Вы находитесь на странице: 1из 14

Company

C ate gor y
Scale of the Plant Scale of the Company



Company (Plant) Prof ile
Company (Plant) Prof ile


C ate gor y
2 Company (Plant ) Organization

division name

respons ible pers on


2 Company (Plant ) Organization

division name
Production preparati ve Capability <Management >


Ca teg ory Que sti on ite m


The meeting name which discusses the target value & achievement situation
in a factory
<man powerproduction plan Quality etc>

Top Management<QRQ>
The daily meeting name whitch TOP management participates
<QRQC meeting (Daily concern countermesure meeting etc>


The ratio of a regular employee and a temporary worker

TOP Management

Attendance rate (%)


Laber turnover rate(engineer and worker)




What kind of consideration is carried out in order not to make
employees turn over?
-Reduce the work load for leader & manager
-Wage setting based on other company base



Is there any correspondence rule when employee turn over
-Operating taking over
-Control of secrecy information


The contents of an effectuation of the cleanliness <5S> in a factory


The safety regulatipns in a factory
Shop floor management

(equipment safeguard , working wear , worker protector etc)


The contents of the worker educational program


The contents of the acceptance educational program to a temporary worker


Existence of the nomination worker system of an important process and
Special processes

ISO TS16949
Certificated of ISO TS16949


Creation department of a "control plan" And existence of a "control plan
creation standard"
Quality management


Market claim incidence rate of an evaluation object part


The Delivery parts reject rate of an evaluation object part


(Scrap & Rework) rate in a process of an evaluation object part (every
key process)

Tire-N
The quality assurance standard document for a Tire-N supplier
Production preparati ve Capability <Management >


Ca teg ory Que sti on ite m
Production preparati ve Capability <New product project>


Ca teg ory Qu est ion ite m


The actual production quantity of evaluation pertinent parts
When there are no pertinent parts, Please reply similar part
name
& production quantity

management

The latest new product project in a factory

Project

The milestone meeting name in the company to a new product project

TOP Management
"The judgment person (TOP Management) to next process" and the
"participant" in a milestone meeting


Process design in charge
Department name, Number of engineer,
and Years of experience ( - )


Please fill in examination and the validation method of a
productive capacity.


The ratio made from in-house and outside-supplier of a "Die"
Process preparation


Die design in charge
Department name, Number of engineer,
and Years of experience ( - )


Jig & Tool design in charge
Department name, Number of engineer,
and Years of experience ( - )


Inspection gauge design in charge
Department name, Number of engineer,
and Years of experience ( - )


Create control plan in charge
Department name, Number of engineer,
and Years of experience ( - )


Create work instruction in charge
Department name, Number of engineer,
and Years of experience ( - )



<New product>
Purchased part receiving inspection in charge
Department name, Number of engineer,
and Years of experience ( - )
Inspection & Test



<New product>
In process inspection & completed product inspection in charge
Department name, Number of engineer,
and Years of experience ( - )



<New product>
Reliability in charge
Department name, Number of engineer,
and Years of experience ( - )
Production preparati ve Capability <New product project>


Ca teg ory Qu est ion ite m
5 The role of th e Mother plant to the Sup ply plant


Ca teg ory Que sti on i tem


Project management ( Gate revier etc )


Pr epar ation of a pr oduc tion Die ( De sign , Si mula tion , Ma nufac turi ng,
Bu y-of f)


Pr epar ation of a pr oduc tion JIG & To ol ( Des ign, Man ufac turin g, B uy-
of f)


Pr epar ation of a pr oduc tion Equ ipmen t ( Desi gn, Manu fact uring , Bu y-of f)

The op era tin g as sig nme nt to


Pr epar ation of a pr oduc tion pro cess ( Pr oces s de sign , Pr ocess

pr epa rat ion fo r p rod ucti on


pr epar ation )


Preparation of a production Equipment ( Design, Manufacturing,
Buy-off)


Preparation of a Inspection tool ( Purchase order,
Manufacturing, Buy-off)


Pr epar ation of a In spec tion equ ipmen t ( Purc hase ord er, Manuf actu ring ,
Bu y-of f)


Pr oduc tion tria l

Tire2
Se lect ion o f Ti re2 supp lier


Im plem entat ion of a rel iabi lity test


Operator education and skill training



How is the physical support plan from the Mother plant to

Supply plant for new product project?


fr om M oth er pla nt

Is a purchased parts supplier & material supplier the same


t o S upp ly pla nt

as that of the Mother plant?


T ran sfe rin g


Work Instructions, Appearance limit sample, etc. are
transfer from the Mother plant?
5 The role of th e Mother plant to the Sup ply plant


Ca teg ory Que sti on i tem
5 The role of th e Mother plant to the Sup ply plant


Ca teg ory Que sti on i tem


Project management ( Gate revier etc )


Pr epar ation of a pr oduc tion Die ( De sign , Si mula tion , Ma nufac turi ng,
Bu y-of f)


Pr epar ation of a pr oduc tion JIG & To ol ( Des ign, Man ufac turin g, B uy-
of f)


Pr epar ation of a pr oduc tion Equ ipmen t ( Desi gn, Manu fact uring , Bu y-of f)


Pr epar ation of a pr oduc tion pro cess ( Pr oces s de sign , Pr ocess

The op era tin g as sig nme nt to


pr epar ation )

pr epa rat ion fo r p rod ucti on



Preparation of a production Equipment ( Design, Manufacturing,
Buy-off)


Preparation of a Inspection tool ( Purchase order,
Manufacturing, Buy-off)


Pr epar ation of a In spec tion equ ipmen t ( Purc hase ord er, Manuf actu ring ,
Bu y-of f)


Pr oduc tion tria l

Tire2
Se lect ion o f Ti re2 supp lier


Im plem entat ion of a rel iabi lity test


Operator education and skill training



How is the physical support plan from the Mother plant to

Supply plant for new product project?


fr om M oth er pla nt

Is a purchased parts supplier & material supplier the same


t o S upp ly pla nt

as that of the Mother plant?


T ran sfe rin g


Work Instructions, Appearance limit sample, etc. are
transfer from the Mother plant?
5 The role of th e Mother plant to the Sup ply plant


Ca teg ory Que sti on i tem

Вам также может понравиться