Вы находитесь на странице: 1из 24

CEBECO I LINE COST (As of July 2006)

Project No.:00-0001
Project Name:MOCK LINE
Description:A1 POLE: 1
Location:MOON
Date Staked:July 21,2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, MACHINE 5/8" X 10" 2 PCS. 28.47 56.94


2. BOLT. SINGLE UPSET 5/8" X 10" 1 PCS. 48.10 48.10
3. INSULATOR, PIN PORCELAIN. 7,62/13,2 KV 1 PCS. 87.75 87.75
4. INSULATOR. SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
5. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 1 PCS. 149.50 149.50
6. WASHER,SQFLAT2-114"X2-114"X3116" 3 PCS. 7.13 21.39

ESTIMATED MATERIAL COST 380.93

Project No.:00-0002
Project Name:MOCK LINE
Description:A2 POLE: 1
Location:MOON
Date Staked:July 21,2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, MACHINE 5/8" X 10" 2 PCS, 28.47 56.94


2. BOLT, MACHINE 5/8" X 12" 2 PCS. 33.60 67.20
3. BRACKET, ANGLE, SECONDARY 1 PCS. 100.05 100.05
4. INSULATOR, PiN PORCELAIN, 7.62/13.2 KV 2 PCS. 87.75 175.50
5. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
6. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 2 PCS. 149.50 299.00
7. SPACER, PIPE, 3/4" X 1-1/2" 2 PCS. 8.04 16.08
8. WASHER,SO.FLAT 2-1/4"X 2-1/4"X 3/16" 3 PCS. 7.13 21.39

ESTIMATED MATERIAL COST 753.41

Project NO.:00-0003
ProJect Name:MOCK LINE
Description:A4 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1 BOLT, OVAL EYE 5/8" X10" 4 PCS 66.15 264.60


2. CLAMP, DEADENDSTRAIN,#2/0ACSR 2 PCS 424.85 849.70
3. CLAMP, LOQP,DEADEND #6-1/0ACSR 4 PCS 38.85 155.40
4. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 2 PCS 61.98 123.96
5 CONN COMPRESSION, YHO#150 2 PCS 66.58 133.16
6. CONNECTOR, HOT LINE CLAMP#6-1/0 1 PCS 180.00 180.00
7 INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 2 PCS 17.25 34.50
8 INSULATOR, SUSPENSION 6" CLEVIS TYPE 4 PCS. 230.00 920.00
9. WASHER,SQ FLAT 2-1J4"X 2-1J4"X 3/16" 4 PCS 7.13 28.52

ESTIMATED MATERIAL COST 2689.84

Project NO.:00-0004
ProJect Name:MOCK LINE
Description:A5 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1 BOLT, OVAL EYE 5/8"X10" 2 PCS. 66.15 132.30


2 CLAMP DEADEND STRAIN #2/6 ACSR 1 PCS 424.85 424.85
3 CLAMP LOOP,DEADEND #6-1/0ACSR 2 PCS 38.85 77.70
4. CLEVIS. SECONDARY SWINGING, 1 3/4"SPOOL 1 PCS 61.98 61.98
5. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
6. INSULATOR SUSPENSION 6" CLEVIS TYPE 2 PCS 230.00 460.00
7. WASHERSQ FLAT2-1/4"X2-1/4"X3/16" 2 PCS 7.13 14.26

ESTIMATED MATERIAL COST 1188.34

Project NO.:00-0005
ProJect Name:MOCK LINE
Description:A5-1 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, OVAL EYE 6/8" X 10" 2 PCS 66.15 132.30


2. CLAMP, DEADEND STRAIN #2/0 ACSR 1 PCS. 424.85 424.85
3. CLAMP, LOOP.DEADEND #6-1/0 ACSR 2 PCS. 38.85 77.70
4. CLEVIS, SECONDARY, SWINGING 1 3/4"SPOOL 1 PCS 61.98 61.98
5. CONN.,COMPRESSLON YHO#150 2 PCS 66.58 133.16
6. CONNECTOR HOT LINE CLAMP#6-1/0 1 PCS 180.00 180.00
7. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS 17.25 17.25
8. INSULATOR, SUSPENSION 6" CLEVIS TYPE 2 PCS 230.00 460.00
9. WASHER,SO FLAT 2-1/4"X 2-1/4"X 3/16" 2 PCS 7.13 14.26

ESTIMATED MATERIAL COST 1501.50

Project NO.:00-0006
ProJect Name:MOCK LINE
Description:C1 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT CARRIAGE 3/8" X 4 1/2" 2 PCS. 7.50 15.00


2. BOLT MACHINE 5/8"X12" 2 PCS. 33.60 67.20
3. BOLT, MACHINE 5/8" X 14" 1 PCS. 37.80 37.80
4. BOLT SINGLE UPSET 5/8" X 12" 1 PCS. 54.23 54.23
5. BRACE, CROSSARM 28 STEEL OR WOOD 2 PCS 84.70 169.40
6. CROSSARM 3-1/2" X 4q/2" X 8' 1 PCS 1400.00 1400.00
7. INSULATOR PIN PORCELAIN, 762/13.2KV 3 PCS 87.75 263.25
8. INSULATOR, SPOOL1 3/4" DIAMETER GROOVE 1 PCS 17.25 17.25
9. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 1 PCS 149.50 149.50
10. PIN,X'ARM,LONG SHANK,5/8"X10-3/4", I"THR 2 PCS 71.50 143.00
11. SCREW. LAG1/2"X4" 1 PCS 12.12 12.12
12. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 5 PCS 7.13 35.65
13. WIRE TIE SOFT ALUM. ALLOY #4 AWG,SOLID 32 FT 2.42 77.44

