Deck floor
pu1 = 547.59 kn
Second floor
Pu = Pu1 + Pu2
Pu = 548 + 481
Pu = 1029 kn
Pu = 1029 kN
Mu = 92.56 kN-m
Ag = 4oo x 400
Try 12 20 mm
T = C 1 + C2
Sub. Fs to (1)
415 = 17.85 (0.217c 1) + 600((c 75/c))
C = 88.35 mm
A = 1c = 0.85 (88.35) = 75.10 mm
Fs = 600 ((88.35 75/88.35)) = 90.66 MPa
T = C1 + C2
651.55 = 536.21 + 114.31 Ok!
Moment = C1 (d a/2)
+ C2 (d d)
= 536.21 (325 75.10/2) + 114.31 (325 75)
Moment = 182.71 kN-m
Pu = 1029 kN
Mu = 92.56 kN-m
Ag = 4oo x 400
Try 12 20 mm
T = C 1 + C2
Sub. Fs to (1)
415 = 17.85 (0.217c 1) + 600((c 75/c))
C = 88.35 mm
A = 1c = 0.85 (88.35) = 75.10 mm
Fs = 600 ((88.35 75/88.35)) = 90.66 MPa
T = C1 + C2
651.55 = 536.21 + 114.31 Ok!
Moment = C1 (d a/2)
+ C2 (d d)
= 536.21 (325 75.10/2) + 114.31 (325 75)
Moment = 182.71 kN-m