PROJECT Construction of 5-Storey Building for the Document Processing

Division at BIR Revenue Region No. 5 (Caloocan City)

NGS Cluster II Legislative and Oversight


SCOPE AND Electrical Works
COST CONTRACT: P 3,478,848.19
AB: P 4,524,332.97
CONTRACT P 37,638,904.50
COST
ABC P 40,000,000.00
Contracting BIR Revenue Region No. 5 (Caloocan City) and Specified Contractor
Parties and Development, Inc.
Contract Date October 15, 2012

Phelp Dodge Thhn Pricelist Stranded Wire Original! beware of fake phelpdodge!
THHN #14 2.0MM2- 1,755.00 (150 METERS PER BOX)
THHN #12 3.5MM2 2,574.00 (150 METERS PER BOX)
THHN #10 5.5MM2 3,939.00 (150 METERS PER BOX)
THHN #8 8.0MM2 6,162.00 (150 METERS PER BOX)
THHN #6 14.0MM2 9,808.50 (150 METERS PER BOX)
THHN #4 22.0MM2 15,405.00 (150 METERS PER BOX)

THHN #2 30.0mm2 22,444.50 (150 meters per box)

electrical home run


A electrical home run is a wiring run that is not branched from another circuit or wiring run, but
that connects directly to the building's main electrical panel.

FACP fire alarm control panel

Note:
Outlet distance from finished floor: 300 cm
Lighting fixtures allowance from ceiling: 0. 3m (3 m usually height ng building)
Conduits for wires ng lighting, outlet etc, except main branches do not use elbows
Couplings, elbows, bushing, locknut etc. compute manually
Lgs means length standard size ng tubo ay 3 meters, meron ding 6 meters, etc.
Wires always x 2, same with ground but different wire size ang ground
Be aware of drop length like that of chandelier
In wiring 3 phase, x 2 always (2 wires), third is ground (different type and size of wire)

Receptacle and outlet the same

Note/observations:
2 x 20 watts FL recessed type is 2 x 40 VA per plans