ESTIMATED MATERIAL COST 2441.84

Project NO.:00-0007
ProJect Name:MOCK LINE
Description:C2 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 4 PCS 7.50 30.00


2. BOLT, DOUBLE ARMING 5/8" X 24" 3 PCS 57.03 171.09
3. BOLT, MACHINE 5/8" X 12" 2 PCS 33.60 67.20
4. BOLT, MACHINE 5/8" X 14" 2 PCS 37.80 75.60
5. BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS 84.70 338.80
6. BRACKET, ANGLE, SECONDARY 1 PCS 100.05 100.05
7. CRGSSARM, 3-1/2"X4-1/2"XS' 2 PCS 1,400.00 2,800.00
8. INSULATOR, PIN PORCELAIN, 7.62/13,2 KV 6 PCS 87.75 526.50
9. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS 17.25 17.25
10. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 2 PCS 149.50 299.00
11. PIN,X'ARM,LGNG SHANK,5/8"X10-3/4", I"THR 4 PCS 71.50 286.00
12. SCREW, LAG 1/2" X 4" 2 PCS 12.12 24.24
13. SPACER, PIPE, 3/4" X 1"1/2" 2 PCS 8.04 16.08
14. WASHER,SQ.FLAT2-114"X2-114"X3116" 13 PCS 7.13 92.69
15. WIRE, SOLID TIE AL #4 AWG 56 MTS 7.95 445.20

ESTIMATED MATERIAL COST 5,289.70

Project NO.:00-0008
ProJect Name:MOCK LINE
Description:C4-1 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. ANCHOR, SHACKLE GALVANIZED 4 PCS. 141.75 567.00


2. BOLT, OVAL EYE 5/8" X 12" 8 PCS. 67.20 537.60
3. BOLT, OVAL EYE 518" X 18" 4 PCS. 87.40 349.60
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 6 PCS. 424.85 2549.10
5. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 2 PCS 61.98 123.96
6. CONN., COMP. #6-1/0 ACSR RUN #6~#2 1 PCS. 35.00 35.00
7. CONN., COMPRESSION, YHD 300 1 PCS. 66.58 66.58
8. CONNECTOR, HOT LINE CLAMP #6-1/0 3 PCS. 180.00 540.00
9. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 2 PCS. 17.25 34.50
10. INSULATOR, SUSPENSION 6" CLEVIS TYPE 12 PCS. 230.00 2760.00
11. NUT, OVAL EYE, 5/8", CONVENTIONAL 4 PCS, 57.75 231.00
12. WASHER,SO.FLAT 2-1/4"X 2-1/4"X 3/16" 8 PCS. 7.13 57.04

ESTIMATED MATERIAL COST 7851.38

Project NO.:00-0009
ProJect Name:MOCK LINE
Description:C7-1 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 4 PCS, 7.50 30.00


2. BOLT, DOUBLEARMING 5/8"X 26" 3 PCS, 65.48 196.44
3. BOLT, OVAL EYE S/8" X12" 1 PCS, 67.20 67.20
4. BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS. 84.70 338.80
5. CLAMP, DEADEND STRAIN. #2/0 ACSR 3 PCS, 424.85 1,274.55
6. CLAMP, LOOP, DEADEND I~5-2/0 ACSR 2 PCS. 40.70 81.40
7. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS. 61.98 61.98
8. CROSSARM, 3-1/2" X 4-1/2" X 8' 3 PCS. 1,400.00 4,200.00
9. INSULATOR, SPOOL 1-314" DIAMETER GROOVE 1 PCS. 17.25 17.25
10. INSULATOR, SUSPENSION 6" CLEVIS TYPE 6 PCS. 230.00 1,380.00
11. NUT, OVAL EYE, 5/8", CONVENTIONAL 3 PCS. 57.75 173.25
12. SCREW, LAG 1/2" X4" 2 PCS. 12.12 24.24
13. WASHER,SO.FLAT 2-1/4"X 2-1/4"X 3/16" 11 PCS. 7.13 78.43
ESTIMATED MATERIAL COST 7,923.54

Project NO.:00-00010
ProJect Name:MOCK LINE
Description:C8 POLE : 1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. ANCHOR, SHACKLE GALVANIZED 2 PCS, 141.75 283.50


