Lean Concrete
Reinforcement Rebar Work from Baement Floor to Floor19 th Level
Formwork Work from Baement Floor Level to Floor19 th Level
Concrete Work from Baement Floor Level to Floor19 th Level
Option 2 STRUCTURE WORK
1. Concrete work m3 1 $ 7.00
2. Form work m2 1 $ 6.00
3. Deformed Rebar work ton 1 $ 130.00
SCOP OF WORK
Lean Concrete
Reinforcement Rebar Work from Baement Floor to Floor19 th Level
Formwork Work from Baement Floor Level to Floor19 th Level
Concrete Work from Baement Floor Level to Floor19 th Level
Option 3 STRUCTURE WORK m2 1 $ 20.00
SCOP OF WORK
Lean Concrete
Reinforcement Rebar Work from Baement Floor to Floor19 th Level
Formwork Work from Baement Floor Level to Floor19 th Level
Concrete Work from Baement Floor Level to Floor19 th Level
NOT: This project is lum sum price from Baement Floor Level to Floor19 th Level
Date: 21/June/216
SAM ATH
GM. of AECC