S.No.

SOR NO Schedule Item

Cutting of trees including cutting of


(PWD, SOR, trunks, Branches and removal
R&B, 6.6.2016) Cutting of trees,
1.1 2.1 including cutting of trunks, branches and
removal of stumps, roots, stacking of
serviceable material with all lifts and up to
a lead of 1000 mtrs and earth filling in the
depression/pit.
(i) Girth from 300 mm to 600 mm nos 25 214 5350.00
Clearing and grubbing of land
Clearing and grubbing road land
including uprooting rank vegetation, grass,
bushes, shrubs, saplings and trees girth
up to 300
mm, removal of stumps of trees cut earlier
and disposal of unserviceable materials
(PWD, SOR, and stacking of serviceable material to be
R&B, 6.6.2016) used or auctioned up to a lead of 1000
1.2 2.1 metres including removal and disposal of
top organic soil not exceeding 150 mm in
thickness.

In area of light jungle Hect. Err:509 43742


1.3 Plot Filling
Filling of land, upto required levels,
with Soil of CBR>5, Procured from
outside project area, including cost of
soil, including all leads and lifts,
as per market
complete with transportation,
rate
compaction,watering if required ,
Including all leads and lift, labour
charges, Royalties, equipents
required. etc.
346169 125 43271176.19

(MP PWD, SOR, Earth work in excavation by


1.08.2014) I.NO.
2.6, PAGE N0.22 mechanical means (Hydraulic
excavator )/manual means over
areas (exceeding 30cm in depth.
1.Sm in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead upto SOm and
lift upto 1.Sm, disposed earth to be
levelled and neatly dressed . (No
1 extra lift is payable if work is done by cum
mechanical means) All kinds of soil.

a F1 = 3.53 X 3.3 X 2.1 (2 NO'S)


CUM 48.93 129.00 6311.33
b F2 = 5.4 X 4.2 X 2.1 (1 NO) CUM 47.63 129.00 6144.01
(MP PWD, SOR, Providing and laying in position cement
1.08.2014)
I.N0.4.1.2.2 PAGE concrete of specified grade excluding
45 the cost of centering and shuttering -
All work up to plinth level: With 40mm
2 nominal size graded stone aggregate.
M 10 Grade concrete

a F1 = 3.070 X 3.040 X .1 (2 NO'S)


CUM 1.87 3808.00 7105.73
b F2 = 4.2 X 2.2 X .1 (2 NO) CUM 1.85 3808.00 7037.18
(MP PWD, SOR, Providing and laying in position
1.08.2014) I.NO.
5.1.1 PAGE NO.65 specified grade of reinforced cement
concrete (with 20mm nominal size
graded stone aggregate) excluding the
cost of Centering,shuttering, finishing
and reinforcement - All work up to
3
plinth level: M 20 -Grade Concrete

a Footing
F1: 3.07 X 2.840 X .350 ( 2 No's)
CUM 6.10 5091.00 31055.10
F2: 4.2 X 1.8 X .350 (2 No's)
CUM 5.29 5091.00 26941.57
b Column
C1 (2.1 X .23 X .23) 8 No's CUM 0.89 5091.00 4520.81
C2 (2.1 X .23 X .6) 4 No's CUM 1.16 5091.00 5900.47
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's CUM 0.78 5091.00 3950.62
PB2 (1.18 X .23 X .3) 4 No's CUM 0.65 5091.00 3303.04
PB3 (1.8 X .23 X .3) 2 No's CUM 0.50 5091.00 2525.14
PB4 (3.37 X .23 X .3) 2 No's CUM 0.93 5091.00 4734.63
(MP PWD, SOR, Reinforcement for R.C.C. work
1.08.2014) I.NO.
5.16.4 PAGE N0.68 including straightening, cutting,
bending, placing in position and
binding including cost of binding wire
up to floor two level including all
4 wastage etc complete. Hot Rolled
Deformed Bars.

a FOOTING
F1 KG 166.80 62.90 10491.72
F2 KG 285.57 62.90 17962.48
b COLUMN
C1 (2.1 X .23 X .23) 8 No's KG 145.56 62.90 9155.72
C2 (2.1 X .23 X .6) 4 No's KG 103.90 62.90 6535.31
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's KG 20.00 62.90 1258.00
PB2 (1.18 X .23 X .3) 4 No's KG 16.77 62.90 1054.52
PB3 (1.8 X .23 X .3) 2 No's KG 19.10 62.90 1201.39
PB4 (3.37 X .23 X .3) 2 No's KG 35.91 62.90 2258.74
(MP PWD, SOR, Centering and shuttering including
1.08.2014) I.NO.
5.9.1 PAGE N0.66 strutting, propping etc. and removal
of form for: Foundations, footings,
5 bases of columns, etc. for concrete
upto plinth.

a Footing
F1 = 3.070 X 3.040 X .350 (2 NO'S)
SQM 8.554 174.00 1488.40
F2 = 4.2 X 1.8 X .350 (2 NO)
SQM 8.400 174.00 1461.60
b COLUMN
C1 (2.1 X .23 X .23) 8 No's SQM 9.568 174.00 1664.83
C2 (2.1 X .23 X .6) 4 No's SQM 8.632 174.00 1501.97
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's SQM 5.978 174.00 1040.17
PB2 (1.18 X .23 X .3) 4 No's SQM 5.000 174.00 870.00
PB3 (1.8 X .23 X .3) 2 No's SQM 3.816 174.00 663.98
PB4 (3.37 X .23 X .3) 2 No's SQM 7.144 174.00 1243.06
(MP PWD, SOR, Filling available excavated earth
1.08.2014)
I.NO.2.25 PAGE (excluding hard rock/Ordinary rock) in
N0.26 Trenches, plinth, sides of foundat
ions etc. in layers not 10
exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering, lead up to 50 m
6 and lift upto 1.5 m.

a F1: 1.41 X 1.18 X 1.6 (2 No's)


CUM 5.324 72.00 383.33
b F1: 4.2 X 1.8 X 1.6 (2 No's) CUM 24.190 72.00 1741.68
(MP PWD, SOR, Supplying and filling in plinth with
1.08.2014) I.NO.
2.27 PAGE N0.26 crusher stone dust/ coarse sand under
floors including, watering, ramming
consolidating in layers not exceeding
20 cm in depth and dressing complete
7

a F1: 1.41 X 1.18 X .2 (2 No's) CUM 0.665 672.00 446.88


b F1: 4.2 X 1.8 X.2 (2 No's) CUM 3.020 672.00 2029.44
Superstructure
(MP PWD, SOR, Providing and laying in position cement
1.08.2014) I.NO.
4.1.2.1, PAGE N0.45 concrete of specified grade excluding
the cost of centering and shuttering -
All work up to plinth level :
1 With 40 mm
nominal size graded stone aggregate.