2. BOLT, DOUBLE ARMING 5/8" X 24" 3 PCS, 57.03 171.09
3. BOLT, MACHINE 1/2"X 6" 4 PCS. 12.00 48.00
4. BOLT, MACHINE 5/8" X 12" 1 PCS. 33.60 33.60
5. BOLT. OVAL EYE 5/8" X 12" 2 PCS. 67.20 134.40
6. BOLT, OVAL EYE 5/8" X 18" 2 PCS. 87.40 174.80
7. BRACE, CROSSARM 60-18 DROP 4 PCS. 428.95 1715.80
8. CLAMP, DEADEND STRAIN, #2/0 ACSR 6 PCS. 424.85 2549.10
9. CLAMP, LOOP,DEADEND #6-1/0ACSR 4 PCS. 38.85 155.40
10. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 2 PCS. 61.98 123.96
11. CONN., COMP.#6-1/0 ACSR RUN #6-#2 5 PCS. 35.00 175.00
12. CROSSARM, 3-1/2" X 4-1/2" X 8' 2 PCS 1400.00 2800.00
13. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 2 PCS, 17.25 34.50
14, INSULATOR, SUSPENSION 6" CLEVIS TYPE 12 PCS. 230.00 2760.00
15. NUT, OVAL EYE, 6/8", CONVENTIONAL 8 PCS. 57.75 462.00
16. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 4 PCS 3.75 15.00
17. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 14 PCS. 7.13 99.82

ESTIMATED MATERIAL COST 11735.97


Project NO.:00-00020
ProJect Name:MOCK LINE
Description:A1-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, MACHINE 5/8" X 12" 2 PCS, 33.60 67.20


2. BOLT, SINGLE UPSET 5/8" X 12" 1 PCS. 54.23 54.23
3. INSULATOR, PIN PORCELAIN, 7,62/13.2 KV 2 PCS, 87.75 175.50
4. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS, 17.25 17.25
5. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 2 PCS. 149.50 299.00
6. SPACER, PIPE, 3/4"X 1-1/2" 2 PCS 8.04 16.08
7. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 1 PCS. 7.13 7.13

ESTIMATED MATERIAL COST 636.39

Project NO.:00-00021
ProJect Name:MOCK LINE
Description:A3
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. ANCHOR, SHACKLE GALVANIZED 1 PCS. 141.75 141.75


2. BOLT, OVAL EYE 5/8" X 10" 2 PCS. 66.15 132.30
3. CLAMP, SUSPENSION 2 BOLT AL #2/0 ACSR 1 PCS. 323.09 323.09
4. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS. 61.98 61.98
5. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
6. INSULATOR, SUSPENSION 6" CLEVIS TYPE 2 PCS. 230.00 460.00
7. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 2 PC8. 7.13 14.26

ESTIMATED MATERIAL COST 1150.63

Project NO.:00-00022
ProJect Name:MOCK LINE
Description:A5-2 ( May be used w/ C1/C1-1/C2/C2-1/C2-2 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. ANCHOR, SHACKLE GALVANIZED 1 PCS. 141.75 141.75


2. BOLT, OVAL EYE 5/8" X 10" 2 PCS 66.15 132.30
3. BOLT, OVAL EYE 5/8" X 18" 1 PCS. 87.40 87.40
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 1 PCS 424.85 424.85
5 CLAMP, LOOP,DEADEND #6-1/0 ACSR 2 PCS 38.85 77.70
6. CLEVIS, SECONDARY SWINGING, 1 3/4"SPOOL 1 PCS 61.98 61.98
7. CONN., COMPRESSION, YHO # 150 2 PCS 66.58 133.16
8. CONNECTOR, HOT L~NE CLAMP #6-1/6 1 PCS 180.00 180.00
9. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
10. INSULATOR, SUSPENSION 6" CLEVIS TYPE 2 PCS. 230.00 460.00
11. NUT, OVAL EYE, 6/8", CONVENTIONAL 1 PCS. 57.75 57.75
12. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 2 PCS 7.13 14.26

ESTIMATED MATERIAL COST 1788.40

Project NO.:00-00023
ProJect Name:MOCK LINE
Description:A7-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 4 PCS. 7.50 30.00


2 BOLT, DOUBLE ARMING 5/8" X 22" 3 PCS 59.45 178.35
3. BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS 84.70 338.80
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 1 PCS 424.85 424.85
5 CLAMP, LOOP,DEADEND #6 1/0 ACSR 2 PCS 38.85 77.70
6. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS 61.98 61.98
7 CROSSARM, 3-1/2"X4-1/2"XS' 3 PCS 1400.00 4200.00
8. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS 17.25 17.25
9 INSULATOR, SUSPENSION 6" CLEVIS TYPE 2 PCS 230.00 460.00
10. NUT, OVAL EYE, 5/8", CONVENTIONAL 2 PCS 57.75 115.50
11 SCREW. LAG 1/2" X 4" 2 PCS. 12.12 24.24
12 WASHER,SQ FLAT 2 1/4"X 2-1/4"X 3/16" 10 PCS 7.13 71.30

ESTIMATED MATERIAL COST 5999.97

Project NO.:00-00024
ProJect Name:MOCK LINE
Description:A5-3 ( May be used w/ A4 & C4-1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. CLAMP, DEADEND STRAIN, #2/0 ACSR 1 PCS 424.85 424.85


2. CLAMP, LOOPrDEADEND #6-1/0 ACSR 2PCS. 38.85 77.70
3. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1PCS. 61.98 61.98
4. CONN,COMPRESSION, YHO#150 2PCS 66.58 133.16
5. CONNECTOR, HOT LINE CLAMP #6-1/0 1PCS. 180.00 180.00
6. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1PCS 17.25 17.25
7. INSULATOR, SUSPENSION 6" CLEVIS TYPE 2PCS. 230.00 460.00
8. NUT, OVAL EYE, 5/8"r CONVENTIONAL 2PCS. 57.75 115.50
ESTIMATED MATERIAL COST 1470.44

