Project : Proposed Intake @SBM3

Location : Brgy. Kiwalan, Dalipuga, Iligan City


Owner : PILMICO

BILL OF MATERIALS

MATERIALS LABOR
No. Items Unit Total
Unit Cost Amount Unit Cost

1 EARTH WORK
Soil Excavation By Machine M3 246.62
Back Fill Excavated Soil M3 126.70
Disposal M3 119.92

2 GRAVEL BEDDING
Wash Gravel 2" M3 5.48

3 CONCRETE WORKS
Lean Concrete 50mm Thk M3 2.74
Structural Concrete 5000psi M3 47.51
cement bags 653.00
sand M3 27.00
gravel M3 48.00

4 FORM WORKS M2 223.27


Two Usage M2 111.64
for tie rod
for Walls for Top Slab (3 layers) total
Phenolic Plywood 3/4" thk. pcs 67.00 8.00 75.00
CocoLumber 2"x4"x8' (for frames) pcs 436.00 52.00 488.00
CocoLumber 2"x2"x8' (for braces/support) pcs 288.00 220.00 192.00 751.00

Tie Rod (space @1.0m o.c.) sets 108.00


C.W. Nail (assorted sizes) keg 2.00
Form Oil gals 4.00

5 REINFORCEMENT WORKS
Rebar D20mmx6.0m KGS 11,334.97
Rebar D20mmx6.0m pcs 760.00
G.I. Tie Wire #16 Kgs 153.00

6 OTHERS:
WATER STOP LM 26.80

WATERPROOFING M2 118.75
LABOR
Amount