M 15 - Grade concrete

a 1.87 X 1.64 X .05 (2 No's) CUM 0.306 4403.00 1347.32


a 4.2 X 3 X .05 (1 No's) CUM 0.630 4403.00 2773.89
(MP PWD, SOR, Providing and laying dampproof course
1.08.2014) I.NO.
4.11, PAGE N0.47 50mm thk with cement concrete 1:2:4
(1 cement:2 sand: 4graded agregate
2 20mm nominal size) sqm 6.020 247.00 1486.94
(MP PWD, SOR, Reinforced cement concrete work (with
1.08.2014)
I.NO.5.2.1 PAGE 20mm nominal size graded stone
N0.65 aggregate) in walls (any thickness).
including attached pilasters,
buttresses, plinth and string courses,
fillets, columns, pillars, posts and struts
etc. above plinth level and up to floor
3 two level excluding cost of centering,
shuttering, finishing and reinforcement:
M 20 -Grade Concrete.

a COLUMN
C1 (5.85 X .23 X .23) 8 No's CUM 2.47 5202 12848.94
C2 (5.85 X .23 X .6) 4 No's CUM 3.22 5202 16750.44
b SLAB
S1 (3.23 X 3 X .15) 2 No's CUM 2.907 5202 15122.21
S2 (3.9 X 5.1 X .15) 1 No's CUM 2.983 5202 15517.57
S3 (2.33 X 2.1 X .15) 2 No's CUM 1.467 5202 7631.33
S4 (3 X 4.2 X .15) 1 No's CUM 1.89 5202 9831.78
C BEAM
B1 (1.41 X .23 X .3) 4 No's CUM 0.62 5202 3230.44
B2 (1.18 X .23 X .3) 4 No's CUM 0.87 5202 4515.34
B3 (1.8 X .23 X .3) 2 No's CUM 0.50 5202 2580.19
B4 (3.37 X .23 X .3) 2 No's CUM 0.93 5202 4837.86
(MP PWD, SOR, Centering and shuttering including
1.08.2014)
I.NO.5.9.3 PAGE strutting, propping etc. and removal of
N0.66 form for : Suspended floors, roofs,
4 landings, balconies and access
platform.
a COLUMN
C1 (5.85 X .23 X .23) 8 No's SQM 43.056 264.00 11366.78
C2 (5.85 X .23 X .6) 4 No's SQM 38.840 264.00 10253.76
b SLAB
S1 (3.23 X 3) 2 No's SQM 19.380 264.00 5116.32
S2 (3.9 X 5.1 ) 1 No's SQM 19.81 264.00 5229.84
S3 (2.33 X 2.1) 2 No's SQM 9.79 264.00 2583.50
S4 (3 X 4.2) 1 No's SQM 12.60 264.00 3326.40
C BEAM
B1 (1.41 X .23 X .3) 4 No's SQM 5.970 264.00 1576.08
B2 (1.18 X .23 X .3) 4 No's SQM 5.000 264.00 1320.00
B3 (1.8 X .23 X .3) 2 No's SQM 3.816 264.00 1007.42
B4 (3.37 X .23 X .3) 2 No's SQM 7.140 264.00 1884.96
d LINTEL
L1 (1.8 X .23 ) 3 No's SQM 1.242 264.00 327.89
L2 (1.05 X .23 ) 2 No's SQM 0.483 264.00 127.51
L3 (1 X .23 ) 2 No's SQM 0.460 264.00 121.44
L4 (.9 X .23 ) 2 No's SQM 0.414 264.00 109.30
(MP PWD, SOR, Reinforcement for R.C.C. work
1.08.2014) I.NO.
5.16.4 PAGE N0.68 including straightening, cutting,
bending, placing in position and
binding including cost of binding wire
up to floor two level including all
wastage etc complete. Hot Rolled
5
Deformed Bars.

b COLUMN
C1 (5.85 X .23 X .23) 8 No's KG 289.44 62.90 18205.78
C2 ( 5.85 X .23 X .6) 4 No's KG 181.00 62.90 11384.90
C Beam
B1 (1.41 X .23 X .3) 4 No's KG 20.00 62.90 1258.00
B2 (1.18 X .23 X .3) 4 No's KG 16.77 62.90 1054.52
B3 (1.8 X .23 X .3) 2 No's KG 12.78 62.90 803.86
B4 (3.37 X .23 X .3) 2 No's KG 23.94 62.90 1505.83
D SLAB
S1 (3.23 X 3) 2 No's KG 155.70 62.90 9793.53
S2 (3.9 X 5.1 ) 1 No's KG 163.20 62.90 10265.28
S3 (2.33 X 2.1) 2 No's KG 79.38 62.90 4993.00
S4 (3 X 4.2) 1 No's KG 88.84 62.90 5588.04
E LINTEL
L1 (1.8 X .23 ) 3 No's KG 9.99 62.90 628.37
L2 (1.05 X .23 ) 2 No's KG 3.88 62.90 244.05
L3 (1 X .23 ) 2 No's KG 3.70 62.90 232.73
L4 (.9 X .23 ) 2 No's KG 3.33 62.90 209.46
(MP PWD, SOR, Brick work with well brunt chimney
1.08.2014) I.NO.
6.4.2, PAGE N0.85 bricks in bulls patent trench kiln,
crushing strength not less than 25 kg/
sqcm and water absorption not more
than 20% in superstructure above
plinth level and upto two floor level i/c
6
curing complete
cement
Mortar 1:6 (1 cement: 6 sand)

a (7.94 X5.85 X .23) - (2.985 X 2.1 X .


CUM 20.00 5255.00 105078.98
23) 2 No's
b 10.34 X 8.25 X .23) - (8.64 X 2.1 X .
CUM 17.63 5255.00 92645.65
23) 1 No's
(MP PWD, SOR, 12mm cement plaster of mix : 1:4 (1
1.08.2014)
I.NO.13.1.1 PAGE cement :4 sand)
7
N0.244
Ceiling
a (1.41 X 1.18) 2 No's SQM 3.33 123.00 409.22
b (2.54 X 3.74) 1 No's SQM 9.49 123.00 1167.27
Wall (Internal)
a (7.94 X 2.6) - (2.98 )2 No's SQM 35.32 123.00 4344.36
b (10.34 X 2.6) - (8.64) 1 No's SQM 18.24 123.00 2244.01
(MP PWD, SOR, 20 mm cement plaster of mix
1.08.2014)
8 I.NO.13.3.1 PAGE
N0.244 (1:4) (1 cement: 4 sand)

a (46.44 -8.64) X (5.85) 2 No's SQM 75.60 175.00 13230.00


b (85.305 -19.996) X (8.25)1 No's
SQM 65.83 175.00 11520.25
(MP PWD, SOR, Finishing walls with water proofing
1.08.2014)
I.NO.13.53.1 PAGE cement paint of required shade : New
9 N0.244 work (Two or more coats applied @
3.84 kg/10 sqm)

a (46.44 -8.64) X (5.85) 2 No's SQM 75.60 48.00 3628.80


b (85.305 -19.996) X (8.25)1 No's
SQM 65.83 48.00 3159.84
(MP PWD, SOR, Distempering with first quality acrylic
1.08.2014)
I.NO.13.48.1 PAGE distemper (ready mixed) of approved
N0.249 manufacturer, of required shade and
colour complete as per manufacturers
10 specification. Two or more coats on
new work

