 54620770,00 21718,00 1160582,12 1266041,00
TOTAL
Instalacin de Trigeneracin mediante motores de gas 107
Consumo de calderas
Mes auxiliares (KWh) Gasto variable ()
117045 2487
Enero
0 0
Febrero
1049 22
Marzo
0 0
Abril
0 0
Mayo
0 0
Junio
0 0
Julio
0 0
Agosto
0 0
Septiembre
0 0
Octubre
0 0
Noviembre
0 0
Diciembre
118094 2509
TOTAL
Instalacin de Trigeneracin mediante motores de gas 108
(/KWmes) (/KWh)
Compra de
electricidad Gasto
Mes (KWh) Variable () Gasto fijo () Gasto total ()
938548 56022 32585 88607
Enero
859293 51291 32585 83876
Febrero
961785 57409 32585 89994
Marzo
870506 51961 32585 84545
Abril
889076 53069 32585 85654
Mayo
918360 54817 32585 87402
Junio
813682 48569 32585 81153
Julio
843199 50331 32585 82915
Agosto
833457 49749 32585 82334
Septiembre
780639 46596 32585 79181
Octubre
820539 48978 32585 81563
Noviembre
858101 51220 32585 83805
Diciembre
10387185 620011 391017 1011028
TOTAL
Por lo que el gasto total anual por la compra de electricidad resulta ser de
1.011.028.
Electricidad
vendida
Mes (KWh) Ingresos ()
1728461 106750
Enero
1561190 96419 1539410
Febrero
95074 1411344 87165
Marzo
1296346 80062 1254528
1944518 120093
Mayo
1463616 90393 1512403
Junio
93406 1672704 103307
Julio 1728461 106750
Septiembre
Octubre
Noviembre
Diciembre
TOTAL
Para evaluar el gasto total o neto con trigeneracin se agrupan los gastos
en la compra de electricidad, los gastos en el suministro de gas natural,
tanto para los motores como para las calderas auxiliares, y a esa cantidad
se le descuenta los ingresos por venta de electricidad a la red. El resultado
final se muestra en la siguiente tabla:
Sin trigeneracin
29%
Gas Natural
Electricidad
71%
Con trigeneracin
35% 34%
Gas Natural
Compra Electricidad
Venta Electricidad
31%
5 Estudio de viabilidad
Para su clculo se han tenido en cuenta los siguientes flujos de caja, los
cuales han sido calculados anteriormente:
El clculo del valor actual neto es un dato que nos informa sobre el valor
del dinero en el tiempo, segn el cual es preferible una cantidad de dinero
ahora que la misma cantidad en el futuro.
El VAN se calcula como la diferencia entre los flujos de caja (FC) ya sean
positivos o negativos, y la inversin Io del proyecto. La expresin del VAN
viene dada por:
FCi
VAN = I0 +
(1 + t)i
El valor tomado de referencia para t es del 10%. Esta tasa es tomada por
decisin de la empresa, y establece el lmite a partir del cual est dispuesta
a invertir.
500.000,00
V.A.N. 0,00
-500.000,00 0 2 4 6 8 10 12
-1.000.000,00 Series1
-1.500.000,00
-2.000.000,00
-2.500.000,00
-3.000.000,00
Aos
6 Conclusiones
El valor positivo del VAN pone de manifiesto esta rentabilidad, por lo que,
una vez realizados todos estos anlisis podemos concluir que el proyecto
para la planta de trigeneracin de este hospital es viable.
A todo ello hay que aadirle que actualmente existe un borrador que pretende
eliminar la restriccin del 10% de autoconsumo, lo que hara aumentar el beneficio
ligeramente.
Instalacin de Trigeneracin mediante motores de gas 116
4
Anlisis
Medioambiental
Instalacin de Trigeneracin mediante motores de gas 117
1 Introduccin
2 Emisiones atmosfricas
La reaccin qumica:
CO2 CO + O2
2.2.1 EGR
Como su nombre indica son catalizadores que si instalan a la salida de los gases
de escape del motor con la funcin de transferir el oxgeno presente en los
compuestos de tipo NOx a los hidrocarburos no quemados (HCx) y al monxido de
carbono. Para que
Instalacin de Trigeneracin mediante motores de gas 119
3 Residuos slidos
Esta planta no genera ningn tipo de residuo slido. Los gases que se
vierten a la atmsfera sin filtrados con el fin de eliminar las partculas
slidas antes de su paso a la chimenea de expulsin.