Project NO.:00-00025
ProJect Name:MOCK LINE
Description:A5-4 ( May be used w/A3 / A5 / C3 / C5-1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, MACHINE 5/8" X 10" 2 PCS. 28.47 56.94


2. CLAMP, CEADEND STRAIN, #2/0 ACSR 1 PCS. 424.85 424.85
3. CLAMP, LOOP,DEADEND #6-1/0 ACSR 2 PCS. 38.85 77.70
4. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS. 61.98 61.98
5. CONN., COMPRESSION, YHO # 150 2 PCS. 66.58 133.16
6. CONNECTOR, HOT LINE CLAMP #6-1/0 1 PCS. 180.00 180.00
7. INSULATOR, PIN PORCELAIN, 7.62/13.2 KV 1 PCS. 87.75 87.75
8. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
9. INSULATOR, SUSPENSION 6" CLEVIS TYPE 2 PCS. 230.00 460.00
10. NUT, OVAL EYE, 5/8", CONVENTIONAL 2 PCS. 57.75 115.50
11, PIN.POLE TOP CHANNEL 20"LONG, 1" THR DIA 1 PCS. 149.50 149.50
12. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 2 PCS. 7.13 14.26

ESTIMATED MATERIAL COST 1778.89

Project NO.:00-00026
ProJect Name:MOCK LINE
Description:A6
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE UPSET 5/8" X 12" 2 PCS. 45.10 90.20


2. BOLT, MACHINE 5/8" X 10" 2 PCS. 28.47 56.94
3. BOLT, OVAL EYE 5/8" X 10" 2 PCS. 66.15 132.30
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 2 PCS. 424.85 849.70
5. CLAMP, LOOP,DEADEND #6-1/0ACSR 4 PCS. 38.85 155.40
6. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 2 PCS. 61.98 123.96
7. CONN., COMPRESSION, YHO # 150 2 PCS. 66.58 133.16
8. CONNECTOR, HOT LINE CLAMP #6-1/0 1 PCS. 180.00 180.00
9. INSULATOR, PIN PORCELAIN, 7.62/13,2 KV 1 PCS. 87.75 87.75
10. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 2 PCS. 17.25 34.50
11. INSULATOR, SUSPENSION 6" CLEVIS TYPE 4 PCS. 230.00 920.00
12. NUT, OVAL EYE, 5/8", CONVENTIONAL 2 PCS. 57.75 115.50
13. PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 1 PCS. 149.50 149.50
14. WASHER,SQ.FLAT2-114"X2-114"X3116" 4 PCS. 7.13 28.52
ESTIMATED MATERIAL COST 3057.43

Project NO.:00-00027
ProJect Name:MOCK LINE
Description:A8
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 4 PCS. 7.50 30.00


2. BOLT, DOUBLE ARMING 5/8" X 20" 3 PCS. 55.83 167.49
3. BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS. 84.70 338.80
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 2 PCS. 424.85 849.70
5. CLAMP, LOOP,DEADEND #6-1/0ACSR 4 PCS. 38.85 155.40
6. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 2 PCS. 61.98 123.96
7. CONN., COMP. #~5-1/0 ACSR RUN #6-#2 1 PCS. 35.00 35.00
8. CONNECTOR, HOT LLNE CLAMP #6-1/0 1 PCS. 180.00 180.00
9. CROSSARM, 3-1/2" X 4-1/2" X 8' 2 PCS. 1400.00 2800.00
10. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 2 PCS. 17.25 34.50
11. INSULATOR, SUSPENSION 6" CLEVIS TYPE 4 PCS, 230.00 920.00
12. NUT, OVAL EYE, 5/8", CONVENTIONAL 4 PCS. 57.75 231.00
13. SCREW, LAG 1/2"X 4" 2 PCS. 12.12 24.24
14. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 10 PCS. 7.13 71.30

ESTIMATED MATERIAL COST 5961.39

Project NO.:00-00028
ProJect Name:MOCK LINE
Description:A9
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, CARRIAGE 3/3" X 4-1/2" 4 PCS, 7.50 30.00


2. BOLT, DOUBLE ARMING 5/8" X 18" 3 PCS. 50.30 150.90
3. BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS. 84.70 338.80
4. CROSSARM, 3-1/2" X 4-1/2" X 8' 2 PCS. 1400.00 2800.00
5. iNSULATOR, PIN PORCELAIN. 7.62/13.2 KV 4 PCS. 87.75 351.00
6. PIN,X'ARM,LONG SHANK,5/8"X10-3/4", I"THR 4 PCS. 71.50 286.00
7. SCREW, LAG 1/2" X 4" 2 PCS. 12.12 24.24
8. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 10 PCS. 7.13 71.30

ESTIMATED MATERIAL COST 4052.24

Project NO.:00-00029
ProJect Name:MOCK LINE
Description:A9-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 2 PCS. 7.50 15.00