Ceiling
a (1.41 X 1.18) 2 No's SQM 65.83 34.00 2238.22
b (2.54 X 3.74) 1 No's SQM 9.49 34.00 322.66
Wall (Internal)
a (7.94 X 2.6) - (2.98 )2 No's SQM 35.32 34.00 1200.88
b (10.34 X 2.6) - (8.64) 1 No's SQM 18.24 34.00 620.30
(MP PWD, SOR, Providing and laying vitrified floor tiles
1.08.2014)
I.NO.11.53.2 PAGE in different sizes with water
N0.205 absorption's less than 0.08% and
conforming to IS : 15622 of approved
make in all colours and shades, laid on
20mm thick cement mortar 1:4 (1
cement : 4 sand) including grouting the
11 joints with white cement and matching SQM 15.62 894.00 13964.28
pigments etc., complete. Size of Tile
600 x 600 x 9-10 mm
(MP PWD, SOR, Providing and fixing factory made ISI
1.08.2014)
I.NO.10.10.1, PAGE marked steel door, windows,
N0.179 ventilators side/ top/ centre hung with
beading and all members such as
F7D, F4B, K11 B and K12 B etc.
complete of standard rolled steel
sections, joints mitred and flash butt
welded and sash bars tenoned and
riveted, including providing and fixing
of hinges, pivots including priming coat
of approved steel primer, but excluding
the cost of other fittings, complete all
as per approved design (sectional
weight of only steel members shall be
measured for payment. Fixing
12 with 15 X 3 mm lugs 10 cm long
embedded in cement concrete block
15 x 10 x 10 cm of cement concrete
1:3:6 (1 cement: 3 sand: 6 graded
stone aggregate 20 nominal size)

a D1 (.9 X 2.1) 2 No's KG 56.70 106.85 6058.40


b D2 (.75 X 2.1) 2 No's KG 44.10 106.85 4712.09
c W1 (1.8 X 1.35) 2 No's KG 72.90 106.85 7789.37
d W2 (1.05 X 1.35) 2 No's KG 42.52 106.85 4543.26
(MP PWD, SOR, Providing and fixing MS Tubular
1.08.2014)
I.NO.10.14.1, PAGE frames for door, windows, ventilators
N0.181 and cupboards with rectangular/ L-type
sections made of 1.60 mm thick MS
sheet, joints mitred, welded and
grinded finish with profiles of required
size including fixing of necessary butt
hinges and screws and applying a
priming coat of approved steel primer.
Fixing with 15 X 3 mm
lugs 10 cm long embedded in cement
13
concrete block 15 x 10 x 10 cm of
cement concrete 1:3:6 (1 cement: 3
sand: 6 graded stone aggregate 20
nominal size)

a D1 (.9 X 2.1) 2 No's KG 22.30 141.90 3164.37


b D2 (.75 X 2.1) 2 No's KG 20.30 141.90 2880.57
c W1 (1.8 X 1.35) 2 No's KG 19.50 141.90 2767.05
d W2 (1.05 X 1.35) 2 No's KG 14.30 141.90 2029.17
(MP PWD, SOR, Structural steel work riveted, bolted or
1.08.2014)
I.NO.10.2, PAGE welded in built up - sections, trusses
N0.178 and framed work, including
cutting,hoisting, fixing in position and
14 applying a priming coat of approved KG 3000.00 68.70 206100.00
steel primer all complete.
(MP PWD, SOR, Designing, Fabricating, testing,
1.08.2014)
I.NO.8.7.1, PAGE installing and fixing in position curtain
N0.114 wall with Aluminium Composite panel
Cladding, with open grooves for linear
as well as curvilinear portions of the
building, for all heights and all levels
etc including:

a) Structural analysis and designand


preparation of shop drawings for
pressure equalisation or rain screen
principle as required, proper drainage
of water to make it watertight including
15 checking af all the structural and sqm 400.00 3800.00 1520000.00
functional design.

b) Providing, fabricating and supplying


and fixing panels of aluminium
composite panel cladding in pan shape
in metallic colours of apoved shades.
The aluminium acomposite panel
cladding sheet shal be coil coated, with
Kynar 500 based PVDF/ Lumiflon
based fluoropolymer resin coating of
approved colour and shade on face # 1
and polymer (service) coating on face
# 2 as specified using stainless steel
c) The fastening brackets of Aluminium
alloy 6005 T5/ MS with Hot Dip
galvanised with serrations and
serrated washers to arrest the wind
load movement, fasteners, SS 316
Pins and anchor bolts of approed
make in SS 316, Nylon separators to
prevent bi-metallic contacts all
complete required to perform as per
specification and drawing. The item
includes cost of all material and labour
component, the cost of all mock ups at
site, cost of all samples of the
individual components for testing in an
approved laboratory, field tests on the
assembled working curtain wall with
aluminium somposite panel cladding,
cleaning till the handing over of the
building for occupation. Base
framework for ACP cladding is payable
under the relevent aluminium items.
The contractor shall provide curtain
wall with aluminium composite panel
cladding having all the performance
characteristics all complete, as per the
architectural drawings and as directed
by the Engineer in charge. However,
for the purpose of payment, only the
actual area of the external face of the
curtain wall with aluminium composite
panel cladding (including width of
(As per market Providing and erecting overhead
rate) signs with a corrosion ressistant 2mm
thk aluminium alloy sheet reflectorised
with high intensity retro- reflective
sheeting vide clause 801.3/ High
intensity prisamtic grade sheeting as
per ASTM D 4956 with vertical and
lateral clearance given in clause 802.2
and 802.3 duly painted on back side
with two coats of grey stove enamel
paint and installed as per clause 802.7
over a designed support system of
structural steel work trestles and
trusses of sections and type as per
structural designs requirement and
16 approved plans ,including painting with SQM 4.50 5670.00 25515.00
one coat of epoxy primer & two coats
of epoxy finish paint.The nut bolts of
boards with angle iron post/ supporting
structure after fixing at site has to be
electrically welded. Retroreflective
sheeting should be with seven years
written warrenty from the manufracture
& authorised distibuter/ convertor for
satisfactory field performance durability
& stipulated retro- reflective sheeting.
this certificate in orginal should be
submitted to the Engineer in charge bt
the contractor/ supplier.
(MP PWD, SOR, a) Providing and laying gang saw cut
1.08.2014)
I.NO.11.29.2.2, 18 mm thick, mirror polished machine
PAGE N0.202 cut granite stone of required size and
shape of approved shade, colour and
texture in flooring laid over 20 mm
thick base of cement mortar 1:4 (1
cement: 4 sand) including grouting the
joints with white cement mixed with
matching pigment, epoxy touch ups
etc. complete as per direction of
17 Engineer in charge. All SQM 40.00 3695.00 147800.00
shades/ colour other than black.