4 Contaminacin acstica
5 Vibraciones
A Bibliografa
PLANOS
ndice planos:
Esquema de Funcionamiento
Instalacin de Trigeneracin mediante motores de gas 1
Instalacin de Trigeneracin mediante motores de gas 2
Instalacin de Trigeneracin mediante motores de gas 3
Instalacin de Trigeneracin mediante motores de gas 4
DOCUMENTO 3:
PLIEGO CONDICIONES
Instalacin de Trigeneracin mediante motores de gas i
ndice
NDICE........................................................................................................................................................I
2. Garantas y penalidades 27
9 ..................................................................................
2.10 28
Representantes..................................................................................................
3 MEJORAS ......................................................................................................................................... 28
.
4 PROCEDIMIENTOS DE EVALUACIN Y CALIFICACIN 29
................................................
5 AMORTIZACIN DE LAS 30
INSTALACIONES.........................................................................
5. Importe de la inversin de obras 30
1 ...................................................................
5. Plan de amortizacin 30
2 .......................................................................................
5. Subrogacin de la deuda 31
3 .................................................................................
1. Equipo de 35
3 absorcin.........................................................................................
1.3.1 Torre de refrigeracin 36
1. Grupo de bombas 37
4 .............................................................................................
1. Instalacin elctrica 38
5 ..........................................................................................
1.5.1 Centro de transformacin 38
1.5.2 Servicios auxiliares 38
1.5.3 Distribucin 38
1.5.4 Protecciones 39
2 OBRA CIVIL...................................................................................................................................... 39
1.1 Objeto
Mquinas enfriadoras
Se dispone de una mquina de absorcin.
1.4.4 Aljibe
Todas las medidas se realizan en [kWh] y para cada hora, con la finalidad de
contemplar las distintas tarifas elctricas para compra y venta.
Resultado de la medida:
EEA = EGEN * 0,985 ECOG EMF si EEA > 0
Las medidas de los contadores se comunican al sistema SCADA, el que
efecta para cada hora esta operacin, y emite el resultado mensual de
Energa autogenerada.
Obra civil:
Instruccin para el proyecto y ejecucin de obras de hormign en masa o
armado (EH-91).
Normas Bsicas de la Edificacin (NBE).
Normas Tecnolgicas de la Edificacin
(NTE).
Pliego de prescripciones tcnicas generales para la recepcin de cementos (RC-88).
Instruccin para el Proyecto y la ejecucin de forjados unidireccionales de hormign
armado o pretensado (EF-88).
Instalacin de Trigeneracin mediante motores de gas 21
Aparatos a presin:
Reglamento de aparatos a presin. Aprobado segn Real Decreto 1244/1979
de fecha 4 de Abril.
Instruccin Tcnica Complementaria ITC-MIE-AP1 del Reglamento de
Aparatos a Presin, relativa a Calderas, Economizadores, Precalentadores de
Agua, sobrecalentadores y Recalentadores de vapor. Aprobada segn orden
del 17 de Marzo de 1.981.
Instruccin Tcnica Complementaria ITC-MIE-AP2 del Reglamento de
Aparatos a Presin, relativa a Tuberas para Fluidos Relativos a Calderas.
Aprobada segn orden del 6 de Octubre de 1.980.
Instruccin Tcnica Complementaria ITC-MIE-AP17 del Reglamento de
Aparatos a Presin, relativa a Instalaciones de Tratamiento y
Almacenamiento de aire comprimido. Aprobada segn orden del 28 de Junio
de 1.988.
Cdigos de diseo: CODAP/ ASME/ ADMERKBLATTER.
Instalacin de
gas:
Instalacin de Trigeneracin mediante motores de gas 22
Autogeneracin elctrica
Supeditado al PCAP se definen en este apartado aspectos tcnicos de la
relacin entre las artes contratantes.
El adjudicatario realizar a su cargo las actividades necesarias para entregar
al hospital la energa trmica objeto del contrato en las condiciones de
calidad exigidas. Entre estas actividades, se citan: aprovisionamientos,
pagos a proveedores, operacin y mantenimiento de instalaciones,
inspecciones reglamentarias, etc.
Sern, igualmente, por cuenta del adjudicatario todos los gastos que la
actividad genere, tales como, consumos de energa, mano de obra,
fungibles, gestin de residuos, etc. Conforme a la legislacin vigente, el
adjudicatario deber realizar una evolucin de riesgos de los puestos de
trabajo del dominio, e implantar las medidas de seguridad que se deriven de
la misma.