2. BOLT, MACHINE 5/8" X 12" 1 PCS. 33.60 33.60
3. BRACE, CROSSARM 28 STEEL OR WOOD 2 PCS. 84.70 169.40
4. CROSSARM, 3-1/2" X 4-1/2" X 8' 1 PCS. 1,400.00 1,400.00
5. INSULATOR, PIN PORCELAIN, 7.62/13.2 KV 2 PCS. 87.75 175.50
6. PIN,X'ARM,LONG SHANK,5/8"Xl0*3/4", I"THR 2 PCS. 71.50 143.00
7. SCREW, LAG 112"X4" 1 PCS. 12.12 12.12
8. WASHER,SQ.FLAT 2-1/4" 2-1/4"X 3/16" 2 PCS. 7.13 14.26

ESTIMATED MATERIAL COST 1,962.88

Project NO.:00-00030
ProJect Name:MOCK LINE
Description:A9-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, MACHINE 1/2" X 10" 1 PCS. 16.13 16.13


2, BOLT, MACHINE 1/2" X 6" 1 PCS. 12.00 12.00
3. BOLT, MACHINE 5/8" X 12" 1 PCS. 33.60 33.60
4. BRACE,SIDEARM,DIAG1-314"ANGLE,3/16"X7 1 PCS. 519.00 519.00
5. CROSSARM, 3-1/2" X 4-1/2" X 8' 1 PCS. 1400.00 1400.00
6, INSULATOR, PIN PORCELAIN, 7.62/13.2 KV 2 PCS 87.75 175.50
7. PIN,X'ARM,LONG SHANK,5/8"X10-3/4", I"THR 2 PCS. 71.50 143.00
8. SCREW, LAG 1/2"X4" 1 PCS. 12.12 12.12
9. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 2 PCS. 3.75 7.50
10. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 2 PCS. 7.13 14.26

ESTIMATED MATERIAL COST 2333.11

Project NO.:00-00031
ProJect Name:MOCK LINE
Description:A15
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE ARMING 5/8" X 18" 2 PCS, 50.30 100.60


2. BOLT, MACHINE 112"X 10" 2 PCS. 16.13 32.26
3. BOLT, MACHINE 1/2"X6" 2 PCS. 12.00 24.00
4. BRACE,SIDEARM,DIAG 1-314"ANGLE,3116"X 7 2 PCB. 519.00 1038.00
5, CROSBARM, 3-1/2" X 4-1/2" X 8' 2 PCS. 1400.00 2800.00
6. INSULATOR, PIN PORCELAIN. 7.62/13.2 KV 4 PCS. 87.75 351.00
7. PIN,X'ARM.LONG SHANK,5/8"X1O-3/4", I"THR 4 PCS. 71.50 286.00
8, SCREW, LAG 1/2"X 4" 2 PCS. 12.12 24.24
9. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 4 PCS. 3.75 15.00
10. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 6 PCS. 7.13 42.78

ESTIMATED MATERIAL COST 4713.88

Project NO.:00-00032
ProJect Name:MOCK LINE
Description:C1-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, CARRIAGE 3/8" X 4-1/2" 4 PCS, 7.50 30.00


2. BOLT, DOUBLEARMING 5/8"X20" 3 PCS, 55.83 167.49
3. BOLT, MACHINE 5/8" X 12" 2 PCS. 33.60 67.20
4, BOLT, SINGLE UPSET 5/8" X 12" 1 PCS, 54.23 54.23
5, BRACE, CROSSARM 28 STEEL OR WOOD 4 PCS. 84.70 338.80
6, CROSSARM, 3-1/2" X 4-1/2" X 8' 2 PCS. 1,400.00 2,800.00
7, INSULATOR, PIN PORCELAIN, 7,62/13.2 KV 6 PCS. 87.75 526.50
8, INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS, 17.25 17.25
9, PIN,POLE TOP CHANNEL 20"LONG, 1" THR DIA 2 PC8, 149.50 299.00
10, PIN,X'ARM,LONG SHANK,5/8"X10-3/4", I"THR 4 PCS, 71.50 286.00
11, ROD, ARMOR DOUBLE SUPPORT 2/0 ACSR 3 SETS 259.00 777.00
12. ROD, ARMOR SINGLE SUPPORT 1/0 ACSR 1 SETS 172.07 172.07
13. SCREW, LAG 1/2" X 4" 2 PCS. 12.12 24.24
14. SPACER, P~PE, 3/4" X 1-1/2" 2 PCS. 8.04 16.08
15. WASHER,SQFLAT2-1/4"X2-114"X3116" 11 PCS. 7.13 78.43
16. WIRE, SOLID TIE AL #4 AWG 56 MTS. 7.95 445.20

ESTIMATED MATERIAL COST 6,099.49

Project NO.:00-00033
ProJect Name:MOCK LINE
Description:C2-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE ARMING 5/8" X 22" 3 PCS. 59.45 178.35


2. BOLT, MACHINE 1/2"X6" 4 PCS. 12.00 48.00
3. BOLT, MACHINE 518" X 12" 2 PCS. 33.60 67.20
4. BRACE, CROSSARM 60-18 DROP 4 PCS. 428.95 1715.80
5. BRACKET, ANGLE, SECONDARY 1 PCS. 100.05 100.05
6. CROSSARM, 3-3/4" X 4-3/4" X 10' 2 PCS 1166.00 2332.00
7. INSULATOR, PIN PORCELAIN, 7.62/13.2 KV 6 PCS. 87.75 526.50
8. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
9. PIN,X'ARM,LONG SHANK,5/8"Xl0-3/4", I"THR 6 PCS. 71.50 429.00
10. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 11 PCS. 7.13 78.43