Area of
slab more than 50 Sq m

(MP PWD, SOR, Providing edge moulding to 18 mm


1.08.2014)
I.NO.11.36.2, PAGE thick marble stone counters, Vanities,
N0.203 window sills etc. including machine
polishing to edge to give high gloss
18 etc. complete as per design approved RMT 40.00 269 10760.00
by the engineer in charge. Granite
Work.
(MP PWD, SOR, Finishing with Epoxy paint (two or
1.08.2014)
I.NO.13.60.1, PAGE more coats) at all locations prepared
N0.251 and applied as per manufacturer's
specifications including appropriate
20 priming coat, preparation of surface, SQM 126.00 109 13734.00
etc. complete. On steel work

(As per market rate) All allied and miscellenous work for
completion of entrance gate work as
21 per engineer-in-charge
Job 10000.00
Sub - Total Amount 2606603.62
Total in lakhs 26.07
Chapter 1 Site Development

Summary Of Cost
A.1 Site development (land levelling/filling) and Boundary wall
Qty. Amount IN
S.No. Schedule Item UNITS
PHYSICAL LACS(Rs)
A.1.1 Site Development 15.71 Hect. 238.04
A.1.2 Entrance Gate 1.00 Nos 26.03
Total 264.07
Chapter 1 Site Development

A.1.1 Site Development (land Levelling/filling)


A.1.1 Boq
Rate
S.No. SOR NO Schedule Item Unit AREA DEPTH QTY Amount (Rs)
(Rs/unit)

(PWD, SOR,
R&B, Cutting of trees including cutting of trunks, Branches and
1.1 6.6.2016) removal Cutting of trees,
2.1 including cutting of trunks, branches and removal of stumps,
roots, stacking of serviceable material with all lifts and up to a
lead of 1000 mtrs and earth filling in the depression/pit.
(i) Girth from 300 mm to 600 mm nos 25.00 214 5350.00
1.3 Plot Filling

Filling of land, upto required levels, with Soil of CBR>5,


Procured from outside project area, including cost of soil,
as per market
including all leads and lifts, complete with transportation,
rate
compaction,watering if required , Including all leads and lift,
labour charges, Royalties, equipents required. etc.
Average
Depth (m)
A1 Cum 12346.94 0.40 4938.77
A2 Cum 24850.55 1.60 39760.88
A3 Cum 138.82 2.40 333.17
A4 Cum 279.92 2.18 609.93
A5 Cum 3596.88 2.21 7937.73
A6 Cum 7700.41 2.36 18140.12
A7 Cum 5171.61 0.13 690.17
A8 Cum 4395.66 1.73 7602.46
A9 Cum 2266.27 0.81 1838.04
A10 Cum 2266.27 0.40 896.53
A11 Cum 1315.39 1.32 1732.54
A12 Cum 1312.87 1.04 1363.00
A13 Cum 1315.39 0.91 1201.44
A14 Cum 2559.31 0.58 1472.61
A15 Cum 2287.80 0.96 2200.71
A16 Cum 3112.65 1.00 3111.05
A17 Cum 3174.91 0.54 1702.05
A18 Cum 1386.48 0.59 824.00
A19 Cum 1560.68 0.86 1344.53
A20 Cum 845.21 0.39 332.37
A21 Cum 910.76 1.64 1491.67
A22 Cum 868.69 0.36 314.65
A23 Cum 461.01 0.97 448.26
A24 Cum 1212.75 0.46 561.01
A25 Cum 997.62 0.52 517.80
A26 Cum 1170.87 0.41 484.32
A27 Cum 1211.48 0.72 874.17
A28 Cum 1375.73 2.75 3786.06
A29 Cum 1549.14 2.69 4162.58
A30 Cum 1311.91 1.66 2179.34
A31 Cum 1284.43 2.33 2986.53
A32 Cum 1308.92 1.44 1887.48
A36 Cum 1318.12 0.40 527.17
A39 Cum 6384.43 0.82 5250.00
A40 Cum 1318.12 2.17 2857.03
A41 Cum 1155.00 1.88 2168.73
A42 Cum 1318.69 1.79 2357.09
A44 Cum 1155.00 0.63 725.80
A45 Cum 1318.69 1.49 1959.96
A46 Cum 4272.45 0.77 3291.79
A47 Cum 4625.81 1.13 5206.24
A49 Cum 1362.47 1.57 2144.56
A50 Cum 1362.47 2.54 3467.43
A51 Cum 1362.47 2.23 3035.05
A52 Cum 1362.47 1.66 2264.63
A53 Cum 2043.71 1.75 3580.80
A54 Cum 2043.71 0.44 906.07
A55 Cum 1362.47 0.19 256.63
A56 Cum 1362.47 0.42 570.62
A57 Cum 1415.86 0.84 1191.82
A58 Cum 1415.86 1.62 2291.28
A60 Cum 2583.85 0.43 1119.24
A61 Cum 3216.79 1.39 4484.68
A63 Cum 4007.05 2.45 9808.66
A64 Cum 2279.83 2.05 4664.63
A65 Cum 3584.78 1.26 4519.78
A66 Cum 2406.25 0.03 67.81
A67 Cum 2461.05 0.66 1632.38
A69 Cum 1437.56 0.62 887.81
A70 Cum 1662.22 0.86 1429.52
Sub Total 190393.18 125 23799146.902
Total Amount 23804496.902
Total Amount In Lakhs 238.045
Chapter 1 Site Development

A.1.2 Entrance Gate,


Estimate of of Construction of Entrance Gate
S.No SOR No Schedule Item Unit Quantity Rate Amount
Sub-structure
(MP PWD, Earth work in excavation by mechanical means (Hydraulic excavator )/manual
SOR,
1.08.2014) means over areas (exceeding 30cm in depth. 1.Sm in width as well as 10 sqm on plan)
I.NO. 2.6, including dressing of sides and ramming of bottom disposal of excavated earth, lead upto
1
PAGE N0.22 SOm and lift upto 1.Sm, disposed earth to be levelled and neatly dressed . (No extra lift is
payable if work is done by mechanical means) All kinds of soil.

