FLO

Work
Sr
Descrption Location done in Length in m No's Rate
No
s. ft

Fixing of floor
By Tape on
protection by Abro
1 outer & inner 451 92 4.60 42.50
Tape
side
(Conventional)

By Tape on
Fixation of floor 48 2 43
outer side
protection by Hot
2 451
Air Machine
( Modified) By Machine
on inner side
19 - -
KALPATARU RADIANCE - TOWER A
VALUE ENGINEERING
FLOOR PROTECTION FOR THE AREA OF 451 SFT

Time in Labour Electricity Rate/u Cost in


Tape Cost Rate/min Cost
min in No's in kw/hr nit Rs

195.50 60 2 0.83 99.60 - - -

102 15 2 1 25 - - -

- 10 2 1 17 1 16 3
Saving in 1
Building

Saved
Machine Working Cost/ Saved
Cost Total Cost Final Cost Cost / 250000
Cost Hours min Rs/s.ft
451 s.ft

- - - - 295 295

145 0.32 80379


- - - - 127

150

40000 2500 0.27 2.7 23