Key Plan

A
BL
QI
Notes

E
80mm FIRE PIPE TO FHR
65mm LV & 40mm FIRE HOSE RACK
(CO2 TYPE 5 KG.)FE2 &
50 50 AIR RELEASE VALVE

FHC A ISSUED FOR TENDER ARN BM* AH* 08.03.15

50
Job Project

50
No Revision Drawn Manager Director Date
65mm SPRINKLER PIPE RISER
STAIR # 1 FROM PREACTION VALVE
IN LEVEL 2
25 25 25 25 Note: * indicates signatures on original issue of drawing or last revision of drawing
Conditions of Use. This document may only be used by GHD's client (and any other
SPRINKLER SYSTEM person who GHD has agreed can use this document) for the purpose for which it was
AIR RELEASE VALVE

50
50
prepared and must not be used by any other person or for any other purpose.

25 25 25 25 D
Master Developper / Owner

40
40
Abu Dhabi Airports Company PJSC
25 25 25 25 Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

25

25
WATCH ROOM

25
25
25 Lead Consultant

GHD GLOBAL PTY LTD


3rd Floor, Guardian Tower, Danet Community
4 5 PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com

Specialist Consultant

Fire Life Safety, Planning


and Regulatory Specialist
FIRE PROTECTION SERVICES - LEVEL 3 PLAN - PART 1
SCALE 1 : 100

Specialist Consultant

Third Party
Operational Advisor

Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
Title

FIRE PROTECTION SERVICES -


LEVEL 3 PLAN - PART 1
Scale 1 : 100 DO NOT SCALE
Drawn A. NOCEJA Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- F127 Rev: A
Plot Date: 7/03/2015 10:17:13 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt