Академический Документы
Профессиональный Документы
Культура Документы
___________________________________________________________________________
1.0 PURPOSE:
To detail the standard operating procedure for operation of meter Toledo electronic
balance Model: B 204-S.
2.0 SCOPE
This SOP applies to Quality control laboratory of Raim Homoeo Laboratories, Bogadia,
Kishoregonj, Bangladesh.
3.0 RESPONSIBILITY
QC Officer
4.0 DEFINITIONS
Nil
5. PRECAUTIONS:
5.1. The room where the instrument is installed should be cooled & humidity should be
controlled & free from dust.
5.2. Check the supply fuses, voltage to the appropriate value.
5.3. Before switching Off or On ensure that the instrument is empty and clean.
5.4. Press the Keys softly.
6. Procedure:
7.0 REFERENCE
Nil