FACT SHEET

Public Scoping Meeting


INTERSTATE 10 AND STATE ROUTE 210
Phase II
E Broadway Blvd Study Area

STUDY OVERVIEW 10
City of ARIZONA
South
Tucson 210 E Golf Links Rd
The Arizona Department of Transportation
(ADOT), in conjunction with the Federal Davis
Monthan
Highway Administration (FHWA), has Ajo Way Air Force
Base

initiated a Design Concept Report (DCR)


19
and an Environmental Assessment (EA)
regarding potential improvements to two

Alvernon Way
S. Nogales Hwy
important corridors that serve greater Valencia Rd
Tucson: Tucson

Houghton Rd
International
Airport

Wilmot Rd
Interstate 10 (I-10) from I-10/Interstate 19
(I-19) interchange to Kolb Road E Aerospace Parkway

Kolb Rd
State Route 210 (SR 210) (Barraza-
10

Rita Rd
Aviation Parkway) from Golf Links Road NORTH

to a future connection with I-10 Map not to scale

Beginning in 2011, Phase 1 of this study included a FeasibilityStudyand Environmental Overview. The
Feasibility Study examined future transportation needs and potential improvements, and the Environmental
Overview identified potential environmental issues in the study area. Based on the Feasibility Study, two
alternatives are being proposed for additional study, as well as the No Build Alternative. Phase2 of this study
includes the preparation of a DCR andEA.

DESIGN CONCEPT REPORT


The DCR will further refine the two alternatives identified in the Feasibility Study. The purpose of the
proposed alternatives is to relieve congestion and improve traffic flow on I-10, and to connect SR 210 with
I-10 to provide commuters an additional route into the downtown Tucson area. The proposed alternatives
were developed based on public and agency input received during Phase 1, as well as the technical analysis
of multiple connection points for SR 210 to connect with I-10.

ENVIRONMENTAL ASSESSMENT
The EA will describe the purpose and need for the proposed project, and analyze the alternatives that
were considered for further study to evaluate the potential social, economic, and environmental impacts
on multiple environmental resource categories such as: air quality, water quality, biological resources, land
use, noise, and neighborhood and community impacts. As a result of input and analysis from Phase I, two
proposed alternatives, System Alternative I and System Alternative IV, along with the No Build Alternative, are
being carried forward for a more detailed analysis and study. System Alternatives I and IV are summarized on
the reverse side of this fact sheet. With FHWA acting as the lead federal agency, the EA will be developed in
accordance with the National Environmental Policy Act.

STUDY PROCESS
The next step is to begin data collection and technical analysis to evaluate and further develop the
alternatives. ADOT will then prepare the DCR and EA, with an anticipated completion date of spring 2019.
Community outreach is ongoing, and the public will have an opportunity to provide comments on the
DCRand EA before they are final.
I-10; I-19 to Kolb Road and SR 210; Golf Links Rd. to I-10
ADOT Project No. 010 PM 260 H7825 01L
Federal Project No. 010-E(210)A
February 2017
Public Scoping Meeting
INTERSTATE 10 AND STATE ROUTE 210 Phase II
System Alternative I System Alternative IV
Designate Alvernon Way as SR 210 from Golf Links Road Designate Alvernon Way as SR 210 from Golf Links
to I-10 and increase the number of travel lanes to four Road to I-10 and increase the number of travel lanes
(4) in each direction to four (4) in each direction
Improve interchange at Alvernon Way to provide access Improve interchange at Alvernon Way to provide
to I-10 access to I-10
Increase lanes in each direction up to four (4) Increase lanes in each direction up to four (4)
(3travel and 1 auxiliary) from I-10/I-19 interchange to (3travel and 1 auxiliary) from I-10/I-19 interchange to
AlvernonWay AlvernonWay
Increase lanes in each direction to six (6) (5 travel and Increase lanes in each direction to six (6) (5 travel and
1auxiliary) on I-10 from Alvernon Way to Kolb Road 1 auxiliary) on I-10 from Alvernon Way to Kolb Road
(see box below)
E Broadway Blvd Study Area E Broadway Blvd Study Area
City of Proposed System Alternative I
10
ARIZONA
Proposed System Alternative IV
South
Tucson 210 E Golf Links Rd
SR 210 Alignment
10
City of
South
ARIZONA

210 E Golf Links Rd


Tucson
SR 210 Alignment
Davis
I-10 Widening
Davis I-10 Widening
Monthan
Air Force Monthan
Ajo Way I-10 and SR 210 Air Force I-10 Collector Distributor
Base Ajo Way
System Interchange Base Roadway

19 19 I-10 and SR 210


System Interchange
Alvernon Way
S. Nogales Hwy

Alvernon Way
S. Nogales Hwy
Valencia Rd Valencia Rd
Tucson
Houghton Rd

Tucson

Houghton Rd
International International
Airport Airport
Wilmot Rd

Wilmot Rd
E Aerospace Parkway E Aerospace Parkway
Kolb Rd

Kolb Rd
10 10
Rita Rd

Rita Rd
NORTH NORTH
Map not to scale Map not to scale

Both proposed system alternatives will add or improve interchanges, widen or replace existing
bridges, and remove some existing interchange ramps to improve spacing and traffic flow on I-10.

A collector-distributor (C-D) roadway is a supplemental facility between freeway main lanes and the
frontage roads (see representative example below). Their primary purpose is to move the weaving and lane
changing traffic away from the high-speed traffic on the freeway. C-D roadways accommodate local traffic
allowing the freeway main lanes to function as an express way for higher-speed through traffic. C-D roadways
can improve traffic flow on freeways and their entrance and exit ramps, as well as improve safety by reducing
freeway merging and weaving movements.

C-D ROADWAY BARRIER FREEWAY MAIN LANES MEDIAN FREEWAY MAIN LANES BARRIER C-D ROADWAY

FOR MORE INFORMATION OR TO SUBMIT COMMENTS:


Mail: A
 DOT c/o I-10 and SR 210 Study
101 N. 1st Avenue, Suite 1950 Toll-free Project Hotline: 1-888-692-2678
Phoenix, AZ 85003
@
Email: i10SR210Study@hdrinc.com Website: www.azdot.gov/i10SR210study