Design, fabricate ,supply, delivery, unloading at site (as per approved equipment layout), site assembly, installation,
testing and commissioning of Hi-wall split units with decorative panel, condensing unit, electronic expansion valves,
drain pump, complete refrigerant piping with insulation, first charge of refrigerant, PVC drain piping, duly 2 coats of
8.1
epoxy painting for M.S.stand for outdoor condensing unit, vibration isolator pads for outdoor, 3 pin plug with power
wiring, cordless remote controller, supports hangers, brackets and other necessary accessories etc. The compressor
shall be inverter based with eco-friendly R410a refrigerant. Power cum control cabling to be included in the unit cost.
Tag No.
TR
( Area Description )
8.1.1 GF-HWU-1 1.5 Nos. 2 37000 74000
8.1.2 2F-HWU-1 1 Nos. 18 29000 522000
8.1.3 1F-HWU-1 2 Nos. 1 50000 50000