a F1 = 3.53 X 3.3 X 2.1 (2 NO'S) CUM 24.46 129.00 3155.71


b F2 = 5.4 X 4.2 X 2.1 (1 NO) CUM 47.63 129.00 6144.01
(MP PWD, Providing and laying in position cement concrete of specified grade excluding the cost of centering
SOR,
1.08.2014) and shuttering - All work up to plinth level: With 40mm nominal size graded stone aggregate. M 10
2
I.N0.4.1.2.2 Grade concrete
PAGE 45

a F1 = 3.070 X 3.040 X .1 (2 NO'S) CUM 1.87 3808.00 7105.73


b F2 = 4.2 X 2.2 X .1 (2 NO) CUM 1.85 3808.00 7037.18
(MP PWD, Providing and laying in position specified grade of reinforced cement concrete (with 20mm
SOR,
1.08.2014) nominal size graded stone aggregate) excluding the cost of Centering,shuttering, finishing and
3 I.NO. 5.1.1 reinforcement - All work up to plinth level: M 20 -Grade Concrete
PAGE NO.65

a Footing
F1: 3.07 X 2.840 X .350 ( 2 No's) CUM 6.10 5091.00 31055.10
F2: 4.2 X 1.8 X .350 (2 No's) CUM 5.29 5091.00 26941.57
b Column
C1 (2.1 X .23 X .23) 8 No's CUM 0.89 5091.00 4520.81
C2 (2.1 X .23 X .6) 4 No's CUM 1.16 5091.00 5900.47
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's CUM 0.78 5091.00 3950.62
PB2 (1.18 X .23 X .3) 4 No's CUM 0.65 5091.00 3303.04
PB3 (1.8 X .23 X .3) 2 No's CUM 0.50 5091.00 2525.14
PB4 (3.37 X .23 X .3) 2 No's CUM 0.93 5091.00 4734.63
(MP PWD, Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
SOR,
1.08.2014) and binding including cost of binding wire up to floor two level including all wastage etc
4 I.NO. 5.16.4 complete. Hot Rolled Deformed Bars.
PAGE N0.68

a FOOTING
F1 KG 166.80 62.90 10491.72
F2 KG 285.57 62.90 17962.48
b COLUMN
C1 (2.1 X .23 X .23) 8 No's KG 145.56 62.90 9155.72
C2 (2.1 X .23 X .6) 4 No's KG 103.90 62.90 6535.31
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's KG 20.00 62.90 1258.00
PB2 (1.18 X .23 X .3) 4 No's KG 16.77 62.90 1054.52
PB3 (1.8 X .23 X .3) 2 No's KG 19.10 62.90 1201.39
PB4 (3.37 X .23 X .3) 2 No's KG 35.91 62.90 2258.74
(MP PWD, Centering and shuttering including strutting, propping etc. and removal of form for: Foundations,
SOR,
1.08.2014) footings, bases of columns, etc. for concrete upto plinth.
5 I.NO. 5.9.1
PAGE N0.66

a Footing
F1 = 3.070 X 3.040 X .350 (2 NO'S) SQM 8.554 174.00 1488.40
F2 = 4.2 X 1.8 X .350 (2 NO) SQM 8.400 174.00 1461.60
b COLUMN
C1 (2.1 X .23 X .23) 8 No's SQM 9.568 174.00 1664.83
C2 (2.1 X .23 X .6) 4 No's SQM 8.632 174.00 1501.97
C Plinth Beam
PB1 (1.41 X .23 X .3) 4 No's SQM 5.978 174.00 1040.17
PB2 (1.18 X .23 X .3) 4 No's SQM 5.000 174.00 870.00
PB3 (1.8 X .23 X .3) 2 No's SQM 3.816 174.00 663.98
PB4 (3.37 X .23 X .3) 2 No's SQM 7.144 174.00 1243.06
(MP PWD, Filling available excavated earth (excluding hard rock/Ordinary rock) in Trenches, plinth, sides of
SOR,
1.08.2014) foundat ions etc. in layers not 10 exceeding 20cm in depth, consolidating each deposited
6 I.NO.2.25 layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
PAGE N0.26

a F1: 1.41 X 1.18 X 1.6 (2 No's) CUM 5.324 72.00 383.33


b F1: 4.2 X 1.8 X 1.6 (2 No's) CUM 24.190 72.00 1741.68
(MP PWD, Supplying and filling in plinth with crusher stone dust/ coarse sand under floors including,
SOR,
1.08.2014) watering, ramming consolidating in layers not exceeding 20 cm in depth and dressing complete
7 I.NO. 2.27
PAGE N0.26

a F1: 1.41 X 1.18 X .2 (2 No's) CUM 0.665 672.00 446.88


b F1: 4.2 X 1.8 X.2 (2 No's) CUM 3.020 672.00 2029.44
Superstructure
(MP PWD, Providing and laying in position cement concrete of specified grade excluding the cost of centering
SOR,
1.08.2014) and shuttering - All work up to plinth level : With 40 mm nominal
1 I.NO. 4.1.2.1, size graded stone aggregate. M 15 - Grade concrete
PAGE N0.45

a 1.87 X 1.64 X .05 (2 No's) CUM 0.306 4403.00 1347.32


a 4.2 X 3 X .05 (1 No's) CUM 0.630 4403.00 2773.89
(MP PWD, Providing and laying dampproof course 50mm thk with cement concrete 1:2:4 (1 cement:2 sand:
SOR,
1.08.2014) 4graded agregate 20mm nominal size)
2 I.NO. 4.11, sqm 6.020 247.00 1486.94
PAGE N0.47
Chapter 1 Site Development

S.No SOR No Schedule Item Unit Quantity Rate Amount


(MP PWD, Reinforced cement concrete work (with 20mm nominal size graded stone aggregate) in walls (any
SOR,
1.08.2014) thickness). including attached pilasters, buttresses, plinth and string courses, fillets, columns,
3 I.NO.5.2.1 pillars, posts and struts etc. above plinth level and up to floor two level excluding cost of centering,
PAGE N0.65 shuttering, finishing and reinforcement: M 20 -Grade Concrete.

a COLUMN
C1 (5.85 X .23 X .23) 8 No's CUM 2.47 5202 12848.94
C2 (5.85 X .23 X .6) 4 No's CUM 3.22 5202 16750.44
b SLAB
S1 (3.23 X 3 X .15) 2 No's CUM 2.907 5202 15122.21
S2 (3.9 X 5.1 X .15) 1 No's CUM 2.983 5202 15517.57
S3 (2.33 X 2.1 X .15) 2 No's CUM 1.467 5202 7631.33
S4 (3 X 4.2 X .15) 1 No's CUM 1.89 5202 9831.78
C BEAM
B1 (1.41 X .23 X .3) 4 No's CUM 0.62 5202 3230.44
B2 (1.18 X .23 X .3) 4 No's CUM 0.87 5202 4515.34
B3 (1.8 X .23 X .3) 2 No's CUM 0.50 5202 2580.19
B4 (3.37 X .23 X .3) 2 No's CUM 0.93 5202 4837.86
(MP PWD, Centering and shuttering including strutting, propping etc. and removal of form for : Suspended
SOR,
1.08.2014) floors, roofs, landings, balconies and access platform.
4 I.NO.5.9.3
PAGE N0.66

