o All routes and its collection points should be identified and accurately
mapped (for tabular / map report, analysis).
o Defined Schedule for each route with respect to its collection point to be
defined in the system.
o Administration of defined route as per new / updated requirement.
To control the time base physical presence of the vehicle, RFID system will
also be implemented along with GPS system in following way:
I. RFID TAG to be mounted on each Bin
J. RFID Reader will be installed on 150 vehicles (Refused compactors and
Dumper Placers)
GIS Report on Master Data at various levels (Zone, Circle) for various
periods (Daily, weekly and monthly), and Verification Report &Exception
reports to be developed.
Date wise, Zone wise, Route wise, collection points served, not served.
Date wise, Zone wise, Route wise number of vehicles (with vehicle details)
used.
Date wise, Zone wise, Route wise list of (count of) DTD vehicles transferred
/ not transferred garbage into Compactor.
Date wise, Zone wise, Route wise list of DTD vehicles transferred garbage
into Compactor how many times.
Date wise, Zone wise list of vehicles violated their routes.
Vehicle wise, date wise list of operation / not in operation.
Date wise, Zone wise total weight of Waste disposed.
Date wise, vehicle wise number of trips at disposal site.
Date wise list of abnormal vehicles whose number of entries into dump
yard not matches.
List of vehicles present into dump yard at any moment.
Date wise, Zone wise list of vehicles with disconnected GPS.
To display real time / archived vehicle traversal route on the map
(Scheduled / Actual).
To display Geofence, Geolocations on the map.
Vehicle summary report (vehicle id, first and last collection points,
Collection start time and end time for the day, Total distance travelled, Total
no of speed violations, Maximum speed attained throughout journey,
Graphical as well as tabular display of total collection points served and
points not served by selected vehicle for any particular day.
Show all collection point with their scheduled serve time
Stoppage Report (Halt Start Time, End Time, Halt Location, and total Halt
time for any selected vehicle for specific date)
Vehicle History (Total distance covered, alerts, violations, average speed,
high speed between start and end date (on weekly and monthly basis) for
Vehicle).
Payment report for Contractors (Based on weight/trips per vehicle per day)
The Report list is generic and actual list of MIS reports will be finalized during
implementation.
Technical Specs(minimum)
Parallel GPS Receiver: minimum 20Channel or more
Acquisition sensitivity: better than ()148dBm
Tracking Sensitivity better than ()155 dBm
Less than 5m Positional Accuracy, (2dRMS confidence level higher than
95%) or 3m CEP
Hot Start < 10s
Warm Start: < 40s
Cold Start <60 s
Outputs as per NMEA 0183
WGS84 compliant
GPRS Communication
In Built Triband GPRS module/Modem
Multi Slot GPRS
GPRS class 10 or Above
Should support all SMS, Voice, Data, GPRS, TCP/IP
Power
Input voltage range 830 Volts
Active mode Peak < 1.0 A
Active mode Avg < 200mA
Sleep Mode < 25 mA
Antenna
Should have GPRS antenna
Should be capable of supporting external GPRS antenna
Should have GPS antenna
Should be capable of supporting external GPS antenna
Ports
8 or more digital Inputs
4 or more digital outputs (For Relays, sirens etc.)
1 or more analog inputs (For analog inputs like Fuel, temperature etc)
Ignition sensing
2 nos RS232 ports
RS232 /GPS out for LED display board thru integrated controller, inside
vehicle. (GPRMC string out in Degree, minutes format with 1/10,000 of
minutes, ddmmyy format every 1 sec feed) (optional)
RS232 for RFID (optional)
2.11. Deliverables
The following shall be the deliverables of the SI:
i. Supplying, Installing and Commissioning the requisite devices with client
software as per specifications mentioned in this RFP at the locations
identified by the department and keeping in spare, an additional five
percentage of devices.
ii. Training the department officials and other stakeholders on the use of
devices and software.
iii. Resolving effectively and within the stipulated time frame, all complaints
related to the functioning of the devices/software through a well-managed
call centre and service centre.
iv. User manual & Training Manual in English and various manuals including
Systems Administration Manuals, Installation Manuals, Operational Manuals
and Maintenance Manuals.
v. Software Testing Documentation (including details of defects/bugs/errors
and their resolution).
vi. Test Plans and Test cases (including Unit Test Plan, System Integration Test
Plan, User Acceptance Test Plan, Security Test Plan, Load Test Plan).
vii. Periodic Status and Review Reports
viii. Internal Review and testing documents of the System Integrator
ix. Software Source Code for the software specifically developed by the
successful bidder for this Project.
Turnover Details
(All values in Rs. crores) Financial Information of Bidder
4300
b. RFID tag
150
c. RFID Reader with Controller