ESTIMATED MATERIAL COST 5492.58

Project NO.:00-00034
ProJect Name:MOCK LINE
Description:C2-2
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE ARMING 5/8" X 22" 5 PCS, 59.45 297.25


2. BOLT, MACHINE 1/2" X 6" 4 PCS. 12.00 48.00
3. BOLT, MACHINE 5/8" X 12" 2 PCS. 33.60 67.20
4. BRACE, CROSSARM 60-18 DROP 4 PCB. 428.95 1,715.80
5. BRACKET, ANGLE, SECONDARY 1 PCS. 100.05 100.05
6. CROSSARM, 3-3/4" X 4-3/4" X 10' 2 PCS. 1,166.00 2,332.00
7. INSULATOR, PIN PORCELAIN, 7.62113.2 KV 6 PCS. 87.75 526.50
8. INSULATOR, SPOOL 3" DIAMETER GROOVE 1 PCS. 32.60 32.00
9. NUT, LOCK MF TYPE, 1/2" 4 PCS. 4.50 18.00
10. NUT, LOCK MF TYPE, 5/8" 19 PCS, 5.50 104.50
11. PIN, X'ARM, CLAMP TYPE, 6'LONG,I"THREAD 6 PCB. 305.84 1,835.04
12. ROD, ARMOR DOUBLE SUPPORT 2/0 ACSR 3 SETS 259.00 777.00
13. ROD, ARMOR SINGLE SUPPORT 1/6 ACSR 1 SETS 172.07 172.07
14. SCREW, LAG 1/2" X 4" 2 PCS. 12.12 24.24
15. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 4 PCB. 3.75 15.00
16. WASHER,SQ.FLAT2-1/4"X2-114"X3/16" 19 PCS. 7.13 135.47
17. WIRE, SOLID TIE AL #4 AWG 56 MTS. 7.95 445.20

ESTIMATED MATERIAL COST 8,645.32

Project NO.:00-00035
ProJect Name:MOCK LINE
Description:C3
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. ANCHOR. SHACKLE GALVANIZED 3 PCS. 141.75 425.25


2. BOLT, OVAL EYE 5/8" X 10" 3 PCS. 66.15 198.45
3. BOLT, OVAL EYE 5/8" X 9" 1 PCS. 53.04 53.04
4. CLAMP, SUSPENSION 2 BOLT AL #2/0 ACSR 3 PCS. 323.09 969.27
5. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS. 61.98 61.98
6. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
7. INSULATOR, SUSPENSION 6" CLEVIS TYPE 6 PCS. 230.00 1380.00
8. ROD, ARMOR SINGLE SUPPORT 2/0 ACSR 4 SETS 160.00 640.00
9. WASHER,SQ.FLAT2-114"X2-114"X3116" 4 PCS. 7.13 28.52
10. WIRE, TIE, SOFT ALUM. ALLOY,#4 AWG,SOLID 8 FT. 2.42 19.36

ESTIMATED MATERIAL COST 3793.12

Project NO.:00-00036
ProJect Name:MOCK LINE
Description:C5-1
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. ANCHOR, SHACKLE GALVANIZED 2 PCS. 141.75 283.50


2. BOLT, OVAL EYE 5/8" X 12" 4 PCS. 67.20 268.80
3. BOLT, OVAL EYE 5/8" X 18" 2 PCS. 87.40 174.80
4. CLAMP, DEADEND STRAIN, #2/0 ACSR 3 PCS. 424.85 1274.55
5. CLAMP, LOOP,DEADEND #6-1/0ACSR 2 PCS. 38.85 77.70
6. CLEVIS, SECONDARY, SWINGING, 1 3/4"SPOOL 1 PCS. 61.98 61.98
7. INSULATOR, SPOOL 1-3/4" DIAMETER GROOVE 1 PCS. 17.25 17.25
8. INSULATOR, SUSPENSION 6" CLEVIS TYPE 6 PCS. 230.00 1380.00
9. NUT, OVAL EYE, 5/8", CONVENTIONAL 2 PCS. 57.75 115.50
10. WASHER,SQ.FLAT 2/1/4"X 2-1/4"X 3/16" 4 PCS. 7.13 28.52

ESTIMATED MATERIAL COST 3682.60

Project NO.:00-00037
ProJect Name:MOCK LINE
Description:C9
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE ARMING 5/8" X 22" 3 PCS. 59.45 178.35


2. BOLT, MACHINE 1/2"X6" 4 PCB. 12.00 48.00
3. BOLT, MACHINE 5/8" X 12" 1 PCS. 33.60 33.60
4. BRACE, CROSSARM 60-18 DROP 4 PCS, 428.95 1715.80
5. CROSSARM, 3-3/4" X 4-3/4" X 10' 2 PCS. 1166.00 2332.00
6. INSULATOR, PIN PORCELAIN. 7,62/13.2 KV 8 PCS. 87.75 702.00
7. PIN,X'ARM,LONG SHANK,5/8"Xl0-3/4", I"THR 8 PCS. 71.50 572.00
8. WASHER. ROUND, 1-3/8 DIAM., 9/16" HOLE 4 PCS. 3.75 15.00
9. WASHER,SQ.FLAT2-114"X2-114"X3116" 10 PCS. 7.13 71.30