a COLUMN
C1 (5.85 X .23 X .23) 8 No's SQM 43.056 264.00 11366.78
C2 (5.85 X .23 X .6) 4 No's SQM 38.840 264.00 10253.76
b SLAB
S1 (3.23 X 3) 2 No's SQM 19.380 264.00 5116.32
S2 (3.9 X 5.1 ) 1 No's SQM 19.81 264.00 5229.84
S3 (2.33 X 2.1) 2 No's SQM 9.79 264.00 2583.50
S4 (3 X 4.2) 1 No's SQM 12.60 264.00 3326.40
C BEAM
B1 (1.41 X .23 X .3) 4 No's SQM 5.970 264.00 1576.08
B2 (1.18 X .23 X .3) 4 No's SQM 5.000 264.00 1320.00
B3 (1.8 X .23 X .3) 2 No's SQM 3.816 264.00 1007.42
B4 (3.37 X .23 X .3) 2 No's SQM 7.140 264.00 1884.96
d LINTEL
L1 (1.8 X .23 ) 3 No's SQM 1.242 264.00 327.89
L2 (1.05 X .23 ) 2 No's SQM 0.483 264.00 127.51
L3 (1 X .23 ) 2 No's SQM 0.460 264.00 121.44
L4 (.9 X .23 ) 2 No's SQM 0.414 264.00 109.30
(MP PWD, Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
SOR,
1.08.2014) and binding including cost of binding wire up to floor two level including all wastage etc
5 I.NO. 5.16.4 complete. Hot Rolled Deformed Bars.
PAGE N0.68

b COLUMN
C1 (5.85 X .23 X .23) 8 No's KG 289.44 62.90 18205.78
C2 ( 5.85 X .23 X .6) 4 No's KG 181.00 62.90 11384.90
C Beam
B1 (1.41 X .23 X .3) 4 No's KG 20.00 62.90 1258.00
B2 (1.18 X .23 X .3) 4 No's KG 16.77 62.90 1054.52
B3 (1.8 X .23 X .3) 2 No's KG 12.78 62.90 803.86
B4 (3.37 X .23 X .3) 2 No's KG 23.94 62.90 1505.83
D SLAB
S1 (3.23 X 3) 2 No's KG 155.70 62.90 9793.53
S2 (3.9 X 5.1 ) 1 No's KG 163.20 62.90 10265.28
S3 (2.33 X 2.1) 2 No's KG 79.38 62.90 4993.00
S4 (3 X 4.2) 1 No's KG 88.84 62.90 5588.04
E LINTEL
L1 (1.8 X .23 ) 3 No's KG 9.99 62.90 628.37
L2 (1.05 X .23 ) 2 No's KG 3.88 62.90 244.05
L3 (1 X .23 ) 2 No's KG 3.70 62.90 232.73
L4 (.9 X .23 ) 2 No's KG 3.33 62.90 209.46
(MP PWD, Brick work with well brunt chimney bricks in bulls patent trench kiln, crushing strength not less than
SOR,
1.08.2014) 25 kg/ sqcm and water absorption not more than 20% in superstructure above plinth level and
6 I.NO. 6.4.2, upto two floor level i/c curing complete
PAGE N0.85 cement Mortar 1:6 (1 cement: 6 sand)

a (7.94 X5.85 X .23) - (2.985 X 2.1 X .23) 2 No's CUM 20.00 5255.00 105078.98
b 10.34 X 8.25 X .23) - (8.64 X 2.1 X .23) 1 No's CUM 17.63 5255.00 92645.65
7 (MP PWD, 12mm cement plaster of mix : 1:4 (1 cement :4 sand)
SOR,
1.08.2014) Ceiling
a I.NO.13.1.1 (1.41 X 1.18) 2 No's
PAGE N0.244 SQM 3.33 123.00 409.22
b (2.54 X 3.74) 1 No's SQM 9.49 123.00 1167.27
Wall (Internal)
a (7.94 X 2.6) - (2.98 )2 No's SQM 35.32 123.00 4344.36
b (10.34 X 2.6) - (8.64) 1 No's SQM 18.24 123.00 2244.01
(MP PWD, 20 mm cement plaster of mix (1:4) (1
SOR,
1.08.2014) cement: 4 sand)
8 I.NO.13.3.1
PAGE N0.244
Chapter 1 Site Development

S.No SOR No Schedule Item Unit Quantity Rate Amount


a (46.44 -8.64) X (5.85) 2 No's SQM 75.60 175.00 13230.00
b (85.305 -19.996) X (8.25)1 No's SQM 65.83 175.00 11520.25
(MP PWD, Finishing walls with water proofing cement paint of required shade : New work (Two or more
SOR,
1.08.2014) coats applied @ 3.84 kg/10 sqm)
9 I.NO.13.53.1
PAGE N0.244

a (46.44 -8.64) X (5.85) 2 No's SQM 75.60 48.00 3628.80


b (85.305 -19.996) X (8.25)1 No's SQM 65.83 48.00 3159.84
(MP PWD, Distempering with first quality acrylic distemper (ready mixed) of approved manufacturer, of
SOR,
1.08.2014) required shade and colour complete as per manufacturers specification. Two or more coats on
10 I.NO.13.48.1 new work
PAGE N0.249

Ceiling
a (1.41 X 1.18) 2 No's SQM 65.83 34.00 2238.22
b (2.54 X 3.74) 1 No's SQM 9.49 34.00 322.66
Wall (Internal)
a (7.94 X 2.6) - (2.98 )2 No's SQM 35.32 34.00 1200.88
b (10.34 X 2.6) - (8.64) 1 No's SQM 18.24 34.00 620.30
(MP PWD, Providing and laying vitrified floor tiles in different sizes with water absorption's less than 0.08%
SOR,
1.08.2014) and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick
I.NO.11.53.2 cement mortar 1:4 (1 cement : 4 sand) including grouting the joints with white cement and
11 PAGE N0.205 matching pigments etc., complete. Size of Tile 600 x 600 x 9-10 mm SQM 15.62 894.00 13964.28

(MP PWD, Providing and fixing factory made ISI marked steel door, windows, ventilators side/ top/ centre
SOR,
1.08.2014) hung with beading and all members such as F7D, F4B, K11 B and K12 B etc. complete of standard
I.NO.10.10.1, rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted,
PAGE N0.179 including providing and fixing of hinges, pivots including priming coat of approved steel primer, but
excluding the cost of other fittings, complete all as per approved design (sectional weight of only
steel members shall be measured for payment. Fixing with 15 X 3 mm lugs 10 cm long
12 embedded in cement concrete block 15 x 10 x 10 cm of cement concrete 1:3:6 (1 cement: 3 sand:
6 graded stone aggregate 20 nominal size)

a D1 (.9 X 2.1) 2 No's KG 56.70 106.85 6058.40


b D2 (.75 X 2.1) 2 No's KG 44.10 106.85 4712.09
c W1 (1.8 X 1.35) 2 No's KG 72.90 106.85 7789.37
d W2 (1.05 X 1.35) 2 No's KG 42.52 106.85 4543.26
(MP PWD, Providing and fixing MS Tubular frames for door, windows, ventilators and cupboards with
SOR,
1.08.2014) rectangular/ L-type sections made of 1.60 mm thick MS sheet, joints mitred, welded and grinded
I.NO.10.14.1, finish with profiles of required size including fixing of necessary butt hinges and screws and
PAGE N0.181 applying a priming coat of approved steel primer. Fixing with 15 X 3 mm lugs 10 cm
13 long embedded in cement concrete block 15 x 10 x 10 cm of cement concrete 1:3:6 (1 cement: 3
sand: 6 graded stone aggregate 20 nominal size)

a D1 (.9 X 2.1) 2 No's KG 22.30 141.90 3164.37


b D2 (.75 X 2.1) 2 No's KG 20.30 141.90 2880.57
c W1 (1.8 X 1.35) 2 No's KG 19.50 141.90 2767.05
d W2 (1.05 X 1.35) 2 No's KG 14.30 141.90 2029.17
(MP PWD, Structural steel work riveted, bolted or welded in built up - sections, trusses and framed work,
SOR,
1.08.2014) including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer all
14 I.NO.10.2, complete. KG 3000.00 68.70 206100.00
PAGE N0.178

(MP PWD, Designing, Fabricating, testing, installing and fixing in position curtain wall with Aluminium
SOR,
1.08.2014) Composite panel Cladding, with open grooves for linear as well as curvilinear portions of the
I.NO.8.7.1, building, for all heights and all levels etc including:
PAGE N0.114

a) Structural analysis and designand preparation of shop drawings for pressure equalisation or rain
screen principle as required, proper drainage of water to make it watertight including checking af
all the structural and functional design.