El adjudicatario realizar la conservacin y mantenimiento, limpieza, etc. y
mantendr las instalaciones en orden y perfecto estado de revista.
A la extincin del contrato, previo a la entrega al hospital, el adjudicatario
realizar una reparacin general de las instalaciones del contrato, de modo
que se garantice la entrega de las prestaciones de diseo.
El Adjudicatario tendr telfonos de atencin al usuario, para informacin y
notificacin de incidencias, atendidos las 24 horas del da, todos los das del
ao.
2.8.1 Generalidades
2.10Representantes
Para coordinar las relaciones que con motivo del desarrollo del objeto del
Contrato necesariamente se tiene que establecer entre el hospital y el
adjudicatario, ambas partes designarn un representante, que tendr
capacidad suficiente para actuar como portavoz de las partes en todas las
actuaciones que precisen de su conformidad, relativas a la organizacin y
control de la explotacin de la CTE.
El cambio de representante deber ser comunicado a la otra parte.
3 MEJORAS
- PARMETROS Y MEDIDAS
En el cuadro de caractersticas del PCAP se detallan los criterios de
adjudicacin y la puntuacin ponderada mxima de cada uno, incluidos los
de calificacin de la oferta tcnica.
- CALIFICACIN
Instalacin de Trigeneracin mediante motores de gas 30
- INFORME TCNICO
Tras el estudio de las ofertas y la documentacin tcnica presentada por los
licitadores, el rgano evaluador entregar un informe tcnico al rgano de
contratacin que, como mnimo, incluir:
Tabulacin tcnica, indicando la calificacin obtenida por cada licitante en
cada uno de los criterios tcnicos de puntuacin establecidos en el PCAP.
Memoria justificativa de las calificaciones asignadas.
1 Equipos instalados
Disposicin: en V a 90;
N metano: >70.
1.1.3 Aeroenfriador
Ventiladores
Una bomba de circulacin que permite hacer pasar agua a travs del
aeroenfriador o intercambiador de recuperacin de baja temperatura.
Se instalar una por cada equipo motor.
1.5.3 Distribucin
1.5.4 Protecciones
2 Obra civil
Obras complementarias:
El recinto est formado por muros de bloque macizos armados de 0,20 metros de
espesor, con una altura libre cercana a los 9 metros. Estos muros deben garantizar
la insonorizacin del recinto. Longitudinalmente el rea est recorrida por un puente
gra de aproximadamente 13 metros de luz y una carga de servicio de 2 toneladas,
cuya viga carril va apoyada en pilares metlicos embebidos en los muros del recinto
y arriostrados en cabeza, por las cerchas intermedias de sustentacin del forjado
acstico y los perfiles de los muros de los extremos.
Instalacin de Trigeneracin mediante motores de gas 41
Est situado entres los dos recintos auxiliares, siendo las otras dos
fachadas de bloques huecos armados de 20 cm de espesor, que garantizan
una resistencia al fuego de RF = 180 minutos.
La solera apoyar un falso suelo flotante para una carga de 250 Kg/cm 2.
El hueco del falso suelo comunica con el recinto auxiliar y con el recinto de
motogeneradores a travs de conductos con las canaletas de la sala de
instalaciones elctricas.
2.6 Cimentacin
La cimentacin se ha concebido superficial, con cimentaciones aisladas, y
zapatas tambin aisladas con vigas de atado de apoyo de fachada para el edificio,
salvo recinto
Instalacin de Trigeneracin mediante motores de gas 43
2.7 Acabados
2.7.1.1 Motogeneradores
- Techo flotante.
PRESUPUESTO
Instalacin de Trigeneracin mediante motores de gas i
ndice
NDICE..........................................................................................................................................................I
1 MEDICIONES..........................................................................................................................................2
2 PRECIOS UNITARIOS.......................................................................................................................... 3
3 SUMAS PARCIALES..............................................................................................................................4
4 PRESUPUESTO GENERAL
...............................................................................................................................................................................
4
Instalacin de Trigeneracin mediante motores de gas 2
1 MEDICIONES
Compresor: 1 unidad
Transformadores: 3 unidades
Instalacin de Trigeneracin mediante motores de gas 3
2 PRECIOS UNITARIOS
Elemento /ud
Compresor 35.045
Transformadores 12.518
3 SUMAS PARCIALES
4 PRESUPUESTO GENERAL