ESTIMATED MATERIAL COST 5668.05

Project NO.:00-00038
ProJect Name:MOCK LINE
Description:C14
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1, BOLT, MACHINE 1/2" X 12" 1 PCS. 21.00 21.00


2. BOLT, MACHINE 1/2" X6" 2 PCS, 12.00 24.00
3, BOLT, MACHINE 5/8" X 16" 2 PCS, 35.75 71.50
4. BRACE, SIDEARM VERTICAL STEEL, 50" 1 PCS, 500.00 500.00
5. BRACE,SlDEARM,DIAG 1-3/4" ANGLE.3/16"X 7 1 PCS. 519.00 519.00
6. CROSSARM, 3-1/2" X 4-1/2" X 8' 2 PCS. 1,400.00 2,800.00
7, INSULATOR, PIN PORCELAIN, 7.62/13.2 KV 4 PCS. 87.75 351.00
8. PIN,X'ARM,LONG SHANK,5/8"XI0-3/4", I"THR 4 PCS. 71.50 286.00
9. SCREW, LAG 1/2"X4" 1 PCS. 12.12 12.12
10. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 3 PCS. 3.75 11.25
11.WASHER,SQ.FLAT2-1/4"X2-114"X3116" 4 PCS. 7.13 28.52

ESTIMATED MATERIAL COST 4,624.39

Project NO.:00-00039
ProJect Name:MOCK LINE
Description:C15
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITYCOST TOTAL

1. BOLT, DOUBLE ARMING 5/8"X24" 4 PCS. 57.03 228.12


2. BOLT, MACHINE 1/2" X 12" 2 PCB. 21.00 42.00
3. BOLT, MACHINE 1/2"X6" 4 PCB. 12.00 48.00
4. BRACE, SIDEARM VERTICAL STEEL, 50" 2 PCS. 500.00 1000.00
5. BRACE,SIDEARM,DIAG 1-314"ANGLE,3116"X7 2 PCS. 519.00 1038.00
6. CROSSARM, 3-1/2" X 4-1/2" X 8' 4 PCB. 1400.00 5600.00
7. INSULATOR, PIN PORCELAIN, 7.62113.2 KV 8 PCS. 87.75 702.00
8. PIN,X'ARM,LONG SHANK,518"X10-314", I"THR 8 PCB. 71.50 572.00
9. SCREW, LAG 1/2" X 4" 2 PCS. 12.12 24.24
10. WASHER, ROUND, 1-3/8 DIAM., 9/16" HOLE 6 PCB. 3.75 22.50
11,WASHER.SQ.FLAT2-114"X2-114"X3116" 12 PCS. 7.13 85.56

ESTIMATED MATERIAL COST 9362.42


Project NO.:00-00011
ProJect Name:MOCK LINE
Description:E1-2 (May be used with A2, A4, A5 & A5-1)
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. ATTACHMENT, GUY MALLEABLE TYPE 1 PCS. 56.61 56.01


2. BOLT, MACHINE 5/8" X 10" 1 PCS. 28.47 28.47
3. CLAMP, GUY 3-BOLT STRAIGHT HEAVY DUTY 2 PCS. 120.75 241.50
4. CONN., COMPRESSION, YHO# 150 2 PCS. 66.58 133.16
5. SCREW, LAG 1/2"X4" 1 PCS. 12.12 12.12
6. WASHER,SQ.FLAT 2-1/4"X 2-1/4"X 3/16" 1 PCS. 7.13 7.13
7. WIRE. GUY 3/8" 7 STRAND STEEL 15 MTS. 58.20 873.00

ESTIMATED MATERIAL COST 1351.39

Project NO.:00-00012
ProJect Name:MOCK LINE
Description:F2-1 ( May be used w/A2, A4, A5 & A5-1)
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. LOG, ANCHOR 8" X 4' 8000-16000 LBS, 1 PCS, 600.00 600.00


2. ROD, ANCHOR SINGLE EYE, 5/8" 7' 1 PCS, 259.35 259.35
3. WASHER,SQ.,FLAT,4"X4"X 1/2", 13/16"HOLE 1 PCS. 50.60 50.60

ESTIMATED MATERIAL COST 909.95

Project NO.:00-00013
ProJect Name:MOCK LINE
Description:M2-1A(May be used w/A11M, IASIAS-IICI/C4-1/CT-1/C8
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. CONN., COMPRESSION, YHD 300 1 PCS. 66.58 66.58


2. CONN., GRD. ROD FOR 5/8 STEEL ROD 1 PCS. 17.15 17.15
3. ROD, GROUND GALVANIZED STEEL 518" X 10' 1 PCS. 260.00 260.00
4. STAPLE, GROUND WIRE 1/2" X 2" 35 PCS. 0.80 28.00
5. WIRE, GROUND, ALUM. # 4 AWG, 1 STRAND 12 MTS 10.66 127.92

