Вы находитесь на странице: 1из 1

Key Plan

A
BL
QI
80mm SPRINKLER PIPE RISER T/A
FOR LV & FHR SYSTEM IN LEVEL 3
Notes
65mm SPRINKLER PIPE RISER T/A
FOR SPRINKLER SYSTEM IN LEVEL 3

FOR SPRINKLER REFER LEVEL 3


E
SPARE FIRE CHIEF 25 25 25 25
DWG. NO. 76-10526-F127

LOBBY

40
25

25
25
25mm TEST & DRAIN VALVE

25

25
25
50

25
25

25

25
TO BE CONNECTED TO THE NEAREST DRAIN POINT

25

25
25 25
100mm
SPARE SPR. PIPE LOOP

25
25
25
50 40 25

40

100
25

25
150mm LV & FHR PIPE RISER F/B-T/A

25
STAIR # 1 LIFT
40 50 65

25
25
25
50mm TEST & DRAIN PIPE T/B

25

25

25
CONFERENCE

25

25
25

25
25

25
D

25
25

25
50 40 25 100mm ZONE CONTROL VALVE (ZCV-4)

25
25
25

25
25

25
ELECTRICAL TELECOM

25
25
100mm SPR. PIPE LOOP

25

25

25
PROTECTED PROTECTED

25
50
WITH FM-200 WITH FM-200

25
TOILET DRESSER 150mm SPRINKLER PIPE RISER F/B
FE3

SPR. PIPE LOOP


STAIR # 3 CORRIDOR G. TOILET A ISSUED FOR TENDER ARN BM* AH* 08.03.15

25
25 25 25 32 25 25 25 25 32 40 40

25
25
No Revision
Job Project
Drawn Manager Director Date
50 40 25

25
100mm
FHC

25
FHC
Note: * indicates signatures on original issue of drawing or last revision of drawing

FE1,FE2 EQUIP. ROOM


C Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
80mm FIRE PIPE DROP TO FHC prepared and must not be used by any other person or for any other purpose.
65mm LV, 40mm HOSE RACK WITH
25 25 32 L. TOILET

25

25
25
25

25
25
PORTABLE FIRE EXTINGUISHERS

25

25
25

25
25

25
FE-1 (WATER TYPE 9 LTR.) &

25 25
FE-2 (CO2 TYPE 5 KG) ANS OFFICE 50 40 32 Master Developper / Owner

25
25
32 50 50 Abu Dhabi Airports Company PJSC

25
Planning & Development
SPARE OFFICE
25

25
PO Box 94449, Abu Dhabi, U.A.E

25

25

25

25

25
25

25
T: +971 (0) 2 505 5000
25 25 32 F: +971 (0) 2 575 8300
WORK AREA
PANTRY

25
B

25
25

25
VIRTUAL CONTROL ROOM Lead Consultant
32

32

50 40 25
32

32
32

32
SPARE OFFICE 80mm FIRE PIPE DROP TO FHC

25
25 25 32 65mm LV, 40mm HOSE RACK WITH

25
25
25

25
25
25
PORTABLE FIRE EXTINGUISHERS

40
FE-1 (WATER TYPE 9 LTR.) &
40

40

40

40

40
100mm
FE-2 (CO2 TYPE 5 KG)
SPR. PIPE LOOP

25
25
25
FHC GHD GLOBAL PTY LTD
25
25

25

25

25
25

3rd Floor, Guardian Tower, Danet Community

32
SPARE OFFICE PO Box 45921 Abu Dhabi United Arab Emirates
STAIR # 2 T 971 2 6968700 F 971 2 4472915

25

25
25
25 25 25 E abumail@ghd.com W www.ghd.com
32 25 25

Specialist Consultant

A
Fire Life Safety, Planning
and Regulatory Specialist

1 2 3 4 5 6
Specialist Consultant

Third Party
Operational Advisor

Client
ADAC
FIRE PROTECTION SERVICES - LEVEL 1 - PART 1
SCALE 1 : 100
Project
MIDFIELD TERMINAL FIRE
STATION
Title

FIRE PROTECTION SERVICES -


LEVEL 1 PLAN - PART 1
Scale 1 : 100 DO NOT SCALE
Drawn A. NOCEJA Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
Date
0 1000 2000 3000 4000 5000 mm This Drawing must not be used for Construction unless signed as Approved
Original Size
SCALE 1: 100 AT ORIGINAL SIZE Drawing No:
A1
DETAIL DESIGN 76-10526- F125 Rev: A
Plot Date: 7/03/2015 10:16:57 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt

Вам также может понравиться