Вы находитесь на странице: 1из 1

Key Plan

A
BL
QI
Notes

A ISSUED FOR TENDER FV BM* AH* 08.03.15

No Revision
Job Project
Drawn Manager Director Date

Note: * indicates signatures on original issue of drawing or last revision of drawing


Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.

Master Developper / Owner

Abu Dhabi Airports Company PJSC


Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

Lead Consultant

GHD GLOBAL PTY LTD


3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com

Specialist Consultant

Fire Life Safety, Planning


and Regulatory Specialist

Specialist Consultant

Third Party
Operational Advisor

Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
Title

FIRE PROTECTION SERVICES -


PUMP ROOM 3D-VIEW
Scale DO NOT SCALE
Drawn F. VILLETE Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
FIRE PROTECTION SERVICES - PUMP ROOM Date

3D VIEW This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- F200 Rev: A
Plot Date: 7/03/2015 10:17:19 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt

Вам также может понравиться