15 b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in sqm 400.00 3800.00 1520000.00
pan shape in metallic colours of apoved shades. The aluminium acomposite panel cladding sheet
shal be coil coated, with Kynar 500 based PVDF/ Lumiflon based fluoropolymer resin coating of
approved colour and shade on face # 1 and polymer (service) coating on face # 2 as specified
using stainless steel screws, nuts, bolys, washers, cleats, weathersilicone sealant, backer rods etc.
Chapter 1 Site Development

S.No SOR No Schedule Item Unit Quantity Rate Amount


c) The fastening brackets of Aluminium alloy 6005 T5/ MS with Hot Dip galvanised with serrations
and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts
of approed make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required
to perform as per specification and drawing. The item includes cost of all material and labour
component, the cost of all mock ups at site, cost of all samples of the individual components for
testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium
somposite panel cladding, cleaning till the handing over of the building for occupation. Base
framework for ACP cladding is payable under the relevent aluminium items. The contractor shall
provide curtain wall with aluminium composite panel cladding having all the performance
characteristics all complete, as per the architectural drawings and as directed by the Engineer in
charge. However, for the purpose of payment, only the actual area of the external face of the
curtain wall with aluminium composite panel cladding (including width of groove ) shall be measure
in sqm. up to two decimal place.
4 mm thick aluminium composite pannel material consisting of 3.5
mm thick FR grade mineral core sandwiched between two aluminium sheets (each 0.5 mm thick)

(As per Providing and erecting overhead signs with a corrosion ressistant 2mm thk aluminium alloy sheet
market reflectorised with high intensity retro- reflective sheeting vide clause 801.3/ High intensity prisamtic
rate) grade sheeting as per ASTM D 4956 with vertical and lateral clearance given in clause 802.2 and
802.3 duly painted on back side with two coats of grey stove enamel paint and installed as per
clause 802.7 over a designed support system of structural steel work trestles and trusses of
sections and type as per structural designs requirement and approved plans ,including painting
with one coat of epoxy primer & two coats of epoxy finish paint.The nut bolts of boards with angle
iron post/ supporting structure after fixing at site has to be electrically welded. Retroreflective
sheeting should be with seven years written warrenty from the manufracture & authorised
16 distibuter/ convertor for satisfactory field performance durability & stipulated retro- reflective SQM 4.50 5670.00 25515.00
sheeting. this certificate in orginal should be submitted to the Engineer in charge bt the contractor/
supplier.

(MP PWD, a) Providing and laying gang saw cut 18 mm thick, mirror polished machine cut granite stone of
SOR,
1.08.2014) required size and shape of approved shade, colour and texture in flooring laid over 20 mm thick
I.NO.11.29.2.2, base of cement mortar 1:4 (1 cement: 4 sand) including grouting the joints with white cement
17
PAGE N0.202 mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer in SQM 40.00 3695.00 147800.00
charge. All shades/ colour other than black.
Area of slab more than 50 Sq m

(MP PWD, Providing edge moulding to 18 mm thick marble stone counters, Vanities, window sills etc.
SOR,
1.08.2014) including machine polishing to edge to give high gloss etc. complete as per design approved by
18 I.NO.11.36.2, the engineer in charge. Granite Work. RMT 40.00 269 10760.00
PAGE N0.203

(MP PWD, Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per
SOR,
1.08.2014) manufacturer's specifications including appropriate priming coat, preparation of surface, etc.
20 I.NO.13.60.1, complete. On steel work SQM 126.00 109 13734.00
PAGE N0.251

(As per market All allied and miscellenous work for completion of entrance gate work as per engineer-in-charge
21 rate)
Job 10000.00
Sub - Total Amount 2603448.01
Total in lakhs 26.03
Chapter 1 Site Development

A.1.2 Boundary Wall Detail Estimate-External


Boundary Wall of Length 0m for complete Project Boundary, Refer Drawing No 5,6
Description: Boundary Wall of a) Footing size 900 mm x 900 mm,thickness=300 mm, b) Height = 1800, c) Plinth Beam = 300mm
x300mm, d) Column size = 230mm x 300mm, e) Top Band = 230mm x 75mm, f) Depth of Footing =1250mm
S. L B H
Sor PARTICULARS NOS QTY UNIT RATE AMOUNT
N0. (m) (m) (m)

Earth work in excavation by mechanical means


MP.PWD, (Hydraulic excavator) / manual means in over
BW- areas foundation trenches or drains (not exceeding
1 1.8.2014 1.5 m in width or 10 sqm on plan) including
, SOR, dressing of sides and ramming of bottoms, lift upto
2.6 1.5 m including getting out the excavated soil and
disposal of surplus excavated soil as directed,
within a lead of 50m.
All kinds of soil.
1 0 2 0.3 0.00 cum 129 0
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means in over
areas foundation trenches or drains (not exceeding
MP.PWD,
1.5 m in width or 10 sqm on plan) including
BW-
dressing of sides and ramming of bottoms, lift upto
1.8.2014 1 0 2 1.3 0.00 cum 491 0
1.5 m including getting out the excavated soil and
, SOR,
disposal of surplus excavated soil as directed,
2.7
within a lead of 50m.
Hard Rock
requiring blasting
Filling available excavated earth (excluding hard
MP.PWD, rock/Ordinary rock) in trenches, plinth, sides of
BW- foundations etc. in layers not exceeding 20cm in
2 1.8.2014 depth, consolidating each deposited layer by
, SOR, ramming and watering, lead up to 50 m and lift
2.25 upto 1.5 m.

0.00 72 0

MP.PWD, Providing and laying in position cement concrete of


BW- specified grade excluding centering and shuttering
3 1.8.2014 All work upto plinth level the cost with 20mm
, SOR, nominal seze graded stone aggregate.
4.1.1.4 M-10

0 1.2 1.2 0.1 0.00 3890 0

Reinforcement for R.C.C. work including


straightening, cutting, bending, placing in position
and binding including cost of binding wire up to
floor two level including all wastage etc. complete.
Hot Rolled deformed Bars.