ESTIMATED MATERIAL COST 499.65

Project NO.:00-00014
ProJect Name:MOCK LINE
Description:M2-2 ( May be used w/A1/A2 & C1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. CONN., COMPRESSION, YHD 300 2 PCS. 66.58 133.16


2. PLATE, GROUNDING,POLE BUTT 1 PCS. 54.00 54.00
3. STAPLE, GROUND WIRE 112" X 2" 40 PCS. 0.80 32.00
4. WIRE, GROUND G.I. 5/16" 3 STR 10 MTS. 17.40 174.00

ESTIMATED MATERIAL COST 393.16

Project NO.:00-00015
ProJect Name:MOCK LINE
Description:M2-9 (May be used w/A2 & C2 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. CONNECTOR, COMP. DB 103 YHO # 300 1 PCS. 75.00 75.00


2. STAPLE, GROUND WIRE 1/2" X 2" 10 PCS. 0.80 8.00
3. WIRE, GROUND ALU. 5/16" 3 STR 3 MTS. 15.95 47.85

ESTIMATED MATERIAL COST 130.85

Project NO.:00-00016
ProJect Name:MOCK LINE
Description:M5-10 ( May be used w/A5-1 & C8 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1 CONN., COMPRESSION, YHO# 150 2 PCS 66.58 133.16


2 CONNECTOR, HOT LINE CLAMP #6-1/0 1 PCS 180.00 180.00
3. CUTOUT-ARRESTER COMB., 100 A 15 KV 1 SETS 5040.00 5040.00
ESTIMATED MATERIAL COST 5353.16

Project NO.:00-00017
ProJect Name:MOCK LINE
Description:E2-2 ( May be used w/C7-1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. BOLT, THIMBLE EYE 5/8" X 10" STRAIGHT 2 PCS. 67.30 134.60


2. CLAMP, GUY 3-BOLT STRAIGHT HEAVY DUTY 4 PCS. 120.75 483.00
3. CONN., COMPRESSION, YHD 300 4 PCS. 66.58 266.32
4. NUT, THIMBLE EYE, 5/8" 2 PCS. 65.00 130.00
5. WASHER,SQ,CURVED,3"X 3"X 5/16",11/16"HOLE 2 PCS. 19.80 39.60
6. WIRE, GUY 7/16", 7-STRAND, HIGH STRENGTH 50 MTS. 71.50 3575.00

ESTIMATED MATERIAL COST 4628.52

Project NO.:00-00018
ProJect Name:MOCK LINE
Description:E7-3 ( May be used w/C4-1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL

1. ATTACHMENT, GUY MALLEABLE TYPE 3 PCS 56.01 168.03


2. BOLT, MACHINE 1/2" X 10" 3 PCS 16.13 48.39
3. BOLT, MACHINE 5/8" X 12" 3 PCS 33.60 100.80
4. CLAMP, GUY 3-BOLT STRAIGHT HEAVY DUTY 6 PCS 120.75 724.50
5. CONN,, COMPRESSION, YHD 300 4 PCS. 66.58 266.32
6. WASHER,SQ,,CURVED,3"X3"XS/16",11/16"HOLE 6 PCS 19.80 118.80
7. WIRE, GUY 7/16", 7-STRAND, HIGH STRENGTH 50 MTS. 71.50 3575.00

ESTIMATED MATERIAL COST 5001.84

Project NO.:00-00019
ProJect Name:MOCK LINE
Description:F2-3 ( May be used wl C4-1 )
Location:MOON
Date Staked:July 21, 2006
Run Date:July 21, 2006

No. DESCRIPTION QUANTITY COST TOTAL


1. LOG, ANCHOR CREOSOTED 10" X 5' 1 PCS. 840.00 840.00
2. ROD, ANCHOR, G.I. TWIN EYE, 3/4" X 8' 1 PCS. 312.75 312.75
3. WASHER,SQ.,FLAT,4"X4"X1/2",13/16"HOLE 1 PCS. 50.60 50.60

ESTIMATED MATERIAL COST 1203.35


Other Assy (F2-1, E1-2, M2-1A, M2-9, M2-2, etc)

1-Phase Assemblies Matls E1-2 E1-3 E5-2 E7-3


1338 1552.03 6029 4961
1 A1 380.93
2 A2 753.41 1338
3 A4 2,689.84 2676
4 A5 1,188.34 1338
5 A5-1 1,501.50 1338
3-Phase Assemblies
1 C1 2,441.84
2 C2 5,289.70 1338
3 C4-1 7,851.38 2676 9922
4 C7-1 7,923.54 2676 6029
5 C8-3 11,735.97 1338

1-Phase Line Ave Cost


1 A1
2
3
4
5

3-Phase Line Ave Cost


1
2
3
4
5
M2-9, M2-2, etc)
Subtotal
(Other Total
F2-1 F2-2 F2-3 M2-2 M2-1A M2-9 M5-10 Assy)
910 982.4 1203.35 393.16 500 131 5353
500 500 880.93
910 1203.35 393.16 500 131 4475.51 5,228.92
1820 2406.7 491 500 164 8057.7 ###
910 1203.35 393.16 500 4344.51 5,532.85
910 1203.35 393.16 500 5353 9697.51 ###

500 500 2,941.84


910 131.00 2379 7,668.70
1820 2406.7 500 17324.7 ###
1820 500 11025 ###
910 500 2748 ###