12MM BARS IN FOUNDATION


(0.9/0.15+0.9/0.15) X 0= 0 Nos of Length =900-50- 0 0.8 0.889 kg/m 0.00 KG
50=800mm or 0.8m
MP.PWD,
BW- 12 MM BARS IN COLUMN (6x0 nos bars) and length
0 3.525 0.889 kg/m 0.00 KG
1.8.2014 of bars =3.525m
4
, SOR,
12 mm bars in PLINTH BEAM ( Boundary length
5.16.4 6 0 0.889 kg/m 0.00 KG
=12m , 6 nos bars)

10MM BARS IN TOP BEAM ( Boundary length =0m ,


2 0 0.617 kg/m 0.00 KG
2nos bars)
8mm Rings in Columnms @175c/c ( 18 rings per
0 1.16 0.395 kg/m 0.00 KG
column x 0 nos) = 0
8MM BAARS IN RINGS OF BEAMS PLINTH
( No of rings = length/.175) =4490/.175 0 1.16 0.395 kg/m 0.00 KG
= 25657
8MM BAARS IN RINGS OF BEAM TOP
0 0.33 0.395 kg/m 0.00 KG
( No of rings = length/0.175) =0/0.175 = 0

SUB TOTAL 0.00 KG 62.9 0


Chapter 1 Site Development

A.1.2 Boundary Wall Detail Estimate-External


Boundary Wall of Length 0m for complete Project Boundary, Refer Drawing No 5,6
Description: Boundary Wall of a) Footing size 900 mm x 900 mm,thickness=300 mm, b) Height = 1800, c) Plinth Beam = 300mm
x300mm, d) Column size = 230mm x 300mm, e) Top Band = 230mm x 75mm, f) Depth of Footing =1250mm
S. L B H
Sor PARTICULARS NOS QTY UNIT RATE AMOUNT
N0. (m) (m) (m)
Providing and laying in position specified grade of
MP.PWD,
reinforced cement concrete ( with 20 mm nominal
BW-
size graded stone aggregate) excluding the cost of
5 1.8.2014
centering shuttering, finishing and reinforcement-
, SOR,
all work up to plinth level.
5.1.1
M20 CONCRETE GRADE
FOOTING 0 0.9 0.9 0.3 0.00 cum
COLUMN 0 1.2 0.23 0.3 0.00 cum
Plinth Beam 1 0 0.3 0.3 0.00
SUB TOTAL 0.00 cum 5091 0
Reinforced cement concrete work ( with 20 mm
nominal size graded stone aggregate) in walls (any
MP.PWD, thickness) including attached, pilasters, buttresses,
BW- plinth and string courses, filets, columns, pillars,
6 1.8.2014 posts and struts suspended floor, roof slab, beams,
, SOR, etc. up to floor two level excluding cost of
5.2.1 centering, shuttering, finishing and reinforcement

M 20 CONCRETE GRADE
COLUMN 0 1.2 0.23 0.3 0.00 cum
top BEAM 1 0 0.075 0.23 0.00 cum
SUB TOTAL 0.00 cum 5202 0
MP.PWD,
Centering and shuttering including strutting,
BW-
propping etc and removal of form work for
1.8.2014
7 , SOR,
FOUNDATION , Footings, Bases of columns
4.3.1
FOR FOUNDATION OF COLUMNS
0 3.6 0.3 0.00 sqm 169 0
( 4 x 0.9)=3.6m
for column (230+300)x2/1000=1.06m 0 1.06 1.2 0.00 sqm 169 0
Centering and shuttering including strutting,
MP.PWD,
propping etc and removal of form work for
BW-
7 1.8.2014
Retaining walls, return walls, walls (any thickness)
, SOR,
including attached pilasters, buttresses, plinth and
4.3.2
string courses fillets etc.
PLINTH BEAM 1 0 0.9 0.00 sqm
TOP BEAM 1 0 0.15 0.00 sqm
SUB TOTAL 0.00 sqm 267 0
MP.PWD,
Centering and shuttering including strutting,
BW-
propping etc and removal of form work for
8 1.8.2014
Columns,
, SOR,
piers, abutments, pillars, posts and struts.
4.3.3
COLUMN 0 1.06 1.2 0.00 sqm 356 0
MP.PWD, Brick work with Fly ash Lime Bricks (Falg Bricks)
BW- conforming to IS: 12894-2002, in super structure
9 1.8.2014 above plinth level upto floor 2 level, having 50 1 0 0.23 1.2 0.00 cum 5230 0
, SOR, kg/cm2 average compressive strength, in cement
6.7.3.1 Mortar 1:4
MP.PWD, Structural steel work riveted, bolted or welded in
BW- built up - sections, trusses and framed work,
10 1.8.2014 including cutting,hoisting, fixing in position and 310.00 KG 68.7 21297
, SOR, applying a priming coat of approved steel primer
10.2 all complete.
FOR BARBED WIRE FENCING ( 45 X 45 X5, 1.5M =
0 5.1 kg/nos 0.00 KG 68.7 0
5.1 KG , @1nos EVERY Collumn)
MP.PWD,
BW- 12 mm cement plaster of mix.
11 1.8.2014 1 0 1.805 0.00 sqm 123 0
, SOR, (1:4) (1 cement :4 sand)
13.1.1
Chapter 1 Site Development

A.1.2 Boundary Wall Detail Estimate-External


Boundary Wall of Length 0m for complete Project Boundary, Refer Drawing No 5,6
Description: Boundary Wall of a) Footing size 900 mm x 900 mm,thickness=300 mm, b) Height = 1800, c) Plinth Beam = 300mm
x300mm, d) Column size = 230mm x 300mm, e) Top Band = 230mm x 75mm, f) Depth of Footing =1250mm
S. L B H
Sor PARTICULARS NOS QTY UNIT RATE AMOUNT
N0. (m) (m) (m)
MP.PWD,
BW-
20 mm cement plaster of mix
12 1.8.2014 1 0 1.505 0.00 sqm 175 0
(1:4) (1 cement:4 sand)
, SOR,
13.3.1
MP.PWD,
BW- Finishing walls with water proofing cement paint of
14 1.8.2014 required shade : New work (Two or more coats applied @ 0.00 SQM 48 0
, SOR, 3.84 kg/10 sqm).
13.53.1

(MP
PWD,
SOR, Painting with synthetic enamel paint of approved brand
15 1.08.201 and manufacture to give an even shade: 6 2 12.00 SQM 53 636
4) Two or more coats on new work
P/252,
I/13.68

Providing and fixing concertina coil fencng with punched


(MP tape concertina coil 600 mm dia 10 metre openable
PWD, length( total length 90m), having 50 nos, rounds per
SOR, length, upto 3m hieght of wall with existing angle iron 'Y'
16 0.00 RM 275 0
1.08.201 shaped placed 24m or 3.0 m apart and with 9 horizontal
4) R.B.T reinforced arbed wire, stud dried ith G.i. Staples and
10.36 GI Clips to retain horizontal, including necessary bolts or
GI

TOTAL 21933
Total in lakhs 0.21933